    PROPOSED DESIGN 

    TECHNICAL SITE SURVEY REPORT 

    (TSSR) 

    INFRASTRUCTURE DEVELOPMENT OF 

    CELLULAR TELECOMMUNICATION NETWORKS 

    Survey  :  Modernization 

    Site Name

     : 

    GRAHAFAMILY3 Site ID  :  20SBY059 

    Region  :  EJBN 

    Branch  :  SURABAYA 

    Project / Scope  :  Buffer Stock2 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    2/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 2(43)

     

    1. SITE SURVEY CHECKLIST1.1. Site InformationTick the box (), when checked.

    SITE NAME : GRAHAFAMILY3  Branch : SURABAYA 

    SITE ID

     : 20SBY059

     

    SITE TYPE :  Area Coverage  Dense Urban  Urban  Sub Urban  In‐Building 

    BTS Type Existing  UltraSite 

    BS24X 

    Metrosite 

    Flexi Multi Radio 

    FlexiBTS 

    Others : ……………… 

    Site Ownership  ISAT  collocate with 

    other Operator 

    Others, specify 

    …………………………………………………………………………………

    ……. 

    SITE ADDRESS:  JL. RAYA LAKARSANTRI 28 RT 04/02, SURABAYA

    TEL:  ‐

    CONTACT PERSONS: 

    Site Access Condition  24 hours 

    limited, specify ……………………………………………………………………………………..  

    Site Access Key  Regional System Key 

    If  others, where……………………………………………………………………………………….. 

    Site Keeper  Name : 

    Phn : 

    Site Contract Status :  Start :  .... / .... / ....  End :  .... / .... / .... 

    Community problem  Yes, 

    Please explain :…………………………………………………………………………………………………….. 

    ………………………………………………………………………………………………………………………….  

    No 

    SURVEY DONE BY:  1. Name: Ahmad Syafii  Phn: 

    Company: PT.PERDANA KOMSEL MANDIRI  Signed: 

    SURVEY DONE BY:  2. Name:  Phn: 

    Company:  Signed: 

    DATE : 

    11 / 

    04 

    12 

    (dd/mm/yy) 

    Note: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    3/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 3(43)

     

    1.2.  Site Location 

    Tick the box (), when checked. 

    COORDINATES :  7°18'2.86"S  112°38'6.00"E

    ELEVATION: 

    25 

    DISTANCE FROM REGIONAL CITY  :  11.5  km Surabaya City 

    DISTANCE FROM MAIN ROAD  0.03  km 

    ROAD CONDITIONS:  Good 

    MATERIAL STORAGE:  ON SITE:  YES  NO 

    MAPS:  ROAD MAP VERTION / INDEX: 

    TERRITORIAL MAP: 

    REMARKS: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    4/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 4(43)

     

    2.  VISUAL CHECKLIST 

    2.1.  Civil Work 

    Check Point OK NOK NA*

    1. Tower / Mini Tower / Pole is completely erected, no missing or loose members. Assembly is doneaccording to manufacturer’s Tower Design Drawings; Height : ___42____ m.Tower/ Mini Tower/ Pole didirikan dengan sempurna, tidak ada bagian yang hilang ataupun kurang.Pendirian menara sudah selesai sesuai gambar rencana oleh pabrikator; Ketinggian: ___42_______m 

    2. Tower / Mini Tower painted according to ICAO, where applicable.Menara/tower telah dicat sesuai dengan standard ICAO (International Civil Aviation Organization) 

    3. No structural defects, no sever rust of bolts, no non-standard welding (especially for co-locatedsites).Tidak ada cacat pada struktur, tidak ada karat pada baut, tidak ditemukan pengelasan yang tidak baik(khusus untuk lokasi dengan penggunaan tower bersama) 

    4. Climbing ladder is completely installed.Tangga telah dibangun dengan lengkap 

    5. Cable trays (vertical & horizontal) are installed & positioned correctly.Tray kabel (vertikal & horisontal) telah rapi dipasang dan ditempatkan dengan benar  

    6. No concerns of over-load on tower, i.e. too many antennas and microwaves, two or more cableladders etc. Load-non-conformance to tower name plate (especially for co-located sites).Pertimbangan beban berlebih pada tower, contoh, terlalu banyak antenna dan microwave, terdapat dua ataulebih kabel ladders, dll. Pembebanan tersebut tidak sesuai dengan yang tercantum pada papan informasi.(Khusus untuk penggunaan pada tower bersama)

     

    7.  Antenna mounting poles are positioned correctly.Tempat pemasangan antena ditempatkan dengan benar  

    8. BTS base frame is constructed according to As Planned Drawings.BTS-base frame dibangun sesuai dengan gambar rencana 

    9. Tower leg stubs grouted with non-shrinking grout.Kaki tower telah digrouting dengan bahan sesuai standar

    10. Backfilling of the foundation is completed.Timbunan tanah pada pondasi telah selesai. 

    *NA = Not Applicable (dipilih jika item tidak digunakan untuk tipe site tertentu) 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    5/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 5(43)

     

    2.2.  Building 

    Tick the box (), when checked. 

    EXISTING/Rooftop:  YES  NO 

    DIMMENTION of 

     ROOFTOP

     m

     x 

    OVERALL CONDITION to ADD ADDITIONAL EQUIPMENT:  OK  NOK 

    CUSTOMER SHELTER AVAILABLE :  YES  NO 

    CUSTOMER OUTDOOR EQUPMENT AVAILABLE :  YES  NO 

    DRAWINGS AVAILABLE: 

    FLOOR LAYOUTS :  YES  NO 

    OTHERS  : 

    HEIGHT : (typical:

     1 floor

     = 3.5

     m)

     m

     

    ACCESS TO ROOF : 

    Stairs, 

    Lift 

    Escalator 

    others, Please note: ………………………………. 

