PROPOSAL

METHOD OF TRIALCOMPACTION (BASE A & BASE B)

ADHI-WASKITA-WIJAYA JO

Table of Contents

OF

REHABILITATION FOR ULAR RIVER FLOOD CONTROL AND

IMPROVEMENT OF IRRIGATION PROJECT

• Flow Chart

• Construction Method

• Location of Trial Compaction

Page 2: Trial Base A & Base B

ADHI-WASKITA-WIJAYA JO

Hauling Material on specified Water

Content Test(OMC -3 ~ +2 %)

START

Stripping of Existing Road Shoulder

Setting Out

Sand cone TestBase B > 97% of MDD,Base A ≥100% of MDD,

OK?

Yes

No

Finish

Spreading Material by Grader with

Thickness 20 cm

Preparation Work

Flow Chart

METHOD OF TRIAL COMPACTION

Submit Laboratory test of Material Proposed Base Course A & B

Stock Material from Stock Pile at Crusher plant

OK?Yes

No Yes

Check Thickness & Elevation

Compacting by Vibro Roller

Check Thickness & Elevation

Page 3: Trial Base A & Base B

• Location of Works : Public Road Heightening Works (Plan attached).• Location of Material : Crusher Plant at Desa Paku which distance 7 KM from Project Area• If the existing ground is bad / soften, base A/ base B for sub grade will be executed thickly 30 cm (compacted).• Installation of Peil schaal at left and right side for monitoring thickness of base A/ base B before and after compaction.

METHOD OF TRIAL COMPACTION (BASE A & BASE B)

• Dump Truck 12 m3 : 3 unit• Grader cater pillar : 1 unit• Vibro Roller Dyna pack 12 ton : 1 unit• Laboratory Apparatus : 1 Set• Survey Apparatus : 1 Set

2. Equipment

ADHI-WASKITA-WIJAYA JO

METHOD OF TRIAL COMPACTION

1. Location

3. Material

•Trial Base A/ base B will be executed with compaction by 6, 8 and 10 passing for each layer• Route of hauling material for trial base A/ base B like enclosure.• Before spreading material, will be checked of field moisture content,• Measuring thickness of base A/ base B before and after compaction.• Execution Trial Base A/ base B.

• Base Course Aggregates Class A 1. Los Angeles Abrasion2. CBR Value3. Plasticity Index4. Specific Gravity5. Gradation

• Base Course Aggregates Class B 1. Los Angeles Abrasion2. CBR Value3. Plasticity Index4. Specific Gravity5. Gradation

4. Sequence of Works

Page 4: Trial Base A & Base B

TheodoliteAss. Surveyor

1. Survey shall be determine location of Trial base A/base B approved by Engineer

2. Stripping Top Soil by Grader

ADHI KARYA

3. Spreading material base A/ base B from stone crusher plant

4. Compacting by Vibro Roller

Density Test

5. After trial base A/ base B finish, density test could be executed

ADHI-WASKITA-WIJAYA JO

METHOD OF TRIAL COMPACTION

Page 5: Trial Base A & Base B

3 m

15 m 15 m 15 m

6 passes 10 passes8 passes

20 cm

20 cm

Sub grade

Base B

Base A

SECTION B - B

Peil schaal

Sub grade

Base A ( 20 cm)

3 m

A A

B

B

SECTION A - A

PLAN

Measure of settlement at each layer Field density and natural moisture content

ADHI-WASKITA-WIJAYA JO

Plan of Trial Base A & Base B

METHOD OF TRIAL COMPACTION

Base B ( 20 cm)

Existing Flood Dike