typical feed schedule

1
Disc. Activity Gen Contract Effective Date 1 2 3 4 5 6 7 8 9 10 11 12 Process simulations PFD H&MB Equipment list Fluids list P&IDs preparation and 1 st issue (IFR) P&ID review with COMPANY P&IDs 2 nd issue (IFH) HAZOP review P&IDs IFD Process equipment sizing & data sheets Equipment Mechanical design, dwgs, data sheets Equipment Material Requisitions Equipment Technical Bid Tabulations PRT Inquiries to Equipment Vendors Material selection report Piping classes summary & specifications Plot plan - 1st issue (IFR) HAZID + Plot Plan review with COMPANY Plot Plan IFD Piping routing Piping MTO Instrument list System architecture drawing Main cable routing drawings MTO Load list Single line diagram Equipment sizing Sub-station arangement drawings Main cable routing drawings MTO HSE Fire Protection drawing Building architectural drawings General Underground Networks drawing Foundation guide drawings Pipe-racks and Steel structures outline drawings Civil MTO SUB Inquiries to Construction contractors COST Cost estimate Front End Engineering Design (FEED) - Typical Engineering schedule (c) The Oil & Gas Engineering Guide, Hervé Baron, Eidtions Technip, 2005 CIV Project Month PL PR EQT PI PM EL I&C

Upload: do-thanh-vinh

Post on 13-Dec-2015

6 views

Category:

Documents


2 download

DESCRIPTION

Typical FEED Schedule

TRANSCRIPT

Page 1: Typical FEED Schedule

Disc. ActivityGen Contract Effective Date 1 2 3 4 5 6 7 8 9 10 11 12

Process simulationsPFDH&MBEquipment listFluids listP&IDs preparation and 1st issue (IFR)P&ID review with COMPANYP&IDs 2nd issue (IFH)HAZOP reviewP&IDs IFDProcess equipment sizing & data sheetsEquipment Mechanical design, dwgs, data sheetsEquipment Material RequisitionsEquipment Technical Bid Tabulations

PRT Inquiries to Equipment VendorsMaterial selection reportPiping classes summary & specificationsPlot plan - 1st issue (IFR)HAZID + Plot Plan review with COMPANYPlot Plan IFDPiping routingPiping MTOInstrument listSystem architecture drawingMain cable routing drawingsMTOLoad listSingle line diagramEquipment sizingSub-station arangement drawingsMain cable routing drawingsMTO

HSE Fire Protection drawingBuilding architectural drawingsGeneral Underground Networks drawingFoundation guide drawingsPipe-racks and Steel structures outline drawingsCivil MTO

SUB Inquiries to Construction contractorsCOST Cost estimate

Front End Engineering Design (FEED) - Typical Engineering schedule

(c) T

he O

il &

Gas

Eng

inee

ring

Gui

de, H

ervé

Bar

on, E

idtio

ns T

echn

ip, 2

005

CIV

Project Month

PL

PR

EQT

PI

PM

EL

I&C