tutorial on static var compensators - · pdf filetutorial on static var compensators san...

65
Reactive Power Compensation - PTD H16M - Rev. 1.0 1 Tutorial on Static Var Compensators San Francisco, June 12, 2005 Presented by: Heinz Tyll Rajiv K. Varma Hubert Bilodeau Chris Horwill Prepared by: Hubert Bilodeau Michael Bahrman Chris Horwill Peter Lips Heinz Tyll Rajiv K. Varma

Upload: dangkhanh

Post on 19-Feb-2018

241 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 1

Tutorial on Static Var CompensatorsSan Francisco, June 12, 2005

Presented by:Heinz Tyll

Rajiv K. VarmaHubert Bilodeau

Chris Horwill

Prepared by:Hubert Bilodeau

Michael BahrmanChris Horwill

Peter LipsHeinz Tyll

Rajiv K. Varma

Page 2: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 2

Tutorial on Static Var CompensatorsSan Francisco, June 12, 2005

OUTLINE

Module 1 - Reasons for reactive power compensation

Module 2 - Basic characteristics of SVC

Module 3 - SVC configurations and implications

Module 4 - Main components in existing installations

Module 5 - Thyristor valves

Module 6 - Regulation, Control and Protection system

Module 7 - Commissioning

Module 8 - Standards

Module 9 - References

Page 3: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 3

Transmission Line CharacteristicsReceiving End Voltage during Power Transfer

Line constants: x’, r’, c’, g’VS VR

S=P+jQTransmission Line

Sending end Receiving end

PSIL = Surge impedance loadingExample: 200 km line with no lossesEffect of capacitive and inductive loading

Page 4: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 4

Voltage Profile along a Long Transmission Line

Page 5: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 5

Voltage Profile along a Long Transmission Line with Midpoint Reactive Power Compensation

Page 6: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 6

Power System Improvements with Var Control:Influence of a Reactive Power Compensator

Page 7: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 7

Voltage Stability

Normal System Conditions – 2000 MVA Short Circuit

n-1 Contingency – 1500 MVA Short Circuit Level

Voltage stability limits power transferAdequate stability margin required for contingenciesInadequate reactive power reserve risks voltage collapseDynamic voltage support via SVC permits higher power transfer

Page 8: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 8

Increased Transfer with Dynamic Voltage Support

n-1 Contingency – 1500 MVA Short Circuit Level

Maximum power flow depends on network and voltage supportSteady state voltage via slow devices, e.g., switched capacitors, tap changersDynamic reactive power reserve required for contingencies Improved post-contingency voltage profile due to SVC dynamic reactive support

Page 9: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 9

SVC Applications in LV Transmission Systems

Power factor correctionImprovement of load voltageDecrease of transmission system losses

to be added to power plant installationsto be added to operating costs

Load balancingSymmetrisation of system voltage

Page 10: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 10

SVC Applications in HV Transmission Systems

Voltage controlImprovement of system voltage regulationunder varying load conditions

Increase in steady state power transfer capacity

Enhancement in transient stability

Prevention of voltage instability

Augmentation of system damping

Improvement of HVDC link performance

Page 11: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 11

Voltage Control: Voltage in the Systemfor Various Operating Conditions

a Heavy load

b Light load

c Outage of 1 line(at full load)

d Load rejectionat bus 2

System Conditions:Load

SVC

230 kV - 300 km

V2V1

Grid

1.2

1.1

1.0

0.9

0.8

ba c d

without SVC

with SVCV2

V2N

Page 12: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 12

Increase in Steady State Power Transfer Capacity: Comparison of different limits of power flow

Page 13: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 13

The problems of distance & variable load

0 MW Ferranti Effect

400kV

Target 800MW Natural Load

1000MW System Collapse

400kV400kV

800MWGeneration

800MWLoad

400kV

Power

400kV

400kV Transmission Line (uncompensated)

Length of Line

800 km

Page 14: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 14

The problems of distance & variable load

400kV400kV

1000MWGeneration

1000MWLoad

400kV

1000MW

400kV

SVCSVC

800 km

400kV

Target 1000MW Increased capacitydue to SVC

Shunt Compensated Line

Length of Line

Page 15: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 15

Power Oscillation Damping (POD) with SVC

SVC

G1

P1, δ1Infinite bus

• If d(∆δ)/dt or ∆f is positive, i.e. rotor is accelerating due to built up kinetic energy, the FACTS device is controlled to increase generator electrical power output

• If d(∆δ)/dt or ∆f is negative, i.e. rotor is decelerating due to loss of kinetic energy, the FACTS device is controlled to decrease generator electrical power output

• Modulation of SVC bus voltage required through auxiliary signals

Page 16: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 16

Two - Area study system (cont’d)

Three-phase fault is introduced in one of the transmission lines between bus 8 and bus 9

Oscillations caused:

• Local rotor mode oscillations• Inter- machine rotor mode oscillations• Inter- area oscillations are associated with swinging of

two machines in area 1 against the other two machinesin area 2.

