turtles
DESCRIPTION
TurtlesTRANSCRIPT
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
Support Division Production Facilities by: •Providing product definitions which may be Manufactured, are Profitable and Service Compatible
1)Process –Product Design, Testing & Development; Service Engineering
4) With What ?(Materials, equipment, etc)
�CAD and CAE Software�Other Predictive and Analytical Software�Acoustic and Structural Testing Equipment (Bench and Vehicle)�Prototype Fabrication Equipment�Metallurgical Analysis Lab�Engine Dynamometer Lab
5) With Who ?(Comp, Skills, Training, etc)
�CAD Designers�FEA/CAE Specialists�Product Engineers�Materials Specialists�Integration Engineers�Testing Technicians
2) Outputs
•Product Definition•Prints and GDT
3) Inputs
•Customer Requirements•Vehicle Performance Targets
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Service Compatible•Providing the necessary testing and engineering to support normal production.
Support the customer by providing a product Definition that:•Meets the vehicle performance targets•Installs easily in vehicle assembly•Meets the cost targets of the program team•Meets program timing requirements
6) How(Methods, procedures, techniques, etc)
�Product Development Process�Standard Test Procedures�Design Guides & Standards�Product Failure Mode Knowledge Base (lessons learned)
•Prints and GDT•CAD Models•Materials Specifications
•Development Prototypes•DV Testing Results•PV testing results
7) How Effective ?
(Measurable objectives)
•Vehicle Performance Targets•Materials Requirements•Packaging Space Available•Durability Targets•NVH Requirements
•Manufacturing Constraints•Program Cost Constraints
•QOS Measurables•Annual Engineering Budget•Customer Satisfaction with Product/Vehicle Requirements met•Program Timing Met
Process Owner: ESPG-NAO
VP Engineering
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –
Supplier Partnership
4) With What ?(Materials, equipment, etc)
�JDE• APQP monitoring•DMR process•Scorecard process•PPV tracking by supplier
5) With Who ?(Comp, Skills, Training, etc)
�Finance�SQA/ �ASQ�Divison Buyers�Plant Buyers
2) Outputs3) Inputs
•Program tracking sheets•DMR alerts
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Establish, manage and maintain a best panel of suppliers for series production and program launch.
Partnership
6) How(Methods, procedures, techniques, etc)
�Monthly reviews for cost and quality�Faurecia Core procedures�Weekly reviews on LCC
Monthly reporting to Product Group and Division staff in LIG.
7) How Effective ?
(Measurable objectives)
•DMR alerts•Spend by supplier for cost and panel status
-PPM-PPV-LCC-Number of suppliers Process Owner:
ESPG-NAO VP-Purchasing and
Supply Chain Management
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
• Process Architecture• PMT and Footprint strategy development• Capacity/Capital
1) Process - Process Design & Manufacturing Development
4) With What?(Materials, equipment, etc)
• 7 Quality Basics• Procurement System• Managing The Change• PSE for ME Principles
5) With Who?(Comp, Skills, Training, etc)
• Advanced Manufacturing engineers• Internal and external training• Lessons learned• Expert Networks
2) Outputs
Manufacturing processes meet all customer & organizational requirements with respect to: • Plant Readiness• Validated Process• Capable Processes
3) Inputs
-Product Design• DFMEA• Supplier PPAP’s• Process Flow• Capital Requirements
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
• Capacity/Capital Management
6) How(Methods, procedures, techniques, etc)
• Management review• Customer specific documents• Faurecia engineering documents
• Capable Processes• Efficient Processes• Customer PPAP approval• PFMEA
7) How Effective?(Measurable objectives)
• 3 PR• Run @ Rate• PPAP• TRS• R3
Process Owner:Manufacturing Engineering Director
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –
Program
Management
4) With What ?(Materials, equipment, etc)
�Work Packages�Program Dashboards�Business Plans�Checklists (GR, FM, other…)�OPX2 System & Master timeline
5) With Who ?(Comp, Skills, Training, etc)
2) Outputs3) Inputs
Program Core Team & WPO extended teams
Function Departments (Mfg, Purc, Eng, Quality)
PSC (Division Management)
PRC (PG Management)
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Manage Programs from acquisition phase through series production to deliver Quality, Cost, Delivery and Performance (remove and Customer) targets.
Management
6) How(Methods, procedures, techniques, etc)
�FCP FAU-P-DSC-2240 and related procedures mentioned therein, Gate Review Procedure�All FCPs in Development leg of FES triangle and more�ESPG PMS Manual�Lola, Best Practices, BIKE, LEGO, Program Portal
2) Outputs
Monthly Programs status G/Y/R, Gate results G/Y/R.Program Delivered Quality, Cost, Delivery, and Performance targets on time, within budget, at target.
7) How Effective ?
