unified planning work program fy thru fy...pepp project evaluation and prioritization process ppp...

130
UNIFIED PLANNING WORK PROGRAM FY 2014/2015 THRU FY 2015/2016 SPACE COAST TPO 2725 Judge Fran Jamieson Way, Bldg. B, Rm 105 Melbourne, Florida 32940 Phone: 3216906890; Fax 3216906827 www.spacecoasttpo.com ADOPTED MAY 8, 2014 Amended 10-9-14; 2-12-15; 3-12-15; 5-14-15; 7-9-15; 10-8-15 Modified 11-18-14; 4-7-15; 6-22-15; 9-15-15 FAP No. PL-0263-050 PL FY 14/15 – 15/16: FM No. 417958-1-14-93 FTA FY 14/15: FM No. 422438-1-14-24 FTA FY 15/16: FM No. 422438-1-14-25

Upload: others

Post on 14-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

ADOPTED MAY 8, 2014 Amended 10-9-14; 2-12-15; 3-12-15; 5-14-15; 7-9-15; 10-8-15

Modified 11-18-14; 4-7-15; 6-22-15; 9-15-15

FAP No. PL-0263-050 PL FY 14/15 – 15/16: FM No. 417958-1-14-93 FTA FY 14/15: FM No. 422438-1-14-24 FTA FY 15/16: FM No. 422438-1-14-25

 

                                                                   

 

UNIFIEDPLANNINGWORKPROGRAM

FY2014/2015THRUFY2015/2016

SPACE COAST TPO 

2725 Judge Fran Jamieson Way, Bldg. B, Rm 105 

Melbourne, Florida 32940 

Phone: 321‐690‐6890; Fax 321‐690‐6827 

www.spacecoasttpo.com

ADOPTED MAY 8, 2014 Amended 10-9-14; 2-12-15; 3-12-15; 5-14-15; 7-9-15; 10-8-15 Modified 11-18-14; 4-7-15; 6-22-15; 9-15-15

FAP No. PL-0263-050 PL FY 14/15 – 15/16: FM No. 417958-1-14-93 FTA FY 14/15: FM No. 422438-1-14-24 FTA FY 15/16: FM No. 422438-1-14-25  

Page 2: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 2 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

In cooperation with:

Florida Department of Transportation Federal Highway Administration Federal Transit Administration

Funded by:

Federal Highway Administration Federal Transit Administration Florida Department of Transportation Brevard County Board of County Commissioners

Catalog of Federal Domestic Assistance (CFDA) Numbers:

20.205 – Highway Planning and Construction

20.505 – Federal Transit Technical Studies Grant (Metropolitan Planning)

 

 

 

 

 

The preparation of this report has been financed in part through grant(s) from the Federal Highway 

Administration and Federal Transit Administration, U.S. Department of Transportation, under the State 

Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, 

U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. 

Department of Transportation. 

UNIFIED PLANNING WORK PROGRAM

FY 2015 THRU FY 2016

Page 3: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 3 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

The following table will be used throughout the timeframe that the FY 15 – FY 16 UPWP is 

effective to record the adoption and any future amendments or modifications that are 

processed. 

Number  Amendment or Modification 

Resolution Number 

Approval Date 

Activity 

N/A  Adoption  14‐23  5/8/14  Space Coast TPO Governing Board Adoption of the FY 15 – FY 16 Unified Planning Work Program 

1  

Amendment  15‐11  10/9/14  Revising SU funding amount and distributing among all tasks and decreasing PL total by $30K to reflect actual funds to be obligated. 

2  

Modification  N/A  11/18/14  Modified FY 15 PL tasks budgets to reflect actual and anticipated expenditures 

3  

Amendment  15‐22  2/12/15  Amendment to include Canaveral Port Authority funds for Rail Station Study 

4  

Amendment  14‐08 and 14‐18 

3/12/15  Amendment to include unspent FY 15 SU funds and program on Complete Streets Feasibility Studies, Safety Study Program and Community Characteristics Update (Per prior approved direction by TPO Board) 

5  

Modification  N/A  4/7/15  Modified FY 15 PL and FY 15 FTA tasks budgets to reflect actual and anticipated expenditures 

6  

Amendment  15‐27  5/14/15  Amendment to include additional $167,845 in TPO SU funds to conduct High Crash Corridor Analysis 

7  Modification  N/A  6/22/15  Modified PL FY 15 and FTA FY 15 tasks budgets to reflect actual and anticipated expenditures 

8  Amendment  16‐02  7/9/15  Adds $30,000 to FY 15 PL funds to match FDOT Work Program Authorized funding amount; Amends revenue sources used for FY 16 PL  

9  Modification  N/A  9/15/15  Modified FY 15 SU tasks budgets to reflect actual and anticipated expenditures. Included distribution of remaining balance from ITS Master Plan and Complete Streets Feasibilities Studies. 

10  Amendment  16‐07  10/8/15  Amendment to adjust FY 16 SU funding amount down by $83,064 and increase FTA total funding for FY 16 by $58,505 to match amounts authorized. 

 

FY 15 – FY 16 UPWP Record of

Adoption and Modifications

Page 4: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 4 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

Acronyms and Abbreviations ………………………………………………………………………………………..  6 

Introduction…………………………… ........................................................................................... 8 

Resolution 14‐23, Adoption of FY 14/15 thru FY 15/16 UPWP ........................................... 20 

Organization and Management ........................................................................................... 21 

A. Participants .......................................................................................................... 21 

B. Agreements ......................................................................................................... 23 

C. Operational Policies and Procedures .................................................................. 26 

Work Program 

Section 1: Administration 

  1.0 Program Management ........................................................................................ 28     1.1 Annual Reporting, Certification and Programming ................................. 31     1.2 Annual Audit ............................................................................................ 33     1.3 Regional/State Planning and Coordination ............................................. 34     1.4 Local Coordination and Planning ............................................................. 37     1.5 Program Management and Technical Assistance ................................... 40    

Section 2 Data Collection 

  2.0 Transportation Data Compilation and Distribution ............................................ 42 

Section 3 Transportation Improvement Program 

  3.0 Transportation Improvement Program ............................................................... 46 

Section 4 Long Range Transportation Planning 

  4.0 Long Range Transportation Planning .................................................................. 50 

Section 5 Project Specific Planning 

  5.0 Multi‐Modal Project Planning ............................................................................. 55     5.1 Corridor Studies ....................................................................................... 58 

TABLE OF CONTENTS

Page 5: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 5 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

    5.2 Management Operations, Safety and Security ....................................... 61  Section 6 Public Involvement 

  6.0 Public Involvement .............................................................................................. 66 

Section 7 Program Planning 

  7.0 Pathways Project Planning .................................................................................. 71     7.1 Bicycle/Pedestrian Education Program ................................................... 74     7.2 Transit Planning and Studies ................................................................... 77 Tables 

  Table 1A.  Summary Budget, Agency Participation for FY 15 ............................ 82 

  Table 1B.  Summary Budget, Funding Source for FY 15 ..................................... 83 

  Table 2A.  Summary Budget, Agency Participation for FY 16 ............................ 84 

  Table 2B.  Summary Budget, Funding Source for FY 16 ..................................... 85 

  Table 3.  FTA Section 5305(d) Deliverable for FY 15 and FY 16 ....................... 86 

  Table 4.  Transportation Planning Studies Summary ....................................... 90 

  Table 5A.  Proposed UPWP Work Schedule for FY 15 ........................................ 93 

  Table 5B.  Proposed UPWP Work Schedule for FY 16 ........................................ 94 

  Table 6.  Federal MAP‐21 Planning Factors ..................................................... 95 

  Table 7.  UPWP Tasks Strategic Plan Goals ...................................................... 96 

Appendices 

  Appendix A  SCTPO Adopted 2014‐15 Strategic Plan ............................................ 98 

  Appendix B  FDOT District 5 General Planning Activities FY 2015 – FY 2016 ........ 100 

  Appendix C  SCTPO Certification Report ............................................................... 106 

  Appendix D  Certifications and Assurances ........................................................... 111‐117 

  Appendix E  Agency Comments and Responses .................................................... 119 

Page 6: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 6 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

   

 

Acronym  Full Name 

ADA  Americans with Disabilities Act 

AMPO  Association of Metropolitan Planning Organizations 

ARRA  American Reinvestment and Recovery Act 

ATMS  Advanced Traffic Management System 

BOCC  Board of County Commissioners 

BPTAC  Bicycle/Pedestrian and Trails Advisory Committee 

CAC  Citizens Advisory Committee 

CAP  Commuter Assistance Program 

CMS  Congestion Management System 

CTST  Community Traffic Safety Team 

DBE  Disadvantaged Business Enterprises 

EAR  Evaluation and Appraisal Report 

ECFRPC  East Central Florida Regional Planning Council 

EPA  Environmental Protection Agency 

ETAT  Environmental Technical Advisory Team 

ETDM  Efficient Transportation Decision Making 

FAA  Federal Aviation Authority 

FDOT  Florida Department of Transportation 

FEC  Florida East Coast Railroad 

FHWA  Federal Highway Administration 

FS  Florida Statute 

FTA  Federal Transit Administration 

FY  Fiscal Year 

GIS  Geographical Information System 

GMSC  Growth Management Subcommittee 

GPC  General Planning Consultant 

ITS  Intelligent Transportation System 

LOGT  Local Option Gas Tax 

LRTP  Long Range Transportation Plan 

MAP‐21  Moving Ahead for Progress in the 21st Century Act 

 

ACRONYMS

Page 7: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 7 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Acronym  Full Name 

MPO  Metropolitan Planning Organization 

MPOAC  Metropolitan Planning Organization Advisory Council  

PD&E  Project Development & Environment 

PEA  Planning Emphasis Area 

PEPP  Project Evaluation and Prioritization Process 

PPP  Public Participation Plan 

SAFETEA‐LU  Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users 

SCAT  Space Coast Area Transit 

SCE  Socio‐Cultural Effects 

SJRWMD  St. Johns River Water Management District 

SR  State Road 

TAC  Technical Advisory Committee 

TBD  To Be Determined 

TDP  Transit Development Plan 

TDLCB  Transportation Disadvantaged Local Coordinating Board 

TIP  Transportation Improvement Program 

TOC  Traffic Operations Committee 

TSM&O  Transportation System Management & Operations   

UPWP  Unified Planning Work Program 

    

 

Page 8: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 8 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

The Space Coast Transportation Planning Organization (TPO) is the designated and constituted 

body responsible for the urban transportation planning and programming process for the Palm 

Bay‐Melbourne‐Titusville Urbanized Area. The proposed use of Federal Highway Administration 

(FHWA) planning and research  and Federal Transit 

Administration funds must be documented in the TPOs Unified 

Planning Work Program (UPWP) in accordance with federal law 

(23 CFR 450.334(a)) and 23 CFR 450.308 (c) and Titles 23 and 49 

of the Federal Transit Act for urbanized area with populations 

over 50,000. This UPWP covers the period of July 1, 2014 

through June 30, 2016 and includes a description of the work to 

be accomplished and cost estimates for each activity.  

The Space Coast TPO serves the citizens of Brevard County, 

located in central Florida and is bordered on the north by 

Volusia County, on the south by Indian River County, and on the west by Seminole, Orange, and 

Osceola counties. Brevard’s eastern border is the Atlantic Ocean.  According to the 2010 U.S. 

Census the total population for Brevard County was 543,346. There are 16 incorporated 

municipalities that the Space Coast TPO serves along with major modal agencies such as the 

Melbourne International Airport, Space Florida, Cape Canaveral Air Force Station, Port Canaveral 

and Patrick Air Force Base. According to the Space Coast Area Transit’s 2013‐2022 Transit 

Development Plan, nearly 75 percent of Brevard’s households have at least two vehicles 

available to them. With such a significant portion of the population with vehicles it is important 

for the TPO to ensure that transportation planning is coordinated among all agencies in a 

continuous, cooperative and comprehensive manner and serves all modes and needs. See Figure 

1 for summary of demographic data. 

In 2013 the Space Coast TPO’s Urbanized Area Boundary was revised and updated with 2010 

Census data. The TPO serves two UAB’s, the Palm Bay‐Melbourne and Titusville urbanized areas. 

Only minor adjustments were made with the Space Coast TPO continuing to serve all of Brevard 

County. 

INTRODUCTION

Page 9: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 9 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Figure 1 – Demographic Summary

Page 10: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 10 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Over the past few years, the Space Coast TPO has taken the initiative of looking at 

transportation planning from a corridors and operational perspective. This approach is becoming 

more evident as the way future transportation improvements will be evaluated. The cost to 

widen roadways continues to increase, roadways are becoming more physically constrained due 

to limited right‐of‐way, and revenue sources continue to decline. The use of the Complete 

Streets concept has been embraced by the Space Coast TPO as one of the tools used to evaluate 

constrained corridors. Many of the municipalities within the TPO’s planning area have adopted 

complete street policies and in FY 13 the TPO completed its Complete Streets Evaluation 

Methodology, Development and Project Screening planning study. The results are being used to 

implement Complete Streets on six corridors. Feasibility Studies on three of the corridors will be 

completed by the TPO during FY 15 with construction of all six projects to be conducted over FY 

15 – FY 17. 

The Space Coast TPO has also been coordinating with the Florida Department of Transportation 

on a new Corridors Planning program. The TPO plans on looking at those corridors that did not 

meet the Complete Streets criteria to be looked at from a broader approach. These studies are 

more suited for higher volume roadways functioning as collectors. The first of these studies will 

begin in FY 15.  

In FY 13 the Space Coast TPO initiated the development of its 2040 

Long Range Transportation Plan that is incorporating these new 

planning concepts. The 2040 LRTP is unique and differs from previous 

plans in that it is based on scenario planning from an economic 

development approach and identifying corridors through typology, 

meaning how various corridors function and how they should be 

improved and/or developed in the future. More information on the 

scope of work for the 2040 LRTP is included under Task 4.0. 

Another tool that plays an important role in improvement of traffic flow and operations is the 

use of Intelligent Transportation Systems (ITS) technology. The TPO has a history of supporting 

this cost effective approach to alleviating congestion and in FY 14 initiated the development of a 

comprehensive ITS Master Plan. As the TPO’s LRTP already calls for the use of ITS/operational 

improvements on many corridors, this plan will help formalize which ITS tools should be 

evaluated and potentially implemented throughout the county. The results of the ITS Master 

Plan will be synchronized with the 2040 LRTP. 

 

Page 11: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 11 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

In FY 14, an updated Bicycle and Pedestrian Mobility Plan was adopted. The plan evaluated all 

corridors and trails throughout the county and provided a prioritized list of projects that will be 

used to implement the most effective projects that moves the TPO into a comprehensive 

connected system providing alternative modal choices of movement. 

All of these projects and programs allow the TPO to meet its requirement for a coordinated, 

comprehensive transportation planning for Brevard County. The TPO plans to continue looking 

for new and innovative methods for improving the transportation network that will continue to 

include Complete Streets, Corridor Planning, Intelligent Transportation Systems and 

Transportation Systems Management and Operations (TSM&O) activities.  

The Space Coast TPO operates under the direction of a Strategic Plan, adopted annually, that 

identifies Goals, Objectives and Strategies for the TPO to work toward (The adopted 2014‐15 

Strategic Plan can be found in Appendix A). The goals lay the foundation for what the TPO is 

working toward to achieve a comprehensive, multi‐modal transportation network and are based 

upon adopted Long Range Planning goals. All work products listed in this UPWP will be used to 

accomplish the TPO’s goals and provide a method for measuring the TPO’s success. Table 7 

provides a matrix of how each task relates to the Goals and Objectives of the TPO’s Strategic 

Plan.  

Following are highlights from each of the work element sections reflecting previous noteworthy 

achievements and the proposed work products to be produced in the next two fiscal years. 

Additional details of each proposed work product are provided under specific work tasks. 

Administration   Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Reaffirmation of Planning Boundary and Board Membership by Governor 

Developed and Adopted Annual Strategic Plans 

Executed separate agreement with Space Florida for continued planning support 

Executed updated Interlocal Agreement for the Creation of the TPO 

Annual Certifications by FDOT with no corrective actions 

FY 13 and FY 14 Operating Budgets and Quarterly reports 

Independent audits of TPO for FY 11 and FY 12 with no corrective actions 

Development of Regional Priorities including trails 

Development of annual Legislative Priorities 

Development of FY 15 – FY 16 UPWP 

Coordination of FDOT Future Corridors Initiative 

Page 12: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 12 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

  FY 15 – FY 16 UPWP Work Products: 

Joint Certification with FHWA, FTA and FDOT in July, 2014 

Monitoring of legislative activities including re‐authorization of federal highway 

transportation act 

Updating and monitoring of Strategic Plans 

Continue Regional Coordination 

Assist with coordination and support of Complete Streets projects 

Complete FDOT’s Pilot Future Corridor Evaluation Study in FY 15 

Conduct Annual Certifications with FDOT 

Develop Annual Operating Budgets and conduct annual audits 

Develop and Execute new Executive Director Contract by October 1, 2015 

Develop FY 17 – FY 18 UPWP 

Data Collection Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Conducted annual collection of traffic volumes and data 

Revised and adopted new Urbanized Area Boundary 

Reviewed and updated Functional Classifications 

Implemented completed web based Crash Data Location System including training 

  FY 15 – FY 16 UPWP Work Products: 

Conduct Annual traffic counts 

Update Community Characteristics Inventory with 2010 Census data 

Use traffic crash location system to develop annual safety report 

Solicit and execute new traffic count contract by September 1, 2015 

Transportation Improvement Program (TIP)  Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Developed, adopted and maintained TIP 

Developed and adopted annual project priorities for SIS and non‐SIS roadways 

Institutionalized Space as a mode of transportation within FDOT Work Program 

Secured funding in FDOT Work Program for Space Infrastructure Projects 

Widening of I‐95 fully funded in FDOT Work Program, unique funding advancement 

Developed Transportation Alternatives priority screening criteria 

New Transportation Alternatives program developed and priority projects identified 

 

Page 13: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 13 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

  FY 15 – FY 16 UPWP Work Products: 

Develop, adopt and maintain TIP in accordance with all federal and state requirements 

Develop and adopt annual project priorities including Space Infrastructure projects 

Conduct annual review and update of Transportation Alternatives Projects Priority List 

Develop Annual Safety Project List based on crash data and trends analysis 

Long Range Transportation Plan (LRTP)  Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Regional coordination with base and future year model data input and initial validation 

for 2040 LRTP 

Initiated scenario and vision planning for 2040 

Secured FDOT Supplemental Funding for scenario and corridor typology planning as part 

of 2040 LRTP development 

Conducted community survey to identify what types of future scenarios citizens 

supported 

Presented first Transportation Symposium and Scenario Choices Workshops 

Identified future planning scenario and vision 

  FY 15 – FY 16 UPWP Work Products: 

Continue regional coordination and model development  

Refine future scenario and development of corridor typologies 

Develop final 2040 LRTP as a mega‐plan incorporating all modes 

Complete list of cost feasible projects and adopt 2040 LRTP in 2015 

Initiate community outreach and program support for implementing LRTP vision  

Project Specific Planning Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Completed SR A1A Corridor Study, US 192 Feasibility Study including intersection analysis 

at Hollywood and Wickham, Central Florida Regional Freight Study, Ellis Road and I‐95 

Northern SJHP Interchange PD&E Study and Southern Parkway Interchange with I‐95 

PD&E  

Conducted Complete Streets Evaluation Methodology, Development and Project 

Screening planning study 

Assisted with Space Florida and Spaceport Master Plans development 

Advocated and received funding for I‐95/Cocoa Safety Wall 

Initiated PD&E study on Malabar Road 

Page 14: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 14 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Initiated Complete Streets Feasibility Studies on Hickory St., Florida Ave., and Hopkins 

Ave. 

Coordination efforts related to All Aboard Florida and other Passenger Rail initiatives 

Coordination of Viera Blvd. PD&E Interchange Study 

Annual development of State of the System Report 

Initiated annual Safety Evaluation Report 

Initiated development of Intelligent Transportation Systems Master Plan 

  FY 15 – FY 16 UPWP Work Products: 

Support follow‐up activities related to the SR A1A Corridor Study, US 192 Feasibility 

Study, Central Florida Regional Freight Study, Ellis Road and I‐95 Northern SJHP 

Interchange PD&E Study, Southern Parkway Interchange with I‐95 PD&E, and Complete 

Streets projects 

Coordination of Design phase of Parkway Interchanges 

Complete Feasibility Studies on Hickory St., Florida Ave., and Hopkins Ave. 

Develop and Publish Annual State of the System and Safety Reports 

Monitor air quality ozone rating 

Endorsement of Viera Blvd. PD&E Interchange Study 

Continue coordination and support of multi‐modal project planning (Rail, Space, Air and 

Seaport) 

Continue development and implementation of Advanced Traffic Management System 

Support and participation on corridor studies include but are not limited to: Babcock 

Street; St. Johns Heritage parkway; and Washingtonia Extension 

Support and participation on FDOT’s new corridor studies program including specific 

selected corridor studies to be identified and funded by FDOT 

Public Involvement Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Continued public outreach efforts through E‐news newsletters; Website maintenance 

and updates; Website surveys; and Community Presentations 

Updated TPO Public Participation Plan 

Conducted Community Survey to gage citizens rating of current transportation systems 

and what types of future developments are supported 

Conducted Transportation Symposium and Choices Workshops 

Update of SCTPO Website 

Page 15: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 15 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Implemented use of social media using Facebook 

  FY 15 – FY 16 UPWP Work Products: 

Initiated development of new public outreach program to include presentations and 

services offered to local municipalities  

Annual review of Public Participation Plan 

Develop youth education section on website 

Develop on‐line trail/bike route map system 

Continue public outreach efforts through E‐news newsletters; Website maintenance and 

updates; Website surveys; and Community Presentations 

Program Planning Previous FY 13 – FY 14 UPWP Noteworthy Achievements: 

Adopted Bicycle and Pedestrian Mobility Plan 

Regional prioritization and support for Coast to Coast Trail 

Ground breaking on Rail Trail; Brevard Zoo and Al Tuttle Trails 

Rail Trail Fully Funded 

Implemented first Walking School Bus Program 

Continued bicycle/pedestrian education program 

Safe Routes to School program 

Adoption of Transit Development Plan  

Completed ADA Compatible Bus Stop Inventory and Evaluation 

  FY 15 – FY 16 UPWP Work Products: 

Follow‐up activities related to adopted Bicycle and Pedestrian Mobility Plan 

Continue involvement with Safe Routes to School Program 

Continue Bicycle/Pedestrian Education Program and expand to middle schools 

Conduct School Travel Survey in 2015 

Expand Walking School Bus Program 

Participate and support of Commit 2 B Fit program 

Support of follow‐up activities related to Space Coast Area Transit’s completed ADA Bus 

Stop Inventory Study 

MAP‐21 Compliance and Planning Factors 

On July 6, 2012, MAP‐21, the Moving Ahead for Progress in the 21st Century Act was signed into 

law. This law, which provides for the funding of surface transportation programs, replaced the 

Page 16: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 16 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

previous law SAFETEA‐LU, which was adopted in 2005. MAP‐21 created a streamlined and 

performance based transportation program and builds upon the programs and policies 

established in 1991 that included focusing on highway, transit, bicycle and pedestrian modes of 

travel.  

The planning factors included as part of MAP‐21 are addressed throughout the UPWP in various 

tasks. The TPO will work cooperatively with FHWA, FTA and FDOT to ensure all requirements of 

MAP‐21 continue to be met. Table 6 reflects the relationship between the UPWP tasks and the 

planning factors that are addressed. 

