RECE!VED VV F 1 /3 Production CompanJ ‘ww.swncom YI ... / U. April 18, 2016 The Honorable George Bedwick, Chairman Independent Regulatory Review Commission 333 Market Street, 14 th Floor Harrisburg, PA 17101 Re: Final Rulemaking: Environmental Protection Performance Standards at Oil and Gas Well Sites (25 Pa. Code Chapters 78 and 78a) - IRRC #3042 Dear Chairman Bedw-ick: SWN Production Company, LLC (“SWNPC”), an oil and gas exploration and production subsidiary of Southwestern Energy Company (“SWN”) active in Pennsylvania, appreciates the opportunity to comment on the Proposed Amendments to 25 Pa. Code Chapters 78 and 78a, “Environmental Protection Performance Standards at Oil and Gas Well Sites’ 1 (collectively, the “New Regutions”) put forth by the Pennsylvania Department of Environmental Protection (“PADEP”), As the third largest producer of natural gas in the US. Lower 48 and a widely-acknowledged leader in responsible energy development, SWN and all its subsidiaries haie a deep commitment to providing the energy that powers our nation and our world in an environmentally sensitive and responsible manner. We at SWNPC understand that our continued success depends upon our dedication not only to the company and its bottom line, but to the environment and the communities in which we operate. To this end, SWNPC supports responsible environmental oil and gas regulation that affords adequate protection to Pennsylvania’s vast natural resources, and commends the PADEP for seeking to improve the state’s oil and gas regulatory regime, including without (imitation with respect to the protection of water resources, public health, consideration of landowner concerns and process transparency. However, while we fully endorse the PADEP’s goals in promulgating the New Regulations, there are certain provisions therein which could have a dramatic negative impact on our ability to operate without any corresponding public benefit, could potentially result in unintended adverse consequences, or which are counterproductive or otherwise problematic from an operational perspective. Thus, starting on the following page is a short discussion of some of these problematic provisions. Please note that our comments pertain to potential impacts on SWNPC’s operations arid are offered solely in the spirit of improving the Rule from an operational perspective, and that they are not meant to be an exhaustive critique or indicate that comments submitted by other operators or industry groups are without merit. Specifically, SWN is a member of the Marcellus Shale Coalition and is in full support of the MSC’s comments as to the New Regulations. Thank you in advance for your review and consideration of the comments provided herein. A’ i1: P)k iXfl5 ti) 000C) t’, &Mh iw m TX 7?3—95.1 wI i)rt4it

Upload: others

Post on 04-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

RECE!VED

VV F 1 /3

Production CompanJ ‘ww.swncomYI ...

• / U.

April 18, 2016

The Honorable George Bedwick, ChairmanIndependent Regulatory Review Commission333 Market Street, 14th FloorHarrisburg, PA 17101

Re: Final Rulemaking: Environmental Protection Performance Standards at Oil and Gas Well Sites (25 Pa.Code Chapters 78 and 78a) - IRRC #3042

Dear Chairman Bedw-ick:

SWN Production Company, LLC (“SWNPC”), an oil and gas exploration and production subsidiary of

Southwestern Energy Company (“SWN”) active in Pennsylvania, appreciates the opportunity to comment on theProposed Amendments to 25 Pa. Code Chapters 78 and 78a, “Environmental Protection Performance Standards

at Oil and Gas Well Sites’1 (collectively, the “New Regutions”) put forth by the Pennsylvania Department ofEnvironmental Protection (“PADEP”),

As the third largest producer of natural gas in the US. Lower 48 and a widely-acknowledged leader inresponsible energy development, SWN and all its subsidiaries haie a deep commitment to providing the energythat powers our nation and our world in an environmentally sensitive and responsible manner. We at SWNPCunderstand that our continued success depends upon our dedication not only to the company and its bottomline, but to the environment and the communities in which we operate. To this end, SWNPC supportsresponsible environmental oil and gas regulation that affords adequate protection to Pennsylvania’s vast natural

resources, and commends the PADEP for seeking to improve the state’s oil and gas regulatory regime, includingwithout (imitation with respect to the protection of water resources, public health, consideration of landownerconcerns and process transparency.