(Measurable objectives)
Program AwardProgram Kick-off MtgWork Package Owners status reportsInitial Business PlansProgram DashboardsFM milestones, QVRs
-FES indicators-PMS Key Indicators for Time To Pass Gates, First Pass Yield, First Time Through, Confidence Index, Programs Status. All measured monthly.-Sop Status report-Customer systems-PLRs
Process Owner: ESPG-NAO
Director of Program Management (with support from PMS Network and PG Functional Managers)
Created by J.Oliver Director-NAO Division PMS
Approved by M. Dewitt ESPG PMS Manager
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –CONTROL
PROGRAM
PROFITABILITY
4) With What ?(Materials, equipment, etc)
�JDE�Cost models�Faurecia’s Business plans
5) With Who ?(Comp, Skills, Training, etc)
�Manufacturing functions�Plant controllers�R&D functions
2) Outputs
• P&L per program
3) Inputs
-Costing information-Actual costs
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Support Division and CBU in achieving program targeted profitabilitySupport initiatives to improve program profitability
6) How(Methods, procedures, techniques, etc)
�Plant visits and audits�Comparison Cost model versus Actual costs�Managing R&O lists
• P&L per program •Updated Business plan per program
7) How Effective ?
(Measurable objectives)
-Objectives of VCM/ OI & IRR-Achieving targeted results
Process Owner:•VP Finance•Program Controller
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –Employee Empowerment
4) With What ?(Materials, equipment, etc)
� FES System� FCP Manual� 7 Core Values
5) With Who ?(Comp, Skills, Training, etc)
Divisional StaffDivisional HR Support & StaffDivision EE Mgr.Plant HR Mgrs.
2) Outputs
Product & plant processes meet all customer & organizational requirements with respect to:
3) Inputs
• Faurecia Strategy• Faurecia PMT
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Application of Business Management System to ensure:Verification of Employee Empowerment (EE) system implementation and effectiveness
6) How(Methods, procedures, techniques, etc)
� Internal and external audits� Management review� OHP validation� Administrative processes� Management development� Compensation and Benefits� Training and succession plans� OAR/APDR processes� Effective communication
requirements with respect to: • Trained competent workforce• Career opportunities• Employee motivation & productivity• Mature industrial relations
7) How Effective ?(Measurable objectives)
• Faurecia PMT• HR Strategy• Employee Expectations• Local Regulations
- Absenteeism Rate- Employee Turnover- Improvement Ideas- Internal Mobility- R3 Efficiency
Process Owner: VP – Human Resources
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
Support ESPG-NAO Division and Plant IT functions and tools through system
1)Process –IT
4) With What ?(Materials, equipment, etc)
�PCs�Email�Phone Calls�Faurecia Intranet�Local IT
5) With Who ?(Comp, Skills, Training, etc)
�Users�Power Users�Managers�Local IT
2) Outputs
•Help Desk FAQs
3) Inputs
•Help Desk System•Project Requests
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
IT functions and tools through system maintenance, uptime, and continuous improvement activities. These “functions and tools” consist of:•Applications (J D Edwards, ‘Future3’, Covisint, etc.)•Network/Infrastructure/Security•Engineering Systems•User Support
6) How(Methods, procedures, techniques, etc)
�Plant visits�Management Meetings�Training Sessions
•Help Desk FAQs•Help Desk Statistics•Documentation on Intranet
7) How Effective ?
(Measurable objectives)
•Project Requests•System monitoring•Interaction with sites
-Meeting Objectives-Achieving Budgeted Targets-Part of OAR
Process Owner: IT Director
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –PC&L
4) With What ?(Materials, equipment, etc)
�JDE�Microsoft Office�E-mail�Faurecia Intranet
5) With Who ?(Comp, Skills, Training, etc)
�Finance�VP Operations�Manager PCL ESPG�PCL Managers
2) Outputs
•Monthly LIG Metrics
3) Inputs
•Regular Plant visits•Weekly PCL Scorecard
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Support Division and Plants in defining and achieving PCL Objectives:•Inventory $ and %•MPM•Customer Delivery Scores•FES Initiatives per FCP’s
6) How(Methods, procedures, techniques, etc)
�Plant visits�Weekly Conference Calls�Plant Audits�JDE�Action Plans
•Monthly LIG Metrics•PCL Intranet site•Weekly PCL Conference calls•Quarterly PCL Mgr meeting
7) How Effective ?
