trinity lake daily operations · 2012. 9. 11. · december 1999 trinity lake daily operations run...

24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAY ELEV 2,334.23 2,334.14 2,334.02 2,333.88 2,333.69 2,333.51 2,333.33 2,333.17 2,333.03 2,332.84 2,332.72 2,332.62 2,332.54 2,332.40 2,332.29 2,332.26 2,332.22 2,332.23 2,332.27 2,332.22 2,332.28 2,332.30 2,332.21 2,332.16 2,332.20 2,332.23 2,332.23 2,332.22 2,332.23 2,332.06 2,332.04 1,904.2 1,903.0 1,901.3 1,899.3 1,896.7 1,894.2 1,891.7 1,889.4 1,887.5 1,884.8 1,883.1 1,881.8 1,880.6 1,878.7 1,877.2 1,876.8 1,876.2 1,876.3 1,876.9 1,876.2 1,877.0 1,877.3 1,876.1 1,875.4 1,875.9 1,876.3 1,876.3 1,876.2 1,876.3 1,874.0 1,873.7 STORAGE -1.1 -1.3 -1.7 -2.0 -2.7 -2.5 -2.5 -2.2 -2.0 -2.6 -1.7 -1.4 -1.1 -1.9 -1.5 -0.4 -0.6 +0.1 +0.6 -0.7 +0.8 +0.3 -1.3 -0.7 +0.6 +0.4 +0.0 -0.1 +0.1 -2.4 -0.3 CHANGE 1,447 989 685 585 449 670 604 761 1,181 615 703 780 857 799 816 660 789 401 602 966 699 489 620 697 542 449 295 857 628 587 432 INFLOW 2,014 1,619 1,521 1,561 1,779 1,937 1,871 1,873 2,166 1,943 1,532 1,476 1,418 1,769 1,574 870 1,061 327 314 1,316 267 349 1,250 1,047 258 235 283 919 550 1,778 572 POWER SPILL OUTLET 0 8 12 12 8 0 0 16 0 4 12 4 0 12 12 0 8 4 8 0 12 0 0 0 4 4 12 8 8 0 0 C.F.S. .00 .02 .03 .03 .02 .00 .00 .04 .00 .01 .03 .01 .00 .03 .03 .00 .02 .01 .02 .00 .03 .00 .00 .00 .01 .01 .03 .02 .02 .00 .00 INCHES .40 .25 .13 .18 .15 .19 .02 PRECIP UNITED STATES DEPARTMENT OF THE INTERIOR U.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA January 25, 2000 TRINITY LAKE DAILY OPERATIONS DECEMBER 1999 RUN DATE: IN LAKE EVAPORATION INCHES C.F.S. COMPUTED* 1000 ACRE-FEET RELEASE - C.F.S. -31.8 21,654 37,449 0 0 168 .42 1.32 TOTALS ACRE-FEET -31,800 42,951 74,280 0 0 333 COMMENTS: * COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION. (1) EVAPORATION AND PRECIPITATION RECORDS TAKEN FROM STATION AT TRINITY RIVER HATCHERY. SUMMARY RELEASE (ACRE-FEET) 74,280 POWER SPILL 0 OUTLET TOTAL 0 74,280 PRECIPITATION THIS MONTH = TO DATE = 1.32 1999 JULY 1, 6.80 1,905.4

Upload: others

Post on 01-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

2,334.23 2,334.14 2,334.02 2,333.88 2,333.69

2,333.51 2,333.33 2,333.17 2,333.03 2,332.84

2,332.72 2,332.62 2,332.54 2,332.40 2,332.29

2,332.26 2,332.22 2,332.23 2,332.27 2,332.22

2,332.28 2,332.30 2,332.21 2,332.16 2,332.20

2,332.23 2,332.23 2,332.22 2,332.23 2,332.06

2,332.04

1,904.2 1,903.0 1,901.3 1,899.3 1,896.7

1,894.2 1,891.7 1,889.4 1,887.5 1,884.8

1,883.1 1,881.8 1,880.6 1,878.7 1,877.2

1,876.8 1,876.2 1,876.3 1,876.9 1,876.2

1,877.0 1,877.3 1,876.1 1,875.4 1,875.9

1,876.3 1,876.3 1,876.2 1,876.3 1,874.0

1,873.7

STORAGE

-1.1-1.3-1.7-2.0-2.7

-2.5-2.5-2.2-2.0-2.6

-1.7-1.4-1.1-1.9-1.5

-0.4-0.6+0.1+0.6-0.7

+0.8+0.3-1.3-0.7+0.6

+0.4+0.0-0.1+0.1-2.4

-0.3

CHANGE

1,447989685585449

670604761

1,181615

703780857799816

660789401602966

699489620697542

449295857628587

432

INFLOW

2,014 1,619 1,521 1,561 1,779

1,937 1,871 1,873 2,166 1,943

1,532 1,476 1,418 1,769 1,574

870 1,061

327 314

1,316

267 349

1,250 1,047

258

235 283 919 550

1,778

572

POWER

SPILL

OUTLET

0 8

12 12 8

0 0

16 0 4

12 4 0

12 12

0 8 4 8 0

12 0 0 0 4

4 12 8 8 0

0

C.F.S.

.00 .02 .03 .03 .02

.00 .00 .04 .00 .01

.03 .01 .00 .03 .03

.00 .02 .01 .02 .00

.03 .00 .00 .00 .01

.01 .03 .02 .02 .00

.00

INCHES

.40 .25

.13

.18 .15

.19

.02

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000TRINITY LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.

-31.8 21,654 37,449 0 0 168 .42 1.32TOTALS

ACRE-FEET -31,800 42,951 74,280 0 0 333COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.(1) EVAPORATION AND PRECIPITATION RECORDS TAKEN FROM STATION AT TRINITY RIVER HATCHERY.

SUMMARYRELEASE (ACRE-FEET)

74,280POWERSPILL 0

OUTLETTOTAL

0 74,280

PRECIPITATIONTHIS MONTH =

TO DATE = 1.32

1999JULY 1, 6.80

1,905.4

Page 2: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345678910111213141516171819202122232425262728293031

DAY ELEV

1,901.31 1,901.31 1,900.89 1,900.60 1,900.91 1,901.02 1,901.35 1,900.89 1,901.17 1,900.88 1,901.17 1,900.90 1,900.67 1,901.18 1,900.82 1,900.36 1,901.38 1,901.15 1,900.91 1,901.29 1,900.96 1,900.86 1,901.42 1,901.72 1,901.43 1,900.97 1,900.67 1,900.62 1,900.99 1,901.13 1,900.91

14,143 14,143 13,830 13,617 13,845 13,926 14,173 13,830 14,038 13,823 14,038 13,837 13,668 14,046 13,779 13,440 14,195 14,023 13,845 14,128 13,882 13,808 14,225 14,450 14,233 13,889 13,668 13,631 13,904 14,008 13,845

STORAGE

+120+0

-313-213+228+81

+247-343+208-216+216-201-169+378-267-339+755-172-178+283-246-74

+417+225-217-344-221-37

+273+104-163

CHANGE

1,8711,7561,6271,6581,9461,8581,9361,6201,8651,7001,3711,2381,1901,4331,145

717890213210

1,048177264

1,062861191127190713438

1,419453

INFLOW

80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 32

POWER

48 80

SPILL

220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220

OUTLETS

0 0 1 1 0 0 0 1 0 0 1 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0

C.F.S.

