u097.01 building area: (sf) 9300 sf anticipated date of completion: 2010 location of project:...
TRANSCRIPT
![Page 1: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/1.jpg)
U097.01
Building Area: (sf)9300 sf
Anticipated date of completion:2010
Location of Project:Sarasota, Florida
Type of Project:Public Safety
Construction materials, mechanical systems or other pertinent information:Metal exterior skinBrick veneerScheduled to achieve LEED Silver
Program Requirements:
The project, a new Fire Station located in Sarasota County, Florida consists of demolition of the existing 3,773 sq. ft. building built in 1968, and construction of a new 9,300 sq. ft., two-story LEED Certified fire station situated along a busy arterial road . The Fire Station will serve as a Disaster Deployment Center built to withstand Category 5 hurricane winds. The facility is scheduled to open in 2010 and will provide Fire and EMS services.
The building is designed to meet the 2030 Challenge Resolution #2006-157 with minimum delivered fossil-fuel energy consumption performance standard being one-half the U.S. average for that building type as defined by the U.S. Department of Energy. This project will incorporate the use of flexible fuels per the Plug-in Hybrid Electric Vehicle Resolution #2005-278 of Sarasota County.
Construction is comprised of spread foundations and reinforced concrete masonry walls, elevated precast floor systems, integral colored flooring, and pre-engineered metal roof framing/ panels. The exterior is a combination of jumbo brick, Portland cement plaster and metal panels. The bay area features fast acting 4-fold sideways-acting 14 ft. square door systems. The following LEED approaches are incorporated into the design:
Use of highly reflective cool paving and roof surfacesA solar water heater system, Installation of a rainwaterharvesting system for bay washing and toilet flushingHigh efficiency split system HVAC units yielding 6/10 Energy and Atmosphere (EA) pointsA water use reduction of 70%+ over baseline 1992 EPA standardsLow VOC materials.
![Page 2: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/2.jpg)
U097.02Night view from northwest
![Page 3: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/3.jpg)
U097.03Worm’s eye view northwest
![Page 4: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/4.jpg)
U097.04View from southwest
![Page 5: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/5.jpg)
U097.05Entrance
![Page 6: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/6.jpg)
U097.06Bird’s eye view
![Page 7: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/7.jpg)
U097.07Current site neighborhood
![Page 8: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/8.jpg)
U097.08Entrance elevation
![Page 9: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/9.jpg)
U097.09North elevation
![Page 10: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/10.jpg)
N
U097.10Ground floor plan (existing, remodel)
![Page 11: U097.01 Building Area: (sf) 9300 sf Anticipated date of completion: 2010 Location of Project: Sarasota, Florida Type of Project: Public Safety Construction](https://reader035.vdocument.in/reader035/viewer/2022070409/56649ea15503460f94ba4c7e/html5/thumbnails/11.jpg)
N
U097.11Second floor dormitory area(new build)