(Measurable objectives)
•Weekly PCL Scorecard•FES Indicators
-Meeting Objectives-Achieving Budgeted Targets-Part of OAR
Process Owner: ESPG-NAO Director,
PC&L
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –MANUFACTURING-
Production and
Service
4) With What ?(Materials, equipment, etc)
5) With Who ?(Comp, Skills, Training, etc)
•Plant Managers & plant teams•Internal and external training•Lessons learned•FES Network- Division•FES Network- Prodcut Group
2) Outputs
Product & plant processes meet all
3) Inputs
•Customer Demand•Employee Training
•7 Quality Basics•Breakthrough Quality Plan•Procurement System•Managing The Change•FES Tools•FCPs
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
6) How(Methods, procedures, techniques, etc)
•FES audits•Management review•LIG Reviews•PMS Gate Reviews
Product & plant processes meet all customer & organizational requirements with respect to: • Optimized Manufacturing
Quantities• Polyvalence, polycompetence
employees• PM’s attained on time• Quality Product• FES Audit Scores
7) How Effective ?
(Measurable objectives)
•Employee Training•Capable Product & Processes•TPM Deployment•Correct Inventory Level•Manufacturing Schedule•PMS Process•CAPex Core Teams
•FR0t, FR1t•Scrap and rework•Delivery Performance•Schedule Attainment•TRS•Productivity•PPOH, PPM, Customer Complaints•FES Indicators
Process Owner: ESPG-NAO
VP-Operations
Application of Business Management System to ensure:•Verification of plant effectiveness•Verification of product conformity to customer requirements (PPAP)•Verification of FES activities effectiveness
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –Prototype Design, Testing & Manufacturing
4) With What ?(Materials, equipment, etc)
� Stainless Steel Tubing/ Flat Stock � Purchased Components� Fabrication/ Inspection Equipment� CNC Machining Centers
5) With Who ?(Comp, Skills, Training, etc)
� Prototype Prod. Engineers� Prototype Group Leaders� Prototype Technicians� Prototype Inspection Techs
2) Outputs3) Inputs
• Blue Prints, Proto Control Plans, EBOM, Check Lists
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Fabricate Prototype Samples to support OEM Customers, Internal Testing and Manufacturing Plant requirements for Development, Testing, Fit & Function. Fabricate Tooling, Dies and Fixtures to support Internal Build, Testing and Manufacturing Plants requirements.
6) How(Methods, procedures, techniques, etc)
� Tool/ Die/ Fixture Building� Tube Bending, Forming� Component Fabrication� Welding (Manual & Automatic)
• Fabricated Hot & Cold End Prototype Exhaust Systems & Components.• Tools, Dies & Fixtures
7) How Effective ?
(Measurable objectives)
Plans, EBOM, Check Lists• Engineering Sample OrderSystem (ESO)• Prototype Build Package
Monthly QOS Metrics:- 6mr Defects per 1,000 (D/1000)- Samples Delivered On Time - Labor Hours per Part- Samples Shipped per Month
Process Owner: ESPG-NAO
VP Engineering,
Prototype Manager
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –
LEGAL
FUNCTIONS
4) With What ?(Materials, equipment, etc)
�Manager’s Legal background�Legal Treatises�Outside Counsel where appropriate
5) With Who ?(Comp, Skills, Training, etc)
�Legal Managers
2) Outputs
•Legal Documents approved for
3) Inputs
-Facts gathered internally-Any applicable documents
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
Support Division-level functions and Plants with:•Draft and review of contracts•Resolution of commercial disputes with Customers and Suppliers
6) How(Methods, procedures, techniques, etc)
�Comprehensive review and understanding of facts.
•Legal Documents approved for signature�Resolved disputes and/or litigation
7) How Effective ?
(Measurable objectives)
-Any applicable documents-Discussions with appropriate Faurecia personnel
-Litigation avoidance due to properly drafted contracts- Delay-avoidance in plant modifications due to legal disputes Process Owner:
•Manager of Tax & Legal ; Asst. Treasurer; Asst. General Counsel
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
1)Process –
HSE
4) With What ?(Materials, equipment, etc)
5) With Who ?(Comp, Skills, Training, etc)
2) Outputs3) Inputs
• Plant Manager• HSE Designate• Faurecia HSE Requirements
• External Legal Requirements• Best Management Practices
•FR0/FR1 Data•QRQC 8D Data
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
6) How(Methods, procedures, techniques, etc)
7) How Effective ?
(Measurable objectives)
Process Owner: ESPG-NAO HSE
Director/Manager
Application of HSE ManagementSystem:• Provide Framework for HSE Network
• Implement HSE PMT/Strategy
•QRQC 8D Data•ESPG Requirements
•FR0/FR1 Data•Internal Review•External(3rd Party) Review
Standardized HSE Mgmt. System.•Reduction in FR0/FR1•ISO 14001 Certification
•Facility Review•Gate Reviews•HSE PMT
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block
FAURECIA EXHAUST SYSTEMS,
NORTH AMERICA, INC
Title: Process Turtle Diagram Form No.:
QP-CRP-T4-003-01
Issued by: K. Kimmet, C. Miller, S. Rich ‹#› of 15
Approved By: P. Bethune Issue Date: 22-5-07
Revision: 01
Note: Printed copies are uncontrolled unless that have an original approval signature in the title block