undergraduate activity - amira
TRANSCRIPT
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 1/15
Undergraduate
Activity Amira Fatiha binti Baharudin
KCT15005
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 2/15
Software Quality
AssuranceBooking Badminton Court from Sports
Complex
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 3/15
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 4/15
Individual TasksCMMI Process Area
Member CMMI Process Area
Tan Jia Chin L2 CM, L5 OID, L5 CAR Amin Muzafar L2 REQM, L4 OPP, L4 QPM
Nasihah L2 SAM, L3 OPF, L3 OPD, L3
OT
Ilykaviron Isal L2 PPQA, L3 PI, L3 VAL, L3
VER
Nadiya Syafiqah L2 MA, L3 DAR, L3 RSKM, L3
IPM
Nur Adiella L2 PP, L2 PMC, L3 RD, L3 TS
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 5/15
Interview Process
They have interview few staffs in UMP Sports Complex.
Now, Sports Complex only use the Walk-in method to booking badmintoncourt.
The staffs gave up to use the E-Comm since the system have manyshortcomings in the process of booking badminton court.
For example,
• 1) Cannot make online payment.
• 2) If 1 student book all the badminton court, other student can’t playbadminton.
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 6/15
Significant Process Areas for Improving
Booking Badminton Court Process
• Nadiya: Measurement & Analysis (MA)
• Adiela: Project Planning (PP)
• Nasihah: Organizational Process Focus (OPF)
• Amin: Requirement Management (RM)
• Ilykaviron: Process & Product Quality Assurance (PPQA)
• Jerry: Causal Analysis & Resolution (CAR)
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 7/15
Summary of Project
• Currently, the E-Comm system have many problems, so they use walk-in booking method. But this walk-in method is not
so convenience for staffs and students.
• Staffs prefer to use the online system if the system is better touse, prefer to develop a new system for Sports Complex.
• With the CMMI process, they can define and suggest how tomake the system alive and useful for UMP staffs and students.
• From their findings, they stated that process areas in level 2 inCMMI is the most significant areas, since these areas areessential in order to understand the process and detecting theproblems or weaknesses in managing booking badmintoncourt process.
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 8/15
Software Testing ATM Machine (Audacity)
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 9/15
Overview
The test object is the ATM system, ATMS.
The company name is Audacity.
Each members are assigned on one featuresof the system by their group leader.
Each member need to commit their part(features) in the deliverables.
They follow the IEEE standard incompleting the project.
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 10/15
Deliverables
The deliverable of this project consists of:
1) Test Item Transmittal Report2) Test Plan
3) Test Design Specification
4) Test Case Specification
5) Test Procedure Specification6) Test Log
7) Test Summary Report
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 11/15
Individual TasksFeatures
Member Features
Chan Mun Kit F007 Transfer Tan Jia Chin F001 Start Up
F002 Shut Down
F003 Session Verification
Lam Yu Jie F004 Transaction Menu
Gan Jit Fook F005 Withdrawal
Foong Meng Wei F006 Cash Deposit
Leong Chin Jian F008 Balance Inquiry
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 12/15
Techniques
Test cases for ATMS were designed using five techniques:
• Equivalence Partitioning
• Boundary Value Analysis
• Decision Table Testing
• State Transition Testing
• Use Case Testing
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 13/15
According to the documents,
• 1) Test Plan: Briefly introduce the testing plan such as
purpose, scope, test traceability, features, planned testactivities, test team roles.
• 2) Test Item Transmittal Reports: Specify the hardware
and software.
• 3) Test Design Specification: Find BV, EP, design statediagram, decision table, use case testing and find out the
coverage of each test case.
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 14/15
According to the documents,
• 4) Test Case Specification: Design test case according to
feature based from test coverage.• 5) Test Procedure Specification: Describes the steps
necessary to perform the test for each test case.
• 6) Test Log Report: Test case is performed and result is
recorded in this log.• 7) Test Summary Report: Provide summary from the
findings in Test Log report.
8/16/2019 Undergraduate Activity - Amira
http://slidepdf.com/reader/full/undergraduate-activity-amira 15/15
Summary of Project
The project is about breaking the testing process into few phases.
Test Design Specification to find out the coverage.
Test Case Specification based on coverage to determine whether a system undertest satisfies system requirements and works correctly.
Test Procedure Specification after identify input, expected result, and proceduresto execute.
Record all test result in a Test Log.
Test Summary Report is then made from the result collected in the Test Log.