    MATERIAL LOADING, 

    Any special tool required?:  Yes  No 

    Please Specify: 

    REMARKS : 

    2.3 .  Surroundings 

    Tick the box (), when checked. 

    SURROUNDING BUILDINGS:

     YES

     NO

     

    HIGHER THAN THE SELECTED BUILDING:  YES  NO 

    DISTANCE FROM THE SELECTED SITE:  km 

    DIRECTION :  deg. 

    POWER LINES NEARBY:  YES, _ _ _ _ _ _ _ _ _ _ _ m.  NO. 

    ANY EXISTING TOWER USED BY OTHER OPERATORS:  YES, distance_________ m 

    Name of  Operator:_____________ 

    NO 

    ON THE ROOF TOP OF THE SELECTED BUILDING OTHER EQUIPMENT (antennas, poles,...) 

    FROM THE OTHER OPERATORS: Name of  operator ______________________  

    YES  NO 

    ENOUGH SPACE FOR NOKIA SIEMENS NETWORKS SIEMENS NETWORKS ANTENNAS/POLES LEFT OVER: 

    YES  NO 

    REMARKS: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    6/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 6(43)

     

    2.4  Equipment Room 

    SHELTER EXISTING TYPE:  Indoor  Outdoor 

    DIMENSIONS:  2.8  m (W)  5.00  m (L)  3  m (H) 

    PROPOSE SPACE NEW 

    EQUIPMENT: 

    Ultrasite Indoor 

    Ultrasite Outdoor 

    Ultrasite Supreme (3G) 

    Flexi EDGE 1 stack 

    Flexi EDGE 2 stack 

    Flexi WCDMA 

    19 rack customize 

    Flexi Multi Radio 

    BTS24X 

    SPACE:  Space available for New Shelter equipment 

    (as propose) ? 

    YES  No 

    Distance from New Equipment to Rectifier: _________________m 

    Distance from New Equipment to FEP :_____________________m 

    Space available for New Shelterless 

    equipment (as propose)? 

    YES  No 

    Spare Hole on H‐Beam ? 

    YES 

    No 

    Distance from New Equipment to Rectifier: _________________m 

    Hole dimension on H‐Beam: ________________________m 

    Distance between Hole on H‐Beam: _______________________m 

    SHIFTING  Any Equipment/Cable need to Shift to get 

    space? 

    YES  No 

    Equipment Name and Qty (cabinet) 

    _Rack 19 

    __________________________________ 

    Did get premise from Indosat Regional to shift equipment ? 

    YES  No 

    Indosat Name that allow: 

    DISMANTLING and 

    SWAP 

    Any Equipment need to dismantled/Swaped 

    to get space? 

    YES  No 

    Equipment Name and Qty (cabinet) 

    ______________________________  

    __________________________________ 

    Did get premise from Indosat Regional to dismantle equipment ? 

    YES  No 

    Indosat Name that allow: 

    MATERIALS: 

    RAISED FLOOR  H‐Beam 

    BRICK WALL 

    Antistatic vinyl floor (CKD Shelter) 

    ROOM TEMPERATURE :  OK  :  NOK 

    AIR CONDITIONER: 

    Available  : 

    Not Available  : 

    Remark :  Use existing  AC  / 

    Unit_____2_________ 

    Capacity___________ 

    Replace existing  AC  /  Add New AC 

    VENTILATION FAN:  YES  NO  NEW NEEDED : 

    LIGHTING:  YES  NO  NEW NEEDED : 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    7/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 7(43)

     

    INDOOR 

    GROUNDING 

    BAR (IGB): 

    EXISTING  NEW NEEDED : 

    IGB #1 

    Total Hole____14______ 

    Remain 

    Hole____8______ 

    IGB #2 

    Total Hole______14_____ 

    Remain 

    Hole_____8_____ 

    Quantity: ____________ 

    Total Hole:____________ 

    Remain 

    Hole:__________ 

    CABLE LADDER/TRAY  EXISTING, Dimmenstion (Width): ____400________mm, 

    Space Available for new Cable : 

    YES  No 

    PROPOSE NEW, Dimmenstion (Width) ________ mm, Length____________mm 

    DRAWINGS AVAILABLE:  FLOOR LAYOUT:  YES  NO 

    OTHERS: 

    REMARKS OF EQUIPMENT ROOM: 

    For Outdoor Site, also measure hole dimension on H‐Beam, make it match with our BTS hole dimension. Please be infomed 

    at Drawing 

    2.5.  Mechanical & Electrical works 

    Check Point OK NOK NA*

    1. KWH system is installed, lockable & functioning correctlySistem KWH telah terpasang, dapat dikunci dan bekerja dengan benar  

    2.  All circuit breakers and wires are installed and labeled properlySemua Circuit Breaker dan kabel telah di pasang dan di beri label yang sesuai 

    3. Lights are installed and working properlySemua lampu terpasang dengan lengkap dan berfungsi dengan baik 

    7.  All steel work (cable tray, ladder, lightning protection) grounding is installed correctlyPentanahan untuk semua pekerjaan baja telah terpasang dengan benar  

    9. Generator equipment available and functioning properlyGenset tersedia dan berfungsi dengan baik 

    *NA = Not Applicable (dipil ih jika item tid ak digunakan untuk tip e site tertentu) 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    8/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 8(43)

     

    2.6.  AC and DC Distribution 

    Tick the box (), when checked.