Public Review/Title VI  

For the development of the FY 14/15 – FY 15/16 UPWP, timely coordination and solicitation 

from other agencies and the public were conducted. The draft UPWP was made available for 

review and comment on March 14, 2014. A summary presentation on the proposed work 

products to be developed over the next two years was given to the TPO Executive Committee on 

March 21, 2014. The Technical and Citizens Advisory Committees on April 7 and to the TPO 

Board on April 10, which was televised on the local Space Coast Government Television channel 

were also provided a summary of work products included in the draft UPWP. Public comment 

was offered at the TPO Executive Committee, TAC/CAC and TPO meetings, along with 

notification on the TPO website. Draft copies of the UPWP were transmitted to the appropriate 

agencies as listed in the FDOT Administrative Manual. Intermodal agencies were also sent copies 

of the draft UPWP as is required as part of the Intergovernmental Coordination and Review 

(ICAR) Agreement. Regional M/TPO’s were also sent copies of the draft. 

Articles soliciting input were posted on the TPO website and included in the TPOs E‐News 

electronic newsletter. Notice was also posted on the TPO Facebook page. All comments received 

were addressed and revisions made where appropriate. (See Appendix E for a list of comments 

and TPO responses).  

In general, all agency plans and programs comply with the public involvement provisions of Title 

VI which states: “No person in the United States shall, on grounds of race, color, or national 

origin, be excluded from participation in, be denied the benefits of, or be subjected to 

discrimination under any program or activity receiving federal financial assistance.” All public 

comments were solicited without regard to race, color, national origin, age, sex, religion, 

disability or family status. The final UPWP was presented and approved by the TPO Board on 

May 8, 2014. 

Page 17: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 17 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Level of Planning Effort 

The task projects outlined in this UPWP respond to Brevard County’s need for transportation 

planning services that provide continuing, cooperative and comprehensive planning services. 

The various UPWP tasks provide planning for all modes of travel: land, air, sea, rail and space. 

The objectives of the various local government comprehensive plans are considered and 

incorporated into the overall transportation system. Work products will be produced not only by 

TPO staff but through consultant services and support from Brevard County, local governments, 

FDOT, FHWA, FTA and other agencies. 

Air Quality Planning 

The Space Coast TPO is currently meeting ozone attainment readings. An analysis is conducted 

annually as part of the State of the System report developed under task 5.2. Upon adoption of 

any new criteria, the Space Coast TPO will comply with the changes as necessary. In the event 

the Space Coast TPOs status changes to being in non‐attainment, for any reason, the UPWP will 

be amended as appropriate to include changes to the development cycle of the LRTP, 

Congestion Management System and other work products related to identifying new strategies 

addressing air quality. 

Planning Emphasis Areas 

The FDOT has identified pedestrian safety as an emphasis area for 2014. Florida has been ranked 

in the top five states in regards to pedestrian and bicyclist deaths over the past decade. TPO’s 

have been asked to develop of further implement a Pedestrian Safety Action Plan in an effort to 

help reduce bicycle and pedestrian crashes. The Space Coast TPO has a strong history of 

supporting its Bicycle and Pedestrian program and will continue to do so in the future (see Tasks 

7.0 and 7.1). As part of the annual State of the System Report (covered under Task 5.2) statistics 

and trends on bicycle and pedestrian safety are included. As part of the TPO’s new Countywide 

Safety Evaluation Report, initiated in FY 14, the TPO will be including safety statistics and trends 

related specifically to bicycle and pedestrians. This annual report will be used as the process to 

identify locations and potential behaviors that can be used to develop countermeasures 

designed to eliminate them. Any education measures identified will be incorporated into the 

bicycle and pedestrian safety education program. Other measures will be addressed as they are 

identified. The following table represents the UPWP tasks that include and consider pedestrian 

safety planning activities. 

Task #  1.0  1.1  1.2  1.3  1.4  2.0  3.0  4.0  5.0  5.1  5.2  6.0  7.0  7.1  7.2 

Pedestrian Safety  X      X  X  X  X  X  X  X  X  X  X  X   

Page 18: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 18 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

FHWA/FTA Planning Emphasis Areas 

The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) have 

jointly issued Planning Emphasis Areas (PEAs) for Federal FY 2015.  Following are the three 

emphasis areas and how the Space Coast TPO is addressing them.  

MAP‐21 Implementation – Transition to Performance Based Planning and Programming. The 

Space Coast TPO has been working on transitioning its planning practices to a more performance 

based planning program for the past few years. The TPO annually adopts a strategic plan that is 

the foundation for the activities the TPO will be focusing on throughout the year. These activities 

all tie into the adopted Long Range Plan Goals. With this approach to planning the TPO is able to 

identify programs to be developed to meet those goals and has worked to implement projects 

that track performance. The Long Range Plan provides the framework with activities such as the 

annual Countywide Safety Evaluation Report and the annual State of the System Report that 

document progress toward reaching established performance goals. The 2040 Long Range 

Transportation Plan (to be adopted in 2015) will continue with this approach and will be 

enhanced in those areas that can contribute to performance based planning and programming. 

Models of Regional Planning Cooperation – Promote cooperation and coordination across 

MPO boundaries and across State boundaries where appropriate to ensure a regional 

approach to transportation planning. The Space Coast TPO already has an integrated planning 

program that includes regional planning. Through partnerships with the Florida Department of 

Transportation and membership on the Central Florida Alliance committee and statewide 

Metropolitan Planning Organization Advisory Council (MPOAC), the Space Coast TPO will 

continue to plan not only from a local perspective but from the larger regional and statewide 

perspective. Current specific projects and activities include Coast to Coast Trail, East Central 

Florida Regional Rail Trail, Future Corridors Pilot Project, Passenger Rail initiatives and other 

large scale transportation planning. 

Ladders of Opportunity – Access to essential services‐as part of the transportation planning 

process, identify transportation connectivity gaps in access to essential services. The TPO has 

already developed documents and programs that assist with identifying access to services and 

consideration to those projects that fill in ‘gaps’. The adoption of the Complete Streets 

Evaluation Methodology and the Bicycle and Pedestrian Mobility Plan, both mapped numerous 

services and access to these. The FDOT has mapped bicycle and pedestrian facility gaps 

throughout the roadway network and Space Coast Area Transit is completing an inventory of all 

Page 19: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 19 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

of its bus stops with documentation of ADA accessibility. In FY 2015, the Space Coast TPO will 

also update is Community Characteristics Inventory to assist with identifying where there are 

gaps in the system in relation to various demographics located in close proximity of these 

services. 

As additional guidance is provided on these emphasis areas, the Space Coast TPO will coordinate 

and adjust work tasks and products as appropriate to address them. The following table 

represents the various UPWP tasks that include the FHWA/FTA planning emphasis areas. 

Task #  1.0  1.1  1.2  1.3  1.4  2.0  3.0  4.0  5.0  5.1  5.2  6.0  7.0  7.1  7.2 

MAP‐21 Implementation  X  X  X  X  X  X  X  X  X  X  X  X  X  X  X 

Models of Regional Planning Cooperation 

X  X    X  X  X  X  X  X  X  X  X  X  X   

Ladders of Opportunity  X      X  X  X  X  X  X  X  X  X  X  X  X 

 

   

Page 20: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 21: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 22: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 23: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 24: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 25: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 26: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 27: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 28: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation
Page 29: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 21 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

  

A.  Participants 

Space Coast Transportation Planning Organization Board (TPO): The Space Coast TPO is a policy 

board of local, elected officials responsible for managing a continuing, cooperative, and 

comprehensive transportation planning process that is consistent with local government 

comprehensive plans. An organizational chart is provided below identifying the structure and 

committees supporting the TPO. The membership of the Space Coast TPO has been established 

under Florida Statute 339.175 and consists of a nineteen member body with representation as 

follows: 

  Board of County Commissioners (5 seats)  City of Melbourne (3 seats)   City of Palm Bay (3 seats)  City of Titusville (2 seats)   City of Cocoa (1 seat)  North Beaches Coalition (1 shared seat)**   City of Rockledge (1 seat)  City of West Melbourne (1 seat)   South Beaches Coalition (1 shared seat)*  Canaveral Port Authority (1 seat)  *South Beaches include Indian Harbor Beach, Indialantic, Melbourne Beach and Satellite Beach **North Beaches include Cape Canaveral and Cocoa Beach 

Based upon 2010 Census data, in 2013 the Space Coast TPOs planning boundary and Board 

Membership were re‐affirmed by the Governor with no changes from prior authorization. 

ORGANIZATION

Page 30: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 22 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Advisory Committees 

The TPO has four standing advisory committees: Technical Advisory Committee (TAC), the 

Citizens’ Advisory Committee (CAC), the Bicycle/Pedestrian and Trails Advisory Committee 

(BPTAC), and the TPO Executive Committee.  

Technical Advisory Committee (TAC): The TAC is comprised of twenty six members, primarily 

planners, engineers and technical staff that represent various local governments and 

transportation agencies within Brevard County. It is the responsibility of the TAC to review and 

evaluate transportation‐related issues and make recommendations to the TPO Board on these 

issues. The TAC conducts their meetings in conjunction with the CAC on the Monday prior to the 

TPO Board meetings. TAC members are appointed by the municipality, office, department, 

division, association, system, authority or board such member represents.  

Citizens Advisory Committee (CAC): The CAC is made up of twenty four members that represent 

a broad cross section of citizens interested in the development of an efficient, safe and cost‐

effective transportation system. The CAC members are appointed by the members of the TPO 

Board and conduct their meetings in conjunction with the TAC. 

Bicycle/Pedestrian and Trails Advisory Committee (BPTAC): The BPTAC is comprised of 

nineteen members representing local law enforcement agencies, educators, engineers, local 

Page 31: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 23 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

governments, bicycle retailers, realtors and avid cyclists, hikers and environmentalists. The 

BPTAC addresses bicycle, pedestrian and trails planning and recommends policies to the TPO 

Board regarding bicycle/pedestrian projects, and enhancement projects. Membership is open to 

all interested citizens or representatives of specialized interest groups. The BPTAC meets bi‐

monthly or as needed. 

TPO Executive Committee: The Executive Committee reviews in detail key transportation policy 

and administrative issues of concern to the TPO. The Committee is comprised of the TPO 

Chairman, Vice‐Chairman, Secretary and up to two at‐large TPO members. The Committee 

evaluates transportation policies, procedures and programs in greater depth than can normally 

occur at regular monthly TPO meetings. The intent is to insure the TPO is effectively addressing 

the county’s critical transportation needs. The Committee is advisory and recommendations 

formed by the Executive Committee are presented to the full TPO for consideration. The 

Executive Committee meets on an as needed basis following regular scheduled TPO Board 

meetings and all meetings are open to the public. 

 

Supported Committee 

The Transportation Disadvantaged Local Coordinating Board (TDLCB) is an independent board 

supported by the Space Coast TPO. A TPO Board member serves as the Chairman of the TDLCB. 

The purpose of the TDLCB is to evaluate the service levels, safety and other issues of transit 

operations provided by Space Coast Area Transit serving the elderly, people with disabilities, or 

otherwise disadvantaged citizens, such as those with low income in Brevard County. 

B.  Agreements 

Planning and funding assistance is provided by the Federal Highway Administration (FHWA), the 

Federal Transit Administration (FTA) and the Florida Department of Transportation (FDOT). 

Through an Interlocal Agreement, the Brevard County Board of County Commissioners provides 

local matching funds for the FTA grant. Other federal agencies involved in the planning effort are 

the Federal Aviation Administration (FAA) and the Environmental Protection Agency (EPA). The 

assistance provided by some of the above agencies is agreed upon through agreements. The 

TPO has executed agreements with the state and local government and agencies to promote a 

comprehensive, continuous, coordinated planning process. Contracts have been authorized by 

the TPO to provide services in support of TPO operations. Current agreements include: 

Page 32: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 24 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Standard Interlocal Agreement – Executed April 22, 2005: The TPO has an interlocal agreement 

with each of the member governmental jurisdictions. This is a one‐time agreement that 

establishes the responsibilities, authorities, membership and other necessary features of the 

TPO. The First Amendment to the Interlocal was entered into on September 13, 2006 that 

incorporated the TPOs approval of appointing alternate members and the shared seat 

representing the City of Cape Canaveral and the City of Cocoa Beach. These two cities entered 

into a separate agreement, similar to the South Beaches Coalition that was made a part of the 

TPOs interlocal agreement. A Second Amendment was executed on October 28, 2008 to provide 

for the legal name change of the Brevard MPO to the Space Coast TPO. At the time of the 

development of this UPWP, an updated and revised Interlocal Agreement was being circulated 

for approval by all local jurisdictions. The TPO Board approved the revised Interlocal at its April 

10, 2014 meeting. It is anticipated that this updated agreement will be completed and recorded 

by July 1, 2014. 

Interlocal Agreement for Services with Brevard County – Executed August 26, 2010: Agreement 

between Brevard County and the Space Coast TPO clarifying the Space Coast TPO as an 

independent organization and defines the services to be provided the TPO by Brevard County 

and to fix the compensation to the County for such services and to define the services to be 

provided to the County by the TPO and to fix the compensation to the TPO for such services. A 

First Amendment to the Interlocal was executed on August 23, 2011 to clarify audit 

requirements are responsibility of the TPO and shall be done independently from Brevard 

County audits. The Interlocal is effective until September 30, 2015; however a one‐time 

extension may be executed for an additional five years. This agreement will be reviewed in 2015 

to determine if an extension or new agreement is needed. 

Joint Participation Agreement for Planning Funds – Executed May 13, 2010: Agreement 

between FDOT and the Space Coast TPO which provides for the use of planning funds to be 

‘passed through’ to the TPO to accomplish the work products identified in the UPWP. The JPA 

also outlines certain administrative and program requirements that must be met to receive the 

funds. The current JPA is effective for a term of five years. However, the JPA has recently been 

revised by FDOT to incorporate MAP‐21 language and was approved by the TPO Board at their 

May 8, 2014 meeting. Once all signatures are obtained and the agreement executed, the new 

JPA will replace the current one, which is anticipated to occur by July 1, 2014. Over the past two 

years the Space Coast TPO has also executed four (4) supplemental agreements to the PL for 

specific projects. If necessary, these supplementals will be amended to reflect the new PL JPA. 

Page 33: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 25 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Supplemental number 1, executed August 28, 2012 was for the development of the Complete 

Streets Methodology study using the TPO’s SU funds and was completed in early 2014.  

Supplemental number 2, executed July 1, 2013, is additional FDOT funds necessary for the 

development of the 2040 LRTP that includes the special approach of scenario planning and 

corridor typologies. This supplemental is effective until December 31, 2014. 

Supplemental number 3, executed November 19, 2013, provides for the use of the TPO’s SU 

funds for the development of an Intelligent Transportation Systems Master Plan. This project is 

to be completed by May 1, 2015. 

Supplemental number 4, executed on December 18, 2013, utilizes the TPO’s SU funds for the 

development of Complete Streets Feasibility Studies. The studies are anticipated to be 

completed by November 2014, however the agreement is effective until May 1, 2015. 

Joint Participation Agreement for Section 5305(d) Funding – Executed September 28, 2011: 

Agreement between FDOT and the Space Coast TPO which provides for the use of Section 

5305(d), Federal Transit Administration funds to be ‘passed through’ to the TPO in order to fulfill 

the requirements of the TPOs UPWP. The JPA also outlines certain administrative and program 

requirements that must be met in order to receive the funds. Each year, a Notice of Grant Award 

is executed as outlined in the original JPA to encumber funds for each UPWP fiscal year. The 

expiration of the current JPA is September 30, 2017. 

Intergovernmental Coordination and Review (ICAR) Agreement – Executed June 20, 2012: The 

ICAR Agreement provides for the coordination and review of transportation issues among all 

modes of transportation (School Board, Airports, Transit, Seaport and Space Florida). The 

current agreement shall be reviewed and renewed every five years. The next review/renewal is 

scheduled to occur by June 20, 2017. An amendment to the ICAR is anticipated to occur in 2014 

to address the removal of the East Central Florida Regional Planning Council as part of dispute 

resolution processes. The removal of the Planning Council was requested by FDOT upon review 

by FDOT legal. 

Interlocal Agreement with Central Florida MPO Alliance – Executed October 19, 2005: The 

MPO Alliance consists of representative from MetroPlan Orlando, Volusia County TPO, 

Ocala/Marion County TPO, Lake‐Sumter MPO, Polk TPO and the Space Coast TPO. The Alliance 

was formed to enhance regional planning for the Central Florida area. The Interlocal was 

amended in February 2007 to address alternates and providing voting rights to Executive 

Page 34: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 26 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Directors when acting as alternates. A second amendment was executed on March 8, 2012 to 

address administrative items and clarifications of MetroPlan’s role as the lead agency handling 

the administration of the Alliance and fixes contribution amounts from member M/TPOs. This 

agreement remains in effect unless dissolved by mutual agreement among the members. 

Other contracts and agreements executed in support of TPO functions include: 

Professional Services Agreement for Traffic Counts 

Professional Services Agreement for Legal Services 

Professional Services Agreement for General Planning Consultants 

Professional Services Agreement for Copier Services 

Professional Services Agreement for Auditing Services 

Professional Services Agreement for development of ITS Master Plan 

Maintenance Agreement with University of Florida for crash data maintenance 

Lease Agreement for office space with Brevard County 

Service level agreement with Brevard County for Information Technology services 

Service level agreement with Brevard County for Asset Management services 

Employment contract with SCTPO Executive Director  

Interlocal with Brevard County for support of Advanced Traffic Management System 

JPA LAP Agreement with FDOT for US 192 Feasibility Study 

C.  Operational Policies and Procedures 

The Space Coast TPO adopted updated policies on April 10, 2014. The Agency Policies and 

Procedures manual contains the rules and procedures for the TPO Board, TAC, CAC, BPTAC, and 

Executive Committee.  Policies include Personnel, Budget and Finance, Travel, Social Media, 

Conflict of Interest, and Title VI with Related Nondiscrimination Requirements. Internal 

procedures address the processes for Project Priorities, Transportation Improvement Program, 

Long Range Transportation Planning, Unified Planning Work Program and many administrative 

operational procedures. The current staffing level of the Space Coast TPO is nine full time 

employees, all of which are members of the Florida Retirement System. 

Official records of the TPO business are maintained in the Space Coast TPO office at 2725 Judge 

Fran Jamieson Way, Bldg. B, Rm 105, Viera, FL 32940. All of the TPO public records, as defined by 

Chapter 119 of Florida Statutes, are available for public inspection during normal business hours. 

                 

Page 35: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 27 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

Task 1.0   Program Management 

1.1 Annual Reporting, and Programming 

1.2 Annual Audit 

1.3 Regional/State Planning and Coordination 

1.4 Local Coordination and Planning 

1.5 Program Management and Technical Assistance (FDOT) 

SECTION 1 ADMINISTRATION

Page 36: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 28 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose:  To ensure the administration and management of the TPO is conducted and completed in 

an efficient, and timely manner, and to maintain capital equipment to support the comprehensive 

transportation planning process, associated public involvement, and education programs. 

Previous Achievements:  

Accomplished the preparation and transmittal of agendas for the TPO Governing Board and its 

associated committees. TPO staff attended and/or participated in various conferences and 

workshops that provided training on transportation planning, modeling, public involvement 

practices, Title VI, technology advances and administrative programs.  

 

The TPO developed and adopted a strategic plan for each calendar beginning in 2012. The strategic 

plan guides the TPO and its staff on which activities it will be undertaking and is used to track 

organizational performance. Each February, a new strategic plan has been adopted along with a 

presentation of the prior year’s top 10 accomplishments. The success of how well the strategies and 

objectives of the plan are achieved are used as the foundation for performance based evaluations 

and recognition. Highlights of the 2013 top 10 included: adoption of a new Public Participation Plan; 

Pilot Project allowing bicycles on Pineda Causeway launched; Groundbreaking on the East Central 

Florida Regional Rail Trail; Adoption of a new Bicycle/Pedestrian and Trails Mobility Plan; Complete 

Streets and the TPO’s first Transportation Symposium. Beginning with the FY 15‐16 UPWP, the 

development, planning and updating of the strategic planning activity will be covered under Task 

1.1, Annual Reporting and Programming. 

 

Annual performance evaluations were conducted on TPO staff and the Executive Director. In FY 13, 

the Executive Director’s contract was renewed and extended to September 30, 2015. 

 

In FY 14, the TPO was reaffirmed of its planning boundary and board membership by the Governor. 

The Space Coast TPO was not reauthorized due to the fact that there were no changes requested in 

either its planning boundary or board membership. 

UPWP TASK NUMBER: 1.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $332,000 $302,000 $634,000TPO SU $42,436 $0 $42,436BOCC $6,000 $0 $6,000FTA $14,000 $14,000 $28,000FTA Match $1,750 $1,750 $3,500TOTAL $396,186 $317,750 $713,936  

TASK TITLE: 

Program Management 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 37: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 29 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Accomplished the preparation and processing of vendor invoices for payment, and submitted 

reimbursement requests for the Federal Highway Administration, FDOT, and Federal Transit 

Administration grants. Prepared, adopted and monitored annual operating budgets to include 

associated contract management. Prepared quarterly financial reports and reconciled year end 

closeouts with actual expenditures. 

 

In FY 14, the TPO adopted amended Operating Policies to reflect current statutory references, laws 

and agreements. Other changes included clarifying requirements for board and committee 

appointments; including the Bicycle/Pedestrian and Trails Advisory Committee as an official sub‐

committee of the SCTPO; updated personnel leave accruals to be consistent with Brevard County 

policy; and updated audit language with latest requirements.  

 

The TPO adopted a recognition program in FY 13 to recognize members serving on the Board and its 

committees. TPO staff tracks attendance and volunteer positions served by its members. 

Recognition to those members meeting the programs requirements are acknowledge each April. 

 

Methodology: 

Complete necessary clerical, managerial and administrative activities related to producing and 

conducting monthly meetings of the TPO Governing Board and its committees. These include but 

are not limited to: compilation of agenda items and packages, transmittal of agendas to members, 

transcription of meeting minutes, posting of agendas and minutes on website, file maintenance, in 

accordance with Florida Statute 286.011, maintenance of office supplies and equipment, processing 

of travel requests and purchase orders. Attend various meetings that include the exchange of 

information, support and coordination activities required to accomplish the tasks identified in the FY 

15 – FY 16 UPWP. 

Continue preparation and processing of TPO grant reimbursement invoices and progress reports. 

Contract management shall include processing of vendor invoices in accordance with Florida Prompt 

Payment Act, monitoring of services to ensure compliance with contract requirements while 

remaining within budget and on schedule. Ensure expiring, and new contracts are executed within 

necessary time constraints so that services are not interrupted. Prepare, present, adopt and monitor 

annual operating budgets. Prepare quarterly financial reports on actual revenues and expenditures. 

In FY 14, the TPO anticipates purchasing a new HP Plotter to replace the existing failing plotter 

purchased in 2002. The TPO utilizes the plotter to enhance the production of quality public 

information products utilizing GIS technology. Maps are generated and used not only on a technical 

Page 38: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 30 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

level for such projects as the Long Range Transportation Plan, reviewing Traffic Analysis Zones and 

various travel demand model output files but has been used extensively for educating the public on 

various projects such as trails, bicycle and pedestrian facilities, census data and specific corridor 

projects such as the St. Johns Heritage Parkway. An HP T‐13000, 6‐color, 44” dual roller plotter or 

similar model will be purchased. The cost of the plotter is anticipated to be in the range of $8,000 to 

$12,000. Funding will be provided by the TPO’s PL planning grant and Brevard County. The 

percentage for each funding source will be split 50/50.  

If any other capital purchases are identified that would enhance the TPO’s performance and 

production of higher quality work products, the TPO will request permission to purchase. Any 

procurement of equipment greater than $5,000 will follow the procedures outlined in the FDOT 

Program Management Handbook and a separate written request for approval will be submitted. All 

capital items shall comply with 49 C.F.R. 18.32 and 18.33, and the Federal Office of Management 

and Budget Circular A‐87, Cost Principles for State, Local and Indian Tribal Governments. [23 C.F.R. 