.00 .02 .03 .03 .02 .00 .00 .04 .00 .01 .03 .01 .00 .03 .03 .00 .02 .01 .02 .00 .03 .00 .00 .00 .01 .01 .03 .02 .02 .00 .00

INCHES

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000LEWISTON LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATION

FRANCIS CARRC.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

-178 33,187 2,352 128 6,820 8 .42TOTALS

ACRE-FEET -178 65,826 4,665 254 13,527 16* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.(1) OUTLET RELEASE INCLUDES THE CONTINUOUS FISH RELEASE OF 75 C.F.S.(2) INCHES OF EVAPORATION TAKEN FROM PAN AT TRINITY RIVER HATCHERY

SUMMARYRELEASE (ACRE-FEET)

4,665TOTAL POWERTOTAL RIVER 18,446 65,990

14,023

47,544

RIVER

JUDGE FRANCIS CARR POWERPLANTTOTAL RELEASE

(2)JUDGE

POWERPLANT(1)

1,511 1,456 1,484 1,465 1,531 1,517 1,512 1,492 1,460 1,508

962 1,039

975 942 979 588 209

605

1 552 448

432

1,067 235

23,970

47,544

Page 3: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY ELEV

1,198.63 1,198.48 1,198.41 1,198.35 1,198.39 1,198.51 1,198.33 1,198.41 1,198.36 1,198.31 1,198.32 1,198.36 1,198.42 1,198.29 1,198.24 1,198.45 1,198.40 1,198.30 1,198.16 1,198.41 1,198.29 1,198.20 1,198.46 1,198.69 1,198.61 1,198.51 1,198.41 1,198.51 1,198.26 1,198.74 1,198.64

206.1 205.6 205.4 205.2 205.4 205.7 205.2 205.4 205.3 205.1 205.2 205.3 205.4 205.1 204.9 205.5 205.4 205.1 204.7 205.4 205.1 204.8 205.6 206.2 206.0 205.7 205.4 205.7 205.0 206.4 206.1

STORAGE

-0.4-0.4-0.2-0.2+0.1+0.4-0.5+0.2-0.1-0.1+0.0+0.1+0.2-0.4-0.1+0.6-0.1-0.3-0.4+0.7-0.4-0.3+0.8+0.7-0.2-0.3-0.3+0.3-0.7+1.4-0.3

CHANGE

1,7381,6851,6641,6521,6131,7031,6931,7501,5761,561

9581,0171,031

9871,045

5701575418

5762773

592544835960

452-19

1,055190

INFLOW

1,761 1,700 1,566 1,539 1,351 1,323 1,760 1,428 1,449 1,435

742 757 742 977 915 57 31 1

22 2

101 148 136 139

PP

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SPILL

200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

OUTLETS

0 8 2 3 3 2 0 3 2 1 1 1 0 3 4 1 1 1 4 2 5 7 6 2 2 8 8 3 4 6 0

C.F.S.

.00 .09 .02 .03 .03 .02 .00 .04 .02 .01 .01 .01 .00 .03 .05 .01 .01 .01 .05 .02 .06 .08 .07 .02 .02 .09 .09 .03 .05 .07 .00

INCHES

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000WHISKEYTOWN LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATION

FRANCISC.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.

-0.2 26,164 20,082 0 6,200 93 1.04TOTALS

ACRE-FEET -0.2 51,896 39,833 0 12,298 184* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.(1) WATER TO CLEAR CREEK BEING DISCHARGED THROUGH 972.00-1110.00 ELEVATION OUTLET.

SUMMARYRELEASE (ACRE-FEET)

39,833POWERSPILL 0 52,131

206.5

12,298OUTLETTOTAL

JUDGE

CARR PP(1)

1,511 1,456 1,484 1,465 1,531 1,517 1,512 1,492 1,460 1,508

962 1,039

975 942 979 588 209

605

1 552 448

432

1,067 235

23,970

47,544

FROMTO

SPRING CR.TO CLEAR CR

CLEARCR.

NATURALFLOW

227 229 180 187 82

186 181 258 116 53-4

-22 56 45 66-18-52 54 18-29 27 72 40 96 83 59 60 20-19-12-45

2,194

4,352

.54 .2

.05

.31 .1

.08

1.28

PRECIPINCHES

PRECIPITATION

1.28 12.83

THIS MONTHJULY 1, 1999 TO DATE

Page 4: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY ELEV

710.05 710.03 709.89 709.10 708.54 707.80 707.67 707.77 708.54 708.87 709.20 709.52 709.72 710.04 710.22 710.52 710.56 710.87 711.06 711.22 711.37 711.56 711.70 711.83 712.04 712.14 712.25 711.86 711.09 710.33 709.54

862 862 858 836 820 799 796 799 820 829 839 848 853 862 868 877 878 887 893 898 902 908 912 916 922 925 929 917 894 871 848

STORAGE

+15-1-4

-22-16-21-4+3

+22+9+9+9+6+9+6+9+1+9+6+5+4+6+4+4+6+3+4

-12-23-23-23

CHANGE

17108

-12031

115553535153323223221

-2-2-2

INFLOW

10 10 10 10 10 10 5

7 10 10 10

0850

TIME

.75

COPPER

1.53

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000SPRING CREEK DEBRIS RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

SPRING CR DEBRIS DAMZINC

C.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

+0 105 0 102TOTALS

ACRE-FEET +0 208 0 202COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

0SPILLOUTLETTOTAL

202 202

848

SPILL OUTLET**KES

COPPERMG/L

Page 5: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

1,019.39 1,019.46 1,019.38 1,019.24 1,019.20

1,019.09 1,019.06 1,019.01 1,019.01 1,018.89

1,018.80 1,018.68 1,018.59 1,018.58 1,018.56

1,018.51 1,018.52 1,018.48 1,018.38 1,018.26

1,018.19 1,018.10 1,017.98 1,017.89 1,017.76

1,017.73 1,017.66 1,017.71 1,017.65 1,017.55

1,017.52

3,272.2 3,273.9 3,272.0 3,268.6 3,267.7

3,265.0 3,264.3 3,263.1 3,263.1 3,260.2

3,258.1 3,255.2 3,253.0 3,252.8 3,252.3

3,251.1 3,251.4 3,250.4 3,248.0 3,245.1

3,243.5 3,241.3 3,238.4 3,236.3 3,233.2

3,232.5 3,230.8 3,232.0 3,230.6 3,228.2

3,227.5

STORAGE

+3.9+1.7-1.9-3.4-1.0

-2.6-0.7-1.2+0.0-2.9

-2.2-2.9-2.2-0.2-0.5

-1.2+0.2-1.0-2.4-2.9

-1.7-2.2-2.9-2.1-3.1

-0.7-1.7+1.2-1.4-2.4

-0.7

CHANGE

7,230 7,460 6,312 5,714 6,411

6,313 6,177 6,028 6,312 4,863

5,359 5,119 5,877 5,747 5,781

5,319 5,790 5,052 4,201 4,717

4,823 4,597 4,281 4,625 4,236

5,011 4,695 5,328 4,422 3,822

3,830

INFLOW

5,289 6,596 7,283 7,279 6,861

7,626 6,542 6,599 6,291 6,291

6,389 6,546 6,928 5,846 5,966

5,902 5,634 5,514 5,359 6,109

5,549 5,557 5,623 5,643 5,664

5,252 5,431 4,658 5,086 4,974

4,134

POWER

SPILL

OUTLET

14

134 35

21

35 21 21

56 21 35 21 56

21 35 21 49 56

119 126 105 63

133

119 105 70 56 49

56

C.F.S.

.00 .02 .00 .19 .05

.03 .00 .05 .03 .03

.08 .03 .05 .03 .08

.03 .05 .03 .07 .08

.17 .18 .15 .09 .19

.17 .15 .10 .08 .07

.08

INCHES

.86 .12 .11

.40 .21

.15

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000SHASTA LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.RIVER

-41.1 165,452 184,421 0 0 1,653 2.36 1.85TOTALS

ACRE-FEET -41,100 328,174 365,799 0 0 3,279COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

365,799POWERSPILL 0

OUTLETTOTAL

0 365,799

PRECIPITATIONTHIS MONTH =

TO DATE = 1.85

1999JULY 1, 12.13

3,268.4

Page 6: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY

38,196 38,441 38,748 38,748 38,196 38,196 38,073 37,951 37,830 37,285 36,864 36,447 36,151 35,680 35,096 34,462 34,807 35,915 36,864 38,134 38,318 37,466 36,924 36,507 35,738 35,154 35,038 34,634 35,154 36,151 37,526

23,058 23,218 23,218 23,098 22,858 22,581 22,345 21,995 21,686 21,341 20,963 20,701 20,403 20,108 19,816 19,599 19,419 19,312 19,205 19,098 18,992 19,098 19,098 19,134 19,169 19,169 19,240 19,276 19,276 19,276 19,312

STORAGE - A.F.