     AC SOURCES AVAILABE :  YES  NO  TAKE FROM SEPARATE ROOM ___________ (yes/No) 

    Distance from equipement room/Oudoor BTS: _________________m  

    PHASES:___3____Phase (3or1) 

    AC POWER STABILITY 

    Refer  to Indosat  authorization  person (Site Keeper) 

    stable  /  unstable 

    ACPDB BOX Available  YES, Distance from proposed BTS : _____1,8______m, from rectifier_____0,6_____m 

    MCB capacity, Main_3x ___25___x Amp, 

    Propose for New CB  : 

    Yes _______________  x Amp  No 

    Any space available :  _____Yes________ (yes/No) 

    NO (Propose NEW), 

    Distance from

     Main

     Sources

     (KWH

     Meter)_________m,

     

    Distance from propose rectifier________m, 

    Support required __________________  (pole, wall mount etc.) 

    AC Junction Box to share AC power between Existing ACPDB and New ACPDB: 

    Yes  No, 

    Distance from KWH meter …………… m, position (Indoor / Outdoor) 

    Arrester  KHW Meter  Yes  No,  brand = …………obo……………………, type ………………………………  

    ACPDB  Yes  No,  brand = …………obo……………………, type ………………………………  

    KWH Meter  Existing :  YES 

    MCB = .....3..... x …35…… amp 

    Amper Existing

     Load

     (measured)

     

    R = ……2…..amp 

    S = ……3.2…….amp 

    T = ……4.6…....amp 

    Upgrade Needed 

    Yes, …………………… KWH 

    No 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    9/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 9(43)

     

    RECTIFIER AVAILABE :  YES  NO 

    SEPARATE ROOM with Propose BTS Equipment____yes_______ (yes/No). 

    Distance from propose equipement: _____2_______m,  

    Brand: __ POWER ONE__ Type PPS 16.48 PCS+10XFMP16   Voltage: ____48___  Phase (Volt), 

    Existing Rectifier  capacity: 

    Modules: Qty

     _6_

     x_32_

     A

     , Total

     Load

     Capacity

     : __160__

     A

     

    Load Current : __96.4__ A, Remain Current  : _96__ A 

    Maximum Capacity of  Modules rectifier : Qty _10_ unit 

    MCB Capacity:  Please Fill In MCB capacity at Rectifier 

    MCB 1 

    (A) 

    MCB 2 

    (A) 

    MCB 3 

    (A) 

    MCB 4 

    (A) 

    MCB 5 

    (A) 

    MCB 6 

    (A) 

    MCB 7 

    (A) 

    MCB 8 

    (A) 

    MCB 9 

    (A) 

    MCB 10 

    (A) 

    63  63  80  10  10  10  10  10  10  10 

    Load  ON  ON  ON  ON  OFF  ON  OFF  OFF  OFF  OFF 

    MCB 11 

    (A) 

    MCB 12 

    (A) 

    MCB 13 

    (A) 

    MCB 14 

    (A) 

    MCB 15 

    (A) 

    MCB 16 

    (A) 

    MCB 17 

    (A) 

    MCB 18 

    (A) 

    MCB 19 

    (A) 

    MCB 20 

    (A) 

    10  16  16 

    Load  ON  OFF  OFF 

    Rectifier  Capacity for New BTS 

    No Need Upgrade 

    Need Upgrade Modules :……………………..  Modules 

    Need Add New MCB : ………………… A 

    Need New Rectifier 

    Battery AVAILABE :  YES  NO 

    Existing Battery Condition: 

    No. of  bank ……3….. , capacity perbank = ………180…………….. amp/hour 

    Total capacity

     battery

     = ………540………..

     amp/hour

     (no.

     of 

     bank

     3 x 180

     capacity

     per

     bank)

     

    Battery Capacity for New BTS 

    No Need Upgrade 

    Need Upgrade Battery  :…………………….. Bank 

    DCPDB BOX Available  YES, Distance from proposed Rectifier:_________m, MCB Capacity: ________A 

    Propose for New CB: ________x Amp, Any space available ___________ (yes/No) 

    NO (Propose NEW), Distance from rectifier_________m, Distance from propose 

    equipment________m, Support required __________________  (pole, wall mount etc.) 

    Please Fill

     In

     MCB/CB

     capacity

     at

     Rectifier

     

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    10/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 10(43)

     

    REMARKS OF AC/DC DISTRIBUTION: 

    2.7.  FEP 

    Tick the box (), when checked 

    EXISTING Dim: Qty ____ _x_________(7/8”, 1  5/8” ec) hole. 

    SPARE Dim: Qty ___________x_______________(7/8”,  1  5/8” ec) hole. 

    WALL THROUGH : 

    NEW,  Propose. Qty _________x______(7/8”,  1  5/8” ec) hole. 

    (6 hole/8 hole/12 hole) 

    Cable Boot Type: 

    7/8” – 1 hole 

    7/8” – 2 hole 

    7/8” – 3 hole 

    1  5/8”  ‐ 1 hole 

    REMARKS OF CABLE FEP: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    11/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 11(43)

     

    2.8.  Earthing/Grounding for Equipment 

    Tick the box (), when checked.

      TYPE:  + EARTH  ‐ EARTH  FLOATING 

    EARTHING BUSBAR:

     

    Grounding System Availibility  Yes  No, reason …………………………………………………………………………………………  

    ………………………………………………………………………………………………………………………………………..  

