![Page 1: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/1.jpg)
Understanding Gas Protection Measure Selection within
Waterproofing Systems
John Naylor – Technical Director
![Page 2: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/2.jpg)
The Main Hazardous Gases
CH4
CO2
H2S
RnN2
CO
VOCs
H2
![Page 3: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/3.jpg)
Sources of UK ground-gas
• Natural– Bedrock and sediments containing Uranium
– Calcareous rock (limestone)
– Coal bearing strata
– Organic sediments (peat, alluvium)
• Anthropogenic– Landfill
– Made ground
– Mining
– Past contaminative activity
![Page 4: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/4.jpg)
P British Coalfields
Risks from:
• Methane
• Carbon Dioxide
• Carbon Monoxide
• Hydrogen Sulphide
• Oxygen deficiency
![Page 6: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/6.jpg)
June 2014
Carbon dioxide discovered in Gorebridge homes
![Page 7: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/7.jpg)
2017 Update
64 homes demolished
![Page 8: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/8.jpg)
23,000 former landfills in England & Wales
![Page 9: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/9.jpg)
Loscoe Explosion, 19863 people injured
![Page 10: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/10.jpg)
Radon Gas
Sou
rce
: H
PA-R
PD
-03
3 I
nd
icat
ive
Atl
as o
f R
ado
n in
En
glan
d a
nd
Wal
es 2
00
7
INDICATIVE
“Radon is the second highest cause of lung cancer in the UK, after smoking”Average Annual Radiation Dose
![Page 11: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/11.jpg)
Published June 2015
• Increased scope (site investigation and risk assessment)
• Updated to latest good practice
• Includes changes to building types
• Expanded and modified scoring tables
• Verification
BS 8485:2015
![Page 12: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/12.jpg)
Ground-Gas Risk Assessments Tier 1 - Is there a pollutant linkage?
- Initial Conceptual Site Model
Tier 2 - Generic risk assessment
- What is the empirical level of risk?
- Need sufficient monitoring data to determine a GSV
and a Characteristic Situation
Tier 3 - Site specific risk assessment
- What is the quantitative risk?
- Use numerical models to calculate gas
accumulation beneath & within buildings
- Detailed qualitative risk assessment
Tier 4 - Receptor monitoring
- Monitoring directly at or near to the receptor
Which ever tier – use multiple-lines of evidence
![Page 13: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/13.jpg)
Conceptual Site Model Development
Using site investigation data and monitoring data to identify plausible pollution linkages that require further management
![Page 14: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/14.jpg)
0
10
20
30
40
50
60
08 Jul 10 Jul 12 Jul 14 Jul 16 Jul 18 Jul 20 Jul 22 Jul 24 Jul 26 Jul 28 Jul 30 Jul
Weekly monitoring on these dates shows almost no methane
Weekly monitoring on these dates shows falling methane
Weekly monitoring on these dates shows rising methane
Methane
Ground Gas VariabilityC
oncentr
atio
n (
%v/v
)
![Page 15: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/15.jpg)
BS8485:2015 Characteristic Situations
CS1 Very Low Risk No Special precautions required
CS2 Low Risk Passive Gas Protection (<30m span)
CS3 Moderate RiskHighest level of passive protection and limit for private unmanaged residential dwellings
CS4 Moderate to High RiskLower active systems for commercial and industrial. Managed residential possible with care.
CS5 High RiskLarge industrial sheds with large open areas. Really think about it.
CS6 Very High RiskYes even here you can develop, but should you be building on it?
![Page 16: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/16.jpg)
BS8485:2015 - Building Types & Sensitivity
Source: Table 3 from BS8485:2015
• Requires Professional Judgement
• Can have different types in the same building
![Page 17: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/17.jpg)
BS8485:2015 - Scoring
Determine your minimum score requirements using a “combination of two or more” of the following elements:
• Ventilation measures
• Structural barrier or basement
• Gas-resistant membrane
You can’t use the same element twice!
![Page 18: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/18.jpg)
• There are several additional notes to this table• You may consider different parts of the building
requiring different scores
BS8485:2015 - Gas Protection Score, Table 4
![Page 19: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/19.jpg)
BS8485:2015 - Table 5 Structural Barrier
• Not all concrete is the same!
• Any breaches in slabs need sealing
• Annex A provides further detail
![Page 20: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/20.jpg)
BS8
10
2:2
00
9
![Page 21: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/21.jpg)
Type or Grade?
Grade is the end use
1 – Car parking
2 – Plant rooms and workshops
3 – Ventilated residential and commercial areas
Type is the protection system
A - Barrier
B – Structurally integral
C – Drained
![Page 22: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/22.jpg)
BS8485:2015 - Ventilation
• Much more detail in
this version
• Need to design it
• Prove your
ventilation works
• No active for
Type A Building
Element Score
Pressure relief 0.5
Passive sub floor ventilation
Very Good 2.5Good 1.5
Active dispersal layer 1.5 to 2.5
Active positive pressurisation
1.5 to 2.5
Ventilated car park(to approved Doc F)
4
![Page 23: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/23.jpg)
Gas resistant membranes meeting ALL of the above
requirements – HERO or ZERO
BS8485:2015 - Table 7
![Page 24: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/24.jpg)
Detail in Design, Detailing in Installation
![Page 25: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/25.jpg)
CIRIA C735 - Verification
• All installations should have some form of verification
• Verification should be proportionate to:
• A) the risks from the site,
• B) the experience of the installation operatives
• Verification should be conducted by suitably qualified and Independent practitioners.
“The process of demonstrating that the risk has been reduced to meet remediation criteria and objectives based on a quantitative assessment of remediation performance”
![Page 26: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/26.jpg)
C735 Decision Structure
CIRIA C735 Figure 3.1
![Page 27: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/27.jpg)
Verification Plan
Verification Plan’s should include:
• Site summary
• Design / specification compliance
• Acceptable installation methods
• Installer / verifier competencies
• Inspection / testing regime
• Non-conformance resolution
• Define Contents of Final Verification
Report
![Page 28: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/28.jpg)
Integrity Testing
a) In line with methodologies in Annex 2, 3 and 4 of CIRIA 735 (Leak Detection)
• Smoke Testing
• Tracer Gas Testing
• Dielectric Testing
b) In line with methodologies in ASTM D4437 (Seam Testing)
• Pick/Probe Test
• Air Lancing
• Pressure Testing
There are also others
![Page 29: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/29.jpg)
Verification Monitoring
Pre and Post Remediation Monitoring Evidence
![Page 30: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/30.jpg)
Summary
1
Site Investigation
• desk study
• trail pits
• monitoring
• laboratory analysis
Weeks to Months
2Risk Assessment
• Conceptual Site Model
• Consideration of gases and vapours
• Generic GSV
• Detailed assessment
• Assigning Characteristic Situation
3
Design & Specification• Proportionate to the risks posed
• BS8485 Points Scoring System
• Ventilation
• Structure
• Membrane
BS8102 Considerations
4
Installation• NVQ Level 2 Qualification
• Protection from Follow on Trades
5
Verification• C735
• Verification Plan
• Independent
• Integrity testing
![Page 31: Understanding Gas Protection Measure Selection within ... · Measure Selection within Waterproofing Systems ... –Calcareous rock (limestone) ... Determine your minimum score requirements](https://reader031.vdocument.in/reader031/viewer/2022020412/5b366b1b7f8b9abc218e8739/html5/thumbnails/31.jpg)
Thank you !