11,834 10,875 10,218 9,211 8,640 8,413 8,115 7,729 7,448 7,174 7,242 7,084 7,242 7,107 6,713 6,585 7,062 7,018 7,129 7,174 7,474 7,379 7,896 8,066 7,872 8,066 8,363 8,263 7,896 8,313 8,189

15,277 14,785 15,434 14,658 14,104 13,248 12,843 12,306 11,293 12,123 12,773 13,734 14,030 13,906 13,611 13,296 11,782 10,207 11,206 13,758 14,229 13,980 14,940 15,173 15,121 15,147 15,121 13,685 13,176 13,758 13,685

116,284 115,855 116,655 117,126 115,209 113,584 112,390 111,303 110,743 111,230 111,241 111,650 111,364 110,016 108,681 107,434 106,515 105,759 106,170 108,350 109,027 108,805 110,357 110,602 111,299 111,166 110,565 109,165 109,086 110,484 111,198

7,2307,4606,3125,7146,4116,3136,1776,0286,3124,8635,3595,1195,8775,7475,7815,3195,7905,0524,2014,7174,8234,5974,2814,6254,2365,0114,6955,3284,4223,8223,830

8,8477,2436,7155,9515,4455,4945,5755,4806,0305,1095,3645,3255,7335,0675,1084,6905,3274,6714,4085,8165,1644,4855,0634,7494,5874,9444,3924,6224,3824,5274,190

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000FULL NATURAL FLOW AT SHASTA DAM DECEMBER 1999 RUN DATE:

-1,880 164,503TOTALS

* October 1, 326,292

27,919 28,536 29,037 31,411 31,411 31,146 31,014 31,322 32,486 33,307 33,399 33,684 33,538 33,215 33,445 33,492 33,445 33,307 31,766 30,186 30,014 30,882 31,499 31,722 33,399 33,630 32,803 33,307 33,584 32,986 32,486

646.7661.0674.4686.2697.0707.9718.9729.8741.8751.9762.5773.1784.5794.5804.6813.9824.5833.8842.5854.1864.3873.2883.2892.7901.8911.6920.3929.4938.1947.1955.4

LAKEBRITTON

MCCLOUDDIV RES

IRONCANYON

RES

PIT 6 PIT 7

1999 TO DATE

SHASTAINFLOW

C.F.S

NATURALRIVERC.F.S

ACCUM *FULL

NATURAL1000 A.F.

RESERVOIRTOTAL

+3,206-429+800+471

-1,917-1,625-1,194-1,087

-560+487+11

+409-286

-1,348-1,335-1,247

-919-756+411

+2,180+677-222

+1,552+245+697-133-601

-1,400-79

+1,398+714

CHANGEA.F. C.F.S.

+1,616-216+403+237-966-819-602-548-282+246

+6+206-144-680-673-629-463-381+207

+1,099+341-112+782+124+351

-67-303-706-40

+705+360

Page 7: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY ELEV

585.12 583.30 584.22 584.81 583.64 583.77 582.46 582.03 583.17 583.93 583.11 582.68 583.19 582.46 583.94 583.88 583.54 583.32 583.47 583.36 583.54 583.12 582.87 583.54 584.64 584.35 584.77 582.76 584.14 584.37 582.37

22,582 21,465 22,026 22,390 21,671 21,750 20,961 20,704 21,386 21,848 21,350 21,092 21,398 20,961 21,854 21,817 21,611 21,477 21,568 21,502 21,611 21,356 21,205 21,611 22,285 22,106 22,365 21,140 21,976 22,118 20,907

STORAGE

+0-1,117

+561+364-719+79

-790-257+682+461-498-258+306-438+893

-37-206-134+91-66

+109-255-151+406+674-179+259

-1,225+836+142

-1,211

CHANGE

7,4818,1378,7038,6908,0208,3898,0087,9078,0277,7877,3967,5697,7176,8497,0286,0725,7075,5335,5705,5005,5505,3745,4625,6055,8595,3865,5534,6645,5044,9064,397

INFLOW

7,481 8,700 8,421 8,503 8,381 8,349 8,406 8,036 7,683 7,554 7,645 7,699 7,562 7,069 6,577 6,090 5,810 5,600 5,523 5,532 5,492 5,500 5,535 5,398 5,516 5,473 5,419 5,280 5,082 4,833 4,840

POWER

167

SPILL

FISHTRAP

0 0 0 3 1 1 0 1 1 1 2 1 1 1 1 1 1 1 1 1 3 3 3 2 3 3 3 2 1 1 1

C.F.S.

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000KESWICK RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

RES.

EVAP

C.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

-1,678 204,350 204,989 167 0 44TOTALS

ACRE-FEET -1,678 405,328 406,596 331 0 87

SUMMARYRELEASE (ACRE-FEET)

406,596POWERSPILL 331

22,582

0FISH TRAP

SPRINGCR. P. P.

RELEASE (1)

1,761 1,700 1,566 1,539 1,351 1,323 1,760 1,428 1,449 1,435

742 757 742 977 915 57 31 1

22 2 0 0 0 0 0 0 0

101 148 136 139

20,082

39,833

*COMPUTED INFLOW IS SUM OF CHANGE IN STORAGE, RELEASES, AND EVAPORATION.(1) EVAPORATION RECORDS TAKEN FROM SHASTA PAN.

SHASTARELEASE

C.F.S

5,289 6,596 7,283 7,279 6,861 7,626 6,542 6,599 6,291 6,291 6,389 6,546 6,928 5,846 5,966 5,902 5,634 5,514 5,359 6,109 5,549 5,557 5,623 5,643 5,664 5,252 5,431 4,658 5,086 4,974 4,134

184,421

365,799

Page 8: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

678910

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

426.24 426.30 426.14 426.09 426.00

425.86 425.66 425.62 425.58 425.54

425.45 425.19 424.99 424.93 424.88

424.83 424.84 424.47 424.18 423.69

423.40 423.24 422.90 422.55 422.16

421.82 421.42 421.17 420.92 420.65

420.27

580.6 581.1 579.7 579.3 578.5

577.3 575.6 575.2 574.9 574.5

573.8 571.5 569.8 569.3 568.9

568.4 568.5 565.4 562.9 558.7

556.3 554.9 552.1 549.1 545.9

543.0 539.7 537.6 535.6 533.3

530.2

STORAGE

+0.4+0.5-1.4-0.4-0.8

-1.2-1.7-0.3-0.3-0.3

-0.8-2.2-1.7-0.5-0.4

-0.4+0.1-3.2-2.5-4.2

-2.5-1.4-2.9-2.9-3.3

-2.8-3.3-2.1-2.1-2.2

-3.1

CHANGE

1,9802,6391,9302,3662,116

1,9051,6072,2472,1192,338

1,2121,5711,7682,4422,276

1,9592,137

9271,196

175

1,2021,6381,155

976837

708701

1,0751,081

972

525

INFLOW

1,644 2,251 2,491 2,430 2,367

2,384 2,339 2,293 2,158 2,391

1,490 2,574 2,503 2,586 2,371

2,054 2,026 2,457 2,376 2,200

2,381 2,149 2,462 2,297 2,351

1,982 2,213 1,980 1,982 1,980

1,980

POWER

SPILL

OUTLET

117 117 119 120 120

120 118 119 118 112

107 108 107 111 106

114 51 51 51 51

51 151 125 141 131

128 135 114 115 109

119

PUMPING

9

20 35 23

9 17 9

17 9

6 17 26 3

14

6 17 11 17 20

6 20 14 17 3

28 28 28 28 3

3

C.F.S.