    Existing Resistance (ohm)  = ………………………….(ohm) 

    Grounding Bar Existing  Existing (yes/No)  No Existing/Propose New 

    1  IGB (Indoor/Outdoor): 

    Total Hole : …14…. hole 

    Spare : ……8…. hole X x x x x x x 

    √ √ √ √ √ x

    Qty:____________pcs___________ Hole 

    2  Horizontal Busbar : 

    Total Hole : …14…. hole 

    Spare : …8……. Hole X x x x x x x 

    √ √ √ √ √ √  x

    Qty:____________pcs___________ Hole 

    3  Bottom Busbar at Vertical 

    Tray: 

    Total Hole : …14…. hole 

    Spare : …8……. Hole 

    X x x x x √  xX √√  x x x x

    Qty:____________pcs___________ Hole 

    Busbar position Height : ……. M 

    4  Middle Busbar at Vertical 

    Tray: 

    Total Hole : …14…. hole 

    Spare : ……8…. Hole 

    Qty:___1_________pcs____8______ 

    Hole 

    Busbar position Height : 34 m 

    5  Top Busbar at Vertical Tray: 

    Total Hole : …14…. hole 

    Spare : ……6…. Hole X x x x x x x 

    √ √ √ √ √ √  x

    Qty:____________pcs___________ Hole 

    Busbar position Height : ……. M 

    Summary grounding system requirement for 2G or 3G 

    Bak Kontrol, bus bar needed, Qty = ……… pcs, …….. hole 

    Vertical Tray,

     bus

     bar

     needed,

     Qty

     = ………

     pcs,

     ……..

     hole

     

    Horisontal Tray, bus bar needed, Qty = ……… pcs, …….. hole 

    FEP/ODBTS, bus bar needed, Qty = ……… pcs, …….. hole 

    IGB, bus bar needed, Qty = ……… pcs, …….. hole 

    Total Cable Grounding BCC 50 mm, = ………………. Mtr 

    REMARKS: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    12/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 12(43)

     

    2.9  Signal Cables and Distribution Frames 

    Tick the box (), when checked 

    TRANSMISSION DDF 

    Total E1

     Needed

     : ..16E1......

     

    Total E1 Available  :  ...1E1..... 

    Detail : 1. Facing to  :  Site PERUM DRIYOREJO 

    E1 Capacity  :  8E1  ( Use : 2E1  / Available : 6E1 ) 

    2.Facing to  :  Site BSC_CITRALAND 

    E1 Capacity  :  15E1  ( Use : 1E1  / Available : 14E1 ) 

    3. Facing to  :  Site  ...... 

    E1 Capacity  :  ......  ( Use : ......  / Available : ......  ) 

    *Note : Pls add  the number  if  more than  3  facing 

    Link Transmision status : 

    Link X‐connect Site Origin 

    (............) Site 1.  (...........)  Site 2. (.............)  Site 3. (...........)  Site 4. (...........) 

    E1 Status  OK /  NOK  OK /  NOK  OK /  NOK  OK /  NOK  OK /  NOK 

    Link X‐connect  Site 5. (...........)  Site 6. (...........)  Site 7. (...........)  Site 8. (...........)  Site 9. (...........) 

    E1 Status  OK /  NOK  OK /  NOK  OK /  NOK  OK /  NOK  OK /  NOK 

    Link X‐connect  Site 10. (...........)  Site 11. (...........)  Site 12. (...........)  Site 13. (...........) 

    BSC 

    destination 

    (..............) 

    E1 Status  OK /  NOK  OK /  NOK  OK /  NOK  OK /  NOK  OK /  NOK 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    13/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 13(43)

     

    SEPARATE ROOM  SEPARATE ROOM NOT EXIST 

    DIMENSIONS :  mm (W)  mm (L)  mm (H) 

    FLOOR:  Th 

    LOCATIONS OF IDF, MDF, DDF: 

    IDF, MDF, DDF RACK  EXIST  NOT EXIST  NOT NEEDED 

    PCM CONNECTIONS  75 Ω (coax)  120 Ω balanced (PCM)…….. pair 

    NUMBER OF FREE PAIRS:  Pair  ,  meters 

    SIGNAL/TRASMISSIONCABLES: 

    FROM  TO  CABLE TYPE  LENGTH  NOTES 

    GRAHAFAMILY3  BSC_CITRALAND  RG214 

    EXTERNAL ALARMS: 

    Omni (external alarm) 

    Available 

    Yes / No 

    ________Yes___________  

    On Service  Yes / No 

    ___________________  

    DDF External alarm available  Yes / No 

    ________Yes__________  

    Connected to OMNI  Yes / No 

    ___________________  

    Existing alarm Connected (check at DDF or OMNI) 

    Alarm Name  Alarm Name  Alarm Name  Alarm Name 

    1. Door

     open

     7.

     AVR

     automatic

     bypass

     13.

     Spare

     19.

     

    2. Fire smoke‐heat Alarm  8. outdoor unit AC  14. Load fuse  20. 

    3. Genset run  9. Arrester fails  15. Battery fuse trip  21. 

    4. Genset fails  10. Spare  16. Rectifier module fails  22. 

    5. Temperature  11. AC power L1/L2/L3 fails  17.  23. 

    6. Rectifier main fails  12. Low voltage battery  18.  24. 

    REMARKS : 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    14/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 14(43)

     

    2.10  Radio Transmission Equipment 

    Tick the box (), when checked. 

    DIRECTION TO SITE 

    (name of  site) 

    TYPE 

    & Model 

    FREQ.  CAPACITY  FEEDER 

    BASE BAND CABLE 

    TYPE 

    RACK 

    BSC_CITRALAND  NEC  7Ghz  15E1  Rg 214 

    PERUM DRIYOREJO  NOKIA  13Ghz  8E1  RG214 

    REMARKS: 

    2.11.  Antenna Tower 

    Tick the box (), when checked. 

