Nokia Standard Document Template

ULTRASITE EDGE BTS

SITE FOLDER

SITE NAME

SITE ID

SITE ADDRESS

Site Specific Details & Documents

Antenna and Feeder System

BTS Installation

BTS Commissioning

BTS Integration

Site Acceptance Report & Certificates

Site layout & VSWR Plots

1. SITE SPECIFIC DETAILS and documents1.1 Site Configuration

Sector 1Sector 2Sector 3

++

Number of Ultra EDGE Cabinet:

Frequency Band Used:

1.2 TRX Configuration This site is to be installed and commissioned according to the following Site Configuration: Cabinet 1, Installed TRX Configuration

TRXARFNTRXARFN

1 stTRX........7thTRX........

2 ndTRX........8thTRX........

3 rdTRX........9thTRX........

4 thTRX........10 thTRX........

5 thTRX........11 thTRX........

6 thTRX........12 thTRX........

1.3 Nokia UltraSite Base Station Cabinet.

1.3.1 RX DIVERSITY:

(No diversity

(By-pass ( 6-way diversity(2-way diversity

(4-way diversity

1.3.2 TX COMBINING:

( 2-way WIDE BAND COMBINING 4-way WIDE BAND COMBINING

REMOTE TUNE COMBINING BY PASS COMBINING1.4SITE SPECIFIC DOCUMENT LISTAll CUSTOMER Site Specific Documents to be listed in the following table and the documents placed following this section.

DOCUMENT NUMBER

If applicableDOCUMENT NAME

ATTACHED

Site Layout

VSWR Plots

Abis time slot allocations DATA

( Tick the appropriate box indicating document attached

(

RF & TRANSMISSION DATA

RF Data

BTS TYPE

TRX

TYPE OF COMBINERS

No. OF COMBINERS

NO. OF ANTENNAE (Total)

TYPE OF ANTENNAE (Model No.)

HEIGHT OF GSM ANTENNAE

ANTENNAE AZIMUTH(degrees)

GSM ANTENNAE TILT(degrees)

FEEDER TYPE

Powrer Attenuation, if any

Transmission Data

Link To: Near EndFar EndRemark

SITE ID

BSC

LINK CAPACITY

LENGTH (km)

LATITUDE

LONGITUDE

HEIGHT(m)

ANTENNA AZIMUTH

ANTENNA TYPE

ANTENNA SIZE(m)

ANTENNAE HEIGHT(m)

POLARIZATION

RADIO EQUIPMENT

TX POWER (dBm)

LINK TERMINAL EQUIPMENT

BAND

FREQ. DESIG.

CENTER FREQUENCY(Ghz)

RX LEVEL(dBm)

FLAT FADE MARGIN (dB)

ANNUAL AVAILABILITY (%)

SPACE DIVERSITY (Y/N)

PCM PLAN(BTS TO BSC)

2. ANTENNA & FEEDER SYSTEM

2.1 Antenna and Feeder System Configuration

Antenna

Sector 1Sector 2Sector 3

Antenna Type/

Serial Nos.

Ant. Height

(m)

Lobe Direction

(Deg.)

Mechanical

Down Tilt Angle

Feeder Type

(, 7/8, 1 5/8)(

(

(

Feeder Code

(CS Code)

Feeder Length

(m.)

External Jumper Length

(m.)

Internal Jumper Length

(m.)

Grounding KitsAnt. 1

InstalledAnt. 2

2.2 ANTENNA & FEEDER COMMISSIONING REPORTITEMDESCRIPTIONCHECKED

(

1FINISHING CHECKLIST

1.1All cables restored to normal position for BTS operation

1.2All connectors properly tightened

1.3All external connectors sealed and waterproof

1.4Paper copy of each Antenna Sweep result included following this section

1.5Each test result printout initialed by the Testing Engineer

Remarks:CARRIED OUT BY:

NAME: _______________________________SIGNED: ________________________DATE: _____/_____/_____

(NSN Representative)

3. BTS INSTALLATION

3.1 TRANSMISSION UNIT

Check the Transmission Unit model used :( FXC RRI

Check the used FB ports:

( FB-1

( CH1 ( CH2 ( CH3 ( CH4 ( CH5 ( CH6 ( CH7 ( CH8 ( CH9 ( CH10 ( CH11 ( CH12 ( CH13 ( CH14

( CH15 ( CH16 ( FB-2 ( CH1 ( CH2 ( CH3 ( CH4 ( CH5 ( CH6 ( CH7

( CH8 ( CH9 ( CH10 ( CH11 ( CH12 ( CH13 ( CH14

( CH15 ( CH16

( FXC E1/T1

Check the used IF ports: ( IF-1( IF-2( IF-3( IF-4( FIUCheck the used FB ports:

