4
107 108 109 103 104 106 101 ramp dn ramp dn Porch up Stair #2 Stor. Closet up Corridor Stair #1 Tele. / CATV Lobby Elevator Sprklr. Riser Rm. Elev. Mach. Rm. Elect. Rm. Unit 1B-2 Unit 1B-2 Unit 1B-1 Unit S-1 Unit S-2 FIRST FLOOR UNIT SECOND FLOOR UNIT THIRD FLOOR UNIT FOURTH FLOOR UNIT FIFTH FLOOR UNIT CORRIDOR CORRIDOR CORRIDOR CORRIDOR CORRIDOR FIRST FLOOR UNIT SECOND FLOOR UNIT THIRD FLOOR UNIT FOURTH FLOOR UNIT FIFTH FLOOR UNIT ELECTRICAL ROOM TOP / PLATE FIN. FLOOR (TOP / SUBFLOOR) FIN. FLOOR (TOP / SLAB) TOP / PLATE FIN. FLOOR (TOP / SUBFLOOR) TOP / PLATE FIN. FLOOR (TOP / SUBFLOOR) TOP / PLATE FIN. FLOOR (TOP / SUBFLOOR) TOP / PLATE FIN. GRADE TOP / PLATE FIRE FLOW DATA 2. ALL OTHER UNDERGROUND PIPING BY CITY. 1. FIRE SPRINKLER CONTRACTOR TO START AT 5'-0" OUTSIDE BUILDING. 3. ALL UNDERGROUND PIPE TO BE INSTALLED RODDED AND/OR BLOCKED, FLUSHED AND TESTED PER NFPA 13 & 24. U.G. NOTES 4. MINIMUM BURY 3'-0". 5. THIS SITE PLAN IS FOR FIRE REFERENCE ONLY. SEE CIVIL DRAWINGS FOR MORE DETAILS. LOCATION: MONROE & MLK JR SOURCE: PORTLAND WATER BUREAU FLOW: 1300 GPM MAX STATIC PRESSURE: 78 PSI RESIDUAL PRESSURE: 56 PSI TEST I.D. NUMBER: 1402 STATIC PRESSURE USED: 62 PSI (JAMIE W 503 823 9083) PORTLAND, OR NE MONROE ST & NE MLK JR BLVD SITE CONTACT: DESCRIPTION HEAD LEGEND QUANTITY PH: PORTLAND, OR 97219 6720 SW MACADAM AVE, SUITE #310 CONTACT: CHUCK CONDITT PH: 503 290-5009

Upload: phunghanh

Post on 27-May-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

107

108

109

103

104

106

101

ram

p dn

ram

p dn

Porch

up

Stair #2

Stor. Closet

up

Corridor

Stair

#1

Tele. / CATV

Lobby

Elevator

Sprklr.

Riser Rm.

Elev.

Mach. Rm.

Elect. Rm.

Unit 1B-2

Unit 1B-2

Unit 1B-1

Unit S-1

Unit S-2 FIRST

FLOOR

UNIT

SECOND

FLOOR

UNIT

THIRD

FLOOR

UNIT

FOURTH

FLOOR

UNIT

FIFTH

FLOOR

UNIT

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

FIRST

FLOOR

UNIT

SECOND

FLOOR

UNIT

THIRD

FLOOR

UNIT

FOURTH

FLOOR

UNIT

FIFTH

FLOOR

UNIT

ELECTRICAL

ROOM

TOP / PLATE

FIN. FLOOR

(TOP / SUBFLOOR)

FIN. FLOOR

(TOP / SLAB)

TOP / PLATE

FIN. FLOOR

(TOP / SUBFLOOR)

TOP / PLATE

FIN. FLOOR

(TOP / SUBFLOOR)

TOP / PLATE

FIN. FLOOR

(TOP / SUBFLOOR)

TOP / PLATE

FIN. GRADE

TOP / PLATE

FIRE FLOW DATA

2. ALL OTHER UNDERGROUND PIPING BY CITY.

1. FIRE SPRINKLER CONTRACTOR TO START AT 5'-0" OUTSIDE BUILDING.

3. ALL UNDERGROUND PIPE TO BE INSTALLED RODDED AND/OR

BLOCKED, FLUSHED AND TESTED PER NFPA 13 & 24.

U.G. NOTES

4. MINIMUM BURY 3'-0".

5. THIS SITE PLAN IS FOR FIRE REFERENCE ONLY.

SEE CIVIL DRAWINGS FOR MORE DETAILS.

