u.g. notes fire flow data - pavilion construction apartments/plan… · sprklr. riser rm. elev....
TRANSCRIPT
107
108
109
103
104
106
101
ram
p dn
ram
p dn
Porch
up
Stair #2
Stor. Closet
up
Corridor
Stair
#1
Tele. / CATV
Lobby
Elevator
Sprklr.
Riser Rm.
Elev.
Mach. Rm.
Elect. Rm.
Unit 1B-2
Unit 1B-2
Unit 1B-1
Unit S-1
Unit S-2 FIRST
FLOOR
UNIT
SECOND
FLOOR
UNIT
THIRD
FLOOR
UNIT
FOURTH
FLOOR
UNIT
FIFTH
FLOOR
UNIT
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
FIRST
FLOOR
UNIT
SECOND
FLOOR
UNIT
THIRD
FLOOR
UNIT
FOURTH
FLOOR
UNIT
FIFTH
FLOOR
UNIT
ELECTRICAL
ROOM
TOP / PLATE
FIN. FLOOR
(TOP / SUBFLOOR)
FIN. FLOOR
(TOP / SLAB)
TOP / PLATE
FIN. FLOOR
(TOP / SUBFLOOR)
TOP / PLATE
FIN. FLOOR
(TOP / SUBFLOOR)
TOP / PLATE
FIN. FLOOR
(TOP / SUBFLOOR)
TOP / PLATE
FIN. GRADE
TOP / PLATE
FIRE FLOW DATA
2. ALL OTHER UNDERGROUND PIPING BY CITY.
1. FIRE SPRINKLER CONTRACTOR TO START AT 5'-0" OUTSIDE BUILDING.
3. ALL UNDERGROUND PIPE TO BE INSTALLED RODDED AND/OR
BLOCKED, FLUSHED AND TESTED PER NFPA 13 & 24.
U.G. NOTES
4. MINIMUM BURY 3'-0".
5. THIS SITE PLAN IS FOR FIRE REFERENCE ONLY.
SEE CIVIL DRAWINGS FOR MORE DETAILS.
LOCATION: MONROE & MLK JR
SOURCE: PORTLAND WATER BUREAU
FLOW: 1300 GPM
MAX STATIC PRESSURE: 78 PSI
RESIDUAL PRESSURE: 56 PSI
TEST I.D. NUMBER: 1402
STATIC PRESSURE USED: 62 PSI
(JAMIE W 503 823 9083)
PO
RT
LA
ND
, O
R
NE
M
ON
RO
E S
T &
N
E M
LK
JR
B
LV
D
SIT
E C
ON
TA
CT
:
DE
SC
RIP
TIO
N
HE
AD
L
EG
EN
D
QU
AN
TIT
Y
PH
:
PO
RT
LA
ND
, O
R 9
72
19
67
20
S
W M
AC
AD
AM
A
VE
, S
UIT
E #
31
0
CO
NT
AC
T: C
HU
CK
C
ON
DIT
T
PH
: 5
03
2
90
-5
00
9
107
108
109
103
104
105
106
101
Porch
up
Stair #2
Stor. Cl.
up
Stair
#1
Tele. / CATV
Lobby
Elevator
Sprklr.
Riser Rm.
Elev.
Mach. Rm.
Elect. Rm.
Unit 1B-2
Unit 1B-2
Unit 1B-2
Unit 1B-1
Unit S-1
Unit S-2
N.E. Monroe Street
N.E
. M
LK
Jr. B
lvd
.
RAMP
BIKE RACKS
RAMP
TO
TA
L6
6
DE
SC
RIP
TIO
N
HE
AD
L
EG
EN
D
QU
AN
TIT
Y
TYCO, TY-B, 1/2",K=5.6, BRONZE, SSU, 155°
13
TYCO, TY-L, 1/2",K=5.6, BRZ, SSSW, 200°
2
* SYSTEM DESIGN IS BASED ON NFPA 13 & 14, 2007 ED. AS FOLLOWS:
* ALL GROOVED COUPLINGS TO BE RIGID U.N.O.(FC= FLEX COUP)
* ALL THREADED PIPING TO BE SCH. 40 BLACK.
GENERAL NOTES
* ALL GROOVED WET PIPING TO BE EDDY FLOW , BLACK.
-MECHANICAL ,ELECTRICAL & PARKING: ORDINARY HAZARD GROUP 1
* ALL ARM OVER, DROP & SPRIG UP PIPING TO BE 1" SCH. 40
-RESIDENTIAL FLOORS 1 THRU 5: LIGHT HAZARD-RESIDENTIAL
* ALL GROOVED DRY PIPING TO BE SCH 10, BLACK.
-STANDPIPE: CLASS I
* SEE HANGER DETAILS FOR PIPE ATTACHMENTS.
-ALL OTHER AREAS: LIGHT HAZARD
PO
RT
LA
ND
, O
R
NE
M
ON
RO
E S
T &
N
E M
LK
JR
B
LV
D
SIT
E C
ON
TA
CT
:
PH
:
PO
RT
LA
ND
, O
R 9
72
19
67
20
S
W M
AC
AD
AM
A
VE
, S
UIT
E #
31
0
CO
NT
AC
T: C
HU
CK
C
ON
DIT
T
PH
: 5
03
2
90
-5
00
9
45
4
TYCO, DS-1 DRY SIDEWALL, 1/2",K=5.6 BRZ, 155°
2
-ATTIC: WET SYSTEM, DRY UPRIGHTS, LIGHT HAZARD .10/900 SQ.FT.
RESIDENTIAL NOTES:
* ALL PIPE FOR FLOORS 2 THRU 4 TO 1" CPVC U.N.O.