However, while we fully endorse the PADEP’s goals in promulgating the New Regulations, there are certainprovisions therein which could have a dramatic negative impact on our ability to operate without anycorresponding public benefit, could potentially result in unintended adverse consequences, or which are

counterproductive or otherwise problematic from an operational perspective. Thus, starting on the following

page is a short discussion of some of these problematic provisions. Please note that our comments pertain to

potential impacts on SWNPC’s operations arid are offered solely in the spirit of improving the Rule from anoperational perspective, and that they are not meant to be an exhaustive critique or indicate that comments

submitted by other operators or industry groups are without merit. Specifically, SWN is a member of the

Marcellus Shale Coalition and is in full support of the MSC’s comments as to the New Regulations. Thank you in

advance for your review and consideration of the comments provided herein.

A’

i1: P)k iXfl5 ti)

000C) t’, &Mh iw m

TX 7?3—95.1 wI i)rt4it

Page 2: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

Page 2

SWNPCComryents on Proposed Amendments to 25 Pa. Code Chapters 78 and 78aApr 18, 2016

Provision:

78a,59c, Centralized Impoundments a) An operator using a centralized impoundment at the time of the

effective date of these regulations shall close the centralized impoundment in accordance with this sectionprobtain a permit in accordance with subpartj Article IX (Relating to Residual Waste Mangment). Theclosure plan shaU be submitted electronically to the Department through its web site review and approval nolater than (six months from the effective date of this regulation.) The operator shall properly close thecentralized impoundment in accordance with the approved plan or obtain a permit in accordance with$ipart D,rticle IX (Relating to Residual Waste Management) no later than ((3) years from the effective dateof this regulation.

SWNPC Comment/Recommendation:

In order to continue to operate efficIently and effectively, SWNPC recommends that the proposed mandate toclose existing impoundments, forcing the construction of centralized tank farms (CTFs) be reconsidered as thiswill have significant cost implications and unintended consequences such as increased truck traffic and increasein surface impaci. Total costs associated with closing our existing four flowback impoundments, two separatefacilities, will range between $3-$5 million dollars. Additionally, the constructiOn of new CTF’s will rangebetween $4.5-$6.5 million dollars, totaling between $8-$13 million dollars for the two (2) facilities in order to

replace the existing impoundments volumes. Furthermore, operating casts would be between .5600-$900

thousand dollars a year, per site. These costs include electronic monitoring, 24 hour on-site support personnel

for truck unloading and tank mixing operations. In total, each CTF location will increase 5WN’s operating cost by$i.2$1.8 million dollars a year.

Increased truck traffic will also have adverse impacts on local road infrastructure and adverse safety implicationsas well. Other unintentional impacts surrounding CTF are the surface footprint and visual impacts to surroundinglandowners, SWN’s replacement CTF’s will be greater than 20 acres in size, exceeding the current 15 acre size forour impoundments. Tank farms will also be highly visible and have greater exposure to strong weather, lighting

strikes, vandalism and otherfactors out of SWNPC’s control.

Timing is also a concern for SWN regarding any mandated CTFfor reuse water. Permit time frames are expected

to take at least a year comparing to traditional timefines, and construction will add an additional six months.

Should pre-coristruction groundwater monitoring be required at each location for a full year this would extendthe total permit time to 18 to 36 months. Lastly, there will be an impact on our ability to utilize our reuse waterand a potentiulfor a loss of 3 million barrels of reuse fluid due to the closing of these impoundments. This will

create an increased operating cost 10 haul and dispose of that water to a tune of approximately $45 million

dollars, and this does not accountfor any production delays.

SWN recommends new construction be based on Centralized Waste Treatment facility design criteria, as outlined

in 40 CER 437.2 (cj. and grandfarhering existing impoundments far 7 years to maximize water reuse and

minimize additional surface construction impacts. Additionally, SWNPC feels PADEP Oil and Gas staff should

manage all reuse water and permitting facilities, with a benefit of streamlined permitting for projects that are

environmentallyfavorable.