Page 17: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 17

Static Var Compensator (SVC)Damping of Power Oscillations (POD)

Page 18: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 18

Improvement of HVDC Link Performance with SVC

Voltage regulation

Support during recovery from large disturbances

Suppression of temporary over voltages

Page 19: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 19

Static Var Compensator (SVC)Typical SVC Configuration

LV bus bar

Fixed filter circuit

Thyristor controlledreactor

Thyristor switchedcapacitor

Control

Step-down transformer

HV

LV

Page 20: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 20

Static Var Compensator (SVC)Common Configurations (1)

TCR, FC TSR, TSCTCR, TSC, FC

Page 21: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 21

Static Var Compensator (SVC)Common Configurations (2)

3AC 60Hz 138 kV

SN = 150 MVA, uk = 10 %

CF1

3AC 60Hz 14.3 kV

STF 1

LF1

TCR 1

LTCR12

LTCR12

3AC 60Hz 14.3 kV

STF 2

LF2

TCR 2

LTCR22

LTCR22

Page 22: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 22

Static Var Compensator (SVC)Loss Comparison

0.4

Page 23: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 23

Main Components of an SVC

Transformer TSC FilterTCR

Page 24: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 24

SVCs Centrals, NGC, UK 275 kV, 150 c / 75 i MVar

Page 25: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 25

SVCs Centrals, NGC, UK 275 kV, 150 c / 75 i MVar

Page 26: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 26

SVC Pelham, NGC, UK 400 kV, 150 c / 75 i MVar

Page 27: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 27

SVC Pelham, NGC, UK 400 kV, 150 c / 75 i MVar

Page 28: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 28

Natal SVCs, Eskom, South AfricaDouble stacked air core reactor

Page 29: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 29

SVC Brushy Hill, NSPC, CanadaFilter Branches

Page 30: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 30

SVC Mead Adelanto, LADWP, USA Capacitor banks (externally fused)

Page 31: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 31

Static Var Compensators (SVC) Filter Capacitor Bank (internally fused)

Page 32: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 32

Thyristor Valve Cooling

IS

Major producers of heat losses are thyristors and snubber resistorsThyristor losses are determined by the forward voltage in the on state and the switching losses during turn on and turn offSnubber losses result from the charging current of the snubber capacitors

Page 33: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 33

Thyristor Triggering & Monitoring Approaches

chec

k-ba

ck s

igna

l

optic

al tr

igge

r sig

nal

elec

tric

al g

ate

puls

e

ETT

Valve Base Electronic(valve control)with LED

TCU

check-backauxiliary power

logicelectric gate pulse

protective gate pulse

voltage detection

chec

k-ba

ck s

igna

l

optic

al g

ate

puls

e

Valve Base Electronic(valve control)with laser

LTT

voltage detection

Page 34: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 34

Auxiliary Powerfor Triggering (Gating) of Thyristors

Typical gate pulse for ETT hasduration of 10 µspeak power of 50 W

Energy is extracted from power circuit at each level

Typical gate pulse for LTT hasduration of 10 µspeak power of 40 mW

Energy is provided by light pulse from ground level

Page 35: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 35

LTT Light Path

Page 36: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 36

Thyristor Valve Control and Monitoring

VALVE BASEELECTRONIC

I/O UNITS

MV SWITCHYARD

DIGITAL FAULTRECORDER

I/O UNITS

HV SWITCHYARD

I/O UNITS

TRANSFORMER

I/O UNITSCONTROL SYSTEM

MONITORINGPLANT CONTROL

CLOSED LOOPCONTROL

Industrial Ethernet

Process Fieldbus

AUXILIARYSUPPLY

I/O UNITS

COOLING SYSTEM

I/O UNITS

PROTECTIONSYSTEMI/O UNITS

DISPATCH CENTER

GATEWAYEXT. DEVICESV/Q CONTROL

PROTECTION(DIGSI, OSCOP, etc.)