    TOWER EXIST:  YES  NO 

    TO BE RENOVATED:  YES  NO 

    UNDER CONSTRUCTION:  YES  NO 

    PLANNED DATE OF COMPLETION:  (dd/mm/.yyyy) 

    LOCATION AND DIRECTION: 

    SEE SITE PLAN: 

    SEE TOWER DRAWING: 

    PHOTOGRAPHS: 

    TYPE:  POSISITION 

    SST  GREEN FIELD 

    POLE  ROOF‐TOP, Height:  m 

    MONOPOLE  Others 

    Others: …………………………………….  

    HEIGHT of  TOWER  42  m 

    REST AND WORKING PLATFORMS/BORDES: 

    TYPE 

    HEIGHT 

    NOTES 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    15/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 15(43)

     

    USED EXISTING, width, ………400….…… mm, length, ……42000……… mm 

    PROPOSE NEW 

    HORIZONTAL LADDER FROM TOWER TO EQUIPMENT ROOM/FEP 

    USED EXISTING, width, ……400…….…… mm, length, ………25000……… mm 

    PROPOSE NEW 

    LENGTH: 

    mm 

    COVERED: 

    YES 

    NO 

    WIDTH:  mm  LENGTH: 

    VERTICAL LADDER: 

    LENGTH:  mm  COVERED:  YES  NO 

    WIDTH:  mm  LENGTH: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    16/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 16(43)

     

    Tick the box (), when checked 

    TOWER STRUCTURE INFORMATION: 

    Y

    Tower Slope

     A

    B

    SST

    C

    Pole/MonoPole

     X

     

    LEG/SIDE  LEVEL (m)  A 

    (mm) 

    (mm) 

    (mm) 

    D (deg) 

    D = Tan‐1

     (X/Y) 

    NOTE 

    X  Y  D 

    42  150  150  2° 

    Note : 

    Tower 

    Leg 

    Size 

    C  :  Pole / Monopole diameter 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    17/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 17(43)

     

    Tick the box (), when checked 

    ANTENNA TOWER LEG LAYOUT, EXISTING AND THEIR TYPES, HEIGHTS AND DIRECTIONS: 

    ANTENNA MW and Others : 

    LOCATION 

    LEG/SIDE 

    LEVEL 

    TYPE 

    No 

    Direction 

    (degree) 

    HEIGHT 

    mm 

    FREQUENCY 

    Mhz 

    NOTE 

    (brand, and Type) 

    40 

    70° 

    900 

    D  40  6  240°  900 

    A  40  6  310°  900 

    B  35  6  80° 

    C  35  6  180° 

    A  35  6  280° 

    Remarks : 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    18/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 18(43)

     

    Tick the box (), when checked 

    MHA EXISTING 

    LOCATION 

    LEG/SIDE 

    LEVEL 

    TYPE 

    No 

    HEIGHT 

    mm 

    FREQUENCY 

    Mhz 

    (Syetem: 

    ie. 

    GSM, DCS, CDMA etc) 

    NOTE 

    (brand, and

     Type)

     

    FEEDER EXISTING 

    SECTOR  LENGTH 

    (m) 

    TYPE 

    (7/8” or 1‐5/8”) 

    Brand  Notes 

    1  52  7/8"  Draka 

    2  52  7/8"  Draka 

    3  52  7/8"  Draka 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    19/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 19(43)

     

    ANTENNA TOWER LEG LAYOUT, NEW ANTENNAS AND THEIR TYPES, HEIGHTS AND DIRECTIONS : 

    BTS ANTENNAS: 

    SECTOR 

    No 

    ANTENNA 

    purpose 

    DIRECTION 

    degrees 

    LOCATION 

    legs/side 

    LEVEL 

    TYPE 

    No 

    HEIGHT 

    mm Antenna Tilt 

    (Electrical / 

    Mechanical ): 

    NOTES 

    1  Tx/Rx  70°  B  40  4  1300  6/‐4 

    Rx div.

     70°

     B

     40

     4 

    1300 

    6/‐4 

    2  Tx/Rx  240°  D  40  4  1300  6/‐5 

    2  Rx div.  240°  D  40  4  1300  6/‐5 

    3  Tx/Rx  310°  A  40  4  1300  6/‐5 

    3  Rx div.  310°  A  40  4  1300  6/‐5 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    20/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 20(43)

     

    MHA and Feeder NEW 

    SECTOR 

    No 

    ANTENNA 

    purpose 

    LOCATION 

    legs/side 

    LEVEL 

    TYPE 

    No 

    HEIGHT 

    mm 

    Feeder 

    Dim (7/8”) 

    or 1‐5/8”) 

    Feeder 

    Length (m) 

    Note 

    (combine or 

    Not Combine) 

    Tx/Rx 

    1  Rx div. 

    2  Tx/Rx 

    2  Rx div. 

    3  Tx/Rx 

    3  Rx div. 

    REMARKS : 

    2.12 Safety & Security

    Check Point OK NOK NA*

    1. Tower’s aircraft warning light(s) (OBL-light) is installed & functioning properlyLampu menara sebagai tanda peringatan untuk pesawat (lampu OBL) sudah terpasang dan bekerja

    2.  Access-ladder and handrails provided as needed and correct as per standardTangga dan pegangan tersedia sesuai dengan kebutuhan dan standar

    3. The site area is free of construction waste and excess material

     Area site bebas dari material sisa dan sampah hasil pembangunan

    4. Safety equipment is available and correct as per standardPeralatan keselamatan (contoh. pemadam api) memadai dan sesuai dengan standar 

     

    *NA = Not Applicable (dipil ih jika item tid ak digunakan untuk tip e site tertentu)