Thn Rght Peopie *lrrg the Right Things,

wsa.i nvw5r. the oesh ifow from ourwdni1jrq Aonet oreetn

Page 3: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

Page 2SWNPCComments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78aApril 18, 2016

Provision:

78a.65 Relating to Site Restoration and Reclamation: Restoration. The owner or operator shall restore landsurface areas disturbed to construct the well site as follows: 1) Post Drilling — within 9 months aftercompletion of drilling a well, the owner or operator shall undertake post-drilling restoration of the well site inaccordance with a restoration plan developed in accordance with subsection (I,) and remove all drillingsupplies, equipment, primary containment and secondary containment not necessary for production orneeded to safely operate the well... (I) ...on a multi-well pad, restoration is required within 9 months afteicompletion of drilling all permitted wells on the well site or 9 months after the expiration of all existing wellpermits on the well site, whichever is later.

SWNPC Comment/Recommendation:

These requirements relating to site restoration and reclamation should be stricken for unconventional wells, asthey pertain more closely to conventional wells. SWNPC believes our locations are constructed to a reasonablesize to ensure safe operations for our producing wells for their life span. SWNPC believes as long as pastconstruction storm water management controls are designed, approved, and constructed to manage rates andvolumes, and the site is permanently stabilized, then minimizing the site is not warranted for theseunconventional well locations and a potential safety concern.

Additionally, typical development timelines for unconventional reservoirs require multiple trips to a pad site,which may span up to a decade of development. Therefore, SWNPC would be required, if held to proposedregulations, to engage in contracting of locations and subsequent expanding of the same locations to supportdevelopment activities, This increased earth disturbance on previously stabilized land surfaces and the increasedroad and construction related traffic will leading to deterioration of local infrastructure, increased road relatedtraffic will also increase the potent,al for other environmental impacts, such as fugitive dust, as well asdecreasing community relations for landowners in our operating areas. If 78o. 65 is approved as proposed.SWNPC would be required to invest upwards of $70 million dollars in contraction and expansion activities forearth disturbance alone.

We thank IRRC for their consideration of our comments to the proposed New Regulations. If you would like todiscuss further, please contact me at 832796••282O and I will make the appropriate staif available.

Sincerely.

,,4 V

The sInt &r rhe jr’t he5D.

waI hvn tie cath tw rrp- trjrq Ai-,eete. ,,i itT

John E. Bergeron, Jr.Senior Vice President Appalachia

Page 4: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

Dev

elop

men

tS

olut

ions

Bal

anci

ng

Env

iron

men

t,O

om

rnu

nit

&E

cono

rnU

adi

visi

onof

Sou

thw

este

rnE

nerg

y

PA

DE

PR

ule

78A

Eff

ect

toSW

NO

pera

tion

s

A

Page 5: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

-

.

I10c;: CDCDCI)

7JCo

(I) .1Cr-,

3))J.

%—

cii-’

C/)ciiQ)CDCODC)J.CD

DCDD3

(DD

%_.1

+

Page 6: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

agem

ent

-C

ost

Impa

ct

__

Cap

ital

Cos

tC

ost

per

site

Num

ber

ofT

otal

Cos

t($

M)

Des

crip

tion

($M

)F

acil

itie

s

Clo

seEx

istin

g1.

5—

2.0

23

-5

Impo

undm

ents

Con

stru

ctne

w4.

5—6.

52

8-1

3C

entr

aliz

edTa

nkFa

cilit

y(C

TF)

Tot

alC

apita

l11

-18

Cos

t Dis

cuss

ion:

Incr

emen

tal

Ope

rati

ngC

ost

-$6

00-

$900

Kpe

ryea

r/

site

.C

ost

incl

udes

elec

tron

icS

CA

DA

mon

itor

ing,

24ho

uron

site

supp

ort

for

truc

kun

load

ing

and

tank

mix

ing

oper

atio

ns.

•N

um

ber

ofs

ites

=2

•T

otal

year

lyop

erat

ing

cost

-$1

.2-

$1.8

M/y

ear

A2

Page 7: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

ua1

Impa

ct

Sur

face

Impa

ct—

33%

larg

erfo

otpr

int

•Im

poun

dmen

t—15

acre

s•

CT

F-+

20ac

res

—To

min

imiz

eop

erat

iona

lde

lays

,w

illco

nstr

uct

new

CTF

son

new

land

duri

ngph

ase

out

peri

odfr

omim

poun

dmen

ts.

