11/22/ 05

Terang Sirasun BaturGas Development Project

Four Seasons Hotel Jakarta, Indonesia

Tuesday, November 22, 2005

Page 2: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 2/24

Page 3: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 3/24

11/22/05

3

• Kangean PSC acquired by EMP from BP in August 2004• Terang field discovered in 1982, Sirasun in 1993 and Batur in

1995• The TSB reserves of 1.6 TCF were certif ied by “ D&M” in May

1995• Kangean PSC Extension approved in December 2004• Development of TSB fields i s expected to deliver gas to East

Java market starting from 4 th Q 2007• Development strategy: Phase-1 with target of production in

4 th Q 2007 and Phase-2 with target of production in the 4 th Q2009.

• Plan Of Development (POD) approved in October 2005• Front End Engineering Design completed in October 2005

IntroductionIntroduction

Page 4: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 4/24

11/22/05

4

Kangean PSC Development Project

2

Iga ngan - 1

Pa gerungan 3 1 24

Palung - 1

S. Sepanjang -1

Sepapan -1

JS 53A

0 20 Km.

SEPANJANG

5E. Sa kala - 1

SAKALA

J S 5 3 B - 1

115 o 00' 115 o 30' 116 o 00'

Arya - 1

1

Sirasun - 2

116 o 30'

KANGEAN

PALIAT

W. K a n ge a n1

2 3

Sidu la ng - 1

Sepanjang isl . - 1 Kiau - 1 JS 25 - 1

Saka la - 1

2

1

Kemirian - 1

600'

BNMP 0318a - E. Somantri

07o 00'

07o 30'

1000'

1500'

JS 50 -1

Kubu - 1

PA G ER UN G A N

Batur

Terang - 1

3 0 0 0

PAGERUNGAN

DEPELOP M ENT

TERANG -SIRASUN

AREASouth Saubi

Karan g Takat

South Celukan

E. Sakal a

West Kangean

SepanjangIsland

JS53East Spur

Pagerungan / TSB

Gas Discoveries

Oil Discoveries

Prospect & Leads

PipelineProposed Pipeline

2

Iga ngan - 1

Pa gerungan 3 1 24

Palung - 1

S. Sepanjang -1

Sepapan -1

JS 53A

0 20 Km.

SEPANJANG

5E. Sa kala - 1

SAKALA

J S 5 3 B - 1

115 o 00' 115 o 30' 116 o 00'

Arya - 1

1

Sirasun - 2

116 o 30'

KANGEAN

PALIAT

W. K a n ge a n1

2 3

Sidu la ng - 1

Sepanjang isl . - 1 Kiau - 1 JS 25 - 1

Saka la - 1

2

1

Kemirian - 1

600'

BNMP 0318a - E. Somantri

07o 00'

07o 30'

1000'

1500'

JS 50 -1

Kubu - 1

PA G ER UN G A N

Batur

Terang - 1

3 0 0 0

PAGERUNGAN

OPTIM IZATION

TERANG -SIRASUN South Saubi

Karan g Takat

South Celukan

E. Sakal a

West Kangean

SepanjangIsland

JS53East Spur

Pagerungan / TSB

Gas Discoveries

Oil Discoveries

Prospect & Leads

PipelineProposed Pipeline

DEVELOP M ENT

Page 5: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 5/24

11/22/05

5

Terang Sirasun Batur Fields Map

100 m ---------------------------------- 200 m< 100 m > 200 mWater Depth:

Page 6: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 6/24

11/22/05

6

Terang 58%

Batur 4%

Sirasun 38%30 km

12 km

% Reserve of Each% Reserve of Each FieldField

Page 7: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 7/24

11/22/05

7

GeohazardGeohazard MapMap

Potential Geohazard:

• Surface Fault• Seismic Activity• Landslide• Shallow Gas

Page 8: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 8/24

11/22/ 05

TSB Well Trajectory Plan

Page 9: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 9/24

11/22/05

9

0

50

100

150

200

250

300

2007 2009 2011 2013 2015 2017 2019 2021 2023 2025 2027 2029

G a s

S a l e s ,

M M S C F D

Daily Contract Quantity

Gas ProductionGas Production ProfileProfile

Page 10: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 10/24

11/22/05

10

(-100 m)