420.121(e)]. 

Annual performance evaluations will be conducted on TPO staff and the Executive Director. In FY 15, 

a new Executive Director’s contract will be developed and executed prior to September 30, 2015. 

Work Products: • Agenda packages and associated activities and materials   ............................. July 2014 – June 2016 • Contract and Financial Management   ............................. July 2014 – June 2016 • Personnel Management and training   ............................. July 2014 – June 2016 • Development, processing and monitoring of financial budget ........................ July 2014 – June 2016 • Development of FY 15 Operating Budget   ............................. May – Sept 2014 • Development of FY 16 Operating Budget   ............................. May – Sept 2015 • Executive Director Contract   ............................. July‐Sept 2015 • Annual Member Recognitions   ............................. April 2015 & 2016 • Initiate development of FY 17 Operating Budget   ............................. March – Sept 2016     

Page 39: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 31 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 Purpose:  Develop, monitor and amend biennial Unified Planning Work Program which identifies 

work products and programs to be undertaken by the Space Coast TPO. Development of annual 

report summarizing previous year accomplishments, provision of project list for which Federal funds 

have been obligated in the preceding year and conduct FHWA/FTA/FDOT certifications. 

Previous Achievements:  

Developed, monitored, and amended FY 13 – FY 14 Unified Planning Work Program. Processed four 

modifications and six amendments to include de‐obligation of unspent FY 13 PL funds. Annual 

reports were prepared that included articles on work products produced by the TPO in the 

preceding year. A list of projects for which Federal funds were obligated was published annually in 

the Transportation Improvement Program and also posted on the TPO website. 

The TPO was certified by FDOT with no corrective actions in 2012 and 2013. The most recent 

certification completed in 2013 is included in Appendix C.  

The TPO developed and adopted a strategic plan for each calendar beginning in 2012. The strategic 

plan guides the TPO and its staff on which activities it will be undertaking and is used to track 

organizational performance. Further details on the previous achievements related to the strategic 

plan are included under Task 1.0, Program Management. It is included here because beginning in FY 

15 strategic planning activities will be charged under this task, 1.1. 

Methodology: 

Monitor and amend as necessary the FY 15 – FY 16 Unified Planning Work Program. In FY 16, a draft 

UPWP will be developed for FY 17 – FY 18. Annual reports will be produced summarizing the 

accomplishments, projects, and work products produced by the TPO during the previous year. 

UPWP TASK NUMBER: 1.1  FUNDING SOURCES:

FY 15 FY 16 TotalPL $30,000 $20,000 $50,000TPO SU $800 $0 $800FTA $8,000 $7,819 $15,819FTA Match $1,000 $977 $1,977TOTAL $39,800 $28,796 $68,596  

TASK TITLE: 

Annual Reporting, Certification and 

Programming 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 40: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 32 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

TPO staff will solicit input on the development and updating of its strategic plan. The plan is to be 

developed based on the calendar year and each year the top ten accomplishments will be 

presented. The adopted 2014‐15 strategic plan is included in Appendix A. 

The TPO is required to publish or otherwise make readily available for public review, an annual 

listing of projects for which Federal funds have been obligated in the preceding year. This list shall 

be incorporated into the Transportation Improvement Program report and will also be made 

available on the TPO website at www.spacecoasttpo.com. This activity is also covered under Task 

3.0, Transportation Improvement Program. 

FHWA’s four year certification cycle will take place in July, 2014 and will be a combined certification 

with FDOT and FTA. Annual certifications with FDOT will be conducted in the spring of 2015 and 

2016. TPO staff will compile all appropriate materials and conduct any research necessary in 

preparation for the reviews. Any corrective actions identified will be addressed as necessary and 

incorporated into the UPWP. 

 Work Products: 

• Monitoring and amending FY 15‐FY 16 UPWP   ............................. July 2014 – June 2016 

• TPO Joint FHWA/FTA/FDOT Certification    ............................. July 2014 

• Project List for which Federal funds have been obligated for FY 15 ................ Oct 2014 

• 2014 Annual Report/Strategic Plan Top Ten   ............................. Dec 2014 – Feb 2015 

• 2015 Strategic Plan     ............................. Dec 2014 – Feb 2015 

• FDOT Annual Certifications   ............................. Spring 2015, 2016 

• Project List for which Federal funds have been obligated for FY 16 ................ Oct 2015 

• 2015 Annual Report/Strategic Plan Top Ten   ............................. Dec 2015 – Feb 2016 

• 2016 Strategic Plan     ............................. Dec 2015 – Feb 2016 

• De‐obligation of unspent PL FY 15 funds   ............................. Feb 2016 

• Development of FY 17 – FY 18 UPWP   ............................. Feb – June 2016 

   

Page 41: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 33 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Purpose: To conduct annual audit of the Space Coast TPO to ensure TPO financial programs and 

processes are adequately performed in accordance with 49 C.F.R. 18.26, OMB Circular A‐133 and 

Section 215.97 F.S. 

Previous Achievements:  FY ending September 30, 2012 and September 30, 2013 audits were 

conducted by Berman, Hopkins, Wright & LaHam, the TPO’s contracted auditor, and all TPO grants 

and accounts were included in the schedule of expenditures and federal award and state financial 

assistance.  There were no corrective actions found.  

In 2014, the TPO extended their contract for services with Berman, Hopkins, Wright & LaHam an 

additional 2 years as per their contract agreement. 

Methodology: 

The firm of Berman, Hopkins, Wright & LaHam will perform audits of the TPO’s financial records for 

the fiscal years ending September 30, 2015, and 2016. Audits will adhere to 49 C.F.R. 18.26, OMB 

Circular A‐133 and Section 215.97 F.S. General United States of America audit standards will be 

followed. Audit findings and reports shall be submitted within nine months of the ending of the 

fiscal year being audited. The audit FY ending September 30, 2014 consulting fee is $24,000 

($19,000 PL; $5,000 FTA) and shall be completed by June, 2015. FY ending September 30, 2015 

consulting fee is $24,500 ($19,500 PL; $5,000 FTA) and shall be completed by June 30, 2016. 

Annual review of Brevard County’s Indirect Cost Allocation Plan will be conducted to verify services 

received from Brevard County are appropriately charged to the TPO. The indirect cost allocation 

plan shall also be provided as part of the Federal Transit Administration Section 5305(d) grant 

applications each year.  

Work Products: 

• Annual review of County Cost Allocation Plan (Indirect Costs) .......................... Feb – June, 2015 & 2016  

• Audit for FY ending September 30, 2014   ................................ March – June 2015 

• Audit for FY ending September 30, 2015   ................................ March – June 2016 

 

UPWP TASK NUMBER: 1.2  FUNDING SOURCES:

FY 15 FY 16 TotalPL $28,000 $28,000 $56,000FTA $4,000 $4,000 $8,000FTA Match $500 $500 $1,000TOTAL $32,500 $32,500 $65,000  

TASK TITLE: 

Annual Audit 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 42: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 34 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To participate in activities of regional and statewide significance to improve mobility of 

people, goods and services. 

Previous Achievements: 

Participation and attendance at Metropolitan Planning Organization Advisory Council and Central 

Florida MPO Alliance meetings. The Central Florida MPO Alliance is comprised of representatives 

from Lake‐Sumter TPO, MetroPlan Orlando, Polk County TPO, Space Coast TPO and Volusia County 

TPO. The Alliance provides a platform for regional transportation issues to be addressed and 

supported through a uniform council. The TPO supports efforts to seek funding for the Coast to 

Coast Connector trail which will link up with the East Central Regional Rail Trail in northern Brevard 

County. 

TPO staff participated in statewide meetings and video conferences to exchange information among 

all the MPOs and to coordinate activities and projects from a FHWA and statewide perspective. 

The FDOT initiated a future corridors initiative to plan for the future of the major transportation 

corridors critical to the state’s economic competitiveness and quality of life over the next 50 years. 

The analysis of the Tampa Bay to Central Florida Area Concept Report identified several potential 

regional connectivity gaps that are candidates for further evaluation. One of these gaps is a 

connection between southeastern Orlando and southern Brevard County. In FY 14 this area was 

being evaluated. The analysis will continue in FY 15 and is anticipated to be complete by December 

2014. 

In FY 14, the TPO was reaffirmed of its planning boundary and board membership by the Governor. 

The Space Coast TPO was not reauthorized due to the fact that there were no changes requested in 

either its planning boundary or board membership. This activity was also covered under Task 1.0 

and 1.4. 

UPWP TASK NUMBER: 1.3  FUNDING SOURCES:

FY 15 FY 16 TotalPL $40,000 $30,000 $70,000TPO SU $1,200 $0 $1,200

TOTAL $41,200 $30,000 $71,200  

 

TASK TITLE: 

Regional/State Planning and 

Coordination 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 43: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 35 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

The TPO’s annual legislative issues for 2013 included: Protect the State Transportation Trust Fund; 

Support Brevard County Road Project Priorities; St. Johns Heritage Parkway System, and Ellis Road 

Improvements, Construct Passenger Rail stations, Invest in Space Transportation Infrastructure, 

Complete the Rail Trail and KSC Loop Trail, and Consider local priorities for flexible Transportation 

Funding. The TPO continued to monitor both state and federal legislation activities related to 

impacts that would impact transportation planning and any changes in requirements for MPO’s.  

In FY 13 and FY 14 the TPO continued their work, through agreement, to support Space Florida 

planning activities. TPO staff was successful in having space recognized by FDOT as its own mode of 

transportation and now have their own funding in the FDOT 5 year work program. FY 13 saw the 

completion of the first Space Port Master Plan.   Local coordination efforts under this agreement are 

covered under Tasks 1.4 and 5.0. 

In FY 13, MetroPlan Orlando initiated an update to their original Freight Study.  TPO staff has 

participated in meetings and presentations. A final report is due in 2014. Activities and work 

products related to this planning effort are also covered under Task 5.0. 

Methodology: 

Attend various meetings including FDOT quarterly meetings that include the exchange of 

information, support and coordination activities required to accomplish the tasks identified in the FY 

15 – FY 16 UPWP. Continue to attend MPOAC meetings and participate in inter‐agency policy 

groups, working groups or other state and/or regional policy committees as warranted. Continue 

participation in the Central Florida MPO Alliance. The TPO will continue to work with the Alliance on 

regional project priorities that include projects of regional impact such as trail projects and those 

utilizing TRIP funding, such as Barnes Blvd.  

Coordination efforts will also continue with the Central Florida Regional Planning Model which is 

used as the travel demand model for the Long Range Transportation Plan. LRTP activities are 

covered under Task 4.0. 

Coordinate with FDOT and FHWA with the Efficient Transportation Decision Making Process (ETDM) 

which creates linkages between land use, transportation and environmental resource planning 

initiatives through early, interactive agency involvement.  

In FY 14, FDOT’s Future Corridors Pilot Study for planning future major transportation corridors 

critical to the state’s economic competitiveness and quality of life was initiated. The pilot study area 

for the Space Coast TPO is included in the Tampa Bay to Central Florida and the Space Coast pilot 

Page 44: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 36 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

study. The study will explore ways to connect southeast Orange County to the Central Brevard area. 

This area is anticipated to have significant growth over the next 50 years. It is anticipated that this 

pilot study will be completed in FY 15. This project also directly supports the FHWA/FTA planning 

emphasis area. 

Monitor state and federal legislative issues and develop position statements as needed. New MAP‐

21 Federal Transportation Act was passed by Congress that replaced SAFETEA‐LU.  TPO staff is 

monitoring changes from this new legislation, and is currently awaiting FHWA and FTA first 

rulemakings regarding performance measurements. Safety performance measures and the highway 

safety improvement program (HSIP) rules are also anticipated to be published soon. Planning rules 

are expected in 2014 and any specific guidelines identified or changes will be incorporated into the 

final FY 15‐16 UPWP.  The TPO will also be monitoring federal legislative actions related to the 

development and passage of a new Highway Transportation Bill, anticipated to be passed at some 

point over the next two years. 

A final report on the update to the 2002 Regional Freight Study is anticipated in 2014.  TPO staff will 

continue to be involved with monitoring freight issues and how they may impact Central Florida. 

This activity is also covered under Task 5.0, Multi‐Modal Project Planning. 

Work Products: • Participation/attendance at MPOAC and Central Florida MPOA meetings………July 2014 – June 2016 • Development of annual Legislative Issues Package   ...............................Sept – Dec, 2015 & 2016 • Monitoring of state and federal legislative issues   ...............................July 2014 – June 2016 • Participation in ETDM process   ...............................July 2014 – June 2016 • MAP 21 Impacts; Performance Measures   ...............................July 2014 – June 2016 • Future Corridor’s Initiative Pilot Project   ...............................Jan ‐ Dec 2014    

Page 45: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 37 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To foster intergovernmental/interagency coordination to ensure a coordinated and 

comprehensive approach to transportation planning and programming.  

Previous Achievements: 

TPO staff continued their active participation and coordination with agencies such as FDOT; 

Melbourne International Airport; Space Florida; Scenic Highway Committee; Brevard County Public 

Works; Sheriff Office; Brevard County Planning and Zoning; Brevard County Emergency 

Management; School Board; Port Canaveral; Space Coast Area Transit and all municipalities within 

Brevard County. These efforts include project reviews and updates, planning, and policy review. 

In FY 13, and FY 14 the TPO continued its separate agreement with Space Florida in support of space 

activities.  The TPO staff efforts, with Space Florida, FDOT and elected officials has resulted in 

recognition of space as its own mode of transportation, and has institutionalized space projects into 

the DOT transportation planning process and work program. The first Spaceport System Plan was 

adopted in FY 13 along with the development of the Cape Canaveral Spaceport Master Plan. 

Regional and state coordination efforts under this agreement are covered under Task 1.3. 

In FY 14, the TPO was reaffirmed of its planning boundary and board membership by the Governor. 

The Space Coast TPO was not reauthorized due to the fact that there were no changes requested in 

either its planning boundary or board membership. This activity was also covered under Task 1.0. 

In FY 13, the North Beaches Coalition, which consists of the cities of Cape Canaveral and Cocoa 

Beach, executed a new Interlocal Agreement that specifies how the cities will share representation 

on the TPO Board. This new interlocal was automatically incorporated into the existing TPO 

Interlocal Agreement. In FY 14, the South Beaches Coalition also executed a new Interlocal 

Agreement. With these new agreements, in FY 14 the TPO then executed an updated and revised 

Interlocal Agreement defining the creation of the Space Coast TPO and provided updated references 

to the new coalition agreements and clarified representation of agencies on the TPO Board. 

UPWP TASK NUMBER: 1.4  FUNDING SOURCES:

FY 15 FY 16 TotalPL $17,000 $32,000 $49,000TPO SU $1,200 $0 $1,200BOCC $16,593 $18,735 $35,328TOTAL $34,793 $50,735 $85,528

 

TASK TITLE: 

Local Coordination and Planning 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 46: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 38 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

The TPO continued efforts to move their number one priority project, the St. Johns Heritage 

Parkway, forward by securing an additional $7.5M in FY 13. The TPO also through significant 

coordination with FDOT was able to obtain funding to construct a safety wall along I‐95 in Cocoa. 

Methodology: 

To continue interagency coordination with Brevard County, School Board, Scenic Highway, 

Emergency Management, Melbourne Airport, and other agencies and municipalities as appropriate. 

The TPO will participate in the development and review of the transportation elements of local 

government comprehensive plans. 

In FY 16 the TPO will renew and update their inter‐local agreement with the Brevard County Board 

of County Commissioners. This agreement provides services for the TPO such as financial, human 

resources and budgeting. The lease agreement will also be renewed and updated with Brevard 

County. Supporting service level agreements will continue to be monitored and renewed as 

appropriate that include information technology and asset management services provided through 

Brevard County. 

TPO staff will continue to assist, as needed, with local modal agencies to coordinate various projects 

including air, rail, transit, trail, seaport and spaceport projects. Coordination efforts with various 

modal agencies are also covered under Tasks 1.3, 5.0, 5.1, 7.0 and 7.2. Projects include, but are not 

limited to Coast to Coast Connector Trail, East Central Florida Regional Rail Trail, Sea Loop Trail, 

Brevard Zoo Trail, Restoration of regional passenger rail service, and Space Florida infrastructure 

projects.  We will also continue to support the St. Johns Heritage Parkway, Viera Blvd. Interchange 

and concurrency reviews and issues on various roadways. 

Space Florida will continue its efforts to locate space projects in Brevard County.  In support of those 

efforts the TPO staff will continue to work to develop the transportation infrastructure necessary to 

keep the Kennedy Space Center a vital player in space exploration and the privatization of launches. 

In FY 15, the TPO anticipates launching a new community outreach program. This program will 

include presenting to local municipalities, modal agencies and business organizations advising and 

educating on what the TPO is and all of the services that the TPO can provide. Pending funding and 

staffing resources the TPO also wishes to begin holding trail and education walks; tour guided rides 

and other engaging activities. Details will be made available once the program is fully developed. 

This activity is also covered under Task 6.0, Public Involvement. 

Page 47: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 39 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

TPO staff will continue to support the Brevard County Emergency Management Department through 

participation in the annual Hurricane Exercise and will also provide staff support during declared 

emergencies at the Emergency Operations Center in Rockledge. During exercises and events staff 

provides information and coordination support for the safety and security of the transportation 

network. This activity is also covered under Task 5.2. 

Work Products: 

• Coordination with local agencies and municipalities   ............................. July 2014 – June 2016 

• Coordination and support of Space Florida   ............................. July 2014 – June 2016 

• Coordination and support of Brevard County   ............................. July 2014 – June 2016 

• Support of trail development and implementation   ............................. July 2014 – June 2016 

• Annual Hurricane Evacuation Drill   ............................. May 2015 & 2016 

 

 

   

Page 48: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 40 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To provide guidance and technical assistance by the FDOT District 5 staff to the TPO, TPO 

staff and TPO committees as requested and required by FDOT policy, in support of FTA Section 

5305(d) grant and the FHWA PL Transportation Planning Grant. 

Previous Achievements: The FDOT has coordinated with and provided technical assistance to the 

TPO staff on various projects. Both the FDOT District Five and Central Office staff provide guidance 

and assistance to the TPO. FDOT has continued to provide the required match for the TPOs Federal 

Planning Grant. In FY 13 and FY 14, FDOT processed various amendments and agreements related to 

the TPO funding several projects with their Federal Surface Transportation Program funds (SU). 

FDOT support and assistance efforts have also included guidance and supervision of administrative 

tasks related to the FTA Section 5305(d) grant (previously referred to as Section 5303), including 

program management, development, review and reporting. TPO staff, in cooperation with FDOT, 

utilizes the TRANCIP software program for administration of its FTA grant. 

Methodology: FDOT will continue its supervision and support of administrative tasks relating to the 

work products and activities identified in the Space Coast TPO’s UPWP for both the PL and FTA 

Section 5305(d) grants. Support shall include provision of state match requirements, program 

management, development, review and reporting efforts of the PL and FTA 5305(d) grants. 

FDOT will also continue coordinating district planning activities that will be performed with federal 

or state funds within Brevard County. See Appendix B for details. 

Work Products: 

• FDOT to provide required match for PL and FTA Section 5305(d) grants ........ July 2014 – June 2016 

• FDOT to provide necessary technical support, program management 

   and administrative oversight in relation to TPO PL and FTA grants ................. July 2014 – June 2016 

   

UPWP TASK NUMBER: 1.5  FUNDING SOURCES:

FY 15 FY 16 TotalHP $186,321 $169,043 $355,364FTA "D" Funds $23,407 $23,116 $46,523TOTAL $209,728 $192,159 $401,887  

TASK TITLE: 

Program Management and 

Technical Assistance 

RESPONSIBLE AGENCY: 

FDOT 

Page 49: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 41 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

 

Task 2.0 Transportation Data Compilation and Distribution 

   

 

   

SECTION 2 DATA COLLECTION

Page 50: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 42 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Purpose: To monitor the existing transportation network, safety and security, socio‐economic 

variables and environmental factors needed for use in both short term and long range 

transportation planning and management systems. 

Previous Achievements: 

In FY 14, the TPO began an Annual Safety and Planning Program that encompasses many existing 

tasks that are inter‐related under one program. The program consist of the collection of traffic 

counts and the website maintenance of the counts, the maintenance of the web based crash data 

location system, the new countywide safety evaluation report, all of which feed into the annual 

State of the System Report. Beginning in FY 15 the TPO will be utilizing SU funds to cover the 

expenses associated with conducting these program tasks on an annual basis. The Safety and State 

of the System Reports are covered under Task 5.2, Management Operations, Safety and Security. 

Annual collection of traffic volumes continued in both FY 13 and FY 14. Traffic volumes are used 

extensively for many transportation planning projects that have included: Long Range 

Transportation Plan; Bicycle and Pedestrian Mobility Plan; Complete Streets; and Feasibility Studies. 

The counts are also used for the TPO’s annual roadway segment rankings used for project 

prioritization. Counts are made available on‐line at the TPOs website through a web‐based program 

provided by MS2 Midwestern. The service agreement for traffic counts with Peggy Malone & 

Associates was renewed for an additional year in FY 14.   MS2 Midwestern’s annual website 

maintenance agreement is included under this task at an approximate cost of $5,500. In the 

calendar year 2013 there were 1,756 unique visitors, a 36% increase from 2012.  Annual traffic 

count published in May. 

Developed by the University of Florida, the TPO launched its own Crash Data Location web‐based 

program in 2013. The TPO conducted targeted training classes for user groups. This new system 

allows for greater use of crash data by being able to identify types of crashes, severity and causes 

and to locate high crash locations.   

UPWP TASK NUMBER: 2.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $45,000 $55,000 $100,000FTA $15,053 $8,000 $23,053FTA Match $1,882 $1,000 $2,882BOCC $20,000 $30,000 $50,000TPO SU $67,645 $63,064 $130,709

TOTAL $149,580 $157,064 $306,644  

TASK TITLE: 

Transportation Data Compilation and 

Distribution 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 51: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 43 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

In FY 14, the TPO initiated the development of an annual Countywide Safety Evaluation Report. The 

report is a system‐wide analysis that utilizes the web‐based crash database location system to 

report on the number, severity, type, time of day and other sorting factors available through the 

system. The analysis also considers the eight Strategic Highway Safety Plan emphasis areas as part of 

the identification of potential locations that may benefit from further analysis and safety 

improvements. The Safety Report is covered under Task 5.2, and was developed through the TPO 

general planning consultant.  

In FY 13 and FY 14, TPO staff coordinated with FDOT on updating the TPO’s urbanized area 

boundary. This GIS mapping exercise was refined based upon 2010 Census data. In FY 14 the TPO 

along with coordination with FDOT and local municipalities reviewed and updated functional 

classification of roadways. This activity was also covered under Task 1.4. 

Methodology: 

On‐going cooperation with the Florida Department of Transportation, Florida Department of 

Highway Vehicles, local law and government agencies to collect data.  Maintain a transportation 

network and demographic database. Continue efforts to provide transportation data to the public, 

media and other requesting agencies.   

Attend GIS coordination meetings, workshops and conferences to enhance knowledge and use of 

GIS in the transportation environment. Continue to utilize GIS in development of maps and 

distribution of data. 

The TPO’s on‐board general planning consultant will continue development of the annual Safety 

Evaluation Report utilizing the web based crash data location system as part of the TPO’s Annual 

Performance Monitoring Program. The report will focus on identifying crash trends, types, and 

location of crashes. Crash data will also be used and incorporated into the annual State of the 

System Report. Maintenance and updating of the crash system is performed by the University of 

Florida at an average annual cost of $17,265 and is funded beginning in FY 15 with the TPO’s SU 

funds. The Safety Report is covered under Task 5.2, and will also be funded with the TPO’s SU funds. 