.00 .03 .07 .12 .08

.03 .06 .03 .06 .03

.02 .06 .09 .01 .05

.02 .06 .04 .06 .07

.02 .07 .05 .06 .01

.10 .10 .10 .10 .01

.01

INCHES

.14

.09

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000FOLSOM LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

PLANTC.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S. RIVER

-49.9 47,780 69,142 0 0 3,356 463 1.62 .23TOTALS

ACRE-FEET -49,900 94,772 137,143 0 0 6,657 918COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES, PUMPING AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

137,143POWERSPILL

PUMPING PLANT 0

6,657TOTAL 143,800

PRECIPITATIONTHIS MONTH =

TO DATE =1999JULY 1, 3.06

580.1

OUTLET 0 .23

Page 9: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

678910

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

121.17 120.62 121.04 121.00 120.95

121.13 123.57 123.57 123.17 123.33

122.29 122.87 123.68 124.10 123.99

123.33 123.17 123.83 123.34 123.73

123.72 123.85 124.45 124.37 123.83

122.70 123.99 122.74 122.45 122.59

122.72

6,992 6,769 6,938 6,921 6,901

6,976 8,059 8,059 7,871 7,946

7,472 7,733 8,111 8,311 8,256

7,946 7,871 8,181 7,951 8,134

8,129 8,191 8,486 8,446 8,181

7,656 8,256 7,674 7,544 7,607

7,665

STORAGE

-749-223+169

-17-20

+75+1,083

+0-188+75

-474+261+378+200

-55

-310-75

+310-230+183

-5+62

+295-40

-265

-525+600-582-130+63

+58

CHANGE

1,9742,3272,5122,3902,369

2,4212,9032,3902,2682,428

2,1462,5762,6792,4812,358

2,3132,3222,5452,2702,477

2,4062,4292,5622,4732,250

2,1832,7191,8351,9642,207

2,040

INFLOW

2,292 2,371 2,342 2,305 2,280

2,283 2,256 2,290 2,262 2,290

2,290 2,353 2,397 2,290 2,295

2,379 2,272 2,303 2,300 2,296

2,319 2,304 2,314 2,395 2,289

2,352 2,321 2,032 1,934 2,080

1,833

POWER

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 3 2 0

0 0 0 0 0

83

SPILL

60 60 60 60 60

60 60 60 60 60

60 60 60 60 60

60 60 60 60 60

60 60 60 60 60

60 60 60 60 60

60

HATCHERY

0 0 1 2 1

0 1 0 1 0

0 1 1 0 1

0 1 1 1 1

0 1 1 1 0

1 1 1 1 0

0

C.F.S.

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000LAKE NATOMA DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAP

C.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

-76 73,217 70,319 88 1,860 20TOTALS

ACRE-FEET -76 145,226 139,478 175 3,689 40

COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.

SUMMARYRELEASES (ACRE-FEET)

139,478POWERSPILL 175

FOLSOM SOUTH CANALHATCHERY

1,924 3,689

7,741

FOLSOMSOUTH CANAL

8

24 32 38

40 40 40 40 40

35 30 30 30 30

30 27 25 25 28

30 33 35 35 35

35 35 35 35 35

35

970

1,924

(1)

(1) INCHES OF EVAPORATION TAKEN FROM FOLSOM PAN.

RELEASES (ACRE-FEET)TOTAL 145,266

Page 10: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

1,039.95 1,040.00 1,040.07 1,040.11 1,040.18

1,040.22 1,040.35 1,040.26 1,040.28 1,040.34

1,040.40 1,040.48 1,040.41 1,040.41 1,040.51

1,040.62 1,040.66 1,040.73 1,040.87 1,040.97

1,041.04 1,041.04 1,041.08 1,041.08 1,041.09

1,041.20 1,041.26 1,041.18 1,041.24 1,041.31

1,041.33

1,866.5 1,867.0 1,867.8 1,868.2 1,868.9

1,869.4 1,870.7 1,869.8 1,870.0 1,870.6

1,871.3 1,872.1 1,871.4 1,871.4 1,872.4

1,873.6 1,874.0 1,874.8 1,876.3 1,877.3

1,878.1 1,878.1 1,878.5 1,878.5 1,878.6

1,879.8 1,880.4 1,879.6 1,880.2 1,881.0

1,881.2

STORAGE

+0.2+0.5+0.7+0.4+0.7

+0.4+1.4-1.0+0.2+0.6

+0.6+0.9-0.7+0.0+1.1

+1.2+0.4+0.7+1.5+1.1

+0.7+0.0+0.4+0.0+0.1

+1.2+0.6-0.9+0.6+0.7

+0.2

CHANGE

1,185743609914428

378773884282830

462457877486634

6851,019

426775559

1,34117

97265174

6161,012

19376787

132

INFLOW

1,003 458 220 692 35

143 0

1,356 161 502

64 18

1,242 410 91

82 790 41 17 13

951 0

736 627

0

0 668 418 22

389

1

POWER

SPILL

OUTLET

76 17 14 7

17

21 76 10 14 7

76 10 10 76 7

14 14 10 7

10

14 17 21 24 21

24 21 31 31 21

24

C.F.S.

.22 .05 .04 .02 .05

.06 .22 .03 .04 .02

.22 .03 .03 .22 .02

.04 .04 .03 .02 .03

.04 .05 .06 .07 .06

.07 .06 .09 .09 .06

.07

INCHES

.22

.09

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000NEW MELONES LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.

+14.5 19,403 11,150 0 0 742 2.15 .31TOTALS

ACRE-FEET +14,500 38,486 22,116 0 0 1,472COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

22,116POWERSPILL 0

OUTLETTOTAL

0 22,116

PRECIPITATIONTHIS MONTH =

TO DATE = .31

1999JULY 1, 3.70

1,866.3

Page 11: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY

9,553 9,682 9,788 9,906

10,020 10,129 10,252 10,330 10,436 10,540 10,642 10,753 10,660 10,460 10,341 10,306 10,395 10,496 10,486 10,475 10,330 10,301 10,382 10,470 10,561 10,590 10,660 10,571 10,525 10,519 10,454

46,206 45,436 44,660 43,872 43,095 42,321 41,548 41,015 40,543 39,118 38,175 37,250 36,558 35,901 35,172 34,359 33,424 32,491 31,673 30,833 30,437 29,631 28,710 27,770 26,819 25,978 25,023 24,247 23,419 22,770 22,379

STORAGE - A.F.

55,759 55,118 54,448 53,778 53,115 52,450 51,800 51,345 50,979 49,658 48,817 48,003 47,218 46,361 45,513 44,665 43,819 42,987 42,159 41,308 40,767 39,932 39,092 38,240 37,380 36,568 35,683 34,818 33,944 33,289 32,833

1,185743609914428378773884282830462457877486634685

1,019426775559

1,34117

97265174

6161,012

19376787132

8544192715769342

44565598

1643847

48254

206257

1,364-461948130

1,068-404549221

-360207566

-417-87457-98

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000FULL NATURAL FLOW AT NEW MELONES DAM DECEMBER 1999 RUN DATE:

-23,583 8,384TOTALS

* October 1, 16,630

56.9 57.7 58.2 59.4 59.6 59.7 60.5 61.8 62.0 62.4 62.4 62.5 63.5 63.6 64.0 64.5 67.2 66.3 68.2 68.4 70.5 69.7 70.8 71.3 70.6 71.0 72.1 71.3 71.1 72.0 71.8

DONNELLSRES

BEARDSLEYRES

1999 TO DATE

NEWMELONESINFLOW

C.F.S

NATURALRIVERC.F.S

ACCUM *FULL

NATURAL1000 A.F.

RESERVOIRTOTAL

-657-641-670-670-663-665-650-455-366

-1,321-841-814-785-857-848-848-846-832-828-851-541-835-840-852-860-812-885-865-874-655-456

CHANGEA.F. C.F.S.

-331-323-338-338-334-335-328-229-185-666-424-410-396-432-428-428-427-419-417-429-273-421-423-430-434-409-446-436-441-330-230

Page 12: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY ELEV

360.10 360.10 360.08 360.08 360.10 360.10 360.08 360.08 360.10 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.08 360.05 360.05 360.05 360.05 360.05 360.05 360.08 360.08 360.08

544 544 543 543 544 544 543 543 544 543 543 543 543 543 543 543 543 543 543 543 543 543 541 541 541 541 541 541 543 543 543

STORAGE

+1+0-1+0+1+0-1+0+1-1+0+0+0+0+0+0+0+0+0+0+0+0-2+0+0+0+0+0+2+0+0

CHANGE

382 383 383 383 384 383 379 375 385 374 353 356 355 357 356 356 356 357 356 353 352 352 325 337 329 328 328 331 331 332 333

SPILL

OUTLET

OAKDALE IRRIGATION DISTRICTSOUTH SAN JOAQUIN IRRIGATION DISTRICT

TRI DAMS PROJECT-CALIFORNIA

January 25, 2000GOODWIN RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

RES.ACRE-FEET

RELEASE - C.F.S.

+0 0 11,044 0TOTALSACRE-FEET +0 0 21,906 0

SUMMARYRELEASE (ACRE-FEET) 125JOINT MAIN CANAL

SOUTH MAIN CANAL 0 22,031

543

0OUTLET

TOTAL

TULLOCHRELEASE

403 404 404 404 404 403 393 400 403 392 376 376 377 379 379 383 380 378 377 376 376 380 355 357 361 360 360 361 362 359 358

11,780 23,366

JOINT MAIN OPERATED BY SSJID AND OID.SOUTH MAIN OPERATED BY OID.