    NoDeficiency Items Target of Completion Person In Charge

    Ketidaksesuaian Target Penyelesaian  Penanggungjawab

     

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    21/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 21(43)

     

    SITE SURVEY REPORT 

    3.1 SITE PHOTO CHECK 

    Detail Photo Taken Number 

    i.  Site Overview:

     ii.  Equipment Location Overview: 

    iii.  Existing BTS Equipment: 

    iv.  New BTS Equipment Location: 

    v.  Existing AC Distribution System: 

    vi.  New AC Distribution System Location: 

    vii.  Existing Transmission Equipment: 

    viii.  New Transmission Equipment Location: 

    ix.  Existing Transmission DDF: 

    x.  New Transmission DDF Location: 

    xi.  Existing Alarm DDF: 

    xii.  New Alarm DDF Location: 

    xiii.  Existing Equipment Power System: 

    xiv.  New 

    Equipment 

    Power 

    System 

    Location: 

    xv.  Existing Battery System: 

    xvi.  New Battery System Location: 

    xvii.  Existing Air Conditioning System: 

    xviii.  New Air Conditioning System: 

    xix.  Existing Site Cabling And Connections: 

    xx.  Existing Grounding System: (Busbar, Connections etc.) 

    xxi.  New Grounding System: (Busbar, Connections etc.) 

    xxii.  New Site Cabling Location: 

    xxiii.  Existing Feeder Run And Cable Wall Through: 

    xxiv.  New Feeder Run And Cable Wall Through: 

    xxv.  Existing Antenna Location: 

    xxvi.  New Antenna Location: 

    xxvii.  New Location for shelter/shelterless expansion 

    xxviii.  New Location

     for

     shelterless

     

    xxix.  Others: (Specify) 

    NOTE: PHOTO OF ALL DAMAGES ON EXISTING CONSTRUCTIONS OR EQUIPMENT SYSTEM HAVE TO BE TAKEN. IF 

    ANY CHANGES TO BE DONE TO EXISTING CONSTRUCTIONS OR EQUIPMENT SYSTEM, PHOTO OF THAT HAVE TO 

    BE TAKEN BEFORE AND AFTER CHANGES. 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    22/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 22(43)

     

    SITE : GRAHAFAMILY3 

    Site Overview 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    23/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 23(43)

     

    SITE : GRAHAFAMILY3 

    Equipment Location Overview 

    Note : Maksimal  2  picture  per ‐ page 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    24/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 24(43)

     

    SITE : GRAHAFAMILY3 

    Existing BTS Equipment 

    Note : Maksimal  2  picture  per ‐ page 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    25/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 25(43)

     

    N / A

    SITE : GRAHAFAMILY3 

    New BTS Equipment Location 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    26/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 26(43)

     

    ACPDB KWH

    SITE : GRAHAFAMILY3 

    Existing AC Distribution System 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    27/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 27(43)

     

    SITE : GRAHAFAMILY3 

    Existing Transmission Equipment 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    28/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 28(43)

     

    SITE : GRAHAFAMILY3 

    Existing Transmission DDF 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    29/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 29(43)

     

    N / A

    SITE : GRAHAFAMILY3 

    New Transmission DDF Location: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    30/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 30(43)

     

    N/A

    SITE : GRAHAFAMILY3 

    Existing Alarm DDF: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    31/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 31(43)

     

    N / A

    SITE : GRAHAFAMILY3 

    New Alarm DDF Location 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    32/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 32(43)

     

    SITE : GRAHAFAMILY3 

    Existing Equipment Power System: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    33/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 33(43)

     

    SITE : GRAHAFAMILY3 

    Existing Site Cabling And Connections: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    34/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 34(43)

     

    SITE : GRAHAFAMILY3 

    Existing Grounding System: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    35/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 35(43)

     

    SITE : GRAHAFAMILY3 

    Existing Feeder Run And Cable Wall Through: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    36/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 36(43)

     

    SITE : GRAHAFAMILY3 

    Existing Antenna Location: 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    37/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 37(43)

     

    DRAWING 

    Detail: 

      Site Location  Page 1 

      Site Layout  Page 2 

      Propose

     

    Site 

    Layout 

    for 

    shelter/shleterless 

    expansion 

    (option 

    for 

    config 

    8/8/8) 

    Page 

    2A 

      Propose Site Layout for New Shelterless  (option for config 8/8/8)  Page 2B 

      Tower Information, Antenna, and Mounting Proposed  Page 3 

      Equipment Lay Out, Existing  Page 4 

      Equipment Lay Out, Proposed  Page 4 

      Equipment Lay Out, Proposed for flexi edge 2 stack (option for config 8/8/8)  Page 4A 

      Equipment Lay Out, Proposed for flexi edge FCOA/19’ rack (option for config 8/8/8)  Page 4B 

      Cable Route Drawing, Indoor  Page 5 

      Cable Tray Layout, Existing  Page 5 

      Cable Tay Layout, Proposed  Page 5 

    Note: 

    1. For  TSSR

     can

     use

      A4

      paper 

     

    2. For   As Built  Drawing should  use  A3  paper  

     3.  several  drawing can be drawed  at  the one  page. 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    38/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 38(43)

     

    4.  TOWER SURVEY FOR TI SITES 

    5.3 Tower Height : 42 m 

    Tower type: Indosat Light duty tower. 