WinCC REMOTE(HMI)

WinCC LOCAL(HMI)

TIMESYNCHRONISATION

GPS RECEIVER

SVC CONTROLROOM

SVC CONTROLROOM

SUBSTATIONCONTROL ROOM

SWITCHYARD

GPS

TSC/TCR

VALVE BASEELECTRONIC

PLANT CONTROL

CLOSED LOOPCONTROL

WinCC LOCAL(HMI)

TSC/TCRVALVE

GPS

TIMESYNCHRONISATION

GPS RECEIVER

Process Fieldbus

Industrial Ethernet

SWITCHYARD

SVC CONTROLROOM

SUBSTATIONCONTROL ROOM

Page 37: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 37

LTT Thyristor Module for SVC Valve

The module is a mechanical building block for the three phase valve setup

Page 38: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 38

SVC Control, Monitoring and Protection

Station Control Hierarchies

Devices or High-Voltage Equipment in SwitchyardLocal control of devices or SVC ControlSubstation ControlDispatch Center Control

Page 39: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 39

SVC Control, Monitoring and Protection

LOCAL (HMI)

VALVE BASEELECTRONIC

I/O UNITS

MV SWITCHYARD

DIGITAL FAULTRECORDER

I/O UNITS

HV SWITCHYARD

I/O UNITS

TRANSFORMER

I/O UNITSCONTROL SYSTEM

MONITORINGPLANT CONTROL

CLOSED LOOPCONTROL

Industrial Ethernet

Process Fieldbus

AUXILIARYSUPPLY

I/O UNITS

COOLING SYSTEM

I/O UNITS

PROTECTIONSYSTEMI/O UNITS

DISPATCH CENTER

GATEWAYEXT. DEVICESV/Q CONTROL

PROTECTION

TIMESYNCHRONISATION

GPS RECEIVER

SVC CONTROLROOM

SVC CONTROLROOM

SUBSTATIONCONTROL ROOM

SWITCHYARD

GPS

TSC/TCR

REMOTE (HMI)

Page 40: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 40

SVC Control, Monitoring and Protection

SVC Control

Plant control and monitoringClosed-loop control or RegulationValve Base ElectronicProtection system

Page 41: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 41

Static Var Compensator (SVC)Plant control

SVC Station Control and Monitoring can be divided into:

Sequence control Operator's or Human Machine Interface (HMI))Local Area Communication (LAN)Time Synchronism and distributionsSequence of events and event recording (SER)Digital fault recorderI/O from switchyard

Page 42: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 42

Static Var Compensator (SVC)Plant control

Typical functions of sequence control

SVC ON/OFF Sequence

Auto-Reclosing

Emergency Shutdown

Remote Control Function (that may include SCADA interface)

Manual and automatic switchyard control

Degraded control modes

Page 43: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 43

Static Var Compensator (SVC)Plant control

The SVC can only be energized if the status of critical systems is confirmed such as:

Cooling System On-Line and no abnormal flow or temperature conditionsInterlocks in ready statePrimary voltage measurement system synchronized and readySwitches in closed positionCLC ready and synchronizedValve Firing System ready and valves blockedTransformer cooling normalPlant Control in proper configuration (local, remote etc.)Relay systems set and no lock-out functions detected

Page 44: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 44

Static VAr Compensator (SVC)Voltage Control

Vsource

Znetwork

TCR TSCFC

LV

Control Regulator

XsSlope

+

-1/sTi-

SystemVoltage

Evaluation

HV

TSC Controller TCR/TSRController

POWER SYSTEM

VRESP

VREF

BSVC

BREF

VT

α

Distribution Unit

VBUS

∆V-

BSVC

Page 45: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 45

Static Var Compensator (SVC)Additional control functions

POD control

Q control

Gain control

Stability control

Voltage symmetrisation

Page 46: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 46

Static Var Compensator (SVC)Further Options

Degraded mode

Var management

Test mode

Redundancy

Page 47: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 47

Control and RegulationControl loop Analysis

SVCNETSOURCERESPBUS IZVVV ×−==

The SVC control loop linking the regulator to the power system canbe represented as shown