JOINTMAIN

SOUTHMAIN

21,906SPILL

4 7 8 8 8 7 5 5 5 6

63 125

RIVER CANALS

Page 13: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY ELEV

500.35 500.49 500.14 500.70 500.00 499.56 498.83 500.64 500.19 500.40 499.84 499.14 500.82 500.86 500.34 499.82 500.61 500.00 499.38 498.96 500.09 499.50 500.19 500.76 500.13 499.55 500.22 500.52 499.98 500.18 500.07

55,682 55,834 55,455 56,062 55,303 54,834 54,057 55,997 55,509 55,737 55,132 54,385 56,192 56,235 55,672 55,111 55,964 55,303 54,641 54,194 55,401 54,770 55,509 56,127 55,444 54,823 55,541 55,867 55,282 55,498 55,379

STORAGE

+1,233+152-379+607-759-469-776

+1,939-488+228-604-747

+1,806+43

-563-561+853-661-662-447

+1,207-631+739+618-683-621+718+326-585+216-119

CHANGE

1,03248221471123

1689

1,379158507790

1,28940996

1018114644

15298664

7306711949

72452870

470300

INFLOW

403 404 404 404 404 403 393 400 403 392 376 376 377 379 379 383 380 378 377 376 376 380 355 351 361 360 360 361 231 359 358

POWER

SPILL

6

131

OUTLET

8 2 1 1 2 2 8 1 1 1 8 1 1 8 1 1 1 1 1 1 1 2 2 2 2 2 2 3 3 2 2

C.F.S.

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000TULLOCH RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

RES.

EVAP

C.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

+930 12,321 11,643 0 137 74TOTALS

ACRE-FEET +930 24,439 23,094 0 272 147

SUMMARYRELEASE (ACRE-FEET)

23,094POWERSPILL 0 23,366

54,449

272OUTLETTOTAL

NEWMELONESRELEASE (1)

1,003 458 220 692 35

143 0

1,356 161 502 64 18

1,242 410 91 82

790 41 17 13

951 0

736 627

0 0

668 418 22

389 1

11,150

22,116

*COMPUTED INFLOW IS SUM OF CHANGE IN STORAGE, RELEASES, ANDEVAPORATION.

Page 14: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

460.86 462.04 463.22 463.96 465.80

466.37 467.43 468.57 469.60 469.95

469.93 469.88 469.83 469.31 468.31

467.68 467.12 466.53 466.28 465.89

465.62 465.45 465.40 465.37 466.12

467.07 467.42 467.96 468.92 469.91

470.95

1,081,904 1,094,047 1,106,234 1,113,899 1,133,032

1,138,981 1,150,070 1,162,035 1,172,879 1,176,572

1,176,361 1,175,833 1,175,305 1,169,823 1,159,303

1,152,691 1,146,824 1,140,653 1,138,041 1,133,971

1,131,156 1,129,385 1,128,864 1,128,552 1,136,371

1,146,300 1,149,965 1,155,628 1,165,716 1,176,150

1,187,142

STORAGE

+8,003+12,143+12,187+7,665

+19,133

+5,949+11,089+11,965+10,844+3,693

-211-528-528

-5,482-10,520

-6,612-5,867-6,171-2,612-4,070

-2,815-1,771

-521-312

+7,819

+9,929+3,665+5,663

+10,088+10,434

+10,992

CHANGE

4,3916,5816,5564,203

10,194

3,3045,9116,0016,0211,894

4,560

5,4382,1343,1168,7568,087

8,044

PUMPING

0 0 0 0 0

0 0 0 0 0

0 0

148 2,670 5,266

3,171 2,729 3,088 1,173 1,916

1,100 870

0 0 0

0 0 0

2,958 2,198

2,008

POWER

38 35 32 31 31

43 56 61 73 90

96 108 106 109 109

129 138 128 122 133

139 141 158 157 160

156 155 157 156 158

46

SPILL

1

1

1

1

1

1

TUNNEL

-318-425-380-308-517

-261-264+92

-481+58

-10-157-12+15+72

-34-91

+106-22-3

-180+118-104

+1-458

-276-132-103-555-471

-448

OR

37 43 50 50 34

34 31 55 34 24

34 24 31 65 37

34 27 27 44 30

37 27 40 37 47

17 27 58 41 34

51

C.F.S.

.11 .13 .15 .15 .10

.10 .09 .16 .10 .07

.10 .07 .09 .19 .11

.10 .08 .08 .13 .09

.11 .08 .12 .11 .14

.05 .08 .17 .12 .10

.12

INCHES

.01 .04

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION

CENTRAL VALLEY PROJECT

January 25, 2000CONSOLIDATED STATE-FEDERAL SAN LUIS RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

LOSS(-)C.F.S.

SAN LUISACRE-FEET

RELEASE - C.F.S.

+113,241 95,191 29,295 3,251 6 -5,548 1,161 3.40 .05TOTALS

ACRE-FEET +113,241 188,811 58,107 6,448 12 -11,004 2,303

SUMMARYRELEASE (ACRE-FEET)

58,107POWERPACHECO TUNNEL 6,448 TOTAL 64,567

PRECIPITATIONTHIS MONTH =

TO DATE =1999JULY 1, .48

1,073,901

SPILL 12 .05

STATE OF CALIFORNIATHE RESOURCES AGENCY

DEPARTMENT OF WATER RESOURCESSTATE WATER PROJECT

PACHECOGAIN(+)

C.F.S.

Page 15: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY ELEV

222.20 222.31 221.60 223.04 219.40 222.52 222.77 222.67 222.58 221.90 221.60 220.75 219.46 218.94 220.33 220.32 220.30 220.70 219.33 219.77 220.76 221.19 221.92 222.83 222.06 220.93 221.92 222.78 222.27 222.08 222.88

48,916 49,208 47,336 51,153 41,605 49,767 50,433 50,166 49,926 48,124 47,336 45,106 41,759 40,432 44,009 43,983 43,931 44,975 41,426 42,557 45,132 46,259 48,176 50,593 48,544 45,577 48,176 50,459 49,102 48,597 50,726

STORAGE

+4,489+292

-1,872+3,817-9,548+8,162

+666-267-240

-1,802-788

-2,230-3,347-1,327+3,577

-26-52

+1,044-3,549+1,131+2,575+1,127+1,917+2,417-2,049-2,967+2,599+2,283-1,357

-505+2,129

CHANGE

3,7343,7893,8003,7153,7143,6993,6923,6823,6881,944

509485338488514512458422417485505508508

2,0083,3343,3693,3303,3562,8843,1633,523

PUMPING

3,219 3,327 3,434 2,861 3,606 3,550 3,492 3,732 3,919 4,269 4,108 4,384 4,294 4,117 4,441 4,427 3,568 3,327 3,667 2,319 2,210 3,390 3,259 3,442 2,436 2,875 3,562 3,362 3,054 3,538 3,231

PUMPING

4,391 6,581 6,556 4,203

10,194 3,304 5,911 6,001 6,021 1,894

4,560 5,438 2,134 3,116 8,756 8,087 8,044

PUMPING

139 241 236 231 232 231 234 236 231 228 298 135

GEN.*

+494+373+391+378+351+513+57

+240+230+320+123+45

+199-4

+40+93+78

+104+47+9

+233+214+175+20

-122-9

+391+154+201+388+542

OR

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION

CENTRAL VALLEY PROJECT

January 20, 2000CONSOLIDATED STATE-FEDERAL O'NEILL FOREBAY DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE GEN.O'NEILLACRE-FEET

RELEASE - C.F.S.

+6,299.0 66,573 108,420 95,191 2,672 +6,268TOTALS

ACRE-FEET +6,299.0 132,048 215,051 188,811 5,300

* DAILY DEL. FIGURES UNAVAILABLE. TOT DEL. IS INCLUDED IN COMPUTING MONTHLY TOTALSSUMMARY

256

RELEASE (ACRE-FEET)

5,300O'NEILL GEN.SAN LUIS PUMP 188,811 256

44,427

215,051DOS AMIGOS PUMPDELIVERIES

S. LUIS O'NEILL

148 2,670 5,266 3,171 2,729 3,088 1,173 1,916 1,100

870

2,958 2,198 2,008

29,295

58,107

DOS AMIGOSCALIF.AQUEDUCT

5,6455,8934,8554,8964,9226,7575,9895,6755,9012,9903,0792,7302,060

535660868510470474715

1,9022,5943,8412,7682,7513,4573,2854,1195,0825,6226,335

107,380

212,988

S. LUISDELIV.

GAINS(+)

LOSS(-)C.F.S.