    Check 

    items: 

    Description  Value from drawings  Value on site 

    Tower leg – bottom section  L130x130x12  130x130x12 

    Diagonal – bottom section  L60x60x6  60x60x6 

    Back to back distance between tower legs at base level  5000 mm  5000 

    Dimension of  Anchor bolts  25 mm  25 

    Number of  Anchor bolts  8  8 

    Lattice of  bottom section as shown on below figure  Yes  Yes 

    Lattice type from drawing  Picture showing lattice of  bottom section of  tower 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    39/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 39(43)

     

    Ver 4

    Tower Ownership

     Antenna Sup po rt (Y/N)

    Type of Diplexer / Triplexer 

    Number of Diplexer / Triplexer 

    MCPA (No/20/40/60 W)

    Number of RRUs

    Requested by (Name)

    Company Dept. / Area Person (Complete Name)

    Signature

    by Date

    by Date

    Date

    Number of Feeder Line per Sector 

    BTS Location (Inside/ Outside Shelter)

     Antenna Ser ial Num ber 

    Updated in NDB by

    Digital Unit / System Module / BBU Typ e

    Number of Digital Unit / System Mo dule / BBU Type

    Data Requested by

    RF Information collected by

    Comments

    Type of Combiner 

    Number of Combiners

     Appro ved by

    Updated in Planning Tool

    Site Name

    Vendor 

    Project Name

    RF SITE FORM

     Aud it Co nsecu tiv e Numb er 

    General Description

    Physical RF Inform ation

    Site ID

    Band or Technology

    Program Name

    Region

    Site Longitude

    City / Town / Village / Area

    Site Latitude

     A

    Survey Date

    Found Configuration

    Site Address

    Type of Antenna (Model)

    B C

    Site Type

    Sector (Add more columns if required)

    Pole/Tower Height

    Number of T RX / Carriers / CEs (Software)

    Type o f RRU

    RRU Loc ation

    (Near Antenna (Height) / Bottom of T ower bu ilding)

     Antenna Elec tr ical Ti lt

    Type of TMA / Pnom / Inline Repeater 

    Type of Filter 

    Type of Feeder (diameter)

    Length of Feeder 

    Feeder Brand

    Number of T RX / Carriers / CEs (Hardware)

    Type of BTS / Node B

    Type of Electrical Tilt (fixed/adjustable/RET)

    Number of Antennas

     Antenna Azim uth

     Antenna Mec han ical Ti lt

     Antenna Heigh t (Abo ve Gr ound )

    Updated in Asset 3G

    GSM 900 MHz

    GSM 1800 MHz

    WCDMA 2100 MHz

    Other

    OptimizationRadio Planning O&M Regional

    CDMA 800 MHz

    Roof Top (Antenas on wall)

    Green Field Tower

    Roof Top (Antenas on poles)

    Green field Monopole

    Roof Top (Antenas on monopo

    Other

    Quality Improvement

    Shelterless

    Project Team

    Updated in NDB

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    40/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 40(43)

     

     Antenna Gain (dB)

    Equipment Capacity

    Hardware Capacity

    Software Capacity

    Frequency Band (GHz)

    Transmitter Frequ ency (MHz)

    Frequency Channel

    Protection Configuration

    Rx Level (dBm)

    Requested by (Name)

    Company Dept. / Area Person (Complete Name)

    Signature

    by

    by Date

    Date

    Tower Height (m)

    Far End

    Site Type

    Site (Add more columns if required) Near End

    Form Filling Date

     Antenna T yp e

     Antenna Diam eter (m)

     Antenna Heigh t (m)

     Antenna Azim uth

     Alti tude (m.a.s .l)

    Found Configuration

    Site Address

    Technology

    Region

    Site Longitud e

    City / Town / Village / Area

    Site Latitude

    NE ID

    MW SITE FORM

     Aud it Co ns ecu tiv e Number 

    General Description

    Physical MW Information

    Site ID

    Data Requested by

    Sub Ban d (MHz)

    Sensitivity Threshold (dBm)

    Feeder Type

    Feeder Length (m)

    Site Name

    Vendor 

    Project Name

    Polarization

    Updated in NDB

    Data performed by

     Appro ved b y

    Updated in Planning Tool

    Comments

    Radio Model

    Modulation Type

    Updated in Connect Planning Tool

    TDM Radio

    IP Hybrid Radio

    IP Radio

    Other

    OptimizationTransmission Planning O&M Regional

    SDH Radio

    Roof Top (Antenas on wall)

    Green Field Tower

    Roof Top (Antenas on poles)

    Green field Monopole

    Roof Top (Antenas on monopo

    Other

    Quality Improvement

    Shelterless

    Project Team

    Updated in NDB

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    41/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 41(43)

     

    Bill of  Quantity Mini CME 

    Type of  Work / Jenis pekerjaan  : Mordernization (Indoor&Outdoor) 

    Project / Proyek

     : Buffer

     Stock2

     ‐(EJBN)

     

    Location / Lokasi  : GRAHAFAMILY3 

    Site ID/Site ID  : 20SBY059 

    CME Descripti on EA QTY

    Green Field (CME)

    Shelter less 1 Rak FLEXI BTS Only lot

    Shelterless 2 Rak Multi BTS lot

    Shelter less 2 Rak FLEXI BTS Only lot

    Shelterless 4 Rak Multi BTS lot

    Shelter less 4 Rak FLEXI BTS Only lot

    Pole FMR lot

    Rooftop (CME)

    Hammer Test & Structur al Design lot

    Base frame beton 20/30 Roff top m

    Pole 3 m set

    Pole 6 m set

    Pole 9 m set

    Pole 12 m set

    POLE FMR Rooftop set

    Existing Modification (CME)CKD Modifikasi Type 1 ( 2 Unit AC ) lot

    CKD Modifikasi Type 2 ( 3 Unit AC ) lot

    OTHER (CME)