LOCATION: MONROE & MLK JR

SOURCE: PORTLAND WATER BUREAU

FLOW: 1300 GPM

MAX STATIC PRESSURE: 78 PSI

RESIDUAL PRESSURE: 56 PSI

TEST I.D. NUMBER: 1402

STATIC PRESSURE USED: 62 PSI

(JAMIE W 503 823 9083)

PO

RT

LA

ND

, O

R

NE

M

ON

RO

E S

T &

N

E M

LK

JR

B

LV

D

SIT

E C

ON

TA

CT

:

DE

SC

RIP

TIO

N

HE

AD

L

EG

EN

D

QU

AN

TIT

Y

PH

:

PO

RT

LA

ND

, O

R 9

72

19

67

20

S

W M

AC

AD

AM

A

VE

, S

UIT

E #

31

0

CO

NT

AC

T: C

HU

CK

C

ON

DIT

T

PH

: 5

03

2

90

-5

00

9

107

108

109

103

104

105

106

101

Porch

up

Stair #2

Stor. Cl.

up

Stair

#1

Tele. / CATV

Lobby

Elevator

Sprklr.

Riser Rm.

Elev.

Mach. Rm.

Elect. Rm.

Unit 1B-2

Unit 1B-2

Unit 1B-2

Unit 1B-1

Unit S-1

Unit S-2

N.E. Monroe Street

N.E

. M

LK

Jr. B

lvd

.

RAMP

BIKE RACKS

RAMP

TO

TA

L6

6

DE

SC

RIP

TIO

N

HE

AD

L

EG

EN

D

QU

AN

TIT

Y

TYCO, TY-B, 1/2",K=5.6, BRONZE, SSU, 155°

13

TYCO, TY-L, 1/2",K=5.6, BRZ, SSSW, 200°

2

* SYSTEM DESIGN IS BASED ON NFPA 13 & 14, 2007 ED. AS FOLLOWS:

* ALL GROOVED COUPLINGS TO BE RIGID U.N.O.(FC= FLEX COUP)

* ALL THREADED PIPING TO BE SCH. 40 BLACK.

GENERAL NOTES

* ALL GROOVED WET PIPING TO BE EDDY FLOW , BLACK.

-MECHANICAL ,ELECTRICAL & PARKING: ORDINARY HAZARD GROUP 1

* ALL ARM OVER, DROP & SPRIG UP PIPING TO BE 1" SCH. 40

-RESIDENTIAL FLOORS 1 THRU 5: LIGHT HAZARD-RESIDENTIAL

* ALL GROOVED DRY PIPING TO BE SCH 10, BLACK.

-STANDPIPE: CLASS I

* SEE HANGER DETAILS FOR PIPE ATTACHMENTS.

-ALL OTHER AREAS: LIGHT HAZARD

PO

RT

LA

ND

, O

R

NE

M

ON

RO

E S

T &

N

E M

LK

JR

B

LV

D

SIT

E C

ON

TA

CT

:

PH

:

PO

RT

LA

ND

, O

R 9

72

19

67

20

S

W M

AC

AD

AM

A

VE

, S

UIT

E #

31

0

CO

NT

AC

T: C

HU

CK

C

ON

DIT

T

PH

: 5

03

2

90

-5

00

9

45

4

TYCO, DS-1 DRY SIDEWALL, 1/2",K=5.6 BRZ, 155°

2

-ATTIC: WET SYSTEM, DRY UPRIGHTS, LIGHT HAZARD .10/900 SQ.FT.

RESIDENTIAL NOTES:

* ALL PIPE FOR FLOORS 2 THRU 4 TO 1" CPVC U.N.O.

* ALL CPVC HANGERS TO BE FEILD LOCATED PER PIPE LISTING.

* SPRINKLERS ARE NOT REQUIRED IN BATHROOMS < 55 SQ. FT.

* MINIMUM SPACING BETWEEN RESIDENTIAL SPRINKLERS IS 8'-0".

* SPRINKLERS ARE NOT REQUIRED IN CLOSETS < 12 SQ. FT.

* DESIGN AND INSTALLATION TO COMPLY WITH NFPA 13.

* BUILDING TO BE HEATED TO MAINTAIN A MIN. OF 40°F.

* SEE BUILDING SECTION ON SHEET FP-1 FOR CEILING HEIGHT.

Unit S-3

Stair #2

Stair

#1

Unit S-5

Unit 1B-6

Corridor

METAL AWNING BELOW

OVER LONG-TERM BIKE

PARKING AREA

METAL AWNING

BELOW OVER

ENTRY / PORCH

AREA

Elevator

Stor.

