TRUNION GATE RESISTANCE ANALYSIS Applied on Diablo Dam, Diablo WA Robert Gordon| May 7, 2015

Upload: nguyendien

Post on 29-Mar-2018

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

TRUNION GATE RESISTANCE ANALYSIS

Applied on Diablo Dam, Diablo WA

Robert Gordon| May 7, 2015

Page 2: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 2

DIABLO DAM GENERAL INFO

• Built: 1927-1929

• Concrete Arch Dam With Gravity Abutments

o389 feet high

o1180 feet at crest

o19 Tainter Radial Gate 20’-6” wide, 18’ to max. Lake

oGates 1-3 Automated in ~1980

oGates 4-19 Operated by Portable Hoist

oNormal Usage Sequence is 2, 3, Teens

Page 3: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 3

MOTIVATION FOR WORK

• Folsum Tainter Gate Failure

• FERC Part 12 Inspection Item

oModel and Determine Maximum Acceptable

Friction

oFriction Test Gates and Determine Current

Condition

Page 4: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 4

PRELIMINARY TESTING

• Contracted Consultant For:

oFEA Model of Gate

oDetermine Method to Test

oTest and Determine Friction Factor on a Portion of

the Gates

• SCL Assisted with Initial Testing

Page 5: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 5

METHOD OF TEST TO DETERMINE TRUNNION

FRICTION

• Cantilevered Beam (73” long) Temporarily

Mounted at Each Trunnion

• Digital Dial Indicator Mounted at The End Beam

• Serial Connection Between Indicator and PC

• Data Collected Using PC Running LabVIEW

• Collect Continuous Data at 10 Hz

• Raise Gate 1 Foot and 2 Foot

Page 6: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 6

FRICTION TEST RESULTS

• Gate 2 Friction

o0.9 Right

o0.6 Left

•Maximum

Acceptable

Friction Factor

0.3: this is

about

0.56mm*2

Page 7: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 7

ACCESS TO LOCATION

• Constructed Work

Platform

• Install Gate Restraint

Page 8: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 8

REMOVAL OF TRUNNION BUSHING CARRIER

• Remove Lead Paint on Trunnion

• Remove 18 1” Rivets Per Side

• Remove Bushing Carrier

Page 9: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 9

TRUNNION PINS

• Trunnion Surface Corroded ~0.025” deep

Page 10: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 10

•Machined With Climax PL2000 Portable Lathe

oRemoved ~0.050” off Diameter

oPolished to ~10 Ra

Page 11: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 11

IMPROVEMENTS TO BUSHING

•Original Bushing had 1 Port with “X” Grove

~+/- 30 Degree of Coverage

•New Bushing (Improve Grease Distribution)

oOuter Circumferential Groove

o4 ports OD to ID

o4 Distribution Bars

o2 Circumferential Grease Dams

Page 12: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 12

BUSHING CARRIER WORK

• Bore Was Damaged From Bushing Movement

•Medium Porosity Casting

• Counter Bore Bolt Holes

Page 13: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 13

REASSEMBLY OF TRUNNION

• Bolted Both Sides Together

oSocket Head Cap Screws

oNordlock Lock Washers

Page 14: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 14

FINAL TESTING

• Dry Gate Opening Test With Beam/Indicator

• Conduct Full Gate Opening

•Wet Gate Opening Test With Beam/Indicator

Page 15: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 15

TRANSDUCER, LOCATIONS, AND FIXTURES

Page 16: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 16

SIMPLIFIED LABVIEW DAQ CODE

Page 17: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 17

ACCESS TO INSTRUMENTED LOCATION

Page 18: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 18

PRE RING TEST

Page 19: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 19

WET GATE FRICTION TESTING DATA

• Repaired Trunnion Friction ~0.07

Page 20: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 20

ALTERNATIVE METHODS TO MEASURE FRICTION

•Mount Strain Gages on Involved Elements

• Strain Gage on Transferable Beam

• Laser/Camera/Burn Paper

• Encoders on Gate Hub

• Load Cells on Hoist Cable/Actuator

Page 21: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 21

KEY FEATURES IN TESTING SYSTEM

•Need Real-time Indications During Testing

•Method to Archive Test Data

• High Resolution

• Rigid Test Fixtures/High Natural Frequencies

•Weatherproof & Robust

Page 22: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 22

FUTURE WORK

• Refurbish of All 19 Gates To Greaseless Design

oReduced Future Labor Costs From Greasing

oBronze Bushing Cost ~= to Greaseless Bushing Cost

oLess Environmental Waste

o Instigation Cost Same

o Improved Worker Safety

Page 23: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

| 23

NEW GREASELESS BUSHING/TRUNNION DESIGN

• Turn Existing Trunnion to Round and Smooth

• Thermally Shrink Fit Stainless Steel Sleeve to

Trunnion Shaft

• Bore Out Cast Bushing Carrier for New Greaseless

Bushing

• Add Two Energized O-ring Seals on

Trunnion/Bushing Ends

Page 24: TRUNION GATE RESISTANCE ANALYSIS - … 3 MOTIVATION FOR WORK •Folsum Tainter Gate Failure •FERC Part 12 Inspection Item oModel and Determine Maximum Acceptable Friction oFriction

OUR VISION To set the standard—to deliver the best customer

service experience of any utility in the nation.

OUR MISSION Seattle City Light is dedicated to exceeding our customers’

expectations in producing and delivering environmentally

responsible, safe, low-cost and reliable power.

OUR VALUES Excellence, Accountability, Trust and Stewardship.