On‐going traffic count data acquisition program. Using the contracted services of Peggy Malone and 

Associates counts are collected annually from October through February. Volume counts are taken 

in 48 hours periods, and bi‐directional at 15 minute intervals. Approximately 450 locations on 

arterial and collector roadways are taken. The data is summarized and a historical report of counts is 

published annually. Counts are uploaded to the TPOs traffic count web‐based program and are 

accessible from the TPO website which is available to the public 24 hours a day, 7 days a week. The 

Page 52: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 44 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

consultant contract averages approximately $70,000 annually. TPO staff performs approximately 

$5,000 in management, administration of contract and post processing of data. Approximately 

$20,000 to $30,000 is funded by Brevard County, in FY 15 $10,000 will be funded with FTA and the 

remaining is funded utilizing the TPO’s SU funds as part of the Annual Performance Monitoring 

Program. The current contract with Peggy Malone was renewed in September 2013 for one year. 

TPO staff anticipates extending the contract for one additional year to 2015 at which time the TPO 

will solicit for services through a Request for Proposals process. The annual traffic count website 

hosted by Midwestern Solutions maintenance cost will also be funded with the TPO’s SU funds 

beginning in FY 15 at approximately $5,800 annually. 

TPO staff, in coordination with Brevard County Public Works, is sharing traffic data utilizing the County’s 

Advanced Traffic Management System (ATMS). The ATMS system has the potential to provide the TPO’s on‐

board general planning consultant the ability to collect traffic counts and data such as speed. 

In FY 15, the TPO will prepare a work order for one of its general planning consultants to update its 

Community Characteristics Inventory. The consultant will compile data from various sources 

including the U.S. Census, Brevard County, and the American Community Survey and link them to 

TAZ’s. The study will look at the ethnic diversity, economic viability, population, and transportation 

needs of the community. Maps can then be created to identify different types of communities and 

where they are located. The profile will be used to help ensure that transportation resources are 

fairly allocated to benefit all segments of the population of Brevard County and will serve to support 

the FHWA/FTA planning emphasis area. The estimated cost of this project is $93,768 and will be 

funded utilizing the TPO’s SU funds. <Update: 9‐15‐15: This activity will be done utilizing existing 

FDOT ETDM program and by existing TPO staff. SU funds are being re‐directed to fully fund 

development of Interactive Trail Guide under task 6.0, already identified as a work product.> 

Work Products: 

• Traffic Data Collection   .......................... Oct – Feb, 2014‐2016 

• Annual Traffic Count Website Maintenance Renewal   .......................... Oct 2014 & 2015 

• Solicit and Execute new Traffic Count Collection Contract  .......................... May – Sept 2015 

• Processing of Traffic Data Collection, Annual Count Report ......................... Mar – June, 2015 & 2016 

• 2014 Safety Evaluation Report   .......................... March ‐ July 2015 

• 2015 Safety Evaluation Report   .......................... March – July 2016 

• Annual Crash Database Website Maintenance Renewal   .......................... Dec 2015 & 2016 

 

Page 53: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 45 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

• Provision of transportation data   .......................... July 2014 – June 2016 

• Coordination of Brevard County ATMS Data   .......................... July 2014 – June 2016 

• Update Community Characteristics Inventory   .......................... May 2015 – May 2016  

   

Page 54: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 46 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

 

Task 3.0 Transportation Improvement Program 

 

   

SECTION 3 TRANSPORTATION IMPROVEMENT

PROGRAM

Page 55: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 47 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To prepare, develop and annually maintain a Transportation Improvement Program (TIP) 

that includes the programs and projects, by phase, to be undertaken in the next five years and 

adheres to the requirements of the federal highway transportation act, MAP‐21. 

Previous Achievements: 

The TPO annually solicits and compiles projects submitted by local modal agencies, County, and 

local cities as part of the TPOs annual Project Priorities process. Projects are reviewed for cost 

feasibility and then prioritized by the SCTPO Board before being submitted to FDOT to be 

considered for funding and inclusion in the FDOT 5‐year work program. In 2013, Strategic 

Intermodal System and space infrastructure projects were adopted by the TPO Governing Board in 

July with non‐SIS and other modes project priorities being adopted in September. 

Projects programmed in the TIP are made available through the TPO’s website maintained by Data 

Transfer Solutions and FDOT. The TIP website enables staff to create custom reports and offer the 

public 24 hour access to the latest list of projects programmed in Brevard County. TIP amendments 

are processed as needed and are then updated to the website throughout the year. Projects for 

which Federal funds have been obligated in the preceding year are included in the TIP publication.  

One of the changes with the adoption of MAP‐21 is the consolidation of various programs into one 

called “Transportation Alternatives”.  This new program includes projects that were previously 

known as Transportation Enhancements, Recreational Trails, Safe Routes to School, and Scenic 

Byways. In FY 14 the TPO solicited these types of projects from multi‐modal agencies, the County, 

and local municipalities to provide an updated list of projects. The TPO also developed a screening 

and ranking criteria to prioritize these types of projects. 

In FY 13 and FY 14 the TPO continued to work with Space Florida through a separate agreement to 

assist with the development and prioritization of space infrastructure projects and to get them 

UPWP TASK NUMBER: 3.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $20,000 $30,000 $50,000TPO SU $2,500 $0 $2,500FTA $4,000 $10,000 $14,000FTA Match $500 $1,250 $1,750TOTAL $27,000 $41,250 $68,250  

 

TASK TITLE: 

Transportation Improvement Program 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 56: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 48 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

programmed in the FDOT Work Program. The TPO has been very successful in this effort and in the 

most recent year of the FDOT Work Program, FY 19 reflects $20 million programmed for space 

infrastructure projects. 

Over the past few years the TPO has also been utilizing its available SU funds to program and 

implement new projects and studies such as Complete Streets and an Intelligent Transportation 

Systems Master Plan. SU funds have also been used to assist with funding regional projects such as 

the East Central Florida Regional Rail Trail and the St. Johns Heritage Parkway. 

Methodology: 

Each year the TPO will solicit from local modal agencies, the County, and local governments, 

projects to consider as part of the prioritization process. TPO staff, in coordination with the Growth 

Management Subcommittee, will review and prioritize these projects and make recommendations 

to the TPO Board for consideration and approval.  A public meeting to receive comments on these 

proposed projects will also be held.  In September of each year, the adopted project list will be 

submitted to FDOT for funding consideration and programming in the FDOT Work Program and the 

SCTPO’s TIP. 

In FY 15, the TPO will begin developing an annual list of safety projects utilizing the web based crash 

data location system.  These projects will be reviewed and where there is need for improvement or 

future analysis it may be submitted for consideration to be prioritized and funded in the TIP.  Work 

efforts and coordination activities for this are also covered under Tasks 1.4, 2.0 and 5.2. 

As needed, TPO staff will continue to assist Space Florida on developing, prioritizing and submitting 

their infrastructure projects to be included in the TPO project priorities and TIP. 

Annually develop and adopt the TIP in July that adheres to all federal and state requirements. 

Incorporate FDOT adopted Work Program and locally funded projects into TIP. Maintain and update 

TIP with approved amendments and post on website and TIP interactive web application. 

TPO will continue to provide input into FDOT Work Program and will attend annual Work Program 

Public meeting. 

Work Products: 

• Annual solicitation of projects   .............. March – June, 2015 & 2016 

• Project Prioritization   .............. May – Sept, 2014, 2015 & 2016 

• Annual safety project list   .............. Mar – June, 2015 & 2016 

• Annual Space Florida Infrastructure Project List   .............. May – Sept 2014, 2015 & 2016 

Page 57: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 49 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

• Adoption of annual TIP   .............. July 2014 & 2015 

• Annual Public Meeting on Project Priorities and TIP   .............. June – July 2014, 2015 & 2016 

• Review and Comment on FDOT Work Program   .............. Nov – Dec 2014 & 2015 

• Maintenance of TIP (Amendments)   .............. July 2014 – June 2016 

   

Page 58: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 50 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

Task 4.0 Long Range Transportation Planning 

 

 

   

Section 4 – Long Ran

ge Transportation Planning 

SECTION 4 LONG RANGE TRANSPORTATION

PLANNING

Page 59: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 51 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To develop, maintain and modify as required, the adopted TPO Cost Feasible Long Range 

Transportation Plan in compliance with MAP‐21 planning requirements. 

Previous Achievements: 

The 2040 Long Range Transportation Plan development was initiated in December 2012. The plan is 

being developed through use of the TPOs general planning consultant with the technical modeling 

aspect in coordination with FDOT.  Early phases of the development have included workshops with 

the Technical and Citizens Advisory Committee’s and the TPO Governing Board to solicit input and 

provide guidance on what concerns and issues should be considered and incorporated into a future 

scenario and vision for the Space Coast. A statistically valid survey was conducted in the summer of 

2013 to also solicit input from citizens. 

A separate project specific website was established, www.spacecoast2040.com to promote the 

development of the plan and to provide access to all available documents created throughout the 

planning process. 

Following the workshops and survey, the TPO conducted its first Transportation Symposium in 

October of 2013 where representatives from all municipalities and transportation modes (All 

Aboard Florida, a private railroad company; Space Coast Area Transit; Port Canaveral; and Space 

Florida) presented what their unique challenges and visions were for the future. There were over 85 

participants in this workshop. Compiling this information formed the foundation for the 

development of four scenarios. Based upon an economic growth approach the four scenarios were 

Current Trend, Port Centers, Connected Communities, and High Tech Lifestyle. Each scenario 

included land use and transportation impacts. Land uses included urban growth, housing mix, job 

mixes and sea level rise. Transportation impacts considered percentage of walkable communities in 

relationship to housing and jobs, network miles impacted on roadways, transit and bicycle facilities. 

Also energy and air quality issues were considered. In February, 2014 a Transportation Choices 

Workshop was held with over 100 participants receiving information on these scenarios. 

UPWP TASK NUMBER: 4.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $40,000 $20,000 $60,000State "D" $67,200 $0 $67,200TPO SU $146,888 $0 $146,888FTA $13,000 $4,000 $17,000FTA Match $1,625 $500 $2,125TOTAL $268,713 $24,500 $293,213  

TASK TITLE: 

Long Range Transportation Planning 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 60: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 52 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Participants were asked to provide feedback on what aspects of each scenario was most liked and 

least liked. The results of the feedback will be used to define the final scenario and vision that will 

guide the development of the cost feasible projects.  

TPO staff and their consultant have coordinated with FDOT on input values to the Central Florida 

Regional Planning Model and upon completion of the model validation will move forward in FY 15 to 

completing future year data inputs. The base year for the 2040 LRTP is 2010. 

Due to the fact that this LRTP is a new approach and involves scenario planning from an economic 

growth approach and includes developing corridor typologies, the SCTPO requested and received 

from FDOT supplemental funds to conduct the 2040 LRTP beginning in FY 14. 

Methodology: 

As a stated in 23 CFR 450.322(f) the final LRTP will address all required elements and will utilize the 

guidance paper issued in November 2012, Federal Strategies for Implementing Requirements for 

LRTP Update for the Florida MPOs. The major tasks to be completed include the development of 

corridor typologies and strategic plans for each, corridor needs, the cost feasible list of projects with 

the preferred network of improvements. The final document will incorporate all modes and 

represent a ‘Metaplan’. This plan will tap into and integrate the main goals, objectives and projects 

already identified in other plans such as Complete Streets, Bicycle, Pedestrian and Trails Mobility 

Plan, Intelligent Transportation Systems Master Plan, Space Coast Area Transit’s Transit 

Development Plan, Master Plans from airports, Space Florida and Port Canaveral. Transportation 

Systems Management and Operations (TSM&O) strategies will also be included in the plan’s 

recommended actions. The goal is to have a fully integrated plan that will meet the needs and 

accomplish the vision developed during the initial phases of the plan development. The Cost 

Feasible 2040 Long Range Transportation Plan will be adopted by October, 2015. Figure 2 provides a 

summary of the 2040 LRTP development schedule. 

TPO staff and their general planning consultant will continue to coordinate with FDOT on data 

inputs and review of the Central Florida Regional Planning Model (CFRPM). Future year (2040) land 

use and zdata will be provided and reviewed. An Existing plus Committed (E+C) network of projects 

will be developed along with a final cost feasible network. 

Additional meetings and solicitation of public comment and input will continue until the adoption of 

the 2040 LRTP.  Outreach efforts will include use of the LRTP website, TPO Board and committee 

meetings, postings on the TPO‘s Facebook site, and other public meetings and appropriate 

techniques.  

Page 61: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 53 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

The fiscal analysis conducted at the time of developing the scope and cost of the 2040 LRTP was 

based upon programmed funding amounts in the TIP at the time, the impacts of MAP‐21 were 

unknown. In April of 2013, the SCTPO was made aware of the fiscal impacts to the annual allocation 

of PL funds from MAP‐21 and new Census data that created two additional TMA’s in Florida. These 

two elements along with a reduced population figure, reduced the SCTPO PL allocation by 

approximately $100,000 annually. Although the SCTPO was able to absorb this impact for FY 14, it is 

not able to sustain this lowered allocation into future years. In order to conserve PL funds to 

maintain daily operations, the use of SU funds to complete the LRTP will be implemented for FY 15 

and FY 16 with approximately $5,000 in FTA funding in FY 15. 

Work Products: 

• Public outreach and input   ............................. July 2014 – June 2016 

• Corridor Strategic Plans   ............................. June 2014 – Dec 2015 

• Alternative and Cost Feasible Network (CFRPM)   ............................. June 2014 – July 2015 

• Development of E+C Network (CFRPM)   ............................. May 2014 – Feb 2015 

• Cost Feasible Plan     ............................. Nov 2014 – April 2015 

• Plan Documentation   ............................. April  – Aug 2015 

• Adoption of 2040 LRTP   ............................. Oct 2015 

Page 62: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 54 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Figure 2 – 2040 LRTP Development Schedule

Page 63: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 55 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

 

Task 5.0   Multi‐Modal Project Planning 

5.1 Corridor Studies 

5.2 Management Operations, Safety and Security 

 

 

 

 

   

Section 5 – Special Project Planning 

SECTION 5 PROJECT SPECIFIC PLANNING

Page 64: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 56 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To provide planning management and technical support for the identification and 

implementation of improved transportation facilities for all modes of travel. 

Previous Achievements: 

TPO staff continued their work efforts through a separate agreement with Space Florida in FY 13 

and FY 14 to provide support in getting space infrastructure projects institutionalized in the FDOTs 

planning process and annual work program. Space has been recognized as its own mode of 

transportation, and is now funded in the FDOT work program. TPO staff has worked extensively with 

Space Florida in reviewing grant applications, formalizing their project request as part of the TPO’s 

annual project prioritization process. In FY 14 TPO staff assisted with the development of Space 

Florida and Spaceport Master Plans.  

In late FY 12 All Aboard Florida, a private enterprise, announced plans to provide non‐stop rail 

service from Orlando to Miami.  Their plans include improvements to their existing track such as 

double and triple tracking, and the placement of gates and safety features.  While currently there 

are no plans to provide a stop in Brevard county, TPO staff will be monitoring this system for any 

impacts on local transportation and safety concerns.  The TPO continues to support a passenger rail 

system between north and south Florida.  

In FY 14 the TPO completed the development of its 

Complete Streets Evaluation Methodology and 

Project Screening project through its general 

planning consultant, Kittelson and Associates. The 

study was a three phase analysis (See Figure 3). The 

first phase looked at various factors and criteria 

from a countywide perspective which resulted in 

identification of opportunity corridors where the 

complete streets concept would be suitable. This 

UPWP TASK NUMBER: 5.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $75,000 $39,450 $114,450TPO SU $323,617 $0 $323,617Port (CPA) $15,000 $35,000 $50,000FTA $15,000 $12,000 $27,000FTA Match $1,875 $1,500 $3,375TOTAL $430,492 $87,950 $518,442  

TASK TITLE: 

Multi‐Modal Project Planning 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Figure 3 – Three Phase Screening Process for Complete 

Street Project 

Page 65: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 57 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

phase utilized the accessibility index developed as part of the Bicycle and Pedestrian Mobility Plan 

that was also under development (see Task 7.0). The second phase further filtered the list of 

candidate corridors through conducting feasibility analysis on the corridors. The final phase was the 

actual ranking and project selection of which there were six projects were recommended and 

adopted for implementation. Figure 4 shows the final list of projects and implementation schedule. 

 

Figure 4 – Complete Streets Adopted Projects and Implementation Schedule 

In the Spring of 2014, TPO staff began feasibility studies (corridor analysis/design review) on Florida 

Avenue, Hickory Street and Hopkins. The TPO’s consultant, Kittelson and Associates are conducting 

the studies and are closely coordinating with the local municipalities and FDOT. The results will be 

used to develop the scope for the design phase and the projects will then move into construction as 

shown in Figure 4. 

In FY 12, an update to the Regional Freight Study conducted by MetroPlan Orlando staff was 

initiated. TPO staff attended associated meetings and presentations. The study which looked at the 

impact and movement of freight, goods and services in the Central Florida region and identified 

current and future needs along with recommended improvements to increase the efficiency and 

effectiveness of freight movement.  The final report will be used as a reference in the 2040 Long 

Range Transportation Plan. 

Page 66: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 58 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Methodology: 

Coordination with Space Florida is anticipated to continue over the next year as the space industry 

located at the Kennedy Space Center works to clarify its future role as not only a governmental 

agency but also to open its facilities and resources to the private sector as the commercial space 

industry continues to grow.  With the success of institutionalizing space as its own mode of 

transportation within the workings of the Florida Department of Transportation and its Work 

Program in FY 15 the TPO will not need to renew its separate agreement with Space Florida. Support 

will continue as part of the TPO’s regular support to local agencies and municipalities covered under 

various tasks. TPO staff has successfully prepared and trained Space Florida staff on the annual 

project prioritization process and submittal of projects to the FDOT.  

Support and coordination of restoring passenger rail and freight services to Brevard and the 

surrounding region will continue. Both regional and local coordination will continue. Current funding 

in the work program of $150 million is available for construction of station locations in Titusville, 

Cocoa and Melbourne. The TPO will enter into an agreement with Canaveral Port Authority in FY 15 

to conduct a Rail Station Location Study to identify where to locate a passenger rail station in 

Brevard County. All Aboard Florida has indicated they will follow‐up with a ridership study to 

determine the station’s feasibility as part of their service running from Orlando to Miami. The study 

will be funded by Canaveral Port Authority and the TPO’s general planning consultant will perform 

the analysis. 

In FY 15 TPO staff will review findings from the updated Regional Freight Study to monitor current 

and any future needs for the safe and efficient movement of freight, goods and services throughout 

the Central Florida region.  The document findings will be used as a resource for the 2040 LRTP. 

With the opening of the Panama Canal to larger cargo ships, ports here in the United States are 

working to get their facilities ready to accommodate the larger ships.  The impact of increased 

freight movement by truck on Brevard County roads through increased use of Port Canaveral will be 

monitored. 

In FY 15 staff will complete the complete street feasibilities studies on Florida Avenue, Hickory 

Street and Hopkins.  Feasibility Studies on Pineapple Ave. and Front Street will also be conducted in 

FY 15 with the balance of funds not expended on the previous studies. Coordination with local 

municipalities will continue through construction. The TPO will also work with those agencies 

without projects programmed but desiring to implement complete streets within their jurisdictions. 

 

Page 67: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 59 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Work Products: 

• Completion of Complete Streets Feasibility Studies   .................... June 2015 

• Support of Space Florida and programming of space infrastructure  

    projects in FDOT work program   .................... May – August, 2015 & 2016 

• Support for of restoring passenger rail service   .................... July 2014 – June 2016 

• Rail Station Location Study   .................... April 2015 – Dec 2015 

• Support of multi‐modal programs (Rail, Sea, Air and Space) .................. July 2014 – June 2016 

• Monitoring of impacts from All Aboard Florida rail service .................... July 2014 – June 2016 

• Support of Implementation of Complete Street Projects   .................... July 2014 – June 2016 

   

Page 68: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 60 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: Participation in the formulation and management of specific corridor studies. 

Previous Achievements: 

TPO staff in FY 13 continued coordination with FDOT, Brevard County Public Works, and project 

consultants on the Ellis Rd. PD&E widening from Wickham Road to I‐95 which includes the 

construction of an interchange at I‐95.  In FY 13 drainage issues posed a major impediment to the 

project and TPO staff working with the consultant were able to address and resolve the issue 

through identification of funding and conducting a comprehensive drainage analysis.  At the close of 

FY 13 additional endangered species studies were requested posing a major delay which would 

move the project out in the funding schedule. In FY 14 TPO staff along with Brevard County’s Public 

Works, FHWA, and Fish and Wildlife reached a consensus which will allow the project to move 

forward as scheduled. 

In FY 13, the City of Palm Bay began construction of the first phase of the Parkway between Malabar 

Road and the city’s northern boundary limits.  

In FY 13 the TPO completed its first phase of their first LAP certified US 192 feasibility study.  The 

study found that this corridor’s travel demands are likely very related to any improvements made to 

the parallel corridor to the north, Ellis Road. With the planned widening of Ellis, the US 192 study 

found that widening of US 192 could be delayed and the limits of where to widen could be 

shortened. The results from the first phase also recommended additional analysis at two major 

intersections along the corridor. In FY 14 phase II looked at the intersection of Hollywood/Evans and 

US 192. Through coordination efforts with FDOT a phase III was recommended by FDOT to consider 

some additional alternatives at the Hollywood/Evans intersection and to also include analysis at the 

second intersection from phase I, Wickham/Minton. Both intersections analysis will be completed in 

June 2014. The final intersection alternative concept will then be ready to be programmed for 

design, pending funding availability. 

UPWP TASK NUMBER: 5.1  FUNDING SOURCES:

FY 15 FY 16 TotalPL $20,000 $30,000 $50,000TPO SU $800 $0 $800FTA $2,000 $4,000 $6,000FTA Match $250 $500 $750TOTAL $23,050 $34,500 $57,550  

 

TASK TITLE: 

Corridor Studies 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 69: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 61 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

In 2012, the SR A1A Corridor Study was initiated to analyze the corridor from Pineda Causeway 

north to Port Canaveral for the identification of improvements that would allow the corridor to 

function and serve the needs of both residents and visitors in an efficient and safe manner. An 

Action Team was created to help guide the study and has been very influential in considering many 

elements that have included such items as landscaping, wayfinding signage, pedestrian and bicycle 

amenities, transit, intersections, ADA concerns, utilities, drainage and several other infrastructure 

improvements. The study is anticipated to be completed in mid‐2014. Recommendations will move 

forward through the project prioritization process as appropriate or other funding mechanisms. Two 

Complete Street projects are already being implemented along or near SR A1A at Minuteman 

Causeway in Cocoa Beach and Ridgewood in Cape Canaveral (see Task 5.0). 

In FY 14, FDOT initiated the Malabar Road PD&E Study. This study is looking at what types of 

potential improvements could be implemented from the section between Babcock Street to US 1. 

Considerations include how to address bicycle and pedestrian issues along with crossing of the 

railroad. The study is anticipated to be completed in early 2015.  

The Viera Company, a private corporation, is coordinating with FDOT, 

Brevard County, and the TPO on the Viera Blvd. PD&E Interchange study. 

Through evaluation of various types of interchanges, the 

recommendation at this time is to construct a diverging diamond 

interchange, the first of its kind in Florida. This type of intersection 

minimizes conflicts and has been successfully implemented in other states 

and in Europe.  

In FY 14, FDOT’s Future Corridors Pilot Study for planning future major 

transportation corridors critical to the state’s economic competitiveness 

and quality of life was initiated. The pilot study area for the Space Coast TPO is included in the 

Tampa Bay to Central Florida and the Space Coast pilot study. The study will explore ways to 

connect southeast Orange County to the Central Brevard area. This area is anticipated to have 

significant growth over the next 50 years. This activity is covered under Task 1.3 as it is a regional 

planning initiative. 

