![Page 1: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/1.jpg)
Nicholas Vlachopoulos, PhD, CD, PEng, PEAssociate ProfessorCivil Engineering Department Royal Military College of Canada04 October 2015
Tunnelling Instrumentation – Support Design, Optimization and Testing
Challenges and Innovations in Tunnelling
Tunnelling Association of Canada Association Canadienne Des Tunnels
OCT 4 – 6, 2015 • Queens University • Kingston, ON Canada
![Page 2: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/2.jpg)
1. Introduction 2. Instrumentation & Observational Method3. Design of Temporary Tunnel Support4. Factors Affecting Support Behaviour / Mechanisms
5. Instrumentation & Physical Testing Schemea. Outline of testingb. Use of fibre optics
6. Selected Results7. Conclusions / Questions / Discussion
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
Outline
![Page 3: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/3.jpg)
Observational Method
• Equations do not yield exact behaviour of site conditions
• Results in over‐conservative design
• The observational method employs instrumentation to predict actual site conditions
• Leads to modification of original design to suit actual ground conditions
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 4: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/4.jpg)
Observational Method
• Common concerns in field monitoring operations:• Too many programs are based on the number of instruments to be used rather than on the questions to be answered
• Sophistication and Automation are substituted for patient proof testing of equipment under field conditions
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 5: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/5.jpg)
Steps to Planning an Instrumentation Plan
• Engineers tend to proceed by first selecting instruments and taking data and then wondering what to do with the data. This is a bad idea. Instead a series of steps should be completed.
• “We need to carry out a vast amount of observational work, but what we do should be done for a purpose and be done well”.
Peck (1972)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 6: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/6.jpg)
Steps to Planning an Instrumentation Plan
• There are 20 Steps to completing a proper instrumentation plan.
• Each step is important…“a monitoring program is a chain with many potential weak links and breaks down with greater facility and frequency than most other tasks in geotechnical engineering”.
Franklin (1977)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 7: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/7.jpg)
Instrumentation and Monitoring
Objective:
• Obtain information on ground response to tunneling • Provide construction control• Verify design parameters and models • Measure performance of the lining during and after construction
• Monitor impact on the surrounding environments• Optimization of the design and execution of safe tunneling works
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 8: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/8.jpg)
Generally instruments employed in tunnel monitoring are as follows:
Instrumentation and Monitoring
AITES/ITA WG2-RESEARCH Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 9: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/9.jpg)
Support Installation Machine
Tunnel Face
Temporary Support Systems
ForepoleRockbolts
Steel set Shotcrete(Modified after Solotrat, 2011)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 10: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/10.jpg)
ForepoleRockbolt
Excavation Direction
Section view
ForepoleRockbolt
a
a
Face view
1. Introduction – Temporary Support
Temporary Tunnel Support Scheme
View: a-a
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 11: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/11.jpg)
ForepolesForepoling machine
Forepole Umbrella
Shotcrete
Fibreglass face reinforcement
![Page 12: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/12.jpg)
Two major aspects need to be addressed:
• Realistic estimate of the expected ground conditions and their potential behaviours as a result of the excavation; and,
• Design and economic and safe excavation and support method for the determined ground behaviours.
Austrian Society for Geomechanics (2010)
Engineering Design
Tunnelling Association of Canada (TAC) – Ontario Chapter
![Page 13: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/13.jpg)
Design of Umbrella Arches (UA)
The design of UAs is complex due to:
• 3D geometry of tunnel face;• high number of parameters involved;• Influence of tunnel face – stability;• 3D analysis to take into account face position;• Overlapping of the successive arches;• Connection between support elements and steel sets; and,• Stiffness and quality of steel sets.