* ALL CPVC HANGERS TO BE FEILD LOCATED PER PIPE LISTING.
* SPRINKLERS ARE NOT REQUIRED IN BATHROOMS < 55 SQ. FT.
* MINIMUM SPACING BETWEEN RESIDENTIAL SPRINKLERS IS 8'-0".
* SPRINKLERS ARE NOT REQUIRED IN CLOSETS < 12 SQ. FT.
* DESIGN AND INSTALLATION TO COMPLY WITH NFPA 13.
* BUILDING TO BE HEATED TO MAINTAIN A MIN. OF 40°F.
* SEE BUILDING SECTION ON SHEET FP-1 FOR CEILING HEIGHT.
Unit S-3
Stair #2
Stair
#1
Unit S-5
Unit 1B-6
Corridor
METAL AWNING BELOW
OVER LONG-TERM BIKE
PARKING AREA
METAL AWNING
BELOW OVER
ENTRY / PORCH
AREA
Elevator
Stor.
Room
DE
SC
RIP
TIO
N
HE
AD
L
EG
EN
D
QU
AN
TIT
Y
NOTES:
* ALL PIPE FOR FLOORS 2 THRU 4 TO 1" CPVC U.N.O.
* ALL CPVC HANGERS TO BE FEILD LOCATED PER PIPE LISTING.
* SPRINKLERS ARE NOT REQUIRED IN BATHROOMS < 55 SQ. FT.
* MINIMUM SPACING BETWEEN RESIDENTIAL SPRINKLERS IS 8'-0".
PO
RT
LA
ND
, O
R
NE
M
ON
RO
E S
T &
N
E M
LK
JR
B
LV
D
SIT
E C
ON
TA
CT
:
PH
:
PO
RT
LA
ND
, O
R 9
72
19
67
20
S
W M
AC
AD
AM
A
VE
, S
UIT
E #
31
0
CO
NT
AC
T: C
HU
CK
C
ON
DIT
T
PH
: 5
03
2
90
-5
00
9
69
2
* SPRINKLERS ARE NOT REQUIRED IN CLOSETS < 12 SQ. FT.
* DESIGN AND INSTALLATION TO COMPLY WITH NFPA 13.
* BUILDING TO BE HEATED TO MAINTAIN A MIN. OF 40°F.
* SEE BUILDING SECTION ON SHEET FP-1 FOR CEILING HEIGHT.
-T
OT
AL
F
OR
F
LO
OR
S 2
, 3
&
4
(7
1x3
)2
13
-T
OT
AL
P
ER
F
LO
OR
71
Unit S-3
Stair
#1
Stair #2
Unit S-5
Unit 1B-5
Unit 1B-4
Unit S-4
Unit 1B-6
Unit 1B-6
Unit 2B-1
Unit S-3
Unit 1B-3
Corridor
Stor.
Room
METAL AWNING BELOW
OVER LONG-TERM BIKE
PARKING AREA
Corridor
Elevator
METAL AWNING BELOW
OVER LONG-TERM BIKE
PARKING AREA
ME
TA
L A
WN
IN
G
BE
LO
W O
VE
R
EN
TR
Y / P
OR
CH
AR
EA
TO
TA
L1
21
DE
SC
RIP
TIO
N
HE
AD
L
EG
EN
D
QU
AN
TIT
Y
TYCO, TY-L, 1/2",K=5.6, BRZ, SSSW, 200°
1
* SYSTEM DESIGN IS BASED ON NFPA 13 & 14, 2007 ED. AS FOLLOWS:
* ALL GROOVED COUPLINGS TO BE RIGID U.N.O.(FC= FLEX COUP)
* ALL THREADED PIPING TO BE SCH. 40 BLACK.
GENERAL NOTES
* ALL GROOVED PIPING TO BE EDDY FLOW , BLACK.
-MECHANICAL ,ELECTRICAL & PARKING: ORDINARY HAZARD GROUP 1
* ALL ARM OVER, DROP & SPRIG UP PIPING TO BE 1" SCH. 40
-RESIDENTIAL FLOORS 1 THRU 5: LIGHT HAZARD-RESIDENTIAL
-STANDPIPE: CLASS I
* SEE HANGER DETAILS FOR PIPE ATTACHMENTS.
-ALL OTHER AREAS: LIGHT HAZARD
PO
RT
LA
ND
, O
R
NE
M
ON
RO
E S
T &
N
E M
LK
JR
B
LV
D
SIT
E C
ON
TA
CT
:
PH
:
PO
RT
LA
ND
, O
R 9
72
19
67
20
S
W M
AC
AD
AM
A
VE
, S
UIT
E #
31
0
CO
NT
AC
T: C
HU
CK
C
ON
DIT
T
PH
: 5
03
2
90
-5
00
9
69
2
-ATTIC: WET SYSTEM, DRY UPRIGHTS, LIGHT HAZARD .10/900 SQ.FT.
RESIDENTIAL NOTES:
* ALL PIPE THIS FLOOR TO BE STEEL.
* SPRINKLERS ARE NOT REQUIRED IN BATHROOMS < 55 SQ. FT.
* MINIMUM SPACING BETWEEN RESIDENTIAL SPRINKLERS IS 8'-0".
* SPRINKLERS ARE NOT REQUIRED IN CLOSETS < 12 SQ. FT.
* DESIGN AND INSTALLATION TO COMPLY WITH NFPA 13.
* BUILDING TO BE HEATED TO MAINTAIN A MIN. OF 40°F.
* SEE BUILDING SECTION ON SHEET FP-1 FOR CEILING HEIGHT.
TYCO, DS-1 DRY UPRIGHT, 1/2",K=5.6 BRZ, 200°
49