Vsource

Znetwork

Control Regulator

XsSlope

+

-1/sTi-

SystemVoltage

Evaluation

HVPOWER SYSTEM

VRESP

VREF BREF

VT

VBUS

∆V-

Valve

Bsvc

BSVC

Slope Xs

V Primary

VSOURCE

VREF

Isvc

NetworkZnet

Vresp

BSVC

Vsource

Znetwork

Control Regulator

XsSlope

+

-1/sTi-

SystemVoltage

Evaluation

HVPOWER SYSTEM

VRESP

VREF BREF

VT

VBUS

∆V-

Valve

Bsvc

BSVC

Slope Xs

V Primary

VSOURCE

VREF

Isvc

NetworkZnet

Vresp

BSVC

Page 48: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 48

Control and RegulationControl loop Analysis

Control Regulator

XsSlope

+

-1/sTi

VRESP

VREF

BREF

∆V

BSVC

ZNETWORK

Valvee -sTd

IsvcVsource-Vresp-

+

Vsource

Vresp-Vref

-

+

IsvcZnetVrespVsource ×=−

Page 49: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 49

Module 7 Commissioning an SVC

The commissioning processPrecommissioning testsSystem and operational considerationsCommissioning testsStandards and guides

Page 50: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 50

Basic steps in the commissioning process

Pre-commissioning testsTests on plant and sub systemsComplete before energising SVC at high voltage

Commissioning testsCorrect operation of the SVC designPerformance to specificationSVC performs correctly on the system

Acceptance by the purchaser

Page 51: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 51

Precommissioning tests

Tests on individual items of plant to be done in an agreedwayInterNational Electrical Testing Association (NETA), www.netaworld.org

Produces documentation on test methods and record sheets (Acceptance Testing Specifications)Certifies testing companies and technicians

Equipment not covered by NETA documentation is tested to manufacturer’s own test sheets by the manufacturer

Page 52: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 52

Precommissioning tests

Purpose of pre-commissioning testsCheck that equipment is undamagedElectrical tests to confirm rating plate detailsChecks on installation

–Cabling–Connections–Insulation resistance

Functional checksGrounding resistance check

Page 53: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 53

Precommissioning tests

Tests to be done on the largest possible sub-systemswithout making equipment aliveTests to be witnessed by the purchaser’s representativewhere possibleComplete test results accepted by the purchaserTest results presented with a master document, listing all test sheets for each equipment

Proceed to the next stage

Page 54: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 54

Safety

Safety rules covering live plantOSHA regulationsPurchaser’s safety rulesQualification of Vendor’s personnel

Page 55: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 55

Effect on system

Test program to be agreed in advanceProgram should give details of each testTest program should state Mvar output for each testLimitations on SVC output during testing

Determined from studies by the purchaserLimits may vary with time of day or day of the weekGenerators may be dispatched during some tests

Page 56: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 56

Operational matters

Personnel qualified to switchSwitching jurisdictionLiaison with control centerTest schedule to accompany the test program

Control center can plan system reconfiguration

Page 57: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 57

Commissioning tests

Detailed test program containsStep by Step details for each testMeans of recording test resultsMvar outputs

Connect recording equipmentStage by stage testing

Page 58: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 58

Commissioning tests Stage 1

Tests to confirm that the SVC has been designed correctlyEnergise all equipmentPass current in manual controlTest in automatic controlCooling plant checksHarmonic measurements

Page 59: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 59

Commissioning tests Stage 2

Tests to confirm that the SVC has met the performance specification

System harmonic measurementsVoltage/current characteristicsSpeed of responseRFI measurementsAcoustic noise measurements

Page 60: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 60

Commissioning tests stage 3

Tests to ensure that the SVC performs correctlyCapacitor and reactor switching testsAutomatic switchgear controlTemperature rise testsTrial operation periodOperation during disturbancesService experience

Page 61: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 61

Service experience

Extension of commissioning testsMonitoring of service experience may last until the endof the warranty period

Commissioning test program does not normally includestaged faultsDFR and SER at the SVC installation used to gatherperformance data

Page 62: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 62

Standards and Guides

IEEE 1303 : 1994. IEEE Guide for Static Var CompensatorField TestsCIGRE Document WG38-01 Task Force 2. Static Var Compensators, Chapter 6

Page 63: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 63

SVC DesignFunctional Specification IEEE 1031

03_03 240203

Page 64: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 64

SVC DesignField Tests for Static Var Compensator IEEE 1303

03_03 240203

Page 65: Tutorial on Static Var Compensators - · PDF fileTutorial on Static Var Compensators San Francisco, June 12, 2005 ... ROOM SUBSTATION CONTROL ROOM SWITCHYARD GPS TSC/TCR VALVE BASE

Reactive Power Compensation - PTD H16M - Rev. 1.0 65

SVC DesignTest Standard for thyristor valves IEC 61954

03_03 240203