( FB-1

( CH1 ( CH2 ( CH3 ( CH4 ( CH5 ( CH6 ( CH7

( CH8 ( CH9 ( CH10 ( CH11 ( CH12 ( CH13 ( CH14

( CH15 ( CH16

( FB-2 ( CH1 ( CH2 ( CH3 ( CH4 ( CH5 ( CH6 ( CH7

( CH8 ( CH9 ( CH10 ( CH11 ( CH12 ( CH13 ( CH14

( CH15 ( CH16

4. BTS COMMISSIONING REPORT4.1DC Supply Voltages Measure the voltage of each DC supply at the connector on top of each BTS rack - observe correct polarity!

BTS Measured Voltage

4.2Power-up Test

POWER UP PROCEDURECHECKED

(

Check that PWSB unit has yellow led on

PWSB turned on

Status after Power Up

LEDsCHECKED

UNITRED

YEL

GRE

(

FXCRRI/E1T1

BOIA

PWSB

DVxxs

RTxxs

BB2As

TSxx

4.4 Cooling Fan CheckBASIC CABINET

FAN UNITS

Unit Cooling Fans

CHECKED (

Note: Cooling fans are checked only visually. Number of working unit cooling fans depends of the BTS configuration:

4.5 Internal Alarm InspectionList any other PERMITTED Active Alarms:

ACTIVE

Alarm NumberALARM DESCRIPTION( Active Alarms Present

4.6 Power MeasurementsTransmitter Output Power Level:

PWR LEVELULTRASITE CABINET 1

BCCH via BTS ManagerTRX 1TRX 2TRX 3TRX 4TRX 5TRX 6TRX 7TRX 8TRX 9TRX 10TRX 11TRX 12

Level = 0

4.7MCLG Frequency TuningUse minimum of 10 sec. gate time

MCLG PreparationsCHECKED

Test equipment warmed up as per manufacturers recommendations

Test Equip:Serial N:Cal. Date:

Enter Initial DAC Value Here:

Adjustment of MCLG frequency for 13.000.000Hz 0.1 HzCHECKED

DAC Value saved to EEPROM

Enter new DAC value here:

4.8 TRX Loop Test

(A hard copy of the BTS Commissioning Report showing successfully passed TRX Loop Tests is attached to this document

Note! Results should show FER and BER results = 0.0 %, RBER results ( 0.2%

4.9 Finishing ChecklistItemDESCRIPTIONCHECKED

(

1EQUIPMENT FINISHING

1.1All cables and connectors restored to normal position for BTS operation

1.2All connectors properly tightened

1.3Sector & cable labels had been affixed

1.4BTS Reset and ready for connection to BSC

1.5Equipment Room cleaned and tidy

Notes on BTS Commissioning:

________________________________________________________________________________________________________________________________________________________________________CARRIED OUT BY

NAME: _______________________________SIGNED: ________________________DATE: _____/_____/_____

(NSN Representative)5. BTS INTEGRATION TEST REPORT5.1 General

Integration of the BTS site into the BSS network is to be conducted after the BTS has been commissioned. During the integration process test calls are performed on all traffic carrying timeslots to confirm equipment operation.5.2

Abis Transmission Link Checked

(

OMU link ON

TRXSIG linkON

5.3

BTS Initialization

ITEMCHECKED (

Configuration data download from BSC OK (BCF in supervisory state)

TRXs in Supervisory state

RF Channel Numbers correct on TRXs

BTS alarm LED status ok

All BTS Internal Alarms cleared at BSC/OMC

5.4 Abis Loop Test

A hard copy of the BTS Commissioning Report showing successfully passed TRX-Abis Tests is attached to this document.

Note! This test can only be performed if BSC connection is established. Results should show BER and HDLC = 0%

5.5. External Alarm Inspection

I/P

No:BSC

Alarm No:Alarm DescriptionStatus

Critical/

Maj/MinAlarm

Polarity

H/L Alarm

Enabled

(()Alarm

Tested on OMC/BSC

(

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

5.6. BTS Test Calls

Sector 1, 2, 3

Testing of all Call CasesPlease check box when Call is OK

SECTORTRX ARFNTS0TS1TS2TS3TS4TS5TS6TS7

SECTOR 1TRX1

TRX2

TRX3

TRX4

TRX5

TRX6

TRX7

TRX8

TRX9

TRX10

TRX11

TRX12

SECTOR 2TRX1

TRX2

TRX3

TRX4

TRX5

TRX6

TRX7

TRX8

TRX9

TRX10

TRX11

TRX12

SECTOR 3TRX1

TRX2

TRX3

TRX4

TRX5

TRX6

TRX7

TRX8

TRX9

TRX10

TRX11

TRX12

5.7Finishing the IntegrationITEMCHECKED (

All BTS alarms cleared locally and at BSC/OMC

MCLG clock(s) checked

13.000.000Hz 0.1Hz

All cables/settings restored for normal BTS operation

Equipment room cleaned and tidy

Notes on BTS Integration

1. ________________________________________________________________________________

