2
FILE SYSTEM The ZONE CONTROL SYSTEM – Protecting Your Interests Content 1. Policy 2. Organising 3. Implementing 4. Measuring Performance 5. Reviewing Performance 6. Auditing (local inspection) 7. ZONE CONTROL SYSTEM 8. Supervise – Management Practice 9. Inform. Instruct and Train Zone Control System FIRE Manual Handling RISK Management Chemical Safety – COSHH Electrical Signs and Signage Accident Prevention First Aid RIDDOR Investigations Contractors on site File System Auditing PPE Issued Induction Purchasing 10. Fire Risk Assessment 11. General Risk Assessments 12. Manual Handling Risk Assessments 13. COSHH Risk Assessments 14. Electrical – PAT Testing 15. Equipment 16. Contractors on Site 17. PPE issue form 18. Purchasing 19. External Safety Audit 38 7 REVIEWING PERFORMANCE Observations Who? Where ? What? o Job/Event/Activity/Task People Response When ? How? TIME Location/ZONE/Area Why? Cos t

Upload: clive-burgess

Post on 14-Apr-2017

167 views

Category:

Technology


1 download

TRANSCRIPT

Page 1: Uks iosh 38   7

FILE SYSTEM

The ZONE CONTROL SYSTEM – Protecting Your Interests

Content1. Policy2. Organising3. Implementing4. Measuring Performance5. Reviewing Performance6. Auditing (local inspection)7. ZONE CONTROL SYSTEM8. Supervise – Management Practice9. Inform. Instruct and Train

Zone Control System FIRE Manual Handling RISK Management Chemical Safety – COSHH Electrical Signs and Signage Accident Prevention First Aid RIDDOR Investigations Contractors on site File System Auditing PPE Issued Induction Purchasing

10. Fire Risk Assessment11. General Risk Assessments12. Manual Handling Risk Assessments13. COSHH Risk Assessments14. Electrical – PAT Testing15. Equipment16. Contractors on Site 17. PPE issue form18. Purchasing19. External Safety Audit

387

REVIEWING PERFORMANCE

Observations

Who?

Where?

What?

o

Job/Event/Activity/Task

People ResponseWhen?

How?

TIME

Location/ZONE/Area

Why?Cost

Page 2: Uks iosh 38   7

INTERNAL AUDITINGLocal Inspections:

What In Place/CAR

Fire Safety Equipment checkEmergency Lighting TestFire DrillsHousekeeping checkFirst Aid Kit - FullCertificated ‘First Aider’Health and Safety Poster/LeafletsRisk Assessments – In dateFire Risk Assessment – Carried OutAccident Book (locked)Security System check log bookInduction – Staff Training – Records maintainedCOSHH Risk Assessments in use (instructions)COSHH Cupboard (locked)Electrical Equipment (listed)Electrical Equipment PAT TestedWork Equipment (listed)Sign and Signposts in correct location and relevantManual Handling (observed) Training completed Safe System of Work in useNear misses/Dangerous occurrences Reported/RecordedFire/Security Logbook – Signed & DatedHSE Poster DisplayedHSE Policy DisplayedOutside Safety Audit carried outSenior Management AuditInsurance Audit carried outHygiene Certificate required?Hygiene Certification (Employees)

40

5

IMPLEMENTING

NAME JOB/EVENT/ACTIVITY/TASK

On back of 8 - 37