Methodology: 

Continue coordination with FDOT, consultants, local governments and the public on the 

development and management of corridor studies that evaluate area travel demands and impact of 

alternative routes. 

Diverging Diamond 

Interchange Concept for 

Viera Bld. at I‐95.

Page 70: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 62 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Work shall include participation in consultant selection, project status meetings, conference calls, 

preliminary work product reviews, participation on technical advisory committees, research and 

consultant relations. The TPO will continue to participate in the following planning and design 

studies: Interstate 95 new interchanges, St. Johns Heritage Parkway and Interchanges, Babcock 

Street at US 192 intersection, Babcock Street at Malabar intersection, SR A1A, US 1, Barnes Blvd., 

Apollo Blvd. Extension, Malabar Road. 

In FY 15, the FDOT will be funding corridor planning studies at various locations. These corridor studies 

will evaluate safety and modal improvements. Proposed corridors include: SR 3 (Courtenay Pkwy), SR 

406 (Garden St), SR 518 (Eau Gallie Blvd), SR 519 (Fiske Blvd), SR 520 (EB/WB King St), SR 5054 (Sarno 

Rd), and US 1 (Washington Ave). 

It should be noted that planning funds programmed for this task are for the TPOs participation and 

coordination role in the specific studies. The funding for the actual studies is administered by FDOT 

using state or federal funds. Work products are typically planning level study documents. Public 

involvement and participation is included in all studies. 

Work Products: 

• US 192 Feasibility Study Phase III   ......................July 2014 

• SR A1A Corridor Study   ......................July 2014 

• Ellis Rd. and Northern Interchange PD&E   ......................July  – Oct 2014 

• Ellis Rd. and Northern Interchange Design   ......................July 2014 – June 2016 

• Coordination and support of corridor projects   ......................July 2014 – June 2016   

• Design phases of Parkway Interchanges   ......................July 2014 – June 2016 

• Coordination and support of corridor projects   ......................July 2014 – June 2016 

 

   

Page 71: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 63 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To plan for the improvement of transportation facilities through optimizing system 

operations which enhance and promote safety conscious planning and security throughout the 

transportation network. 

Previous Achievements: 

In FY 14, the TPO began an Annual Performance Monitoring Program that encompasses many 

existing tasks that are inter‐related under one program. The program consist of the collection of 

traffic counts and the website maintenance of the counts, the maintenance of the web based crash 

data location system, the new countywide safety evaluation report, all of which feed into the annual 

State of the System Report. Beginning in FY 15 the TPO will be utilizing SU funds to cover the 

expenses associated with conducting these program tasks on an annual basis. The collection of 

traffic counts and maintenance of the counts and crash system are covered under Task 2.0, 

Transportation Data Compilation and Distribution. 

Each year the TPO undertakes the development of a State of the System Report through their 

general planning consultant.  The study provides a technical analysis of Brevard’s transportation 

network and level of service functionality. Roadway segments are then ranked based upon technical 

criteria which are used to assist in the yearly development of the TPO’s project priorities. 

Demographic trends and transit usage are also included in the report. 

In FY 13 the TPO conducted a Request for Proposal to solicit for consultant services to develop an 

Intelligent Transportation System (ITS) Master Plan. The TPO identified a selection committee to 

review and rank the submitted proposals. Five total firms submitted proposals with three firms 

being shortlisted by the selection committee. The highest ranking firm, Metric Engineering, was 

recommended and approved by the TPO in November 2013.  Key tasks of the Plan include 

developing Goals and Objectives, and an ITS Vision for Brevard.  Documentation of existing 

conditions and infrastructure will be conducted along with identifying ITS needs and applicable 

UPWP TASK NUMBER: 5.2  FUNDING SOURCES:

FY 15 FY 16 TotalPL $60,000 $60,000 $120,000TPO SU $583,677 $36,936 $620,613FTA $15,000 $19,706 $34,706FTA Match $1,875 $2,462 $4,337TOTAL $660,552 $119,104 $779,656  

 

TASK TITLE: 

Management Operations and Security 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 72: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 64 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

strategies, a regional architecture, concept of operations and a prioritized list of ITS projects for 

consideration and implementation. The kick‐off for the plan was conducted in April 2014 with the 

completion of the plan anticipated in early 2015. The total cost for the master plan is $270,000 and 

is funded using the TPO’s SU funds. 

TPO staff continues to be involved with the Community Traffic Safety Team and Traffic Incident 

Management Committees.  In FY 13 these two committees decided to hold combined meetings 

every other month to allow for a better exchange of information and ideas. 

In FY 14, the TPO initiated the development of an annual Countywide Safety Evaluation Report 

utilizing the TPO’s and state crash database systems. The report summarizes the number, severity, 

type, time of day and other sorting factors available through the systems. The analysis also 

considers the eight Strategic Highway Safety Plan emphasis areas as part of the identification of 

potential locations that may benefit from further analysis and safety improvements. The safety 

scoring criteria was also updated in the State of the System Report using the analysis. This report 

will be conducted on an annual basis as part of the overall Annual Safety and Planning Program. 

TPO staff annually participates in the states hurricane exercise, locally held at the Brevard 

Emergency Operations Center in Rockledge. During exercises and events staff provides information 

and coordination support for the safety and security of the transportation network. This activity is 

also covered under Task 1.4. 

Methodology: 

The Space Coast TPO Congestion Management System (CMS) plan lays out a process for an annual 

cycle of data collection, congestion analysis, improvement identification, prioritization and 

performance monitoring. This process is compiled into the State of the System (SOS) report as part 

of the TPOs Annual Performance Monitoring Program. The CMS builds upon previous TPO, FDOT, 

SCAT and local government efforts in congestion management, data collection, intergovernmental 

coordination and cooperative project identification. Consultant services are used to develop the 

annual SOS and beginning in FY 15 will be funded with the TPO’s SU and FTA funds (approximately 

$40,000 SU and $10,000 FTA annually).  

The SOS report also allows the TPO to monitor its overall air quality ozone rating. In the event new 

attainment levels are approved and Brevard is found to be in non‐attainment, the LRTP will need to 

be updated in include conformity measures. Amendments as necessary, to various TPO documents 

will be conducted to address non‐attainment processes and strategies. The Space Coast TPO has 

always been found in attainment to date. 

Page 73: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 65 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

The TPO’s newly developed web based crash data location system allows for greater use of crash 

data and crash analysis, which includes types of crashes, severity and causes. The ability to conduct 

additional analysis will provide the TPO the opportunity to address safety issues as part of its project 

planning. In FY 14, the TPO developed its first annual safety evaluation report. The report was 

developed by the TPO’s general planning consultants (This activity is also referenced under Task 

2.0). Information contained in the report allows the TPO to identify high crash locations and monitor 

the occurrence of the eight Strategic Highway Safety Plan emphasis areas. Information from the 

safety report will be annually incorporated into the SOS to provide the safety score that is used as 

one of the seven scoring elements in ranking corridors. 

In FY 15, the TPO, through the use of the TPO’s SU funds, will conduct a follow‐up study to the 

above safety report on those corridors ranking high in crashes and severity and will include all crash 

types. Field audits will be conducted and countermeasures developed specific for each corridor. 

Systemic countermeasures may also be identified if appropriate. Improvements will be categorized 

as short‐term (maintenance activity), mid‐term (can be included in an upcoming improvement 

project) and long term improvements (need to be added to work program). 

The FDOT has identified pedestrian safety as an emphasis area for 2014. TPO’s have been asked to 

develop or further implement a Pedestrian Safety Action Plan in an effort to help reduce bicycle and 

pedestrian crashes. As part of the above annual safety report, emphasis will include bicycle and 

pedestrian data and analysis. Any countermeasures identified will be addressed under appropriate 

UPWP tasks. Also, in FY 15, if appropriate, a work order will be issued to one of the TPO’s general 

planning consultants to develop a Pedestrian and Bicycle Safety Action Program that analysis in 

detail the vulnerable road user crashes identified as part of the Safety Plan. 

In FY 14 the TPO initiated the development of an Intelligent Transportation System Master Plan with 

Metric Engineering.  Key tasks of the Plan include developing Goals and Objectives, and an ITS Vision 

for Brevard.  Documentation of existing conditions and infrastructure will be conducted along with 

identifying ITS needs and applicable strategies, a regional architecture, concept of operations and a 

prioritized list of ITS projects for consideration and implementation. The kick‐off for the plan was 

conducted in April 2014 with the completion of the plan anticipated in early 2015. The integration of 

Transportation Systems Management and Operation (TSM&O) applications will be included in the 

final documentation. The total cost for the master plan is $270,000 and is funded using the TPO’s SU 

funds. 

TPO staff will continue to support the Brevard County Emergency Management Department through 

participation in the annual Hurricane Exercise and will also provide staff support during declared 

Page 74: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 66 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

emergencies at the Emergency Operations Center in Rockledge. During exercises and events staff 

provides information and coordination support for the safety and security of the transportation 

network. This activity is also covered under Task 1.4. 

Work Products: 

• Annual State of the System   ................. Feb – Sept 2014, 2015 & 2016 

• Annual Monitoring of Air Quality Ozone Reading   ................. Sept 2014 & 2015 

• Crash Data Location System   ................. July 2014 – June 2016 

• Annual Safety Report   ................. March – June 2015 & 2016 

• Ped/Bike Safety Action Program   ................. April 2015 – February 2016 

• High Crash Corridor Analysis   ................. May 2015 – February 2016 

• Pedestrian/Bicycle Safety Action Program   ................. May – Dec 2015 

• Advanced Traffic Management System Support   ................. July 2014 – June 2016 

• ITS Master Plan     ................. Jan 2014 ‐Mar 2015  

• Emergency Operations Support   ................. As needed 

   

Page 75: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 67 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

 

Task 6.0 Public Involvement 

 

 

   

SECTION 6 PUBLIC INVOLVEMENT

Page 76: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 68 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To enhance public participation in the transportation planning process by providing 

appropriate opportunities for input, development and dissemination of information utilizing various 

types of media. 

Previous Achievements: 

In FY 13 the TPO coordinated with Clear Channel and launched its first safety message on their 

digital billboards.  These billboards run along I‐95, US 1 and other high visibility areas throughout 

Brevard County.  The messages include education about texting while driving, walking alert, and the 

3ft Bicycle law.  In addition, to billboards the same messages have been aired on public radio 

channel WFIT FM 89.5.   

TPO staff participated in recorded news interviews on general project planning, bicycle access, and 

trail projects.  These interviews were run on Florida Today’s news site making them accessible to the 

public.  In addition, Florida Today has printed news about the TPO’s upcoming meetings in the “local 

briefs” section of the paper to further draw the public’s attention to current planning activities. 

In FY 13 and FY 14 TPO staff made presentations at public venues that included Chambers of 

Commerce, Homeowners’ associations, and numerous public meetings relating to specific 

transportation projects. TPO staff responds to and provides comments and information for media 

articles, and all public inquiries as well. TPO Board meetings continue to be televised live on local 

Space Coast Government Television, and a link from Brevard County Government’s home website is 

also available for the public to access TPO information.  Meeting agendas, materials and minutes are 

posted on the TPO’s website. Electronic newsletters have been produced along with informational 

brochures, and annual reports of the TPO’s activities and work products. 

In FY 13 the TPO adopted a social media policy and launched an account on Facebook 

as another way to get information about projects and programs out to the public.   

UPWP TASK NUMBER: 6.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $87,784 $70,000 $157,784TPO SU $109,508 $0 $109,508FTA $22,400 $22,400 $44,800FTA Match $2,800 $2,800 $5,600TOTAL $222,492 $95,200 $317,692  

 

TASK TITLE: 

Public Involvement 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 77: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 69 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

As part of the TPO’s Strategic Plan, reports are developed and presented at monthly TAC/CAC and 

TPO meetings to keep the members informed on staff’s progress as well as to let the public know 

more about what activities are being worked on. 

In FY 14 the TPO’s Public Participation Plan was updated and revised to be more user friendly for the 

public. The Plan provides clear information on how the public may participate in the process and 

what types of outreach mechanisms the TPO uses to promote transportation planning. Figure 5 is an 

excerpt from the plan that provides many methods on how to get involved, both text and visual 

icons are used to improve comprehension and understanding.   

As part of development of the Long Range Transportation Plan the TPO organized and held its first 

Transportation Symposium in October 2013, and conducted a community on‐line survey.  The public 

outreach specific to the 2040 LRTP is covered under Task 4.0, Long Range Transportation Planning. 

In FY 14 the TPO selected the website design firm of eWareness to design a new, more user friendly 

TPO website.  The new design will be built with the goal to attract the public to stop, look, and learn 

about the TPO.  The emphasis will be ease of use, providing timely and informative data on projects 

and programs, have a customer feedback form, a youth education section, bicycle safety event 

registration form, as well as provide links to additional information related to projects.  Completion 

of the website is anticipated by July 1, 2015 with additional enhancements to continue as needed. 

The TPO has adopted a formal Title VI and Limited English Proficiency Plan (LEPP) policies. A 

complaint policy that includes the process of how to file a complaint is also available. In FY 14 these 

policies were moved and prominently displayed for viewing or downloading from the TPO’s website 

home page. 

Methodology: 

TPO will continue efforts to reach the public regarding all of its projects and programs through 

additional use of electronic media, social media, the news, frequent participation in public 

information forums including Chamber of Commerce, homeowners’ association, city council, and 

public meetings relating to transportation multi‐modal projects. Responding to media requests for 

information, public inquiries and requests for assistance with problems, and public speaking 

requests will continue.  

TPO Board meetings will continue to be televised, when available, through Brevard County’s Space 

Coast Government Television. Opportunities for interviews on special 

projects or programs will continue to be sought. Meeting notices will be 

Page 78: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 70 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

posted on the TPO website, and El Playero (Spanish newspaper).  

In FY 15, the TPO anticipates launching a new community outreach program. This program will 

include presenting to local municipalities, modal agencies and business organizations advising and 

educating on what the TPO is and all of the services that the TPO can provide. Pending funding and 

staffing resources the TPO also wishes to begin holding trail and education walks; tour guided rides 

and other engaging activities. Part of this program may also include development of a customer 

satisfaction and feedback element. Details will be made available once the program is fully 

developed. This activity is also covered under Task 1.4, Local Coordination and Planning. 

In FY 15, TPO staff will monitor the use and feedback from the newly designed website to gauge 

effectiveness and identify additional improvements that may increase usage. Pending funding 

availability, the TPO will seek to develop and implement an on‐line trail/bike route map. The TPO 

would utilize consulting services to conduct this activity which is anticipated to cost approximately 

$100,000 depending on level of detail. Funding for this activity is being covered by SU funds. Funds 

were made available after researching the what would be needed to update the TPO’s Community 

Characteristics (Task 2.0) and it was determined that activity can be covered by TPO staff in 

coordination and utilization of the FDOT’s ETDM program. 

*Note: Public Involvement activities on project specific studies are covered under the specific task 

that they are listed under. 

Work Products: 

• Distribution of documents and informational materials   ................. July 2014 – June 2016 

• Creation of New TPO website   ................. Jan 14 – May 15 

• Maintain TPO website   ................. July 2014 – June 2016 

• Youth Education Section on website   ................. Oct 2015 

• On‐line trail/bike route map   ................. Aug 2015 – Sept 2016 

• Development of Community Outreach Program   ................. July – Dec 2014 

• Launch of Community Outreach Program   ................. Jan 2015 

• Annual Review of Public Participation Plan   ................. Dec 2014 & 2015 

 

   

Page 79: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 71 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Figure 5 – Excerpt from Adopted Public Participation Plan 

HOW TO GET INVOLVED IN SPACE COAST TRANSPORTATION PLANNING

CALL US 321-690-6890 during normal business hours 8:00 a.m. to 4:30 p.m. Monday through Friday

WRITE TO US Space Coast TPO, 2725 Judge Fran Jamieson Way, Bldg B Melbourne, FL, 32940

EMAIL US General Inquiries: [email protected] Public Involvement/Media: [email protected] Title IV/Limited English Proficiency: [email protected] Website/Facebook: [email protected]

VISIT OUR WEBSITE www.spacecoasttpo.com

COME TO AN EVENT The SCTPO participates in special events throughout the county and hosts workshops for citizens to learn about projects where they work and live. Visit the SCTPO website at www.spacecoasttpo.com to learn more.

PARTICIPATE IN PERSON Make a public comment at a SCTPO board or committee meeting OR Visit the SCTPO, 2725 Judge Fran Jamieson Way, Bldg B, Melbourne

VOLUNTEER Contact your local city council representative or your county commissioner to serve as a representative on a SCTPO committee or contact [email protected] for more information

   

Page 80: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 72 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

Task 7.0 Pathways Project Planning 

  7.1 Bicycle/Pedestrian Education Program 

  7.2 Transit Planning and Studies 

 

 

   

Section 7 – Systems Planning 

SECTION 7 PROGRAM PLANNING

Page 81: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 73 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To implement Comprehensive Bicycle, Pedestrian and Trail Plans through coordination 

with local agencies and municipalities. 

Previous Achievements:  

Significant work has been completed on the continued implementation of the TPOs Greenways and 

Trails Master Plan.  Florida’s Governor Rick Scott attended the ground breaking for the East Central 

Florida Rail Trail in December 2013 to announce that the trail was fully funded for design and 

construction.  The Brevard Zoo trail held its ground breaking ceremony in early 2013 with 

construction completed in early 2014. The Al Tuttle Trail completed another segment of 

construction, and the PD&E for the Kennedy Space Center Loop trail is underway. Support for the 

Coast to Coast Trail continues and was prioritized as a regional priority (see task 1.3). 

In FY 13 the TPO’s general planning consultant completed development of the Bicycle and 

Pedestrian Mobility Plan. The plan includes updated GIS layers for bicycles, pedestrian and trail 

facilities, review and identification of sidewalk gaps, criteria for screening and ranking potential 

projects both for short and long term implementation. Typical sections, wayfinding guidelines and 

policy review were also conducted. The TPO’s BPTAC committee along with representatives from 

local municipalities acted as the steering committee for the plan. The TPO conducted public 

meetings to solicit input and comments on the plan. The accessibility index created to identify areas 

that represented high potential for biking and walking needs was also used in the Complete Streets 

Methodology and Project Screening study developed under Task 5.0. 

In FY 13 TPO staff and FDOT staff worked diligently with local bicycle clubs and residents to launch 

the Bicycle Access on Limited Highway program on the Pineda Causeway.  There was an in depth 

interview between staff and Florida Today news and a filmed live actual riding across the Pineda 

Causeway done by Florida Today to make the public aware of this new pilot program. 

UPWP TASK NUMBER: 7.0  FUNDING SOURCES:

FY 15 FY 16 TotalPL $20,000 $20,000 $40,000TPO SU $1,000 $0 $1,000FTA $24,000 $25,000 $49,000FTA Match $3,000 $3,125 $6,125TOTAL $48,000 $48,125 $96,125  

 

TASK TITLE: 

Pathways Project Planning 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 82: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 74 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

In FY 14 the TPO adopted into its operational policy the Bicycle, Pedestrian and Trails Committee 

(BPTAC) as a formal committee which clarified the structure and responsibilities of the community 

based group. 

With the adoption of MAP‐21 a major change was made to the Safe Routes to School grant 

program. All grants for Enhancements, Recreational trail, Scenic byway, and Safe Routes to School 

grants were combined into the Transportation Alternatives Grant program. All applicants will now 

be seeking funding from one source of funds. In FY 14, the TPO developed and utilized a new scoring 

and ranking criteria to prioritize Transportation Alternatives projects. Prioritization is covered under 

Task 3.0, Transportation Improvement Program. 

The TPO and its staff have continued to coordinate with Brevard County School Board, Brevard 

County and local municipalities through the Safe School Access Committee. This committee 

convenes when needed to conduct field studies on the safety aspects of getting to and from schools. 

Methodology: 

In FY 14, the TPO adopted its Bicycle and Pedestrian Mobility Plan. The plan identifies criteria to be 

used to evaluate potential bike/ped projects. Project implementation is identified over the short 

and long term. Cost estimates for the projects were also developed. The BPTAC will be reviewing 

and discussing the projects and identifying an implementation and funding plan. In FY 15 a map of 

the existing and proposed network will be produced to help guide the implementation of the full 

plan.  

Coordination and work activities related to participation and support of the Federal Safe Routes to 

School program, now under the Transportation Alternatives program will continue. Participation 

and coordination of the Safe School Access Committee will also continue. 

The FDOT has identified pedestrian safety as an emphasis area for 2014. Florida has been ranked in 

the top five states in regards to pedestrian and bicyclist deaths over the past decade. TPO’s have 

been asked to develop of further implement a Pedestrian Safety Action Plan in an effort to help 

reduce bicycle and pedestrian crashes. As part of the annual Safety Evaluation Report and State of 

the System Reports, any improvements and/or programs identified will be implemented. 

Coordination with the school board and local municipalities through the Safe School Access 

Committee to address the safety of children walking to and from school and school bus stops will 

continue.  

Page 83: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 75 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

TPO staff support and coordination of the TPO’s Bicycle, Pedestrian and Trails Committee will 

continue. Agenda preparation, filing of minutes, mailing of agenda packages, meeting room set‐up, 

posting of meeting notices on the TPO website and member coordination. Nominations and 

presentation of annual BPTAC awards will continue. Award categories include Education, 

Enforcement, Community Partnership, Engineering, Encouragement, “Get on a Trail”, and Lifetime 

Achievement. 

Continue to implement the Brevard County Comprehensive Bicycle and Pedestrian Plans through 

coordination with local law enforcement agencies, school officials, the media, engineers, planners 

and municipalities. Participate as appropriate in programs that encourage the use of bicycle and 

pedestrian activities as an alternative travel mode. Coordinate with Space Coast Area Transit 

regarding intermodal opportunities between bicycle/pedestrian facilities and transit. Continue 

coordination and review of County site plans for provision of bicycle and pedestrian facilities. 

Continue coordination with the Brevard County Public Works department on design and 

implementation of sidewalk facilities. 

The FDOT pilot project to allow bicycles on limited access facilities, the Pineda Causeway in Brevard, 

will be completed in FY 16. Results of the pilot project will be developed and follow‐up actions will 

be conducted based upon final recommendations. Education and awareness of the project will 

continue. 

Continue to coordinate and implement trails. On‐going trail projects include: East Central Florida 

Regional Rail Trail, North Merritt Island Pioneer Trail, SR A1A Trail, Brevard Zoo Trail, Al Tuttle Trail, 

St. Johns River Heritage Trail, Coast to Coast Trail, and KSC Sea Loop Trail. 

Work Products: 

• Continue coordination to implement bicycle/pedestrian/trail facilities ... July 2014 – June 2016 

• Coordination of Pilot Project allowing bicycles on Pineda Causeway ....... July 2014 – June 2016 

• Coordination and Management of BPTAC   ....................... July 2014 – June 2016 

• Annual BPTAC Recognition Awards   ....................... April 2015 & 2016 

• Implement Bike/Ped Mobility Plan   ....................... July 2014 – June 2016 

• Develop existing/planned facilities map   ....................... July 2014 – Feb 2015 

• Implement Comprehensive Bicycle and Pedestrian Plans   ....................... July 2014 – June 2016 

• Pedestrian Safety Countermeasures   ....................... July 2014 – June 2016 

• Continue Safe School Access Evaluations   ....................... July 2014 – June 2016 

 

Page 84: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 76 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To provide education and training to the residents of Brevard County on bicycle and 

pedestrian safety and other alternative modes of transportation such as transit. 

Previous Achievements: 

The TPO is a supporter and participant in the Federal Safe Routes to School program. In FY 13 the TPO’s 

“Feet Not Fuel” safety education website, acquired through a Safe Routes to School grant, was chosen 

to be used in conjunction with the Commit2B Fit program curriculum being taught in Brevard County 

Public schools. 

