ull & erd wells - | iadd

20
1 ULL & ERD Wells Challenges & Solutions

Upload: others

Post on 11-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ULL & ERD Wells - | IADD

1

ULL & ERD Wells

Challenges & Solutions

Page 2: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Speaker

Iain Hutchison

15 – 16 February 2017

2

Page 3: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Who-is Iain Hutchison?

CEng & Fellow of IMechE

Merlin ERD President

25+ Year Drilling Engineer

– Conocophillips, Marathon, Shell, Apache, Unocal, Lloyds of

London, Woodside, BHP, K&M etc.

ULL & ERD independent expert

Spitfire & P51d Mustang pilot

3

Page 4: ULL & ERD Wells - | IADD

Todays Presentation

Achievements ULL & ERD

Differences

What are the limits?

– How to predict, then extend?

Critical success factors

4

Page 5: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

The Start

5

Page 6: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

What’s Possible

6

Page 7: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

The Start

7

Page 8: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Progress

8

Page 9: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Industry Achievements

Page 10: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Drainage Area

Copyright © 2016 Merlin ERD Ltd

18,000

Ft

35,000

Ft

40,000

Ft

Page 11: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Differences ULL & ERD

ERD : access reservoir

ULL : reservoir contact

ULL : sub-set of ERD

– Use ERD innovations

– Toe Contribution

11

Page 12: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Hole Cleaning Regimes

Page 13: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Low Hanging Fruit (NPT)

Avoidance is better than cure

Page 14: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Limits

• Equipment• Lease Size• Completion• Production• Well Maintenance, P&A• Aspirations

BeliefConfidence

Page 15: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Limits

• Equipment• Lease Size• Completion• Production• Well Maintenance, P&A• Aspirations

BeliefConfidence

Page 16: ULL & ERD Wells - | IADD

Engineering Modelling

Page 17: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Who are Merlin ERD?

Industry Leaders - independent ERD & ULL services

• Engineering studies

• Ops Preparedness & Training

• Rigsite support

IADC contributing authors

Making your: - problems smaller,- profits bigger

- lives easier

Offices: USA, Europe & Australia

Page 18: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

Conclusion

Industry has

– Drilled beyond 44,000 ft

– Lateral beyond 36,000 ft

– Capability beyond 50,000 ft

Limited by dreams & aspirations

Each case on its merits

Simple not Easy!

18

Page 19: ULL & ERD Wells - | IADD

19

What’s Your Limit?

www.MerlinERD.com

T: 713 730 3035

E: [email protected]

Contact us to extend it:

Page 20: ULL & ERD Wells - | IADD

©Merlin ERD Ltd 2017: Licence required for use

QUESTIONS?

20Engage the best: www.MerlinERD.com