Vis

ual

Imp

act

Com

par

ison

(see

dra

win

g)

—T

ank

Farm

prof

ile

wit

hfe

ncin

g—

Impo

undm

ent —

hill

side

wit

hfe

ncin

g

‘4,

3

Page 8: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

Cap

ital

Cost

Co

stper

Wel

lA

nnua

lC

ost

bas

edO

ptio

n2(A

ssu

mes

incr

ease

due

to($

)on

90w

ell

count

only

SW

tru

cked

tru

ckin

g($

M)

250

tru

cks/

wel

l)

1,40

0tr

uckl

oads

per

$560

,000

$50.

4$1

00K

per

wel

lan

dw

ell

toha

ulal

lwat

er$9

Mpe

rye

arba

sed

on90

wel

lco

unt

Incr

ease

in$4

50,0

00$4

5C

ompl

etio

ntim

edu

eto

wat

erm

ovem

ent

—3—

6day

s

Tot

alC

apit

alC

ost

$1,0

10,0

00/w

ell

$95.

4M/y

ear

$54M

/yea

rIn

crea

se

Dis

cuss

ion:

•P

art

68B

—st

ates

that

unde

rgro

und

pipi

ngw

illno

tbe

allo

wed

tom

ove

reuse

wat

er,

thus

all

re-u

sew

illre

quir

etr

ucki

ng•

Tab

leas

sum

es10

0%of

all

wat

erm

oved

bytr

uck

and

exis

ting

pipe

line

Ifal

low

edto

pipe

fres

hwat

er,

tru

cklo

ads

will

infr

astr

uctu

reis

shut

-in.

dec

reas

e(S

eeO

ptio

n2)

L?L

.i

‘4

.1

4

Page 9: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

CD

L)D4J

a —

C)“a)

CDcuI1%)

• —

E0

C)1%)

ci)

C)v*)

0U

C)-c3

C)

D

in• —

Iw

II-’

CD=

in

C CD L..

ECCD

‘Iv,- CDC v-,CD

•1-’0

a)C

V.,0

CDCDCD

I’C4- CDCa)-

CD a);>F”

(I)4J

-D CCDC cl_c L.

CD4— V.,Cu

.—

cl0

CD

-(I) O’i— r a)a) _J

>a) bOa)U

CU CD CDIf)

V.,-5C clbDa)CD -czDa)

C V) ) > 4_)CD va) CC

b.O(I V) —

CD CD —

c) •— CDC C%p

bO•

-m

I I I

4

“3UFU

C)z

LC)

Page 10: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

c.a

I

..ati

on

s

Oth

erC

onsi

dera

tion

s/C

once

rns

—P

ossi

ble

oper

atio

nal

dela

ysdu

eto

perm

itti

ngof

CTF

s•

Tim

ing

Com

pone

nts:

—P

ossi

ble

requir

emen

tto

mon

itor

GW

1ye

arbe

fore

cons

truc

tion

—P

erm

it—

lyea

r—

Con

stru

ctio

n6

mon

ths

•T

otal

Per

mit

Tim

e—

18—

36m

onth

s(d

epen

den

tup

onti

min

gbet

wee

n1

&2

abov

e)—

Eff

ect

onR

e-us

eif

tim

ing

gap

bet

wee

nim

poundm

ent

shut

-in

and

CTF

cons

truc

tion

•L

oss

of3,

000,

000

barr

els

ofre

-use

flui

din

clos

ing

ofim

poun

dmen

ts—

Res

ulti

ngin

15%

incr

ease

inFW

nee

ded

•In

crea

sein

Ope

rati

ngco

stto

haul

-off

and

disp

ose

ofre

-use

-$4

5M

—P

rodu

ctio

nde

lays

due

toco

mpl

etio

nti

min

gin

crea

se(‘

540

tota

lda

ysof

prod

ucti

onde

lay)

—In

crea

seC

apit

alco

stan

dcu

rren

tlo

wga

spr

ices

—ef

fect

capi

tal

depl

oym

ent

econ

omic

s

A’

6

Page 11: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

nen

tO

ptio

ns-

IL

All

owfo

rco

nst

ruct

ion

ofne

wim

poundm

ents

bas

edon

consi

sten

ten

gin

eeri

ng

req

uir

emen

ts—

Req

uire

new

cons

truc

tion

bede

sign

edba

sed

onC

entr

aliz

edW

aste

Tre

atm

ent

faci

litie

s(C

WT

)cr

iteri

aas

outli

ned

in40

CFR

437.