In 2012, TPO staff conducted its biennial school travel survey in coordination with Brevard County 

School Board. The survey was conducted electronically and included questions on which method of 

transportation is used for getting to schools, use of a helmet which bicycling, seat belt usage, etc. The 

2012 survey results reflected a new trend of bicycle helmet usage declining. 

In FY 13 the TPO received 2 new trailers, and multiple bicycles which are being used to expand the 

outreach of the bicycle safety education program.  In addition the TPO received another $2,000 grant 

from Florida Traffic Safety which was used to repair and perform maintenance on the bicycle program 

equipment, and to purchase equipment.  The Space Coast TPO continues to be a recipient of donated 

helmets which are given out to low income families. 

In FY 13 through the coordinated efforts of TPO staff the first “Walking School Bus” program was 

instituted at Stevenson Elementary.  In FY 15 TPO staff will be working to expand this program to other 

schools. 

Methodology: 

Through coordination efforts with Space Coast Area Transit, the TPO continues to promote alternative 

modes of transportation including transit and the use of bikes on buses program. In addition the TPO 

UPWP TASK NUMBER: 7.1  FUNDING SOURCES:

FY 15 FY 16 TotalPL $30,000 $30,000 $60,000TPO SU $1,000 $0 $1,000FTA $49,600 $50,000 $99,600FTA Match $6,200 $6,250 $12,450TOTAL $86,800 $86,250 $173,050  

 

TASK TITLE: 

Bicycle/Pedestrian Education Program 

RESPONSIBLE AGENCY: 

Space Coast TPO 

Page 85: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 77 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

supports and participates in the National Walk Your Child to School Day and National Bike to School 

Day. 

In FY 15, staff will coordinate with Brevard County schools to conduct a biennial travel survey which 

counts how school age children get to school. The biennial survey is used to determine how various 

education programs are working and where to potentially target special programs to help encourage 

helmet or seat belt usage. 

TPO staff will work to expand the new Walking School Bus program to other appropriate schools where 

the program could be implemented and supported. 

Continue to implement the Comprehensive Bicycle and Pedestrian Plans through a strong public 

information and education program with an emphasis on school age children. Bicycle rodeos will 

continue to be conducted at Brevard County schools and local community groups and organizations. 

Continue to train physical education teachers, community leaders and law enforcement staff in 

bicycle/pedestrian safety and use of transit as another alternative form of transportation. Continue 

support and coordination of the school crossing guard program as necessary. 

The FDOT has identified pedestrian safety as an emphasis area for 2014. Florida has been ranked in the 

top five states in regards to pedestrian and bicyclist deaths over the past decade. TPO’s have been 

asked to develop and further implement a Pedestrian Safety Action Plan in an effort to help reduce 

bicycle and pedestrian crashes. The Space Coast TPO has a strong history of supporting its Bicycle and 

Pedestrian program and will continue to do so in the future (see Tasks 7.0 and 7.1). As part of the 

annual State of the System Report (covered under Task 5.2) statistics and trends on bicycle and 

pedestrian safety are included. As part of the TPO’s new Countywide Safety Evaluation Report, initiated 

in FY 14, the TPO will be including safety statistics and trends related specifically to bicycle and 

pedestrians. This annual report will be used as the process to identify locations and potential behaviors 

that can be used to develop countermeasures designed to eliminate them. Any education measures 

identified will be incorporated into the bicycle and pedestrian safety education program. Other 

measures will be addressed as they are identified. 

Work Products: 

• Pedestrian Safety Countermeasures   .................... July 2014 – June 2016 

• Commit 2B Fit     .................... July 2014 – June 2016 

• Annual National Walk to School Day   .................... Fall 2014 & 2015 

• Annual Bike to School Day   .................... Spring 2015 & 2016 

• School Travel Survey   .................... Fall 2014 

Page 86: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 78 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

• Safe Routes to School Program   .................... July 2014 – June 2016 

• Bicycle Rodeo Education Program   .................... July 2014 – June 2016 

• Bike/Ped Education     .................... July 2014 – June 2016 

• Helmet Distribution Program   .................... July 2014 – June 2016 

• Walking School Program expansion   .................... Fall 2014 

   

Page 87: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 79 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Purpose: To support transit development programs and encourage use of transit system. 

Previous Achievements: 

The TPO is the Designated Official Planning Agency (DOPA) for Brevard and as such, a TPO member 

serves as the Chairman of the Transportation Disadvantaged Local Coordinating Board. Space Coast 

Area Transit has been appointed as the community transportation coordinator for Brevard County. 

Reports of the TDLCB committee meetings are provided to the TPO Board.  

SCAT items are routinely included in the TPO E‐news and the Director of SCAT serves on the 

Technical Advisory Committee and provides updates on transit activities and programs. Transit 

considerations are incorporated in corridor studies, planning studies and the Long Range 

Transportation Plan.  Each year transit trends are included as part of the State of the System Report. 

(See Task 5.2) 

The Commuter Assistance Program was transferred to the Florida Department of Transportation 

and has been branded reThink. The goals of the program are to promote alternative modes of 

transportation, relieve traffic congestions, improve air quality and conserve resources.  

In FY 13 the Space Coast Area Transit completed an update to the 2013‐2022 Transit Development 

Plan (TDP).  The TDP serves as the vision for transit in Brevard County over the next ten years and 

was prepared in accordance with the TDO Rule 14‐17.001, which was formally adopted by the FDOT 

on February 20, 2007. Major updates must be conducted every five years and the plan requires a 

separate public involvement plan, and opportunities for review and comment during the 

development of the mission, goals, objectives, alternatives, and 10‐year implementation program. 

TPO staff participated as part of a steering committee throughout the plans development. The TDP 

is a resource used by the TPO in various plans including the Long Range Plan. 

In FY 13 SCAT initiated an ADA Assessment and Transition Plan Project of routes and bus stops. The 

purpose of the study was to address SCAT’s interest in improving access, security, and operations at 

UPWP TASK NUMBER: 7.2  FUNDING SOURCES:

FY 15 FY 16 TotalFTA (5305(d)) $1,200 $4,000 $5,200FTA (5307) $330,000 $330,000 $660,000FDOT $41,250 $41,250 $82,500FTDC $30,834 $30,834 $61,668FTA Match $41,400 $41,750 $83,150TOTAL $444,684 $447,834 $892,518  

TASK TITLE: 

Transit Planning and Studies 

RESPONSIBLE AGENCY: 

Space Coast TPO, Space Coast Area 

Transit 

Page 88: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 80 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

its bus stops and facilities throughout the system, as well as providing enhanced amenities for its 

passengers. The project is being conducted in phases with the inventory of facilities being 

completed in early 2014. Other phases include the identification and prioritization of improvements 

to address accessibility, security, operations, and passenger comfort issues. The final phase is the 

development of a phasing plan to implement the improvements based on anticipated funding 

and/or resources available over time. The SCAT bus stop and facility accessibility analysis will 

provide a comprehensive and detailed assessment of SCAT’s bus stops and facilities as they relate to 

compliance with the ADA and FAC requirements. The final results and recommendations are 

anticipated to be completed in June, 2014. Implementation and follow‐up activities will be 

conducted over the next few years.  

Section 5316 funds continued to provide evening and weekend service on the Space Coast Area 

Transit fixed route network to provide low income individuals greater access to employment and 

employment locations.  Section 5317 funds provided paratransit service beyond ADA requirements 

through two subrecipients: Space Coast Early Intervention Center and Brevard Alzheimer’s 

Foundation. 

Methodology: 

TPO staff will continue to meet with SCAT staff to discuss specific project status. Monitor legislative 

and other agency activities relating to transit issues.  

The TPO will develop and implement short term and long term transit improvement strategies 

based on the findings of the Transit Development Plan and bus stop survey.  

On an ongoing basis, Space Coast Area Transit surveys transit routes, reviews boardings and 

alightings at strategic locations, identifies locations suitable for bus shelters or other transit 

infrastructure. In FY 15 and FY 16 coordination between SCAT and the TPO will be initiated to follow‐

up on the implementation of the findings from the ADA Assessment and Transition Plan Project. 

Continue to coordinate with Space Coast Area Transit and assist on certain task orders to be 

performed by consultant services when appropriate. Transit studies will recommend operational 

improvements to the transit system, which, when implemented, are intended to encourage use of 

the public transportation system. Other studies may include analysis of the economic impact of the 

provision of specific transit services and routes. 

Continue a cooperative effort with Space Coast Area Transit regarding transportation disadvantaged 

planning and consider the needs of the transportation disadvantaged in the development of the 

Page 89: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 81 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Transportation Improvement Program. Assist SCAT in meeting provisions of transportation 

disadvantaged legislation as required in Florida Statutes Chapter 427 Rules 41‐2. SCAT has been 

designated the Community Transportation Coordinator. Continue to disseminate information 

regarding the transportation disadvantaged program and participate in TDLCB meetings, reporting 

back to TPO Board on a quarterly basis. 

In FY 15 and FY 16, TPO staff will coordinate with SCAT on the integration of transit needs and 

services within the 2040 Long Range Transportation Plan. 

In FY 15, SCAT will utilize Section 5339 grant funds (Bus and Bus Facilities Program) in support of 

capital only purchases of its program. Section 5339 is a capital‐only program and funds are limited 

to capital projects to replace, rehabilitate, and purchase buses and bus‐related equipment, and to 

construct bus‐related facilities. These funds are anticipated to be used to procure new buses and 

vans.   

Continue to consider transit services and needs in development of plans and corridor studies. 

Specific corridor studies are covered under Task 5.1, and include but are not limited to US 1, 

Malabar Road PD&E, Viera Blvd. PD&E Interchange and the St. Johns Heritage Parkway and 

Interchanges. Transit is also considered a major component of Complete Streets and will be 

addressed in the TPO Complete Streets projects as appropriate. 

In FY15 and FY16, Space Coast Area Transit will conduct a Comprehensive Operational Analysis 

(COA) of the SCAT’s fixed route service.  This analysis will describe current SCAT services as a key 

initial step to determine how adequately SCAT’s services perform in meeting the transportation 

needs of both existing and potential customers.  Second, the analysis will determine the 

effectiveness and efficiency of individual routes.  Third, it will make recommendations to address 

unmet needs and unserved markets.  Fourth, it will identify a methodology for ongoing evaluation of 

the fixed route system.  Fifth, it will describe any organizational or institutional practices which have 

a significant effect (either positively or negatively) on transit service.  The overall goal of the COA is 

to ensure that SCAT is providing the most efficient and effective bus service to Brevard County.  The 

route structure and stop level analyses will determine if system modifications should be made to 

improve ridership potential while maintaining or decreasing financial impacts.  Staff will participate 

in meetings and conferences, administer the funding, and review all invoices provided by the 

consultant.   

Space Coast Area Transit will conduct a major rewrite of the Transit Development Plan as required 

and directed by Florida Administrative Rule 14‐73 in FY16.  Space Coast Area Transit will also 

Page 90: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 82 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

conduct the required yearly updates to the Transit Development Plan as required in Rule 14‐73.  

Passenger survey(s) will also be conducted as a task order in both the Comprehensive Operations 

Analysis and the Transit Development Plan.   

In FY15, Space Coast Area Transit will conduct and compile a Transportation Disadvantaged Service 

Plan in accordance to the rules of the Florida Commission for the Transportation Disadvantaged.   

Work Products: 

• Attendance and participation on TDLCB   .................... July 2014 – June 2016 

• Coordination and support of SCAT activities and programs ................... July 2014 – June 2016 

• Annual transit trend analysis in State of System Report   .................... Mar – Sept, 2014, 2015 & 2016 

• Implementation of ADA Assessment and Transition Plan   .................... July 2014 – June 2016 

• Implementation of Section 5339 grant funds   .................... July 2014 – June 2016 

• Transit integration into 2040 LRTP   .................... July 14 – Sept 15 

• Integration of transit in Complete Streets projects   .................... July 2014 – June 2016 

• Comprehensive Operational Analysis Study   .................... Oct 14 – Dec 15 

   

Page 91: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 83 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

Table 1A.  Summary Budget, Agency Participation for FY 15 

Table 1B.  Summary Budget, Funding Source for FY 15 

Table 2A.  Summary Budget, Agency Participation for FY 16 

Table 2B.  Summary Budget, Funding Source for FY 16 

Table 3.  FTA Section 5305(d) Deliverables for FY 15 and FY 16 

Table 4.  Transportation Planning Studies Summary 

Table 5A.  Proposed UPWP Work Schedule for FY 15 

Table 5B.  Proposed UPWP Work Schedule for FY 16 

Table 6.  Federal MAP‐21 Planning Factors 

Table 7.  UPWP Tasks Strategic Plan Goals 

TABLES

Page 92: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 84 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 1A: Summary Budget, Agency Participation for FY 15; Adopted May 8, 2014 

Amended 10/9/2014; 2/12/2015; 3/12/2015; 5/15/2015; 7/9/2015; Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015 

 

*Task 5.0, Local funds include $15,000 provide by Canaveral Port Authority for Rail Station Location Study. 

   

Task Description

Federal  

Funds  (PL 

& FTA)

PL Only   

(Consultant)

FTA Only 

(Consultant)

SU Only 

(Consultant) FDOT

Brevard 

County 

(Local)

SCTPO 

(SU) Total

1.0 Program Management $346,000 $7,750 $42,436 $396,186

   1.1 Annual Reporting, Cert. & Programming $38,000 $1,000 $800 $39,800

   1.2 Annual Audit $8,000 $19,450 $4,550 $500 $32,500

   1.3 Regional/State Planning & Coord. $40,000 $1,200 $41,200

   1.4 Local Coordination & Planning $17,000 $16,593 $1,200 $34,793

   1.5 FDOT ‐ FTA State Match $23,407 $23,407

FDOT ‐ PL State Soft Match $186,321 $186,321

2.0 Transportation Data Compilation & Dist. $40,053 $10,000 $10,000 $63,145 $21,882 $4,500 $149,580

3.0 Transportation Improvement Program $24,000 $500 $2,500 $27,000

4.0 Long Range Transportation Planning $46,000 $2,000 $5,000 $146,888 $67,200 $1,625 $268,713

5.0 Multi‐Modal Project Planning $90,000 $316,117 $16,875* $7,500 $430,492

   5.1 Corridor Studies $22,000 $250 $800 $23,050

   5.2 Management Operations, Safety & Security $45,000 $20,000 $10,000 $508,787 $1,875 $74,890 $660,552

6.0 Public Involvement $60,184 $50,000 $2,800 $9,508 $122,492

7.0 Pathways Project Planning $44,000 $100,000 $3,000 $1,000 $148,000

   7.1 Bicycle/Pedestrian Education Program $79,600 $6,200 $1,000 $86,800

   7.2 Transit Planning and Studies $1,200 $330,000 $72,084 $41,400 $444,684

TOTALS $901,037 $101,450 $359,550 $1,134,937 $349,012 $122,250 $147,334 $3,115,570

Page 93: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 85 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 1B: Summary Budget, Funding Source for FY 15; Adopted May 8, 2014;  

Amended 10/9/2014; 2/12/2015; 3/12/2015; 5/14/2015; 7/9/2015; Modified 11/18/2014; 4/7/2015; 6/22/2015; 9/15/2015 

FEDERAL STATE LOCAL STP OTHER

Section Section State* Section Section SCTPO

TASK NO. DESCRIPTION PL  5305(d) 5307 Match 5305(d) 5307 SU Other Source TOTAL1.0 Program Management $332,000 $14,000 $1,750 $42,436 $6,000 BOCC $396,186 1.1 Annual Reporting, Cert. and Programming $30,000 $8,000 $1,000 $800 $39,800 1.2 Annual Audit $28,000 $4,000 $500 $32,500 1.3 Regional/State Planning and Coordination $40,000 $1,200 $41,200 1.4 Local Coordination and Planning $17,000 $1,200 $16,593 BOCC $34,793 1.5 FDOT - FTA State M atch $23,407 $23,407

FDOT - PL 112 State Soft M atch $186,321 $186,321

2.0 Transportation Data Compilation and Distribution $45,000 $15,053 $1,882 $4,500 $20,000 BOCC $86,435 Traff ic Counts & Program Maintenance $45,520 $45,520 Crash Web Based Program Maintenance $17,625 $17,625

3.0 Transportation Improvement Program $20,000 $4,000 $500 $2,500 $27,0004.0 Long Range Transportation Planning $40,000 $13,000 $1,625 $67,200 FDOT** $121,825

2040 LRTP $146,888 $146,8885.0 Multi-Modal Project Planning $75,000 $15,000 $1,875 $7,500 $99,375

Complete Streets Feasibility Studies $316,117 $316,117 Rail Station Location Study $15,000 Port $15,000

5.1 Corridor Studies $20,000 $2,000 $250 $800 $23,050 5.2 Management Operations, Safety and Security $60,000 $15,000 $1,875 $74,890 $151,765

State of the System Report $69,210 $69,210 Safety Evaluation Report $184,826 $184,826 ITS Master Plan*** $134,833 $134,833 High Crash Corridor Analysis $119,918 $119,918

6.0 Public Involvement $87,784 $22,400 $2,800 $9,508 $122,4927.0 Pathw ays Project Planning $20,000 $24,000 $3,000 $1,000 $48,000

Interactive Trail Guide $100,000 $100,000 7.1 Bicycle/Pedestrian Education Program $30,000 $49,600 $6,200 $1,000 $86,800 7.2 Transit Planning and Studies $1,200 $330,000 $41,250 $150 $41,250 $30,834 FTDC $444,684

TOTAL $844,784 $187,253 $330,000 $250,978 $23,407 $41,250 $1,282,271 $155,627 $3,115,570

FY 2014/15 PL Allocation $641,450

Carryforward from prior year $30,000De-obligation from FY 13 $173,334

Estimated Total PL Funds Available $844,784*For Fiscal Year 2014/15, the FDOT w ill soft match the PL Funds using toll revenue expenditures as a credit tow ard the non-Federal matching share.

The amount identif ied on this line represents the amount of soft match required (both State and Local) for the amount of Federal PL funds requested in this UPWP.

**Task 4.0, FDOT Supplement Funds for 2040 LRTP: $67,200 is estimated balance remaining from FY 14, total funding provided w as $150,000

***Task 5.2, ITS Master Plan, SU Funds: The $134,833 is balance remaining

Page 94: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 86 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 2A: Summary Budget, Agency Participation for FY 16 

Adopted May 8, 2014; Amended 2‐12‐2015; 7‐9‐2015; 10‐8‐2015 

 

*Task 5.0, Local funds include $35,000 provide by Canaveral Port Authority for Rail Station Location Study.   

Task Description

Federal  

Funds  (PL 

& FTA)

PL Only   

(Consultant)

FTA Only 

(Consultant)

SU Only 

(Consultant) FDOT

Brevard 

County 

(Local) Total

1.0 Program Management $316,000 $1,750 $317,750

   1.1 Annual Reporting, Cert. & Programming $28,000 $1,000 $29,000

   1.2 Annual Audit $8,000 $20,000 $4,000 $500 $32,500

   1.3 Regional/State Planning & Coord. $30,000 $30,000

   1.4 Local Coordination & Planning $32,000 $18,735 $50,735

   1.5 FDOT ‐ FTA State Match $23,116 $23,116

FDOT ‐ PL State Soft Match $169,044 $169,044

2.0 Transportation Data Compilation & Dist. $63,000 $63,064 $31,000 $157,064

3.0 Transportation Improvement Program $40,000 $1,249 $41,249

4.0 Long Range Transportation Planning $24,000 $500 $24,500

5.0 Multi‐Modal Project Planning* $51,450 $36,500 $87,950

   5.1 Corridor Studies $34,000 $500 $34,500

   5.2 Management Operations, Safety & Security $79,525 $36,936 $2,440 $118,901

6.0 Public Involvement $88,900 $3,500 $2,800 $95,200

7.0 Pathways Project Planning $45,000 $3,125 $48,125

   7.1 Bicycle/Pedestrian Education Program $80,000 $6,250 $86,250

   7.2 Transit Planning and Studies $4,000 $330,000 $72,084 $41,750 $447,834

TOTALS $923,875 $23,500 $334,000 $100,000 $264,244 $148,099 $1,793,718

Page 95: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 87 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 2B: Summary Budget, Funding Source for FY 16 

Adopted May 8, 2014; Amended 2‐12‐2015; 7‐9‐2015; 10‐8‐2015 

FEDERAL STATE LOCAL STP OTHER

Section Section State* Section Section SCTPO

TASK NO. DESCRIPTION PL  5305(d) 5307 Match 5305(d) 5307 SU Other Source TOTAL1.0 Program Management $302,000 $14,000 $1,750 $317,750 1.1 Annual Reporting, Cert. and Programming $20,000 $7,819 $977 $28,796 1.2 Annual Audit $28,000 $4,000 $500 $32,500 1.3 Regional/State Planning and Coordination $30,000 $0 $30,000 1.4 Local Coordination and Planning $32,000 $0 $18,735 BOCC $50,735 1.5 FDOT - FTA State M atch $23,116 $0 $23,116

FDOT - PL 112 State Soft M atch $169,043 $0 $169,0432.0 Transportation Data Compilation and Distribution $55,000 $8,000 $1,000 $30,000 BOCC $94,000

Traff ic Counts & Program Maintenance $0 $45,799 $45,799 Crash Web Based Program Maintenance $0 $17,265 $17,265

3.0 Transportation Improvement Program $30,000 $10,000 $1,250 $41,2504.0 Long Range Transportation Planning $20,000 $4,000 $500 $24,5005.0 Multi-Modal Project Planning $39,450 $12,000 $1,500 $52,950

Rail Station Location Study $0 $35,000 Port $35,000 5.1 Corridor Studies $30,000 $4,000 $500 $34,500 5.2 Management Operations, Safety and Security $60,000 $19,706 $2,463 $82,169

State of the System Report $0 $36,936 $36,9366.0 Public Involvement $70,000 $22,400 $2,800 $95,2007.0 Pathw ays Project Planning $20,000 $25,000 $3,125 $48,125 7.1 Bicycle/Pedestrian Education Program $30,000 $50,000 $6,250 $86,250 7.2 Transit Planning and Studies $4,000 $330,000 $41,250 $500 $41,250 $30,834 FTDC $447,834

TOTAL $766,450 $184,925 $330,000 $233,409 $23,116 $41,250 $100,000 $114,569 $1,793,718

FY 2015/16 PL Allocation $644,661

Carryforward from FY 14 $40,837

Carryforward from FY 15 $49,804

Non‐recurring PL allocation $31,148 (One‐time allocation from banked funds not needed for new MPO's)

Estimated Total PL Funds Available $766,450*For Fiscal Year 2015/16, the FDOT w ill soft match the PL Funds using toll revenue expenditures as a credit tow ard the non-Federal matching share.

The amount identif ied on this line represents the amount of soft match required (both State and Local) for the amount of Federal PL funds requested in this UPWP.

