tteenn--t developmentt development...microsoft powerpoint - bulgaria presentation_traceca_17-04-2013...
TRANSCRIPT
22.4.2013 г.
1
REPUBLIC OF BULGARIA REPUBLIC OF BULGARIA ––
PRIORITY LINKS AND PROJECTSPRIORITY LINKS AND PROJECTS
17 April17 April 20201133
MINISTRY OF TRANSPORT,
INFORMATION TECHNOLOGY AND COMMUNICATIONS
REPUBLIC OF BULGARIA
Dimitar SavovNational TRACECA Secretary
and Director of the National Transport Policy Directorate
MTITC – REPUBLIC OF BULGARIA
TRACECA TRACECA –– Important Transport Important Transport Corridor for BulgariaCorridor for Bulgaria
MTITC – REPUBLIC OF BULGARIA
Strategic FrameworkStrategic Framework
� Strategy for the Development of the Transport System of the Republic of Bulgaria until 2020
� Operational Programme on Transport 2007-2013
� General Transport Master Plan for Bulgaria
� Improvement the Transport Connectivity and the Market Access: Priority 8 from the National Programme for Development of the Republic of Bulgaria: Bulgaria 2020
� Strategy for Development of the Transport Infrastructure of the Republic of Bulgaria through the Concession Schemes
MTITC – REPUBLIC OF BULGARIA
TENTEN--T DevelopmentT Development
� TEN-T – an important element of the Bulgarian transport policy
� TEN-T Green Paper
� Revision of the TEN-T Guidelines
� Priority development of common interest projects with European added value
� TEN-T planning in 2 layers:� Core network – includes the most important
international links in EU
� Comprehensive network – feeds into and distributes traffic from the core network
22.4.2013 г.
2
MTITC – REPUBLIC OF BULGARIA
TENTEN--T ObjectivesT Objectives
� Ensuring the sustainable mobility of persons and goods within an area without internal frontiers in respect to the social and safety conditions, environmental protection and competition
� Strengthening the economic and social cohesion
� Optimal usage of the existing capacity and interoperability between different transport modes
� Ensuring high-quality infrastructure on acceptable economic terms
� Improvement and facilitation of the access
� Effective connection between TEN-T and the neighbouring countries and regions
MTITC – REPUBLIC OF BULGARIA
COMPREHENSIVE NETWORK
MTITC – REPUBLIC OF BULGARIA
Road InfrastructureRoad Infrastructure
5 new proposals:
� Construction of new sections along Hemus Motorway
� Rila Expressway
� Ruse – Shumen Expressway I-2
� Varna – Durankulak Expressway
� Plovdiv – Rudozem road
MTITC – REPUBLIC OF BULGARIA
Railway InfrastructureRailway Infrastructure
� All main Bulgarian railway sections are included in the comprehensive network
� Intermodal terminals –Sofia, Plovdiv, Varna, Burgas, Ruse, Vidin, Lom, Dragoman, Svilengrad and Gorna Oryahovitsa
22.4.2013 г.
3
MTITC – REPUBLIC OF BULGARIA
PortsPorts
In the comprehensive network are included:
� The sea ports of Varna and Burgas
� The inland waterway ports of Vidin, Lom, Oryahovo, Svishtov, Ruse, as well as the additionally included port of Silistra
MTITC – REPUBLIC OF BULGARIA
AirportsAirports
In the comprehensive network are included 5
major Bulgarian airports of Sofia, Burgas, Varna,
Plovdiv and Gorna Oryahovitsa
MTITC – REPUBLIC OF BULGARIA
CORE NETWORK
MTITC – REPUBLIC OF BULGARIA
Road NetworkRoad Network
Sofia – Veliko Tarnovo – Ruse – Bucharest section
Comprehensive network
Core network
New proposals
Airports
22.4.2013 г.
4
MTITC – REPUBLIC OF BULGARIA
Railway NetworkRailway Network
Sofia – Gorna Oryahovitsa – Ruse – Bucharest section
Comprehensive network
Core network
New proposals
Intermodal terminal Core network Port
Comprehensive network Port
MTITC – REPUBLIC OF BULGARIA
Core Network CorridorsCore Network Corridors & CEF& CEF
� Core network corridors for the realisation of the core network� Coordinated planning of the investments� Interoperability
� Synchronised activities between different countries situated along the same corridor
� More efficient usage of the infrastructure� Attraction of investment and optimisation of the terms
� Connecting Europe Facility (CEF)� Designed for the core network
� In correspondence with the new TEN-T policy for sustainable development and environmental protection
� Indicative projects list foreseen for implementation until 2020
MTITC – REPUBLIC OF BULGARIA
Operational Operational ProgrammeProgramme on Transport on Transport Priority AxesPriority Axes
№ Priority Axes IndicativeBudget (€)
1Development of railway infrastructure along the major national and Pan-European transport axes
640 000 000
2Development of road infrastructure along the major national and Pan-European transport axes
929 587 365
3 Improvement of intermodality for passengers and freights
321 093 801
4 Improvement of the maritime and inland-waterway navigation
46 850 000
MTITC – REPUBLIC OF BULGARIA
Railway Infrastructure Development Railway Infrastructure Development 2007 2007 –– 2013 (1)2013 (1)
� Projects in a final implementation stage� Reconstruction and Electrification of the
Svilengrad – Turkish/Greek Borders Railway Line
� Construction of New Combined Bridge over the Danube River at Vidin (Bulgaria) – Calafat (Romania) and adjoining infrastructure
� Projects under implementation� Reconstruction and Electrification of the Plovdiv
– Svilengrad Railway Line (Parvomai –Svilengrad section)
� Modernisation of the Sofia – Plovdiv Railway Line (Septemvri – Plovdiv section)
� Rehabilitation of the Railway Infrastructure along Plovdiv – Burgas Railway Line
22.4.2013 г.