Room

DE

SC

RIP

TIO

N

HE

AD

L

EG

EN

D

QU

AN

TIT

Y

NOTES:

* ALL PIPE FOR FLOORS 2 THRU 4 TO 1" CPVC U.N.O.

* ALL CPVC HANGERS TO BE FEILD LOCATED PER PIPE LISTING.

* SPRINKLERS ARE NOT REQUIRED IN BATHROOMS < 55 SQ. FT.

* MINIMUM SPACING BETWEEN RESIDENTIAL SPRINKLERS IS 8'-0".

PO

RT

LA

ND

, O

R

NE

M

ON

RO

E S

T &

N

E M

LK

JR

B

LV

D

SIT

E C

ON

TA

CT

:

PH

:

PO

RT

LA

ND

, O

R 9

72

19

67

20

S

W M

AC

AD

AM

A

VE

, S

UIT

E #

31

0

CO

NT

AC

T: C

HU

CK

C

ON

DIT

T

PH

: 5

03

2

90

-5

00

9

69

2

* SPRINKLERS ARE NOT REQUIRED IN CLOSETS < 12 SQ. FT.

* DESIGN AND INSTALLATION TO COMPLY WITH NFPA 13.

* BUILDING TO BE HEATED TO MAINTAIN A MIN. OF 40°F.

* SEE BUILDING SECTION ON SHEET FP-1 FOR CEILING HEIGHT.

-T

OT

AL

F

OR

F

LO

OR

S 2

, 3

&

4

(7

1x3

)2

13

-T

OT

AL

P

ER

F

LO

OR

71

Unit S-3

Stair

#1

Stair #2

Unit S-5

Unit 1B-5

Unit 1B-4

Unit S-4

Unit 1B-6

Unit 1B-6

Unit 2B-1

Unit S-3

Unit 1B-3

Corridor

Stor.

Room

METAL AWNING BELOW

OVER LONG-TERM BIKE

PARKING AREA

Corridor

Elevator

METAL AWNING BELOW

OVER LONG-TERM BIKE

PARKING AREA

ME

TA

L A

WN

IN

G

BE

LO

W O

VE

R

EN

TR

Y / P

OR

CH

AR

EA

TO

TA

L1

21

DE

SC

RIP

TIO

N

HE

AD

L

EG

EN

D

QU

AN

TIT

Y

TYCO, TY-L, 1/2",K=5.6, BRZ, SSSW, 200°

1

* SYSTEM DESIGN IS BASED ON NFPA 13 & 14, 2007 ED. AS FOLLOWS:

* ALL GROOVED COUPLINGS TO BE RIGID U.N.O.(FC= FLEX COUP)

* ALL THREADED PIPING TO BE SCH. 40 BLACK.

GENERAL NOTES

* ALL GROOVED PIPING TO BE EDDY FLOW , BLACK.

-MECHANICAL ,ELECTRICAL & PARKING: ORDINARY HAZARD GROUP 1

* ALL ARM OVER, DROP & SPRIG UP PIPING TO BE 1" SCH. 40

-RESIDENTIAL FLOORS 1 THRU 5: LIGHT HAZARD-RESIDENTIAL

-STANDPIPE: CLASS I

* SEE HANGER DETAILS FOR PIPE ATTACHMENTS.

-ALL OTHER AREAS: LIGHT HAZARD

PO

RT

LA

ND

, O

R

NE

M

ON

RO

E S

T &

N

E M

LK

JR

B

LV

D

SIT

E C

ON

TA

CT

:

PH

:

PO

RT

LA

ND

, O

R 9

72

19

67

20

S

W M

AC

AD

AM

A

VE

, S

UIT

E #

31

0

CO

NT

AC

T: C

HU

CK

C

ON

DIT

T

PH

: 5

03

2

90

-5

00

9

69

2

-ATTIC: WET SYSTEM, DRY UPRIGHTS, LIGHT HAZARD .10/900 SQ.FT.

RESIDENTIAL NOTES:

* ALL PIPE THIS FLOOR TO BE STEEL.

* SPRINKLERS ARE NOT REQUIRED IN BATHROOMS < 55 SQ. FT.

* MINIMUM SPACING BETWEEN RESIDENTIAL SPRINKLERS IS 8'-0".

* SPRINKLERS ARE NOT REQUIRED IN CLOSETS < 12 SQ. FT.

* DESIGN AND INSTALLATION TO COMPLY WITH NFPA 13.

* BUILDING TO BE HEATED TO MAINTAIN A MIN. OF 40°F.

* SEE BUILDING SECTION ON SHEET FP-1 FOR CEILING HEIGHT.

TYCO, DS-1 DRY UPRIGHT, 1/2",K=5.6 BRZ, 200°

49