Page 96: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 88 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 3: Federal Transit Administration Section 5305(d) Deliverables for FY 2015 and FY 2016 

Task No.  Description Total FTA 5305(d) 

Funding  Deliverable  Page #’sFY 2015 FY 2016

1.0  Program Management  $17,500  $17,500  • FTA FY 15 Section 5305(d) application‐May 2015 • FTA FY 16 Section 5305(d) application‐May 2016 • Administration and submittal of FTA Section 5305(d) invoices and progress reports for FY 14 and FY 15‐ Minimum quarterly • DBE Reports‐Quarterly or as requested 

28‐30 

1.1  Annual Reporting, Certification and Programming 

$10,000  $9,774  • 2014 Annual Report‐Feb 2015 • 2015 Annual Report‐Feb 2016 • 2015 Strategic Plan‐Feb 2015 • 2016 Strategic Plan‐Feb 2016 • Monitoring of FY 15 and FY 16 UPWP, processing of modifications and amendments as necessary‐July 2015 – June 2016 • Development of FY 17‐FY 18 UPWP 

31‐32 

1.2  Annual Audit  $5,000  $5,000  • FY ending September 30, 2014 audit‐May 2015 • FY ending September 30, 2015 audit‐May 2016 

33 

2.0  Transportation Data Compilation & Distribution 

$18,817  $10,000  • Collection of 2014 Traffic Volumes‐Oct thru Dec 2014 • Collection of 2015 Traffic Volumes‐Jan thru Feb and  Oct thru Dec 2015 • Collection of 2016 Traffic Volumes‐Jan thru Feb 2016 • 2014 Countywide Safety Report‐July 2015 • 2015 Countywide Safety Report‐July 2016 • Community Characteristics Inventory Report‐ March 2015  

42‐44 

Page 97: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 89 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 3: Federal Transit Administration Section 5305(d) Deliverables for FY 2015 and FY 2016 (continued) 

Task No.  Description Total FTA 5305(d) 

Funding  Deliverable  Page #’sFY 2015 FY 2016

3.0  Transportation Improvement Program  $5,000  $12,500  • Annual Solicitation of Projects‐March thru June 2015 and 2016 • Project Prioritization‐May thru Sept, 2015 and 2016 • Adoption of annual TIP‐July 2015 and 2016 • Monitoring and Maintenance of TIP including amendments‐July 2014 thru June 2016 

46‐47 

4.0  Long Range Transportation Planning  $16,250  $5,000  • Development of E+C Network‐August 2014 • Development of Cost Feasible Network‐July 2015 • Development of corridor plans‐Nov 2014 • Adoption of 2040 LRTP‐Sept 2015 

50‐53 

5.0  Multi‐Modal Project Planning  $18,750  $15,000  • Support of Space Infrastructure Program‐July 2014 thru June 2016 • Support of multi‐modal programs (Rail, Sea, Air and Space)‐July 2014 thru June 2016 • Completion of Complete Streets Feasibility Studies‐Nov 2014 

55‐57 

5.1  Corridor Studies  $2,500  $5,000  • SR A1A Corridor Study‐July 2014 • Ellis Rd. and Northern Interchange PD&E‐Aug 2014 • St. Johns Heritage Parkway and Interchanges‐July 2014 thru June 2016 • Design phases of Ellis Rd. and Interchanges‐July 2014  thru June 2016 • Support of FDOT Corridor Studies‐July 2014 thru  June 2016 

58‐60 

 

Page 98: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 90 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 3: Federal Transit Administration Section 5305(d) Deliverables for FY 2015 and FY 2016 (continued) 

Task No.  Description Total FTA 5305(d) 

Funding  Deliverable  Page #FY 2015 FY 2016

5.2  Management Operations, Safety and Security 

$18,750  $24,633  • 2013 State of the System Report‐Oct 2014 • 2014 State of the System Report‐Oct 2015 • 2015 State of the System Report‐Oct 2016 • 2014 Countywide Safety Report‐July 2015 • 2015 Countywide Safety Report‐July 2016 • ITS Master Plan‐March 2015 • Web based crash location database support‐July 2014  thru June 2016 

61‐64 

6.0  Public Involvement  $28,000  $28,000  • Distribution of documents and materials‐July 2014 thru June 2016 • Creation and launch of new website‐July 2014 • Youth Education section on website‐Oct 2015 • On‐line trail/bike route map‐Sept 2015 • Outreach through social media, newspapers, television, presentations and events‐July 2014 thru June 2016 

66‐69 

7.0  Pathways Project Planning  $30,000  $31,250  • Pineda Causeway Bicycle Pilot Project on Limited Access Highways‐July 2014‐June 2016 • Bike/Ped Trails Recognition Awards‐April 2015 and 2016• Existing/Planned Facilities Map‐Feb 2015 • Implementation of Bike/Ped Mobility Plan‐July 2014 thru June 2016 • Continued support and planning of bicycle, pedestrian  and trail facilities‐July 2014 thru June 20165

71‐73 

 

Page 99: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 91 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Table 3: Federal Transit Administration Section 5305(d) Deliverables for FY 2015 and FY 2016 (continued) 

Task No.  Description Total FTA 5305(d) 

Funding  Deliverable  Page #’sFY 2015 FY 2016

7.1  Bicycle/Pedestrian Education Program  $62,000  $62,500  • Commit 2B Fit Program support and implementation‐ July 2014 thru June 2016 • National Walk to School Day‐Oct 2014 and 2015 • National Bike to School Day‐May 2015 and 2016 • 2014 School Travel Survey‐Oct/Nov 2014 • Bicycle Rodeo Education Program‐July 2014 thru  June 2016 • Support programs for bike/ped education‐July 2014  thru June 2016 

74‐76 

7.2  Transit Planning and Studies  $1,350  $5,000  • Attendance and participation on TDLCB‐July 2014 thru June 2016 • Coordination and support of Space Coast Area Transit activities and programs‐July 2014 thru June 2016 • Annual trend analysis in State of the System Report‐Oct 2014 and 2015 • Integration of transit into 2040 LRTP‐July 2014‐ Sept 2015 • Implementation of ADA Assessment and Transition Plan‐July 2014 thru June 2016 

77‐80 

   

Page 100: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 92 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 4: Transportation Planning Studies Summary 

Brevard Urban Area Transportation Planning Studies July 1, 2014 to June 30, 2016 

Name  Study Area  Participating Agencies  Anticipated Schedule  Project Description 

Apollo Boulevard  Sarno Rd. to Eau Gallie Blvd. SCTPO, FDOT, Brevard County, Melbourne 

Construction Spring 2014 

Widening and extending .865 miles of Apollo Blvd. to  intersect with Eau Gallie Blvd. 

Babcock St. ( SR 507)  Melbourne Ave. to Fee Ave. SCTPO, FDOT, Brevard County, Melbourne 

Construction Underway Major Intersection Improvements 

Babcock St. (SR 507)  Malabar Rd to Palm Bay Rd. SCTPO, FDOT, Brevard County, Palm Bay 

Design Underway  Widen to 6 lanes 

Barnes Boulevard  Murrell Road to Fiske Blvd.  SCTPO, FDOT, Brevard County, Rockledge 

Construction FY 13/14  Add lanes and reconstruct 

Ellis Road  Wickham to John Rodes Blvd. 

SCTPO, FDOT, Brevard County, Melbourne 

PD&E Underway Design FY 13/14 

Evaluation of widening from  2 to 4 lanes 

Interstate 95  S of Malabar to Brevard County Line 

SCTPO, FDOT  Construction Underway Widening to six lanes  

Interstate 95  South of SR 406 to N of  SR 44 

SCTPO, FDOT  Construction FY underway 

Widening to six lanes 

Interstate 95 Interchange 

Ellis Rd. & St. Johns  Heritage Parkway 

SCTPO, FDOT, Melbourne Airport, Melbourne, West Melbourne, County 

PD&E Underway Design – 60%  

Evaluation of new interchange with I‐95 at Ellis Road 

Interstate 95 Interchange 

North of Micco Rd. & St. Johns Heritage Parkway 

SCTPO, FDOT, Palm Bay  PD&E underway  Design – 60% Construction FY 15/16 

Evaluation of new interchange with I‐95 just north of  Micco Rd 

Malabar Road  Babcock St to US 1  SCTPO, FDOT, Brevard County, Malabar 

PD&E Underway  Evaluation of potential improvements for corridor 

Page 101: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 93 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 4: Transportation Planning Studies Summary (continued) 

Brevard Urban Area Transportation Planning Studies July 1, 2014 to June 30, 2016 

Name  Study Area  Participating Agencies  Anticipated Schedule  Project Description 

US 1  Pine Street to Cidco Road SCTPO, FDOT, Brevard County, Cocoa 

Construction Underway  Widening to six lanes 

US 192 Intersections  Hollywood / Evans Wickham / Minton 

SCTPO, FDOT, Brevard County, West Melbourne, Melbourne 

Feasibility Study Underway 

Detailed analysis for upcoming design phase 

East Central Florida Regional Rail Trail 

Canaveral Ave to  Volusia County Line 

SCTPO, FDOT, Titusville, County 

Construction FY 13/14  New off road trail facility

Sea Loop Trail  Sand Point Park to  Volusia County Line 

SCTPO, FDOT, Titusville, Wildlife Refuge, KSC 

PD&E underway  Evaluation of implementing bike Path/trail facility 

Washingtonia Ext.  West of I‐95 connecting SJHP to Stadium  

SCTPO, FDOT, County  PD&E FY 13/14  New roadway 

SR 501 Clearlake  Michigan to Industry  SCTPO, FDOT, Cocoa  PD&E FY 14/15  Widening/Intersection improvement 

SR 3 (Courtenay Pkwy) SR 406 (Garden St) SR 518 (Eau Gallie Blvd) SR 519 (Fiske Blvd) SR 520 (EB/WB King St) SR 5054 (Sarno Rd) US 1 (Washington Ave) 

FDOT Corridor Planning Studies 

SCTPO, FDOT, County,  Titusville, Melbourne, Indian Harbour Beach, Rockledge, Cocoa,  Melbourne 

Corridor Study FY 14/15  Various improvements to include safety and pedestrian needs 

 

Page 102: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 94 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 4: Transportation Planning Studies Summary (continued) 

Brevard Urban Area Transportation Planning Studies July 1, 2014 to June 30, 2016 

Name  Study Area  Participating Agencies  Anticipated Schedule  Project Description 

Florida Ave Hickory Street Hopkins Street 

King to Rosa L Jones New Haven to Nasa SR 50 to US 1 

SCTPO, FDOT, Cocoa, Melbourne, Titusville 

Feasibility Study FY 14 – FY 15 

Evaluation of Complete Street Concepts 

Peachtree Street  Blake St to Pineda Street  SCTPO, FDOT, Cocoa  Construction FY 14/15  Complete Street 

North Atlantic Ave  SR A1A to North City Limits 

SCTPO, FDOT, Cape Canaveral 

Construction FY 14/15  Complete Street 

Minutemen Causeway  Cedar Ave to Beach  SCTPO, FDOT, Cocoa Bch Construction 14/15  Complete Street 

   

Page 103: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 95 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 5A: Proposed UPWP Work Schedule for FY 15 

PROPOSEDUPWPPLANNINGWORKSCHEDULEFORFISCALYEAR2015

Task 

No.  Task Title 

JULY 14 

AUG 14 

SEPT 14 

OCT 14 

NOV 14 

DEC

 14 

JAN 15 

FEB 15 

MAR 15 

APRIL 15 

MAY 15 

JUNE 15 

1.0  Program Management   

1.1  Annual Reporting and Programming   

1.2  Annual Audit             

1.3  Regional/State Planning and Coordination   

1.4  Local Coordination and Planning   

1.5  Program Mgmt. and Tech. Assistance (FDOT)   

2.0 Transportation Data Compilation and 

Distribution                        

3.0  Transportation Improvement Program   

4.0  Long Range Transportation Planning   

5.0  Multi‐Modal Project Planning   

5.1  Corridor Studies   

5.2  Management Operations and Security   

6.0  Public Involvement   

7.0  Pathways Project Planning   

7.1  Bicycle/Pedestrian Education Program   

7.2  Transit Planning and Studies   

Page 104: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 96 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 5B: Proposed UPWP Work Schedule for FY 16 

PROPOSEDUPWPPLANNINGWORKSCHEDULEFORFISCALYEAR2016

Task 

No.  Task Title 

JULY 15 

AUG 15 

SEPT 15 

OCT 15 

NOV 15 

DEC

 15 

JAN 16 

FEB 16 

MAR 16 

APRIL 16 

MAY 16 

JUNE 16 

1.0  Program Management   

1.1  Annual Reporting and Programming   

1.2  Annual Audit             

1.3  Regional/State Planning and Coordination   

1.4  Local Coordination and Planning   

1.5  Program Mgmt. and Tech. Assistance (FDOT)   

2.0 Transportation Data Compilation and 

Distribution                        

3.0  Transportation Improvement Program   

4.0  Long Range Transportation Planning   

5.0  Multi‐Modal Project Planning   

5.1  Corridor Studies   

5.2  Management Operations and Security   

6.0  Public Involvement   

7.0  Pathways Project Planning   

7.1  Bicycle/Pedestrian Education Program   

7.2  Transit Planning and Studies   

Page 105: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 97 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 6: Federal MAP‐21 Planning Factors 

  MAP‐21 Planning Factors 

UPWP 

Task 

Number 

Support the 

economic vitality of 

the metropolitan

 

area, especially by 

enabling global 

competitiven

ess, 

productivity, and 

efficien

cy 

Increase the safety 

of the 

transportation 

system

 for 

motorized and non‐

motorizedusers

Increase the 

security of the 

transportation 

system

 for 

motorized and non‐

motorizedusers

Increase 

accessibility and 

mobility of peo

ple 

and freight 

the en

vironmen

t/ 

quality of life/ 

promote 

consisten

cy 

between 

transportation 

improvemen

ts and 

Enhance the 

integration and 

connectivity of the 

transportation 

system

, across and 

between m

odes 

throughout the 

State, for people 

andfreight

Promote efficient 

system

 

managem

ent and 

operation 

Emphasize the 

preservation of the 

existing 

transportation 

system

 

1.0  X  X  X    X  X  X  X 

1.1  X      X  X    X  X 

1.2                 

1.3  X  X  X  X  X  X  X  X 

1.4  X  X  X  X  X  X  X  X 

1.5  X  X  X  X X  X  X  X 

2.0  X  X      X  X     

3.0  X  X  X  X  X  X  X  X 

4.0  X  X  X  X  X  X  X  X 

5.0  X  X  X  X  X  X  X   

5.1  X  X  X  X  X  X     

5.2  X  X  X  X  X  X  X  X

6.0    X  X  X  X    X 

7.0  X  X  X  X  X  X    X 

7.1    X  X  X X  X    X 

7.2  X  X  X  X  X  X  X  X

Page 106: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 98 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Table 7: UPWP Tasks Strategic Plan Goals 

  SCTPO Strategic Plan Goals 

 

PLAN: Improve Regional Planning and 

Decision‐Making 

IMPLEMENT: Enhance Transportation 

System Performance 

LEAD: Ensure the Agency is 

Financially Stable, Soundly 

Managed, and Staffed by 

Competent, Engaged 

Professionals 

COMMUNICATE: Foster 

Community Enrichment, 

Empowerment and 

Engagement 

UPWP 

Task 

Number 

Build

 consensus 

for inter‐ and 

intra‐ m

odal 

priorities 

Analyze data to 

iden

tify safety 

and security 

issues 

Iden

tify existing 

transportation 

facilities for 

improvemen

ts 

Expand inter‐

modal 

connectivity for 

peo

ple and 

goods 

Increase 

transportation 

system

 safety 

and security 

Improve m

obility 

of existing 

transportation 

facilities 

Ensure tim

ely 

and accurate 

financial 

reporting

Promote board 

and volunteer 

leadership 

involvem

ent

Strengthen

 staff 

professional 

skills and 

expertise

educational 

program

s for 

targeted

 Coordinate 

advocacy to 

promote system 

priorities

Enhance public 

participation 

with electronic 

med

ia

1.0  X  X  X  X X X X X  X X X X

1.1  X      X   X X

1.2        X  

1.3  X  X  X  X X X   X X X

1.4  X  X  X  X X X   X X X

1.5  X  X  X  X X X X   X X X X

2.0  X  X  X  X X X   X X X

3.0  X  X  X  X X X X X  X X X

4.0  X  X  X  X X X X X  X X X X

5.0  X  X  X  X X X X  X X X X

5.1  X  X  X  X X X X  X X X X

5.2  X  X  X  X X X X  X X X X

6.0  X    X  X  X X X X

7.0  X  X  X  X X X X  X X X X

7.1    X  X  X X X X  X X X X

7.2  X  X  X  X X X   X X X X

Page 107: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 99 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

SCTPO Adopted 2014‐15 Strategic Plan 

Appendix A – SCTP

O Business Plan 

APPENDIX A

Page 108: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

January 2014 to December 2015

Starting Proceeding Complete

REVISED 1-1-14

Space Coast Transportation Planning Organization

Strategic Plan Priorities 2014-2015

Roads to rockets…the sky is NOT the limit

QUALITY, COMMITMENT, AND INTEGRITY ARE THE FOUNDATION FOR OUR SUCCESS

D. LEAD Ensure the agency is financially stable,

soundly managed, and staffed by competent, engaged professionals

D1. Ensure timely and accurate adminstrative and financial reporting

D1.1. Report formal budget and contract performance

D1.2. Conduct annual independent audit

D2. Promote board and volunteer leadership involvement

D2.1. Produce purposeful agendas with relevant topics

D2.2. Recognize board members and volunteers for service

D3. Strengthen performance, professional skills, and expertise

D3.1. Refine the approved performance appraisal program

D3.2. Pursue training opportunities to increase skills and expertise

A. PLAN Improve regional planning and decision-making

A1. Build consensus for inter- and intra-modal priorities

A1.1. Involve local government/modal agencies in system priority development

A1.2. Coordinate with FDOT to fund priorities for all modes

A1.3. Identify long range transportation needs through 2040

A1.4. Participate in FDOT regional corridors pilot study

A2. Monitor and report transportation system performance

A2.1. Develop annual system performance report

A2.2. Use traffic count and crash data to identify safety improvement needs

A2.3. Update community characteristics inventory using new census data

A3. Identify transportation facilities for improvements

A3.1. Complete bicycle, pedestrian, trails mobility plan and identify priorities

A3.2. Conduct Complete Streets screening and identify priority projects

A3.3. Coordinate with FDOT and local jurisdictions to begin corridor studies

A3.4. Initiate countywide intelligent transportation system master planning

C. COMMUNICATE Foster community enrichment, empowerment and engagement

C1. Offer educational programs for targeted populations

C1.1. Coordinate bicycle and pedestrian safety programs

C1.2. Offer technical training to improve transportation planning

C1.3. Present informational programs to increase community awareness

C2. Coordinate advocacy to promote system priorities

C2.1. Create a new community outreach program

C2.2. Identify and advance state legislative priorities

C2.3. Engage new constituencies to support transportation plans

C3. Enhance public participation

C3.1. Utilize media to expand public interest

C3.2. Conduct public surveys to gather input and feedback

C3.3. Develop a customer satisfaction feedback program

C3.4. Upgrade and launch new SCTPO website

B. IMPLEMENT Enhance transportation system performance

B1. Expand inter-modal connectivity for people, goods, and economic vitality

B1.1. Advance priority road projects

B1.2. Support aviation, rail, seaport, space, and transit priorities

B1.3. Coordinate efforts to fund, design, and build priority trail projects

B2. Increase transportation system safety and security

B2.1. Facilitate responses to citizen and community safety concern

B2.2. Partner with FDOT and local communities to address sidewalk gaps

B3. Improve mobility of existing transportation facilities

B3.1 Target existing corridors for multi-modal transportation improvements

B3.2. Address local government needs during resurfacing projects

B3.3. Assist SCAT with addressing bus stop improvements

Page 109: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 101 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

 

FDOT District 5 

General Planning Activities FY 2015 – FY 2016 

 

   

Appendix B – FDOT District 5 General Planning Activities  APPENDIX B

Page 110: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 102 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

FDOT District Five General Planning Activities & Specific Tasks Fiscal Year 2014/2015 & Fiscal Year 2015/2016 Unified Planning Work Program  

March 2014 

  GENERAL PLANNING ACTIVITIES 

The Florida Department of Transportation (FDOT)  is a contributor to transportation planning and policy 

development  in  District  Five.    Generally,  the  specific  recurring  transportation  planning  activities 

accomplished by FDOT’s District Five Planning Office can be placed  in one of  the  following categories:  

Transportation Planning Activities, Data Collection Activities and Systems Planning Activities. 

Transportation Planning Activities: 

MPO/TPO Support Provide a MPO/TPO  Liaison between  the Department and each MPO/TPO; Provide  supporting 

information  and  documentation  to  support MPO/TPO  planning;  Review  and  take  appropriate 

action  on  Transportation  Improvement  Program(TIP)  and  TIP  Amendments;  Review  and  take 

appropriate action on Unified Planning Work Program (UPWP) and UPWP Amendments; Review 

and  take appropriate action on  Long Range  Transportation Plan; Review and  take appropriate 

action on Public Involvement Plan; Prepare and conduct Federal and State Certification reviews; 

Assist MPOs/TPOs in attending various committee meetings and Community Awareness Planning 

Meetings; Assist MPOs/TPOs with Work Program System issues and reports; Assist MPOs/TPOs in 

State  and  Federal Grant  Programs;  and  Support  and  assist with  Transit  issues  and  initiatives. 

Review  and  update MPO/TPO  contract  agreements  (Interlocal  Agreement  for  the  Creation  of 

Metropolitan  Planning  Organization,  Intergovernmental  Coordination  and  Review  (ICAR),  and 

Transportation Planning Funds Joint Participation Agreement.   

Assist  with  providing  revenue  forecasts  to  the  MPOs/TPOs  to  develop  their  Long  Range 

Transportation Plans; Provide support and assistance to assure that the MPOs/TPOs comply with 

the state and federal policies, procedures and federal code of regulation; comply with Title VI in 

the  planning  process  (UPWP,  TIP, Model  Validation,  etc.)  and  comply with  other  certification 

requirements;  Provide  supporting  information  and  documentation  to  support  MPO/TPO 

planning;  Assist MPO/TPO with  boundary  and membership  issues  for merging  and  emerging 

MPOs/TPOs. 

Transit Support Provide a Transit Analyst between the Department and each MPO/TPO; Assist MPOs/TPOs with 

transit related  issues and  initiatives; Review and recommend appropriate action on TIP and TIP 

Amendments  and  UPWP  and  UPWP  Amendments  for  transit  projects.    Assist MPOs/TPOs  in 

attending  the  Transportation  Disadvantaged  Local  Coordinating  Board  (TDLCB)  Meetings; 

Page 111: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 103 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Provides  technical  assistance  to  the  TDLCB;  Review  and  update  MPO/TPO  transit  grant 

agreements for Section 5303 grants and transit programs; Assist MPOs/TPOs with Work Program 

and execution of all related system issues and reports.    

Intergovernmental Support and Review Review  and  submit  recommendations  on  Local  Government  Comprehensive  Plans  (LGCP) 

amendments,  both  proposed  and  adopted,  and  Evaluation  and  Appraisal  Reports,  Capital 

Improvement Elements  (CIEs), and Capital  Improvement Plan  (CIPs) and TCEAs  for appropriate 

land  uses  and  transportation  related  impacts  on  those  facilities  of  state  concern.    Assist 

MPOs/TPOs with feasibility studies and implementation planning. 

Strategic Intermodal System Plan (SIS Strategic Plan) Process  requests  for designation  changes;  coordinate  regional  and  local  facilities with  the  SIS; 

coordinate  the  Department’s  transit  initiative  with  the  SIS;  manage  policy  level  public  and 

partner  involvement  efforts  related  to  the  SIS;  Assist  in  technical  level  public  and  partner 

involvement efforts related to the SIS; Assist in providing revenue forecasts. 

Public Involvement Conduct  Public  Involvement  activities  related  to  Planning  and  Concept  Development  studies, 

Efficient  Transportation  Decision  Making  (ETDM),  Project  Development  and  Environmental 

(PD&E) studies, and Work Program Public Hearings; Provide tools  for developing and reviewing 

projects  at  the  Planning  Screen  Phase  (used  in  the  development  of  MPO/TPO  long  range 

transportation plans and FIHS cost‐feasible plan. 

Bicycle/Pedestrian Support Support  and  assist with  bicycle,  pedestrian  and  transit  related  issues  and  initiatives.    Provide 

interagency  coordination  and  technical  support  in  the  area  of  multimodal  transportation 

planning and development. Review and provide feedback on local roadway and site plans for the 

inclusion  of  alternative  transportation  facilities.  Review  and  provide  feedback  on  alternative 

transportation  planning  documents  and  studies.  Act  as District  Five  steward  for  regional  trail 

initiatives and projects. Coordinate multimodal  transportation network  infrastructure  inventory 

and needs assessment for all facilities in District Five. 