    OD Vertic al Cable Tray, W 40cm m

    OD Horizontal Cable Tray, W 40cm m

    Indoor Cable Tray W=40 cm, (Indoor CKD) m

    Grounding cable, Al tape 3x25mm m

     Al B usb ar, 300x100x10mm pcs 1

    MCB 80A phase 1 pcs

    MCB 100A phase 1 pcs

    FEP 8 Holes pcs

    FEP 12 Holes pcs

    Feeder Shiftin g lot

    Rearranging of existing feeder lot

     AC 1.5 PK set

     AC 2PK set

    Removal Air Condition er set

    PARTNER TI:

     

    Name / Nama  : 

    Date / Tanggal  : 

    PT. NOKIA

     SIEMENS

     NETWORKS

     

    Name / Nama  : 

    Date / Tanggal  : 

    PT. INDOSAT

     

    Name / Nama  : 

    Date / Tanggal  : 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    42/43

    20SBY059_GRAHAFAMILY3

     

    Number/Version: tssr.ver.7  Date: 11.04.2012 Check List Page 42(43)

     

    ON‐SITE AGREEMENT CERTIFICATE / Berita  Acara Kesepakatan Lapangan 

    Type of  Work /  Jenis  pekerjaan  :  Mordenization (Indoor&Outdoor) 

    Project / Proyek   :  Buffer Stock2 

    Location / Lokasi   :  GRAHAFAMILY3 

    Site ID/Site

     ID

     : 20SBY059

     

    According by Site Survey at Site Location, we can explain the result : 

    Berdasarkan Hasil  Survey  di  Lokasi, Dapat  Kami  Uraikan Sebagai  Berikut  : 

    1. BTS Installation Plan  / Rencana Pemasangan BT S 

    It  will  install  BTS GSM FMR with config  324. 

    Dismantle existing  feeder, 1 set  

    Dual  Duplexed  Outdoor  Filter,  3  pcs 

    2. Antenna and Feeder Installation Plan  / Rencana Pemasangan  Antenna dan Feeder  Cable 

     it will  install 3 Antenna Argus CVVPX308.10R‐6P at 3 sector with height 40 m 

    3. Main Power Supply System Installation Plan / Rencana Pemasangan Catu Daya 

     use existing Rectifier 

    4. Transmission System Installation Plan / Rencana Pemasangan Sistem Transmisi  

     using existing transmission 

    5. CME Work Package Plan / Rencana Package CME yang diperlukan 

    Civil Work Package/Paket  Pekerjaan Civil  

    Mechanical & Electrical Work/Paket  Pekerjaan Mekanikal  & Elektrikal  

    6. Comments that help with the site plan /Keterangan lain  yang membantu  pembangunan site 

     AlBusbar, 300x100x10mm,  1 pcs 

    Acknowledgement 

    Site READY for TI implementation 

    Site SUDAH siap untuk TI Implementation 

    Site NOT ready for TI implementation 

    Site BELUM siap untuk TI Implementation 

    PARTNER TI: 

    Name / Nama  : 

    Date / Tanggal  : 

    PT. NOKIA SIEMENS NETWORKS 

    Name / Nama  : 

    Date / Tanggal  : 

    PT. INDOSAT 

    Name / Nama  : 

    Date / Tanggal  : 

  • 8/17/2019 Tssr 2g Grahafamily3 Pkm

    43/43

    20SBY059_GRAHAFAMILY3

     

    Change Note History: 

    Version  Change Note 

    5  First Release 

    5.1 

    • Change format on tower structure information, add detail on tower slope calculation. 

    • Add template for picture 

    • Change Header on top right, form Survey Checklist to SiteID_SiteName 

    • Add item for drawing (mounting & cable tray layout) 

    5.2 

    • Add AC Power measurement each phase, ACPDB information 

    • Add information on battery and rectifier 

    • Delete battery room information 

    • Add Site information about site access key, list of  surveyor, 

    • Add building information on access to roof  

    • Add on equipment room information 

    • Edit on FEP type, 

    • Add item on grounding system information 

    • Edit and Add information on Cable ladder information 

    • Add Column

     direction

     antenna

     on

     antenna

     tower

     leg

     layout,

     existing

     and

     their

     types,

     heights

     and

     directions 

    • Add item on “On Site Agreement” 

    5.3 • Delete drawing page 

    • Add 5 page additional survey for Tower Structure Information 

    5.4 

    • Add photo New Location for shelter/shleterless expansion 

    • Add photo New Location for shleterless. 

    • Add Drawing Equipment Lay Out proposed 

    • Add Drawing Equipment Lay Out, Proposed for flexi edge 2 stack (option for config 8/8/8) 

    • Add Drawing Equipment Lay Out, Proposed for flexi edge FCOA/19’ rack (option for config 8/8/8) 

    • Revise ON SITE AGREEMENT 

    5.5 

    • Revise Equipment Room 

    • Delete Cable

     Tray

     at

     point

     1.6

     

    •  Change MCB Capacity at Rectifier 

    • Add Rectifier Capacity for new BTS 

    • Add Battaery capacity for new BTS 

    • Revision and Add Grounding Equipment type 

    • Modification Transmission DDF 

    • Revise ON SITE AGREEMENT 

    6.1 

    • Add visual checklist civil work 

    • Add ME Work Check 

    • Add Safety % Security check list 

    7.5 

    • Add Indosat site audit form 

    • Add site contract information 

    • Add AC Power stability • Modification Room temperature for Air Conditioner 

    • Add option for BTS FMR type & BS24x type (in site type & equipment room) 

    • Add link x‐connection 

    • Add Acknowledgement for TI implementation progress in OSAG 

    • Add RF and MW Site form 

    • Add BoQmini CME