umgeni river canalisation: final basic assessment …projects.gibb.co.za/portals/3/projects/201305...
TRANSCRIPT
Head Office 14 Eglin Road, Sunninghill 2191 Johannesburg, South Africa Tel: +27 11 519 4600 Fax: +27 11 807 5670 www.gibb.co.za
DAEA EIA Reference: DM/0068/2012
eThekwini Municipality: Coastal, Stormwater and Catchment Department
UMGENI RIVER CANALISATION: FINAL BASIC ASSESSMENT REPORT – Revision 0.1 Volume 1
April 2013 J25130/D
\
UMGENI RIVER CANALISATION: BASIC ASSESSMENT REPORT
Revision 0.1
CONTENTS
Volume Description
VOLUME 1
BASIC ASSESSMENT REPORT
APPENDIX A Site Plans
APPENDIX B Photographs
APPENDIX C Facility Illustration
VOLUME 2
APPENDIX D Specialist Reports
APPENDIX D1 Biodiversity
APPENDIX D2 Heritage
APPENDIX D3 Umgeni Canal Assessment (Flood Level)
APPENDIXD4 Umgeni Canal Soils Investigation
VOLUME 3
APPENDIX E Public Participation
VOLUME 4
APPENDIX F Environmental Management Programme
VOLUME 5
APPENDIX G Other Information
APPENDIX G1 Final Scoping Study (2005)
APPENDIX G2 Record of Decision (2006)
APPENDIX G3 Water Use Licence (2006)
APPENDIX G4 Exemption from Mining Permit (2008)
APPENDIX G5 GIBB Document Control Sheet