2. Temporary Tunnel SupportChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 14: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/14.jpg)
3. Mechanisms – Forepole Element
Mechanisms
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
(Jeff Oke, Grad Student 2013)
![Page 15: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/15.jpg)
Design Procedure1. Choice of an initial forepole spacing 2. Choice of an initial diameter and thickness of forepole3. Choice of an initial steel set spacing4. Choice of forepole (steel pipe)
5. Evaluation of Design Length
6. Choice of Structural Schema
7. Computation of Bending Moments8. Computation of Stresses in forepole9. Compare acting stress and steel yield stress
10. Definition of the forepole length (machines available)11. Definition of excavation length12. Design of the supports and steel arch foundations
Analytical Design Approaches
Not adequate
Change theGeometricalParameters
Peila, 2013
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 16: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/16.jpg)
Geo‐Mechanical Understanding
“ The rapid increase in use [of umbrella arch systems] has not been followed by an increased understanding of the interactions between the support system and the surrounding rock mass”
“ Currently during tunnel design, as well as on site, parameters for the [umbrella arch] system… are fixed by experience or an empirical approach”
Volkmann (2003) 4. Physical Testing Scheme
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 17: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/17.jpg)
Embedded rebar specimen Forepole Specimen
Specimens Subjected to:
Bending
Axial loading
Shearing
Laboratory Testing
4. Physical Testing SchemeChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 18: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/18.jpg)
1.25mm spatial resolution (continuous strain profile)
Operational accuracy is within ±10µƐ
Is based on low‐cost, standard telecom fiber
One transducer for thousands of measurement points
Distributed Optical Sensing (DOS)
DOS instrumented bolt installed in the roof of a coal mine
4. Physical Testing SchemeChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 19: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/19.jpg)
Continual Strain MonitoringTesting – Rock Bolt
• Developed a prototype
Diametrically opposed grooves along the length of a Rebar Bolt
Run fiber- optic instrumentation along the grooves in Rebar
4. Physical Testing SchemeChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 20: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/20.jpg)
Tests conducted on ASTM A53 steel pipe:‐ 114mm OD, 6.02mm wall‐ 21.3mm OD, 2.77mm wall
Optical instrumentation embedded into 2mm machined groove, as well as surface mounted
Multiple epoxy resins and adhesives experimented with to bond instrumentation
4. Physical Testing SchemeChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 21: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/21.jpg)
Three Point Bending Cantilever Bending Axial Loading
4. Physical Testing SchemesChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
(Brad Forbes, Grad Student 2014)
![Page 22: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/22.jpg)
114mm OD steel pipe
Optical fiber
Support spans from 0.5m to 3.0m
4. Symmetrical Bending: 114mm OD
4 inch schedule 40 ASTM A53 Grade B steel pipe
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 23: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/23.jpg)
114mm OD steel pipe
Optical fiber
Strain gauge
Support spans from 0.5m to 3.0m
4. Symmetrical Bending: 114mm ODChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 24: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/24.jpg)
Pullout‐Test
![Page 25: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/25.jpg)
5. Symmetrical Bending: 114mm OD ‐ Results
top section of the pipe in compression bottom section of the pipe in tension
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
Bending‐Test
![Page 26: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/26.jpg)
5. Symmetrical Bending: 114mm OD ‐ Results
• Absolute average of the top and bottom section of the pipe under bending
• Yields an approximately linear response
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 27: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/27.jpg)
5. Axial Pull‐out Load ‐ Results
• The strain profile shows inconsistencies at the end of the grouted section.
• These correspond to 1 inch long foam spacers used to center the steel pipe while grouting
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 28: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/28.jpg)
5. Axial Pull‐out Load ‐ Results
Shows the potential for the optical technique to be used to detect minor features
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 29: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/29.jpg)
Double Shear Configuration
Experimental Plot – Top section of rebar
Spatial Resolution
40cm
25cm
10cm
1.25mm
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 30: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/30.jpg)
Double Shear Configuration
Experimental Plot – Top section of rebar
Spatial Resolution
40cm
25cm
10cm
1.25mm
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 31: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/31.jpg)
Double Shear Configuration
Experimental Plot – Top section of rebar
Spatial Resolution
40cm
25cm
10cm
1.25mm
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 32: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/32.jpg)
Double Shear Configuration
Experimental Plot – Top section of rebar
Spatial Resolution
40cm
25cm
10cm
1.25mm
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 33: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/33.jpg)
Double Shear Configuration
Experimental Plot – Top section of rebar
40cm 1.25mm
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 34: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/34.jpg)
Is Continuous Monitoring Necessary?
(1) (3)(2) (4)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 35: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/35.jpg)
Is Continuous Monitoring Necessary?