INFLOW - C.F.S

STATE OF CALIFORNIATHE RESOURCES AGENCY

DEPARTMENT OF WATER RESOURCESSTATE WATER PROJECT

TOTAL 409,418

12,433

Page 16: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

506.95 507.15 507.62 508.06 508.47

509.35 509.93 510.37 510.91 511.42

511.89 512.35 512.73 513.17 513.61

513.96 514.39 514.64 514.97 515.65

515.99 516.62 516.94 517.33 517.48

517.78 518.18 518.64 518.95 519.20

519.46

236.7 237.3 238.8 240.1 241.4

244.2 246.1 247.5 249.2 250.8

252.3 253.8 255.1 256.5 257.9

259.1 260.5 261.3 262.4 264.7

265.8 267.9 269.0 270.3 270.8

271.8 273.2 274.7 275.8 276.6

277.5

STORAGE

+0.9+0.6+1.5+1.4+1.3

+2.8+1.8+1.4+1.7+1.6

+1.5+1.5+1.2+1.4+1.4

+1.1+1.4+0.8+1.1+2.3

+1.1+2.1+1.1+1.3+0.5

+1.0+1.4+1.6+1.1+0.9

+0.9

CHANGE

582416836774732

1,4851,006

787944909

838826698802801

650795489626

1,216

6431,165

660792387

637801896631530

550

INFLOW

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0

MADERA

SPILL

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0

FRIANT-KERN

23 11 5 2 9

10 5 7 3

10

3 3 4 8 4

1 9 2 6 6

2 9 0 9

10

5 10 19 11 10

12

C.F.S.

.23 .11 .05 .02 .09

.10 .05 .07 .03 .10

.03 .03 .04 .08 .04

.01 .08 .02 .06 .06

.02 .08 .00 .08 .09

.05 .09 .17 .10 .09

.11

INCHES

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000MILLERTON LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.

+41.8 23,904 0 0 0 228 2.18 .00TOTALS

ACRE-FEET +41,771 47,414 0 0 0 452COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES, PUMPING AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

CANALSFRIANT-KERN

MADERA 0 0 5,185

PRECIPITATION

THIS MONTH =TO DATE =1999JULY 1, 1.15

235.7

5,185 0.00

CANALS

AT FRIANTTOTAL RELEASES

OUTLET

90 90 90 78 71

72 72 72 72 72

72 72 72 72 72

72 72 72 72 72

72 93

121 121 122

122 108 89 89 89

89

RIVER

2,614

5,185

RIVER

Page 17: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

123456789

10111213141516171819202122232425262728293031

DAY

60,273 60,185 60,141 60,126 60,111 59,975 59,361 58,763 58,224 57,631 57,054 56,507 56,008 55,423 54,884 54,333 53,797 53,239 52,667 52,236 52,002 51,657 51,422 51,160 50,886 50,613 50,340 50,067 49,972 49,972 49,958

1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083 1,083

STORAGE - A.F.

41,152 40,169 39,282 38,525 37,815 37,210 37,196 36,986 36,919 36,814 36,747 36,785 36,919 37,034 37,254 37,399 37,350 37,515 37,680 37,747 37,602 37,005 36,709 36,728 36,547 36,308 36,176 35,987 35,591 35,581 35,582

103,483 103,463 103,248 103,385 103,365 103,229 103,033 102,720 102,384 102,349 102,096 101,902 101,766 101,572 102,740 102,096 101,708 101,126 100,603 100,062 99,407 98,426 97,487 96,913 96,244 95,521 94,701 93,813 93,228 92,494 91,711

276,413 276,090 274,774 273,620 272,529 269,993 268,431 267,221 265,698 264,334 262,929 261,836 261,016 259,772 260,210 259,313 258,265 257,649 256,604 254,943 254,569 252,380 251,292 250,369 249,914 248,922 247,484 246,261 245,238 244,994 244,445

3,956 4,015 3,876 4,015 3,754 3,838 3,724 3,724 3,694 3,739 3,968 3,705 3,784 3,694 3,416 3,984 3,812 3,850 3,953 3,709 3,605 3,576 3,576 3,546 3,546 3,754 3,620 3,590 3,584 3,488 3,860

22,603 22,603 22,603 22,603 22,636 22,636 22,603 22,636 22,603 22,603 22,636 22,603 22,636 22,661 22,661 22,695 22,720 22,720 22,720 22,753 23,308 23,308 23,358 23,360 23,383 23,392 23,400 23,425 23,434 23,434 23,451

582416836774732

1,4851,006

787944909838826698802801650795489626

1,216643

1,165660792387637801896631530550

252253172192182207219177177221130275284175

1,02219875817899

37945440

11132715813776

279115407273

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000FULL NATURAL FLOW OF SAN JOAQUIN RIVER AT FRIANT DAMDECEMBER 1999 RUN DATE:

-32,622 7,927TOTALS

* October 1, 15,723

20,469 19,652 19,199 18,633 18,273 17,265 16,705 15,807 15,221 14,627 14,344 13,928 13,309 12,940 12,849 12,659 12,513 12,550 12,570 12,564 12,452 12,038 12,292 12,533 12,760 13,005 13,231 13,458 13,449 13,869 13,998

23,394 24,920 25,342 25,250 25,492 24,757 24,726 25,502 25,570 25,488 25,001 25,323 25,511 25,365 25,323 25,064 25,282 25,566 25,328 24,789 25,110 25,287 25,365 25,046 25,465 25,246 24,933 24,838 24,897 25,073 24,802

24.525.025.325.726.026.526.927.227.628.028.328.829.429.731.832.233.734.034.235.035.936.036.236.837.137.437.638.138.339.139.7

T.A.EDISONLAKE

FLO-RENCELAKE

HUNT-INGTON

LAKE

SHAVERLAKE

MAMMOTHPOOL

RED-INGERLAKE

CRANEVALLEY

KERCKHOFF

1999 TO DATE

MILINFLOW

C.F.S

NATURALRIVERC.F.S

ACCUM *FULL

NATURAL1000 A.F.

RESERVOIRTOTAL

-654-323

-1,316-1,154-1,091-2,536-1,562-1,210-1,523-1,364-1,405-1,093

-820-1,244

+438-897

-1,048-616

-1,045-1,661

-374-2,189-1,088

-923-455-992

-1,438-1,223-1,023

-244-549

CHANGEA.F. C.F.S.

-330-163-663-582-550

-1,279-787-610-768-688-708-551-413-627+221-452-528-311-527-837-189

-1,104-549-465-229-500-725-617-516-123-277

Page 18: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEVATION

240.24 239.90 240.00 239.83 239.84

239.83 239.80 239.83 239.60 239.52

239.54 239.50 239.46 239.57 239.34

239.14 238.99 238.95 238.81 238.40

238.62 238.60 238.60 238.58 238.58

238.58 238.59 238.57 238.50 238.45

238.50

503 458 470 450 451

450 446 450 422 412

415 410 405 418 391

367 349 345 331 289

311 309 309 307 307

307 308 306 299 294

299

STORAGE

+91-45+12-20+1

-1-4+4

-28-10

+2-5-5

+13-27

-24-18-4

-14-42

+22-2+0-2+0

+0+1-2-7-5

+5

CHANGE

0 0 0 0 0

0 0

37 75 0

0 0 0 0 0

0 0 0 0 0

27 85

105 0 0

0 0 0 0 0

0

12,346 11,544 11,769 11,601 11,645

11,640 11,526 11,703 11,162 11,241

11,101 10,926 10,894 10,972 10,026

9,176 8,964 7,264 6,932 7,452

7,861 7,865 7,211 7,300 7,300

7,300 7,300 7,300 7,200 7,100

7,100

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000RED BLUFF DIVERSION RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKECANAL

ACRE-FEET

-114 329 290,721TOTALS

ACRE-FEET -114 653 576,645

SUMMARYRELEASE (ACRE-FEET)