(-200 m)

TSB DevelopmentTSB Development OverviewOverview

Page 11: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 11/24

11/22/05

11

• Low Pressure Reservoir • 98+% Methane, no H 2S, min. CO 2• Design Life 15 yrs• Facili ty Design Capacity 330 MMscfd• ‘Fit for Purpose’ and ‘Proven Design’•

High Reliability & Availabili ty• Min. suction pressure 150 psig & dischargepressure 1300 psig• Compliance with International Standards/Codes• For Phase-I: Water depth at Terang is 100 meter

Key Design ParametersKey Design Parameters

Page 12: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 12/24

11/22/05

12

Phase-1

Phase-2

EPC ‘Hull & Mooring’

PO ‘Compressor’

PO ‘Subsea System’

EPCI ‘Subsea Facilit ies& Integration’

EPCI ‘Topside Facilit y’

TSB DevelopmentTSB Development Strategy: Phase-IStrategy: Phase-I

Drill 5 Wells

Hot Tap

Page 13: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 13/24

11/22/05

13

Scope :Supplies the following :• Subsea Wellhead & Trees•

Subsea control system• Dynamic & Static Umbilical• Manifold• Topside Control Equipment

PO Subsea SystemPO Subsea System

Page 14: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 14/24

11/22/05

14

FUTURE

Scope :Two units Gas Turbine Compressors c/w Turbine Control System.

HPC1

HPC2

HP Header MP Header

Prod Separator

P-1P-2

V-1 V-2

GasToDehy’d

LP Header

P-4

V-4

V -3

MPC 1

MPC 2

LLP Header

LPC 1

LPC 2

V-5

PO TurbinePO Turbine CompressorCompressor

Page 15: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 15/24

11/22/05

15

Hull Structural Plan

EPC Hull & Mooring SystemEPC Hull & Mooring System

Page 16: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 16/24

11/22/05

16

Process Flow Diagram

EPCI TopsideEPCI Topside FacilityFacility

Page 17: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 17/24

11/22/05

17

Terang

Batur Sirasun

Subsea Production Facilities Lay-out

EPCI Subsea FacilityEPCI Subsea Facility

Page 18: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 18/24

11/22/05

18

Subsea Control System Layout

EPCI Subsea FacilityEPCI Subsea Facility

Page 19: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 19/24

11/22/05

19

SCOPE EPCI

'TOPSIDE'

EPC 'HULL

& MOORING' PO 'COMPR.'

EPCI

'SUBSEA'

PO

'SUBSEA'

COMPRESSOR X X

PROCESS EQUIPMENT X X

HUL L X X

MOORING SYSTEM X X

SUB SEA CTRL SYSTEM X X X

TOPSIDE SUBSEA CTRL EQUIPMENTX X X

SUB SEA FL OWL INE SYSTEM X X

Interface Matrix ofInterface Matrix of FacilityFacility

Page 20: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 20/24

11/22/05

20

Manageability

React Infl uence

R i s k

L o w

M e d

H i g h

MedLow High

Legend:

1. ProjectOrganization7. GOI Approval .

10. Bidde rs participation

5. Interface OffshoreIns tallation (Fa c vs. Drilling)

11. availability oflocal fabricator

3. Inter departme ntalcommunication

/suppo rt

4. P roject/ C ontract Integration

Lega l Standing

8. Rig Availability

Risk & Disciplinecompetency

Externalrelationship

EM P Culture& InternalRelationship

2. Com p policy & procedures

6. Contractorcompetency /capa city

9. EJGP Integrity

Project DevelopmentProject Development Risk Risk

Page 21: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 21/24

11/22/05

21

Project ScheduleProject Schedule

Page 22: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 22/24

11/22/05

22

ProjectProject CostCost

Total Estimated C ost: USD 400 million

Phase-I Estimated C ost: USD 275 million

Phase-II Estimated C ost: USD 125 million

Page 23: TSB Gas Development Project

8/10/2019 TSB Gas Development Project

http://slidepdf.com/reader/full/tsb-gas-development-project 23/24

11/22/05

23

Company ExpectationCompany Expectation

• No LTA• Gas-in before December 2007• Project executed within approved budget

• Facility performance meets design requirement• Appreciate local content• Maximize gas recovery