(1) (3)(2) (4)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 36: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/36.jpg)
Is Continuous Monitoring Necessary?
(1) (3)(2) (4)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 37: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/37.jpg)
Is Continuous Monitoring Necessary?
(1) (3)(2) (4)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 38: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/38.jpg)
Is Continuous Monitoring Necessary?
(1) (3)(2) (4)
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 39: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/39.jpg)
Is Continuous Monitoring Necessary?
40cm
![Page 40: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/40.jpg)
Is Continuous Monitoring Necessary?
25cm
![Page 41: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/41.jpg)
Is Continuous Monitoring Necessary?
25cm
![Page 42: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/42.jpg)
Is Continuous Monitoring Necessary?
10cm
![Page 43: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/43.jpg)
Is Continuous Monitoring Necessary?
10cm
![Page 44: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/44.jpg)
Is Continuous Monitoring Necessary?
1.25mm
![Page 45: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/45.jpg)
Is Continuous Monitoring Necessary?
1.25mm
![Page 46: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/46.jpg)
Is Continuous Monitoring Necessary?
1.25mm
Double shear test
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 47: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/47.jpg)
Field Trials
3‐groove DOS instrumented bolt installed in shale roof of a coal mineDepth of ore body approx. 725ft
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 48: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/48.jpg)
Conclusions
DOS provides a novel opportunity in support monitoring:
‐ Provides a very sensitive spatial resolution (1.25mm)
‐ Has a high operational accuracy
‐ Optical fiber is extremely cheap (implement an array of DOS elements)
Validated for further development with temporary support system(s):
‐ improve understanding of individual components of the umbrella arch system and the system as a whole with a view to improving design
‐ potential tool for predicting ground conditions ahead of the tunnel face
6. ConclusionsChallenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 49: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/49.jpg)
Nicholas Vlachopoulos, PhD, CD, PEng, PEAssociate ProfessorCivil Engineering Department Royal Military College of Canada04 October 2015
Tunnelling Instrumentation – Support Design, Optimization and Testing
Challenges and Innovations in Tunnelling
Tunnelling Association of Canada Association Canadienne Des Tunnels
OCT 4 – 6, 2015 • Queens University • Kingston, ON Canada
![Page 50: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/50.jpg)
Research Support
National DéfenseDefence Nationale
DRDC
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 51: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/51.jpg)
Field Trials
3‐groove DOS instrumented bolt installed in shale roof of a coal mine
OF loopOF loop
Depth of ore body approx. 725ft
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 52: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/52.jpg)
Field Trials
DOS instrumented bolt installed in the roof of a coal mineDepth of ore body approx. 725ft
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 53: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/53.jpg)
Field Trials
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 54: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/54.jpg)
Orientation of bending
• Developed a DOS rebar element with three lengths of optical fiber (i.e. three machined out grooves)
• Fiber lengths are orientated at approx. 120 deg. from each other
• Determine the direction of maximum bending, in turn allowing the magnitude of bending to be calculated, and ultimately the axial component separate from bending
• Signal loss overcome at loops by using a specialized low‐bend loss optical fiber
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 55: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/55.jpg)
Orientation of bending
#2
#1
• Two grooves aligned with bending direction
Why we need 3 grooves!
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 56: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/56.jpg)
Orientation of bending
#2#1
• Two grooves aligned 90 deg. from bending direction (i.e. neutral axis)
Why we need 3 grooves!
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 57: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/57.jpg)
Orientation of bending
cos
: Orientation (degrees) of maximum bending from length 1
: Orientation (degrees) of specified length from length 1
cos
cos cos θ cos sin sincos cos θ cos sin sin
sin tan tan 1 cos E Ecos
θ1 cos E Ecos
sin
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 58: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/58.jpg)
Orientation of bending
#1
#2
#3
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter
![Page 59: Tunnelling Instrumentation – Support Design, Optimization ... - Tunnelling Instrumenta… · Instrumentation Plan • There are 20 Steps to completing a proper instrumentation plan](https://reader034.vdocument.in/reader034/viewer/2022052500/5f81deba798ab91a874bf851/html5/thumbnails/59.jpg)
Orientation of bending
#1
#2
#3
Challenges and Innovations in TunnellingTunnelling Association of Canada (TAC) – Ontario Chapter