TOTAL 577,298

412

RELEASE

RIVERTO SACTOCORNING

CANAL

RELEASE C.F.STEHAMACOLUSA

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0

0

0

CORNING CANAL 0TEHAMA-COLUSA CANAL 653TO SACTO RIVER 576,645

Page 19: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

678910

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

1,194.09 1,194.11 1,194.11 1,194.10 1,194.10

1,194.10 1,194.09 1,194.10 1,194.12 1,194.13

1,194.14 1,194.16 1,194.18 1,194.18 1,194.20

1,194.21 1,194.22 1,194.24 1,194.25 1,194.25

1,194.25 1,194.27 1,194.29 1,194.30 1,194.32

1,194.34 1,194.34 1,194.36 1,194.36 1,194.38

1,194.40

41.33 41.37 41.37 41.35 41.35

41.35 41.33 41.35 41.38 41.40

41.42 41.45 41.48 41.48 41.51

41.53 41.55 41.58 41.59 41.59

41.59 41.63 41.66 41.68 41.71

41.74 41.74 41.77 41.77 41.81

41.84

STORAGE

+0.00+0.03+0.00-0.02+0.00

+0.00-0.02+0.02+0.03+0.02

+0.02+0.03+0.03+0.00+0.03

+0.02+0.02+0.03+0.02+0.00

+0.00+0.03+0.03+0.02+0.03

+0.03+0.00+0.03+0.00+0.03

+0.03

CHANGE

1026107

15

145

223218

1829271331

1822302116

1634342433

3415321530

30

INFLOW

SPILL

10 10 10 10 10

10 10 10 10 10

10 10 10 10 10

10 10 10 10 10

10 10 10 10 10

10 10 10 10 10

10

OUTLET

0 0 0 5 5

4 3 4 5 0

0 3 0 3 5

0 3 4 3 6

6 7 8 6 6

8 5 5 5 4

4

C.F.S.

.00 .00 .00 .10 .10

.07 .06 .08 .09 .00

.00 .06 .00 .05 .10

.00 .05 .08 .05 .12

.12 .14 .15 .12 .11

.15 .10 .10 .10 .08

.08

INCHES

.10

.12

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-ORLAND PROJECT-CALIFORNIA

January 25, 2000EAST PARK RESERVOIR DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.

+.49 681 0 310 117 2.26 .22TOTALS

ACRE-FEET +490 1,351 0 615 232COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.DATA BASED ON 24 HOUR PERIOD ENDING 0800 AM.

SUMMARYRELEASE (ACRE-FEET)

SPILL 0OUTLET

TOTAL 615

615

PRECIPITATIONTHIS MONTH =

TO DATE = .22

1999JULY 1, 3.66

41.33

Page 20: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

830.52 830.69 830.80 830.92 831.03

831.11 831.18 831.20 831.27 831.30

831.32 831.34 831.37 831.39 831.43

831.46 831.50 831.52 831.54 831.55

831.56 831.57 831.59 831.60 831.62

831.63 831.64 831.64 831.66 831.66

831.68

37.78 37.97 38.09 38.22 38.34

38.43 38.51 38.54 38.61 38.65

38.67 38.69 38.73 38.75 38.80

38.83 38.87 38.90 38.92 38.93

38.94 38.95 38.98 38.99 39.01

39.02 39.03 39.03 39.05 39.05

39.08

STORAGE

+0.11+0.19+0.12+0.13+0.12

+0.09+0.08+0.02+0.08+0.03

+0.02+0.02+0.03+0.02+0.05

+0.03+0.05+0.02+0.02+0.01

+0.01+0.01+0.02+0.01+0.02

+0.01+0.01+0.00+0.02+0.00

+0.02

CHANGE

73111778478

6155275534

2827332839

3339272826

2525292229

2222162816

27

INFLOW

15 15 15 15 15

15 15 15 15 15

15 15 15 15 15

15 15 15 15 15

15 15 15 15 15

15 15 15 15 15

15

SPILL

OUTLET

2 1 0 2 1

1 0 1 1 2

2 1 1 2 1

1 1 1 1 5

4 4 2 1 2

1 1 1 1 1

1

C.F.S.

.05 .02 .01 .06 .04

.02 .01 .02 .02 .05

.05 .02 .03 .05 .04

.02 .03 .02 .02 .15

.12 .10 .05 .03 .05

.04 .04 .03 .03 .03

.02

INCHES

.16 .02

.14 .02

.01

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-ORLAND PROJECT-CALIFORNIA

January 25, 2000DECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*1000 ACRE-FEET

RELEASE - C.F.S.

+1.37 1,224 465 0 46 1.27 .35TOTALS

ACRE-FEET +1,370 2,428 922 0 91COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.DATA BASED ON 24 HOUR PERIOD ENDING 0800 HOURS.

SUMMARYRELEASE (ACRE-FEET)

SPILL 922OUTLET

TOTAL 0

922

PRECIPITATIONTHIS MONTH =

TO DATE = .35

1999JULY 1, 3.70

37.67

STONY GORGE RESERVOIR DAILY OPERATIONS

Page 21: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345678910111213141516171819202122232425262728293031

DAY ELEV

3,457.08 3,457.09 3,457.09 3,457.09 3,457.09 3,457.09 3,457.03 3,457.03 3,457.03 3,457.03 3,457.03 3,457.03 3,457.03 3,457.03 3,456.97 3,456.97 3,456.97 3,456.95 3,456.93 3,456.91 3,456.90 3,456.90 3,456.84 3,456.84 3,456.84 3,456.78 3,456.78 3,456.75 3,456.71 3,456.71 3,456.67

32,558 32,564 32,564 32,564 32,564 32,564 32,529 32,529 32,529 32,529 32,529 32,529 32,529 32,529 32,495 32,495 32,495 32,484 32,472 32,461 32,455 32,455 32,421 32,421 32,421 32,387 32,387 32,370 32,348 32,348 32,325

STORAGE

+57+6+0+0+0+0

-34+0+0+0+0+0+0+0

-34+0+0

-11-12-11-6+0

-34+0+0

-34+0

-17-22+0

-23

CHANGE

391014141312-413111313121213-51012757

1114-51414-21374

122

INFLOW

9 6

13 13 12 11 12 12 10 12 12 11 11 12 11 9

11 11 10 12 12 12 11 13 13 14 12 14 14 10 12

CONDUIT

SPILL

1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

PK CR

0.4 0.0 0.0 0.0 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.3 0.0 0.9 0.9 0.4 0.3 0.4 0.4 0.2 0.6 0.0 0.6 0.3

C.F.S.

.024 .000 .000 .000 .016 .013 .000 .000 .000 .000 .000 .000 .000 .000 .012 .000 .011 .012 .016 .000 .050 .047 .021 .016 .021 .023 .012 .030 .000 .035 .018

INCHES

.67

.44

.18

.28

.30

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CENTRAL VALLEY PROJECT-CALIFORNIA

January 25, 2000JENKINSON LAKE DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

-175 305 357 0.0 31.0 6.8 .377 1.87TOTALS

ACRE-FEET -175 606 708 0.0 61.5 13.5COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.DATA BASED ON 24 HOUR PERIOD ENDING 0800.

SUMMARYRELEASE (ACRE-FEET)

708.1CAMINO-CONDUITSLY PARK CREEK

SPILL 61.5 0.0

365.0

PRECIPITATIONTHIS MONTH =

TO DATE =1999JULY 1, 9.35

32,501

343.1 1.87

CAMINO SLYCAMPCREEKC.F.S.