2. ________________________________________________________________________________

CARRIED OUT BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(NSN Representative)WITNESSED BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(VODAFONE Representative)

6.SITE ACCEPTANCE DOCUMENTS

CERTIFICATES OF COMPLETION

6.1Certificate of Completion for Antenna Installation6.2 Certificate of Completion for Ultra BTS installation6.3 Certificate of Completion for Ultra BTS Integration &Commissioning6.4 Site Acceptance Certificate6.5 Certificate of Completion for MW Link Installation & Commissioning6.1 CERTIFICATE OF COMPLETION

FOR ANTENNA INSTALLATION

CUSTOMER NAME

SITE NAME

SITE NO

SITE ADDRESS

STAGECOMPLETE/OK(INITIALS)COMMENTS/ DEFICIENCY

ANTENNA TILT

ANTENNA ORIENTATION

ON BEHALF OF:

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(NSN Representative)WITNESSED BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(VODAFONE Representative) 6.2 CERTIFICATE OF COMPLETION FOR

ULTRA BTS INSTALLATIONCUSTOMER NAME

SITE NAME

SITE NO

SITE ADDRESS

STAGECOMPLETE/OK(INITIALS)COMMENTS/ DEFICIENCY

PREPERATIONS

CABINET INSTALLATION

INTERFACE CABLING

UNIT INSTALLATION AND SETTINGS

FINISHING THE INSTALLATION

ON BEHALF OF:

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(NSN Representative)WITNESSED BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(VODAFONE Representative)6.3 CERTIFICATE OF COMPLETION FOR

ULTRA BTS INTEGRATION & COMMISSIONING

CUSTOMER NAME

SITE NAME

SITE NO

SITE ADDRESS

SOFTWARE Ver of the BTS

SOFTWARE Version of Managar SW used for Commissioning

STAGECOMPLETE/OK

(INITIALS)COMMENTS/ DEFICIENCY

PREPERATIONS

EQUIPMENT INSTALLATION

COMMISSIONING TESTS

FINISHING THE COMMISSIONING

ON BEHALF OF:

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(NSN Representative)WITNESSED BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(VODAFONE Representative)6.4 SITE ACCEPTANCE CERTIFICATE

This is to certify that the said equipment has been accepted

SITE NAME

SITE ID

SITE CONFIG...

SITE ADDRESS

ELEMENT ID

ULTRA INDOOR BTS

ULTRA OUTDOOR BTS

ULTRA MINI BTS

ANY OTHER

ON BEHALF OF:

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(NSN Representative)WITNESSED BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(VODAFONE Representative)

6.5 CERTIFICATE OF COMPLETION FOR MW LINK INSTALLATION &COMMISSIONING

MW COMMISSIONINGSITE ASITE B

Single terminal / main unit from redundant pairRedundant unitSingle terminal / main unit from redundant pairRedundant unit

Site Name

Antenna Size

Antenna Height

Antenna Make

IF Cable make (RG223/RG214/Flexbus)

Antenna Orientation (Deg)

Polarisation

Frequency___________KHz____________Khz

Capacity______________________

Calculated RX level

___________dBm___________dBm___________dBm___________dBm

Measured RX level

___________dBm___________dBm___________dBm___________dBm

The difference between above values is acceptable (+4 -2 dB)( OK( OK( OK( OK

Measured AGC voltage ____ , ____V ____ , ____V ____ , ____V ____ , ____V

Configuration stored on disk( OK

Filename: _______________( OK

Filename: ______________( OK

Filename: ______________( OK

Filename: ______________

Statistics stored on disk( OK

Filename: _______________( OK

Filename: ______________( OK

Filename: ______________( OK

Filename: ______________

NMS commissioning( OK (tested locally)

( OK (tested from OMC)( OK (tested locally)

( OK (tested from OMC)( OK (tested locally)

( OK (tested from OMC)( OK (tested locally)

( OK (tested from OMC)

ON BEHALF OF:

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(NSN Representative)WITNESSED BY

NAME: _______________________________SIGNED: _________________________DATE: _____/_____/_____

(VODAFONE Representative)

PAGE 22ULTRASITE EDGE BTS __________________________________________________________________________________________________