uic loader and unloader automation transformation
TRANSCRIPT
![Page 1: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/1.jpg)
http://www.smthelp.com
Universial Inserter Loader And Unloader Automation Transformation
Shenzhen Southern Machinery Sales and Service Co., Ltd
![Page 2: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/2.jpg)
http://www.smthelp.com
• Reduce the operator labor intensity • Reduce the equipment efficiency loss caused by operator sabotage • Save operators, one person can operate several machines. • Can the attachment (In - line) SMT production line. • A more secure protection operation. • Automatic production mode.
Manual loader and unloader
Automatic loader and unloader(material box model)
Automatic loader and unloade(attachment
model)
![Page 3: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/3.jpg)
http://www.smthelp.com
Technical renovation project mainly includes four modules setup and training:
1. Bridge type automatic institution adapted for changing plate 2. Container loader and material box unloader 3. Electric control circuit 4. Software Settings.
The content of the technical
5.Training
• Training operation for operator
• Maintenance engineer training
![Page 4: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/4.jpg)
http://www.smthelp.com
The implementation steps • Technical renovation engineering installation and debugging need about 1.5 days • Operation training and maintenance training need 0.5 days
Component installation project include: 1.Installation of bridge type automatic agency for changing board
2.Rotary worktable PCB fixture from stationary orbit type
Lift bridge components
Fixed clamp Rail clamp
![Page 5: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/5.jpg)
http://www.smthelp.com
The implementation steps 3.Installation material box loader and unloader machine
4.Electric control circuit
5.Software Settings.
![Page 6: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/6.jpg)
http://www.smthelp.com
Customers give evaluation is: stable and reliable, simple and easy to use and cost-effective
![Page 7: Uic loader and unloader automation transformation](https://reader034.vdocument.in/reader034/viewer/2022042520/58f1b1411a28ab95128b45df/html5/thumbnails/7.jpg)
http://www.smthelp.com
Southern Machinery