9 6 7 6 5 5 5 5 5 5 5 5 6 5 5 5 5 5 4 5 5 4 3 4 4 4 3 4 5 4 4

152

301

E.I.D. PROJECTE.I.D. WATER RIGHTS

Page 22: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

678910

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

427.46 427.46 427.43 427.42 427.42

427.42 427.41 427.40 427.40 427.40

427.38 427.38 427.38 427.36 427.36

427.35 427.34 427.33 427.31 427.29

427.27 427.27 427.25 427.23 427.22

427.22 427.21 427.20 427.18 427.18

427.16

1,367,957 1,367,957 1,367,415 1,367,235 1,367,235

1,367,235 1,367,054 1,366,873 1,366,873 1,366,873

1,366,512 1,366,512 1,366,512 1,366,150 1,366,150

1,365,969 1,365,789 1,365,608 1,365,246 1,364,885

1,364,523 1,364,523 1,364,162 1,363,800 1,363,620

1,363,620 1,363,439 1,363,258 1,362,897 1,362,897

1,362,535

STORAGE

+361+0

-542-180

+0

+0-181-181

+0+0

-361+0+0

-362+0

-181-180-181-362-361

-362+0

-361-362-180

+0-181-181-361

+0

-362

CHANGE

22745

-205-1657

7711

-2210695

-1205662

-10362

01120

-80-98

-89168-44-57

5

108-8

-13-9887

-90

INFLOW

SPILL

33 33 33 33 33

71 96 57 64 41

50 50 50 50 50

73 90 93 73 48

40 61 90 90 90

90 71 60 66 75

75

OUTLET

12 12 36 42 24

6 6

12 42 54

12 6

12 30 12

18 12 18 30 36

54 107 48 36 6

18 12 18 18 12

18

C.F.S.

.02 .02 .06 .07 .04

.01 .01 .02 .07 .09

.02 .01 .02 .05 .02

.03 .02 .03 .05 .06

.09 .18 .08 .06 .01

.03 .02 .03 .03 .02

.03

INCHES

.20

.08

.15 .06

.02

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-SOLANO PROJECT-CALIFORNIA

January 25, 2000LAKE BERRYESSA DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED* ACRE-FEET

RELEASE - C.F.S.

-5,061 154 0 1,929 779 1.30 .51TOTALS

ACRE-FEET -5,061 305 0 3,826 1,545COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

SPILL 0OUTLET

TOTAL 3,826

3,826

PRECIPITATIONTHIS MONTH =

TO DATE = .51

1999JULY 1, 3.78

1,367,596

Page 23: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

6789

10

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

130.46 130.57 130.67 130.36 130.10

129.97 130.37 130.26 130.58 130.22

129.85 130.24 130.37 130.30 130.47

130.03 129.36 129.66 129.95 130.06

129.85 129.72 129.82 129.87 130.00

130.15 130.03 129.53 129.13 129.09

129.43

629 641 652 619 591

578 620 608 642 603

565 605 620 612 630

584 518 547 576 587

565 553 562 567 581

596 584 534 497 493

525

STORAGE

-9+12+11-33-28

-13+42-12+34-39

-38+40+15

-8+18

-46-66+29+29+11

-22-12+9+5

+14

+15-12-50-37-4

+32

CHANGE

3031313333

47109447828

4646424147

5562

1017052

3950798383

8369505673

76

INFLOW

25 25 25 25 25

25 25 25 25 25

25 25 25 25 25

25 25 25 25 25

25 25 25 25 25

25 25 25 25 25

25

PUTAH

10 0 0

25 22

29 63 25 36 23

40 0 9

20 13

53 70 61 29 20

24 30 49 55 51

50 50 50 50 50

35

PUTAH

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 1 1

1 1 0 0 0

0 0 0 0 0

0

C.F.S.

.05 .02 .07 .09 .04

.01 .01 .03 .06 .03

.08 .07 .02 .08 .08

.02 .03 .02 .19 .28

.23 .22 .06 .05 .02

.06 .02 .08 .07 .06

.06

INCHES

.08

.05

.07 .04

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-SOLANO PROJECT-CALIFORNIA

January 25, 2000DECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHES

C.F.S.

COMPUTED*ACRE-FEET

RELEASE - C.F.S.

-113 1,767 775 1,042 4 2.21 .24TOTALS

ACRE-FEET -113 3,505 1,537 2,067 8COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES AND EVAPORATION.

SUMMARYRELEASE (ACRE-FEET)

PUTAH CREEK 1,537PUTAH SOUTH CANAL 2,067

PRECIPITATIONTHIS MONTH =

TO DATE = .24

1999JULY 1, 2.71

639

LAKE SOLANO DAILY OPERATIONS

SOUTH CREEK

Page 24: TRINITY LAKE DAILY OPERATIONS · 2012. 9. 11. · december 1999 trinity lake daily operations run date: january 25, 2000 in lake evaporation inches c.f.s. computed* 1000 acre-feet

12345

678910

1112131415

1617181920

2122232425

2627282930

31

DAY ELEV

739.88 739.82 739.78 739.75 739.71

739.68 739.62 739.56 739.51 739.46

739.43 739.40 739.37 739.31 739.27

739.24 739.20 739.15 739.10 739.07

739.04 738.99 738.95 738.91 738.87

738.83 738.78 738.74 738.73 738.69

738.64

161,409 161,248 161,141 161,061 160,953

160,873 160,712 160,552 160,418 160,284

160,204 160,123 160,043 159,882 159,775

159,695 159,588 159,454 159,320 159,239

159,159 159,026 158,920 158,814 158,708

158,602 158,469 158,364 158,337 158,231

158,099

STORAGE

-80-161-107-80

-108

-80-161-160-134-134

-80-81-80

-161-107

-80-107-134-134-81

-80-133-106-106-106

-106-133-105-27

-106

-132

CHANGE

5.4-58.4-6.718.7

-14.2

15.7-34.9-33.5-31.8-51.5

-1.28.5

33.3-51.1-22.2

6.25.4

-6.7-7.331.3

33.1-18.4-23.6-1.35.3

25.4-3.0

-15.416.66.0

-15.0

75.0 77.0 74.0 75.0 75.0

75.0 106.0 98.0 88.0 69.0

64.0 66.0 90.0 90.0 70.0

70.0 89.0

107.0 103.0 92.0

89.0 90.0 90.0 90.0 91.0

104.0 106.0 69.0 48.0 94.0

100.0

TUN-

SPILL

5.0 5.0 5.0 5.0 5.0

5.0 5.0 5.0 5.0 5.0

5.0 5.0 5.0 5.0 5.0

5.0 7.0 5.0 5.0 5.0

5.0 5.0 5.0 5.0 5.0

5.0 6.0 5.0 5.0 5.0

5.0

OUTLET

.9

.7

1.7

.7

.5

17.0 19.2 19.9 17.3 12.4

13.4 13.7 22.1 7.8 7.1

8.4 17.1 16.2 13.5 8.4

9.8 15.0 13.9 17.3 12.2

17.7 18.2 11.0 12.3 13.9

21.0 15.9 14.2 17.2 14.6

10.1

AF.

.115 .130 .135 .117 .084

.091 .093 .150 .053 .048

.057 .116 .110 .092 .057

.067 .102 .095 .118 .083

.121 .124 .075 .084 .095

.144 .109 .097 .118 .100

.069

INCHES

PRECIP

UNITED STATES DEPARTMENT OF THE INTERIORU.S. BUREAU OF RECLAMATION-CACHUMA PROJECT-CALIFORNIA

January 25, 2000LAKE CACHUMA DAILY OPERATIONSDECEMBER 1999 RUN DATE:

IN LAKE

EVAPORATIONINCHESDIRECT

AF.

COMPUTED*INFLOW

RELEASE - AF.

-3,390 -185.3 2,624.0 .0 158.0 4.5 447.8 3.049 .00TOTALS (AF)(AVG)

COMMENTS:* COMPUTED INFLOW IS THE SUM OF CHANGE IN STORAGE, RELEASES, AND EVAPORATION MINUS PRECIP ON THE RESERVOIR SURFACE.DATA BASED ON 24-HOUR PERIOD ENDING 0800.INDICATED OUTLETS RELEASE INCLUDE ANY LEAKAGE AROUND GATES.

SUMMARYRELEASE (ACRE-FEET)

2,624.0TUNNEL SPILLDIRECT DIVERSIONS

.0 4.5 TOTAL 2,786.5

PRECIPITATIONTHIS MONTH =

1999JULY 1, TO DATE =

161,489

OUTLET 158.0 .00

SYR

.0

739.91

PRECIP ON

.0 159,700

4,950,703

S.Y.R.W.C.D. .0 1.72

NEL DIVERS. WCDAF.RES. SURF.ACRE-FEET

DWRINFLOW

13

25 4

28 3

AF.

73

SEEPAGE

1.4 1.4 1.4 1.4 1.4

1.4 1.4 1.4 1.4 1.4

1.4 1.4 1.4 1.4 1.4

1.4 1.4 1.4 1.4 1.4

1.4 1.4 1.4 1.4 1.4

1.4 1.4 1.4 1.4 1.4

1.4

43.4