5
MTITC – REPUBLIC OF BULGARIA
� Other projects for the period� Design of the Vidin – Sofia Railway Line (Vidin – Ruska Byala
section), Sofia – Dragoman Railway Line and key Railway Junctions (Sofia, Plovdiv and Burgas)
� Rehabilitation of the Sofia Central Railway Station� Construction of an Intermodal Terminal in Plovdiv� Preparation for the Construction of an Intermodal Terminal in
Ruse� Extension of the NRIC Geographic Information System
Railway Infrastructure Development Railway Infrastructure Development 2007 2007 –– 2013 (2)2013 (2)
MTITC – REPUBLIC OF BULGARIA
� Projects under implementation� Construction of the last part of the Trakia Motorway,
Lot 4: Yambol – Karnobat (Zimnitsa – Karnobat section)
� Construction of the Maritsa Motorway, Lot 1: Orizovo –Dimitrovgrad and Lot 2: Dimitrovgrad – Harmanli
� Construction of the Struma Motorway, Lot 1: Dolna Dykania – Dupnitsa, Lot 2: Dupnitsa – Blagoevgrad and Lot 4: Sandanski – Kulata
� Connection of the Hemus Motorway with the Sofia Ring Road
� Western Arc of the Sofia Ring Road� Kardzhali – Podkova Road
� Other projects for the period� Kalotina – Sofia Motorway, Lot 1� Modernisation of road section (E 79) Vratsa (Mezdra) –
Botevgrad
Road Infrastructure Development Road Infrastructure Development 2007 2007 –– 20132013
MTITC – REPUBLIC OF BULGARIA
Improvement of the Navigation Improvement of the Navigation ConditionsConditions
� Projects under implementation� Establishment of River Information Services
System in the Bulgarian part of the Danube River – BULRIS
� Vessel Traffic Management Information System – VTMIS, Phase 3
� Improvement of the Systems for Navigation and Topo-Hydrographic Measurements on the Danube River
� Design and Implementation of a Geographic Information System for the Port Infrastructure Management
� Other projects for the period� Preparation of the Improvement of the Danube
Navigation in the Bulgarian – Romanian common section Project
MTITC – REPUBLIC OF BULGARIA
Extension of the Sofia MetropolitanExtension of the Sofia Metropolitan
� One of the most successful projects under OP Transport 2007 – 2013
� Completed stages� Stage I – II metro-diameter: Road node
Nadezda – Cherni vrah Blvd. Section
� Stage ІІ – Lot 1: Obelya – Nadezhda and Lot 2: Mladost 1 – Tsarigradsko shose
� Stages under implementation� Lot 1: Tsarigradsko shose – Sofia Airport
� Lot 2: Mladost 1 – Business Park in Mladost 4
22.4.2013 г.
6
MTITC – REPUBLIC OF BULGARIA
Transport Infrastructure Transport Infrastructure Development till 2020 (1)Development till 2020 (1)
� Construction of the entire “east-west” railway and road direction through South Bulgaria (Serbian border – Sofia – Plovdiv – Burgas/Svilengrad – Turkish/Greek borders)� Modernisation of the Vidin – Ruska Byala, Sofia – Pernik
– Radomir and Ruse – Varna Railway lines� Construction of the Sofia, Plovdiv and Burgas Railway
Junctions and Sofia, Plovdiv and Ruse Intermodal Terminals� Construction of the Third Metro Line in Sofia� Construction of Struma Motorway, Hemus Motorway
and Cherno more Motorway � Improvement of the Navigation on the Danube River
MTITC – REPUBLIC OF BULGARIA
Rail Projects
Road Projects
IWW Projects
Intermodal Terminals
Transport Infrastructure Transport Infrastructure Development till 2020 (2)Development till 2020 (2)
MTITC – REPUBLIC OF BULGARIA
Current Concessions Current Concessions
� Port terminal Lesport
� Port terminal Balchik
� Port terminal Rosenets
� Port terminal Burgas-East 2
� Port terminal Svishtov
� Port terminal Somovit
� Port terminal Oryahovo
� Port terminal Vidin-North and Ferry Complex Vidin
� Port terminal Vidin-South
� Port terminal Lom
� Port terminal Burgas-West
� Burgas and Varna Airports
� Plovdiv Central Railway Station
MTITC – REPUBLIC OF BULGARIA
� Concession procedures in preparation stage:� Sofia Airport and Balchik
Airport
� Plovdiv Airport
� Port terminal Ruse-East� Port terminal Vidin-Centre
� Varna Central Railway Station
� Potential concessions:� Varna Port� Sofia Central Railway Station
and Poduyane Railway Station
Future ConcessionsFuture Concessions
22.4.2013 г.
7
MTITC – REPUBLIC OF BULGARIA
THANK YOU FOR YOUR ATTENTION!THANK YOU FOR YOUR ATTENTION!
Dimitar SavovNational TRACECA Secretary and
Director of the National Transport Policy Directoratetel. +359 2 9409 425, fax +359 2 9409 827
e-mail: [email protected]
Kiev, Ukraine
17 April 2013