tsa clubhouse 2020/2021 · visionstatus and funding plan for tsa clubhouse 2020/2021 13apr2019...
TRANSCRIPT
TSA Clubhouse 2020/2021Safety MeetingApril 13, 2019
Confidential - For TSA Distribution Only
VisionTimeline Plan for TSA Clubhouse 2020/2021
Dec
2018 2019
Jan Mar Apr/Oct
TRANSACT & BUILD
2020
Apr
FUNDCONCEPTConfidential - For TSA Distribution Only
Feb Octweare
here
VisionStatus and Funding Plan for TSA Clubhouse 2020/202113APR2019
Confidential - For TSA Distribution Only
No decision has been made at this point and any decision to build (TSA bylaws – major asset purchase) is a membership decision
2
1 3Rough Order of Magnitude Cost:
Expected Cost will be between $250K to $300K
Funding:1. Temporary Assessment – $10 per month
175 members X $10 per month X 5 years = $100K
2. Donations – $50K to $100K
Events, Key Members and Naming Rights
3. Loan – $100K
3 Year Secured Loan
Same way we funded runway improvements
Next Steps:1. Temporary Assessment to begin in May 2019
2. TSA will begin accepting Clubhouse 2020/2021 Pledges
Money will start being collected once project is ratified
John Duke will be Sole Point of Contact for Donations
3. Ratification and Build
Ratification will occur at OCT 2020 Member Meeting
Build decision will occur ONLY
• once sufficient funds have been secured (as previously stated) to maintain required TSA investment balances per TSA bylaws
• timing is correct to build during winter months
Note:The faster the donations come in, the sooner the
Clubhouse becomes a reality!
Sheet Number
Seal
Sheet Name
Revision Date
Scale:Date:File:Project:
Stephen Hundley AIA7921 Deer TrailDallas, Texas [email protected]
ARCHITECT:
TSA CLUBHOUSERendering04/12/2019No Scale
Rendering
A00
MECH
EQUIPMENT OFFICE
TRAINING
CLUB ROOM
KITCHEN
COVERED PATIO
SPIRAL STAIRCASETO OBSERVATIONDECK
RETRACTABLE DOORS
LINE OF ROOF OVERHANG ABOVE
LOBBY
SCALE: 1"=4'-0" TOTAL AREA: 2,570 SF
STORAGE/
Sheet Number
Seal
Sheet Name
Revision Date
Scale:Date:File:Project:
Stephen Hundley AIA7921 Deer TrailDallas, Texas [email protected]
ARCHITECT:
TSA
3'-9
"6'
-7"
60'-10"
3'-6" 10'-2" 10'-2" 3'-6" 9'-2" 8'-8" 11'-0"
32'-0
"
15'-3
"14
'-11"
16'-9
"
48'-9
"
31'-8
"
17'-6" 6'-6" 20'-4"
61'-10"
DRESSING
OVERHANG ABOVELINE OF DECK
LINE OF ROOF OVERHANG ABOVE
ENTRY
CONFERENCE
LOCKERS
JAN
SHOWER
DRESSING
SHOWER
2019_02_25 FP Stdy0316 Mar 20191" = 4'-0"
LOCKERS
WOMEN MEN
REFRIGERATOR
SIN
K W
/ D
ISPO
SER
DW
RANGE
LINE OF OLD CLUBHOUSE
PROPOSEDNEW CLUBHOUSEFOR TEXAS SOARINGASSOCIATION
FLOOR PLAN
A100
30'-0"
INSTRUCTION
SLID
ING
GLA
SS D
OO
R
8'-0
"
UP
28'-1
1/2
"
NORTH
FLOOR PLAN
48'-9
"
5'-0
"4'
-1 1
/2"
5'-0
"
43'-9
"
1'-7"
10'-6" 7'-0 1/2"
31'-0"
24'-0
"
5'-2
"
24'-0"
4'-0" 4'-0"5'-10 1/2" 5'-10 1/2"
8x8 GLASS BLOCK 8x8 GLASS BLOCK
OPERATIONS
PROPOSED OBSERVATION DECKSCALE: 1"=8'-0" TOTAL AREA: 1,,770 SF
Stephen Hundley AIA
Sheet Number
Seal
Sheet Name
Revision Date
Scale:Date:File:Project:
Stephen Hundley AIA7921 Deer TrailDallas, Texas [email protected]
ARCHITECT:
OPEN TO BELOW
OBSERVATION DECK
TSA
1" = 4'-0"
LINE OF ROOF OVERHANG
PROPOSEDNEW CLUBHOUSEFOR TEXAS SOARINGASSOCIATION
A101
DECK, ROOF, PLAN
NO
RTH
DN
ROOF SCUPPER, TYPICAL
AC CONDENSERSINGLE-PLY ROOFING
2019_02_25 FP Stdy0316 Mar 2019
Stephen Hundley AIA
Sheet Number
Seal
Sheet Name
Revision Date
Scale:Date:File:Project:
Stephen Hundley AIA7921 Deer TrailDallas, Texas [email protected]
ARCHITECT:
10'-0
"2'
-0"
10'-0
"2'
-0"
23'-0
"
ENTRY
KITCHEN
INSTRUCTIONLOWER PATIO ENTRY
BUILDING SECTION
NORTH ELEVATION
EIFS SYSTEM
EIFS SYSTEM
CURB FLASHING
PROPOSEDNEW CLUBHOUSEFOR TEXAS SOARINGASSOCIATION
A102
EXTERIOR ELEVATIONS
TSA
1" = 4'-0"
ROOF SLOPING 1/4" PER FOOT
EIFS SYSTEM
HARDIPLANK PANELSCURB FLASHING
OUTDOOR GRILLE ENCLOSURE
2019_02_25 FP Stdy0316 Mar 2019
SCALE: 1" = 4'-0"
SCALE: 1" = 4'-0"
Stephen Hundley AIA
Sheet Number
Seal
Sheet Name
Revision Date
Scale:Date:File:Project:
Stephen Hundley AIA7921 Deer TrailDallas, Texas [email protected]
ARCHITECT:
EAST ELEVATION
SOUTH ELEVATION
10'-0
"2'
-0"
PROPOSEDNEW CLUBHOUSEFOR TEXAS SOARINGASSOCIATION
A103
EXTERIOR ELEVATIONS
TSA
1" = 4'-0"10'-0
"2'
-0"
23'-0
"
10'-0
"2'
-0"
ROOF SLOPING 1/4" PER FOOT
2019_02_25 FP Stdy0316 Mar 2019
SCALE: 1" = 4'-0"
SCALE: 1" = 4'-0"
TEXAS SOARING ASSOCIATION
Stephen Hundley AIA
WEST ELEVATION
Sheet Number
Seal
Sheet Name
Revision Date
Scale:Date:File:Project:
Stephen Hundley AIA7921 Deer TrailDallas, Texas [email protected]
ARCHITECT:
10'-0
"2'
-0"
PROPOSEDNEW CLUBHOUSEFOR TEXAS SOARINGASSOCIATION
A104
EXTERIOR ELEVATIONS
TSA
1" = 4'-0"
2019_02_25 FP Stdy0316 Mar 2019
TEXAS SOARING ASSOCIATION
SCALE: 1" = 4'-0"