2(c)

—B

enef

itsin

clud

ere

duce

dsu

rfac

eim

pact

and

visu

alim

pair

men

t

•G

ran

dfa

ther

exis

ting

impoundm

ents

for

7yea

rs—

Ben

efits

incl

ude

min

imiz

ing

addi

tiona

lsu

rfac

eco

nstr

ucti

onim

pact

sM

axim

ize

wat

erre

use

•G

ran

dfa

ther

exis

ting/p

erm

itte

dw

ater

mo

vem

ent

pipe

line

syst

ems

—R

equi

rean

nual

pre

ssure

test

com

plia

nce

ofM

AO

Pfo

rPL

—B

enef

its

incl

ude

min

imiz

ing

truc

king

com

plex

ity,

and

road

and

brid

gere

pair

s

•S

impl

ify

PA

Sta

tepe

rmit

ting

for

reuse

wat

erm

anag

emen

t—

Allo

wD

EP

Oil

and

Gas

tom

anag

eal

lre

use

wat

eran

dpe

rmitt

ing

faci

liti

es

—S

trea

mli

nepe

rmit

ting

for

proj

ects

that

are

envi

ronm

enta

lly

favo

rabl

e(r

euse

oppo

rtun

itie

sfr

omot

her

oper

ator

s)I

‘.47

Page 12: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

J2..

÷_A

‘48

Page 13: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

j2

_A

‘4

I

9

Page 14: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

Impa

cts

•S

ecti

on65

aR

equi

res

Pos

tD

rillin

gR

esto

rati

on:

—W

ithin

9m

onth

sof

drill

ing

or—

With

in9

mon

ths

from

expi

rati

onof

drill

perm

it

•Is

sues

/Con

cern

s—

Reg

ulat

ion

man

dat

esad

diti

onal

eart

hdi

stur

banc

ein

conf

lictw

ithty

pica

lun

conv

enti

onal

deve

lopm

ent

tim

elin

es—

Unn

eces

sary

inve

stm

ent

ifP

CS

Mis

adeq

uat

efo

rpa

das

orig

inal

lyco

nstr

ucte

dan

dst

abel

ized

—P

adre

duct

ion

crea

tes

anun

safe

wor

kar

eaif

need

edfo

rw

ell

cont

rol

—In

crea

ses

road

traf

fic,

acce

lera

ted

road

dete

rior

atio

n,du

stpo

tent

ial

AV

[

10

Page 15: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

nE

xam

ple

.4

Dat

eO

per

atio

n$

2010

Dri

lled

initi

alac

reag

eho

ldin

gw

ells

Jul

TD

’d2”

’wel

l

2011

Feb

Con

trac

tpa

d$1

00,0

00

Apr

Inte

rim

Res

tora

tion

Dea

dlin

e

2013

Exp

and

pad

for

upco

min

gdr

illin

g$

80,0

00

2014

Mar

TD

’d6t

hw

ell

Sep

Con

trac

tP

ad$1

00,0

00

Dec

Inte

rim

Res

tora

tion

Dea

dlin

e

2017

Exp

and

pad

for

upco

min

gdr

illin

g$

80,0

00

May

TD

10tl

weI

l

Nov

Con

trac

tP

adfo

rre

mai

nder

ofpr

oduc

tion

$100

,000

2018

Jan

Inte

rim

Res

tora

tion

Dea

dlin

e

Tot

alIn

teri

mE

arth

Dis

turb

ance

toD

evel

op$4

60,0

00

cU

nit

Out

line

s

Wel

lP

ad

Acr

eage

Hol

ding

Wel

ls

1st

Ret

urn

Dril

ling

Tri

p

Fina

lR

etur

nD

rillin

gT

rip

pz_.

A11

Page 16: U. YI Southwestern Energy Company (“SWN”) /3 Proposed … 04-19... · 2016-04-19 · Page 2 SWNPC Comments on Proposed Amendments to 25 Pa. Code Chapters 78 and 78a April 18,

...N)

+

IIU)

zQ)c:-a

i3C)

cD—CD0XCI) ;=-I’-‘—

DS?.OCD0CD

Q1.