Safety The  District  Five  Intermodal  System  Development  Safety  efforts  will  support  the  following:  

Florida’s  Pedestrian  and  Bicycle  Focused  Initiative,  Corridor  Planning  Studies  for MPOs/TPOs 

projects  for  Completed  Streets,  Multimodal  Corridors,  Context  Sensitive  Solutions  and 

Transportation  Design  for  Livable  Communities,  and  Improvements  to  accommodate  transit 

accessibility, pedestrians and accessibility for persons with disabilities. 

 

Page 112: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 104 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

Transportation Systems Management and Operations (TSM&O) Program Develop a District Five Transportation Systems Management and Operations  (TSM&O) Program 

within a team of champions made up of MPOs/TPOs, transit agencies and District staff. 

Data Collection Activities: 

Systems Inventory Provide for the efficient transfer of road  jurisdiction by the Department and  local governments 

based on mutual agreement; functionally classify roads,  including the designation of federal aid 

eligibility and develop, analyze, and assign an integrated statewide network of federal, local and 

state systems. 

Mapping Maintain and provide mapping  information  related  to  the SIS; Maintain and update  functional 

classification maps. 

Systems Planning Activities: 

Development of Regional Impact (DRI) Review Conduct  large  scale development  review  through  the DRI process or as  requested by Regional 

Planning Councils.   These reviews offer technical comments and may result  in the development 

and coordination of transportation projects and funding partnerships, including agreements with 

developers.  These  projects  are  then  coordinated  with  the  MPOs/TPOs  during  project 

development, prioritization, or programming. In addition, provide review and comments for the 

review of master plans, sectors plans and sub‐DRI developments for impacts to the state highway 

system. 

Systems Management Provide assistance for determining the need for, and feasibility of, new access points  (IJRs) and 

modifications (IMRs) to existing access points on the FIHS and other SIS facilities; Conduct Level‐

of‐Service  analysis  that  will  determine  current  and  future  conditions  of  the  State  Highway 

System; Project Design Traffic and 18 KIP Equivalent Single Axle Loadings (ESALs) preparations.  

Modeling The  District  will  continue  to  support  regional  transportation  modeling  activities  and  gather 

information  on  how  to  make  improvements  through  improved  policies,  procedures  and 

guidelines  for  transportation  demand  forecasting  for  the  Florida  Standard  Model;  Assist  in 

validation  of  models  and  conduct  planning  studies  requested  by  local  governments  and 

MPOs/TPOs. 

Page 113: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 105 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

FIHS/SIS Conduct  Traffic/Travel  Demand  Assignment  Studies;  Develop  traffic  projections;  Develop  and 

maintain a SIS Needs Plan and SIS Cost Feasible Plan; Provide  input  for FIHS modifications and 

refinements; Develop, coordinate and distribute FIHS corridor plans. 

FDOT DISTRICT FIVE SPECIFIC ACTIVITIES 

This section provides a listing, with a short description of some of the more prominent FDOT District Five 

activities and projects anticipated during Fiscal Year 2014/2015 and Fiscal Year 2015/2016. 

ETDM/SCE To assist and collaborate with Space Coast TPO, Lake‐Sumter MPO, Ocala/Marion County TPO, 

METROPLAN  ORLANDO  and  Volusia  County  TPO  with  the  implementation  of  the  Efficient 

Transportation Decision Making  (ETDM) Process.   District Five  is coordinating with each of  the 

MPOs/TPOs to determine which projects should be sent out for an ETDM review.     

The District will  continue assisting  the MPOs/TPOs with  their ETDM/SCE  (Sociocultural Effects) 

tasks by helping  to  coordinate  schedules, provide  guidance,  and  assist  in  sending projects  for 

Planning Screen reviews,  including providing guidance with summary reports for those projects.  

The District will continue to run Programming Screens on projects prior to PD&E, as required by 

FHWA, FDOT will provide ETDM technical assistance and training to MPO/TPO staff as needed or 

requested.  

Modeling The  Department  will  continue  to  support  the  District  Five  MPOs/TPOs  (Space  Coast  TPO, 

Lake/Sumter MPO, Ocala/Marion TPO, METROPLAN ORLANDO, and Volusia TPO) with ongoing 

modeling activities applications, enhancements and technical support.   

FDOT District Five Tentative Five‐Year Work Program Public Hearings To  develop  and  conduct  the  Department’s  Tentative  Five  Year Work  Program  and  consider 

making any changes  to  the Program  that  is necessary  to balance  the Five Year Work Program.  

The Work  Program  Public  Hearing(s)  is  being  developed  and  conducted  pursuant  to  Section 

339.135(4)(C), Florida Statutes, as amended.   The Public Hearing(s) will  include  information  for 

Brevard,  Flagler,  Lake, Marion, Orange, Osceola,  Seminole,  Sumter  and Volusia Counties.    The 

Public  Hearing(s)  will  include  consideration  of  proposed  projects  for  the  Florida’s  Turnpike 

Enterprise.  The Public Hearing(s) and Public Information Meetings are conducted annually.  The 

Department continuously coordinates with the MPOs/TPOs in their project priority development 

and project selection  in the Department’s Tentative Five Year Work Program.   The Department 

will hold a Public Hearing(s) for the tentative work program  in November and December of the 

2015  and  2016  Calendar  year.    The  Department  will  continuously  coordinate  with  the 

MPOs/TPOs  to  provide  video  tapings  of  each  Public  Hearing  to  be  broadcasted  on  public 

Page 114: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 106 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

television.    The Department will  continue  to  provide  a website  for  the Work  Program  Public 

Hearing.  The website will include a link to a webinar option for the MPOs/TPOs and citizen’s to 

access to join into the District’s Work Program Public Hearing.  The website will continue to have 

information and maps on the Department’s Tentative Five Year Work Program.  

District Five GIS Initiative/CFGIS District Five continues  to utilize  the  resources of  the Central Florida GIS  (CFGIS)  initiative.   The 

availability of  the Data Clearinghouse allows members of  the general public, while providing a 

Users Group forum for GIS users within the Central Florida region, to facilitate data sharing and 

information exchange.   

The Department  is  continuing  to upkeep  their GIS  interactive  tools up‐to‐date developing and 

available  utilizing  the  CFGIS  information  portal.    Some  tools  currently  available  on  this  portal 

include:  TransMap, which  serves  transit data;  the  Strategic  Intermodal  System  Implemental & 

Management  (SISIM)  tool which  allows  partners  throughout  the  district  to  share  information 

concerning the  implementation of operational  improvements  for SIS  facilities; etc.   Additionally 

District Five maintains a non‐GIS specific information Traffic Data web page on this website.  This 

would make  transportation data  currently begin maintained by  the Department more publicly 

available as an interactive tool to be housed on the CFGIS server. 

FUNDING SOURCES 

  FY 2014/2015  FY 2015/2016 

FDOT General Planning 

Activities and Specific 

Task 

Consultant Funding  $5,560,000 $5,583,482

Grant Funding  $373,482 $350,000

TOTAL  $5,933,482 $5,933,482

 

   

Page 115: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 107 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

 

 

 

 

 

 

 

Space Coast TPO Certification Report 

January 2013 

 

   

Appendix C – SCTP

O Certification Report  

APPENDIX C

Page 116: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 108 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

2013 MODIFIED JOINT CERTIFICATION REVIEW 

Florida Department of Transportation, District Five 

And  

Space Coast Transportation Planning Organization 

 

Attendees:  Bob Kamm (SCTPO), Georganna Gillette (SCTPO) Laura Carter (SCTPO) Mary Schoelzel (FDOT) 

and Theodis Perry (FDOT) 

The Space Coast Transportation Planning Organization  (SCTPO) has  the  responsibility  for ensuring  that 

the major transportation issues in their planning areas are addressed and that the requirements in state 

and  federal  law  governing  the metropolitan  transportation  planning  process  are met.      Certification 

reviews are the tool used to determine whether the MPO/TPOs are fulfilling this responsibility.  They are 

conducted on an annual basis by the Florida Department of Transportation (FDOT) and on a four (4) year 

cycle by  the  Federal Highway Administration  (FHWA) and  the  Federal Transit Administration  (FTA)  for 

MPO/TPOs  in  Transportation  Management  Areas  (TMA)  areas.  The  only  exception  is  "conditional 

certification" issued for a MPO/TPO by FHWA [23 USC 143].   The next federal certification review for the 

Space Coast Transportation Planning Organization will be conducted in year 2014. 

The 2013 State Modified Joint Certification Review process for the SCTPO started with meetings between 

FDOT District Five Staff and the SCTPO Staff held on January 28, 2013.   The discussions were organized 

around a set of questions developed by FDOT Staff to review all of the transportation planning processes 

and  requirements mandated by  Federal  and  State  law.        The  SCTPO  staff provided  responses  to  the 

questions  that  led  to  additional  dialogue.  The  findings,  summary  of  noteworthy  achievements,  and 

recommendations presented in this Modified Joint Certification Review are drawn from the responses to 

the questions and the review meeting. They also reflect the emerging importance of regionalism. 

FINDINGS 

General 

The  SCTPO  continues  to  have  a  positive  cooperative  working  relationship  with  the  FDOT,  Local 

Governmental  Agencies,  Regional  Planning  Agencies,  Space  Florida,  Port  Authority  and  other 

Transportation and Land Use Agencies to support the initiatives needed for the Transportation demands 

within Brevard County.     The SCTPO Staff has worked diligently  in  the past year  to plan and prioritize 

projects of  significant  importance  in  their  TPO boundary  area.      They  continue  to move  forward with 

planning  and  developing  regional  projects.  These  projects  include  roadways,  bicycle/pedestrian, 

complete  streets,  multi‐modal  planning,  safety  projects,  pedestrian  sidewalk/trails,  space  and  other 

transportation facilities. 

Page 117: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 109 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

The SCTPO staff is to be commended for their outstanding work on the implementation and submission 

of their 2013‐2017 Transportation Improvement Program (TIP). They included all the new changes to the 

TIP  in  an  expeditious  accurate  manner  as  requested  by  the  Department  and  FHWA.  The  TPO  also 

successfully completed and submitted their bi‐annual Unified Planning Work Program (UPWP) and annual 

Prioritized List of Projects. 

The SCTPO is currently working with the FDOT staff on the 2010 Census Urban Boundary Smoothing.  This 

is an ongoing process requiring a series of back and forth exchanges and updates between the TPO and 

FDOT.   As  the Urban Boundary Smoothing process  is  taking place, TPO Staff  is beginning  to assess  the 

need for any Functional Classification updates as well. 

In  addition,  the  SCTPO  has  begun  conversations  and  strategizing  on  incorporating  the  new MAP‐21 

(Moving  Ahead  for  Progress  in  the  21st  Century  Act)  performance  measures  into  their  planning 

documents. 

The  SCTPO  staff  continues  to  support  their  TPO  Board  Members,  Technical Advisory   Committee   

Members,   and  Citizen's  Advisory   Committee  Members   with updated  information   and  training  to  

help  them  better  understand  their  roles  and  the importance  of their participation.  The Department 

appreciates the support that the TPO and Local Agencies provide to move projects forward to enhance 

and complete the transportation needs in Brevard County. 

Summary of Noteworthy Achievements 

The Space Coast TPO undertook several new initiatives in 2012 in coordination with the public and local 

government  agencies.          The    2011    SCTPO    became    project  specific  "Local  Agency  Program  (LAP) 

Certified" and because of that initiative, they successfully  completed  their  first LAP  project  in FY  2012  

for  the US 192 Feasibility Study. There were  two major  intersection  improvement projects on US192 y 

programmed as the result of this Study. 

The second initiative embarked upon by the SCTPO is their first Complete Street Multi‐Modal Feasibility 

Study. SCTPO  Staff  worked  closely  with the District and the "SR  A1A Action  Team" on this Feasibility  

Study    for  State   Road A1A    in  the  cities of Cape Canaveral    and Cocoa Beach.    Several Action  Team 

meetings and a Public Charette were  held  throughout   the  year  to  gather  input  on  short‐term   and  

long‐term  project priorities for the corridor.  The results of this study will be presented later this year. 

The third initiative was the update of the Bicycle and Pedestrian Mobility Plan. The SCTPO Staff with the 

assistance of a project‐working group and the Bicycle Pedestrian and Trails Advisory Committee started 

the  update  of  their  Bicycle  and  Pedestrian  Mobility  Plan  that  will  be  used  to  implement  an 

interconnected system of bicycle and pedestrian facilities.  The SCTPO staff has participated in five public 

involvement events to gather input on the Mobility Plan and it's anticipated to be complete in the spring 

of 2013. 

Page 118: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 110 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

The SCTPO's fourth initiative is to continue with its Bicycle/Pedestrian Safety Education Program, Feet not 

Fuel  Program  and  the  Commit  2B  Fit  Program.  Kim  Smith,  the  SCTPO's  Bicycle/Pedestrian  Education 

Specialist  distributed  5,100  helmets,  participated  in  51  safety  education  events,  and  assisted  in  the 

implementation of the Commit 2B Fit program in 10 schools. Furthermore, for her dedication and efforts, 

Kim  was  awarded  a  plaque  from  the  City  of  Rockledge  Police  Department's  Community  Relations 

Department  for  supplying helmets  and  assisting with helmet  fittings with  their  "Bike  Safety Outreach 

Program". 

In 2012,  the TPO completed  their  fifth  initiative, which was  the  implementation of a web based crash 

location  system  to  better  analyze  crash  reports  and  to  incorporate  into  the  safety  element  of 

performance‐based measures for transportation planning. The TPO also hosted training and coordination 

with seven local agencies in Brevard County. 

Finally, their sixth initiative is to institutionalize Space as a mode of transportation. The SCTPO continues 

its cooperative efforts with Space Florida in assisting them in developing their Spaceport Master Plan and 

incorporating it into the local, regional, and state transportation planning process. In FY 2012 SCTPO Staff 

worked with FDOT  to help  institutionalize Space as a mode of  transportation and as a  result of  those 

efforts,  FDOT Central Office  reorganized  to  create  the Aviation  and  the  Spaceport Office.  In  addition, 

$100M ($20 million annually) was included in FY 2014‐2018 FDOT Work Program for Space infrastructure 

projects. 

Accountability 

The  content  of  the quarterly  reports  submitted by  the  SCTPO with  invoices have been  very  efficient, 

timely and adequate in detail and competency.   These reports are intended to document progress made 

and difficulties encountered in implementing a MPO's/TPO's mission and vision through the UPWP.  They 

also are used to help assess the eligibility and justification of the MPO's/TPO's expenses to be reimbursed 

with federal funds.    

Planning Fund Carryover Balances 

Planning funds are intended to be used for innovative productive planning activities within a reasonable 

timeframe and are subject to redistribution or loss if certain requirements are not met. The Space Coast 

TPO is commended for their continued work in utilizing these Planning Funds. 

Public Involvement 

Since  the adoption of  the SCTPO Public  Involvement Plan on February 11, 2010,  the TPO continues  to 

ensure  that public participation  is an  integral and effective part of  the TPO's activities so decisions are 

made with the benefit and consideration of public perspectives.   This plan  is essential to the successful 

implementation of any  transportation planning project or program.   The SCTPO holds an annual Open 

Page 119: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 111 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

House to discuss the Long Range Plan, Transportation Improvement Program and Project Priorities with 

the public. 

The Space Coast TPO also continues  to  improve  their public outreach and  information efforts via  their 

website  http://www.spacecoasttpo.com,  "Space  Coast  TPO  E‐News"  and  various  workshops  to 

disseminate timely information about the SCTPO and transportation projects throughout Brevard County. 

The  information  includes  work  products,  Traffic  Counts,  Bicycle/Pedestrian,  Complete  Streets, Multi‐

Modal Planning, Safety, Public Involvement, and Transportation Data. In addition, the TPO has a full time 

Bicycle and Pedestrian Education staff person that is heavily involved in public outreach and encourages 

citizens to participate in various advisory committees as well as the Technical I Citizen Advisory Meetings 

and the TPO Board Meetings. 

Public Transportation 

The  SCTPO  continues  to  have  a  continuous  and  cooperative  relationship with  the  Space  Coast  Area 

Transit  (SCAT),  their  Public  Transportation  partners.    The  SCTPO  continues  to  assist  their  Public 

Transportation partners  in obtaining  the necessary planning coordination with agencies and/or groups 

who  could  be  affected,  assists  in  checking  for  consistency with  the  Florida  Transportation  Plan,  Local 

Government Comprehensive Plans and other statewide modal plans.   Space Coast Area Transit updated 

their Transit Development Plan for FY 2009‐2018 and the SCTPO staff participated as a member of their 

TDP Steering Committee. 

Efficient Transportation Decision Making (ETDM) 

The Space Coast TPO continues to work with the Department to support the efforts in the development 

of the ETDM Process.  As priorities change the TPO and Department will continue to work collaboratively 

on sending projects through for ETDM review. 

RECOMMENDATIONS/ACTIONS 

1. The Space Coast TPO should continue to ensure that they work with their FDOT MPO/TPO Liaison concerning  any  issues or  requests.     All  inquiries  and  request  should  come  to  the  FDOT MPO Liaison directly and  if others need to be  informed  it will be the responsibility of the FDOT MPO Liaison to assure that they directly get the information   

   

Page 120: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 112 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

JOINT CERTIFICATION  STATEMENT  ON THE METROPOLITAN 

TRANSPORTATION PLANNING  PROCESS     Pursuant to the requirements of 23 U.S.C. 134 (k)(5), 23 CFR 450.334(a), the Department and the MPO have performed a review of the certification status of the metropolitan transportation planning process for the Space Coast Transportation Planning  Organization with respect to the requirements of:  

1.   23 U.S.C. 134 and 49 U.S.C. 5303;  

2.   Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d‐1) and 49 C.F.R. Part 21 

 3.   49 U.S.C.  5332  prohibiting discrimination  on  the  basis  of  race,  color,  creed, national origin, 

sex, or age in employment or business opportunity;  

4.   Section 1101(b) of SAFETEA‐LU (Public Law 109‐59) and 49 C.F.R. Part 26 regarding the involvement of disadvantaged business enterprises in USDOT funded projects; 

 5.   23 C.F.R. Part 230 regarding the implementation of an equal employment opportunity 

program on Federal and Federal‐aid highway construction contracts;  

6.   The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and the regulations found in 49 C.F.R. Parts 27, 37, and 38; 

 7.   The Older Americans Act, as amended  (42 U.S.C. 6101) prohibiting discrimination on the 

basis of age in programs or activities receiving Federal financial assistance;  

8.   Section  324  of  23  U.S.C.  regarding  the  prohibition  of  discrimination on  the  basis  of gender; and 

 9.   Section  504 of  the Rehabilitation Act of  1973  (29 U.S.C. 794) and 49 C.F.R. Part 27 

regarding discrimination against individuals with disabilities.  Included  in  this  certification  package  is  a  summary  of  noteworthy  achievements  by  the  MPO, attachments  associated  with  these  achievements,  and  (if  applicable)  a  list  of  any  recommendations and/or corrective actions.  The  contents of  this  Joint Certification Package have  been  reviewed by  the MPO  and  accurately  reflect  the  results  of  the  joint  certification  review meeting  held  on  January  28, 2013.  Based on a  joint review and evaluation, the Florida Department of Transportation and the Space Coast Transportation Planning Organization recommend that the Metropolitan Planning Process for the Space Coast Transportation Planning Organization be “certified”.    

Page 121: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 113 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

           

Certifications and Assurances  

A. Debarment and Suspension Certification B. Disadvantaged Business Enterprise Utilization C. Lobbying Certification for Grants, Loans 

and Cooperative Agreements D. Title VI/Nondiscrimination Policy Statement 

    

Appendix D – Certifications an

d Assurances  

APPENDIX D

Page 122: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 114 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Debarment and Suspension Certification    As required by the USDOT regulation on Government wide Debarment and Suspension at 49 CFR 29.510  

(1) The Space Coast TPO hereby certifies to the best of its knowledge and belief, that it and its principals:  

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency;  

(b) Have not, within a three‐year period preceding this proposal, been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state or local) transaction or contract under a public transaction, violation of federal or state antitrust statutes; or commission of embezzlement, theft, forgery, bribery, falsification or destruction or records, making false statements, or receiving stolen property;  

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state or local) with commission of any of the offenses listed in paragraph (b) of this certification; and  

(d) Have not, within a three‐year period preceding this certification, had one or more public transactions (federal, state or local) terminated for cause or default.  

(2) The Space Coast TPO also hereby certifies that if, later, it becomes aware of any information contradicting the statements of paragraphs (a) through (d) above, it will promptly provide that information to the U.S.D.O.T. 

  Authorized Signature:    

__Jerry Allender____________________    _____5‐8‐14 & 4‐9‐15____________ 

Mr. Jerry Allender           Date Space Coast TPO Chairman  

Page 123: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 115 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Disadvantaged Business Enterprise Utilization  It is the policy of the Space Coast Transportation Planning Organization that disadvantaged businesses, as defined by 49 Code of Federal Regulations, Part 26, shall have an opportunity to participate in the performance of TPO contracts in a nondiscriminatory environment. The objectives of the Disadvantaged Business Enterprise Program are to ensure non‐discrimination in the award and administration of contracts, ensure firms fully meet eligibility standards, help remove barriers to participation, create a level playing field, assist in development of a firm so it can compete successfully outside of the program, provide flexibility, and ensure narrow tailoring of the program.  The Space Coast Transportation Planning Organization and its consultants shall take all necessary and reasonable steps to ensure that disadvantaged businesses have an opportunity to compete for and perform the contract work of the Space Coast Transportation Planning Organization in a non‐discriminatory environment.  The Space Coast Transportation Planning Organization shall require its consultants to not discriminate on the basis of race, color, national origin and sex, age, handicap/disability, or income status in the award and performance of its contracts. This policy covers in part the applicable federal regulations and the applicable statutory references contained therein for the Disadvantaged Business Enterprise Program Plan, Chapters 337 and 339, Florida Statutes, and Rule Chapter 14‐78, Florida Administrative Code.       Authorized Signature:    

___ Jerry Allender _________________    ____5‐8‐14_& 4‐9‐15_____________ 

Mr. Jerry Allender           Date Space Coast TPO Chairman 

   

Page 124: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 116 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Lobbying Certification for Grants, Loans and Cooperative Agreements  In accordance with Section 1352 of Title 31, United States Code, it is the policy of the Space Coast Transportation Planning Organization that:  (1) No Federal or state appropriated funds have been paid or will be paid by or on behalf of 

the Space Coast Transportation Planning Organization, to any person for influencing or attempting to influence an officer or employee of any Federal or state agency, or a member of Congress or the state legislature in connection with the awarding of any Federal or state contract, the making of any Federal or state grant, the making of any Federal or state loan, extension, continuation, renewal, amendment, or modification of any Federal or state contract, grant, loan, or cooperative agreement.  

(2)  If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan or cooperative agreement, the undersigned shall complete and submit Standard Form‐LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions.  

(3) The Space Coast Transportation Planning Organization shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subgrants and contracts and subcontracts under grants, subgrants, loans and cooperative agreement), which exceeds $100,000, and that all such subrecipients shall certify and disclose accordingly.  

(4) This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each failure. 

  Authorized Signature:    

___ Jerry Allender _________________    _______5‐8‐14_& 4‐9‐15__________ 

Mr. Jerry Allender           Date Space Coast TPO Chairman   

Page 125: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 117 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Title VI/Nondiscrimination Policy Statement  The Space Coast Transportation Planning Organization assures the Florida Department of Transportation that no person shall on the basis of race, color, national origin, sex, age, disability, family or religious status, as provided by Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987 and the Florida Civil Rights Act of 1992 be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination or retaliation under any program or activity.  The Space Coast Transportation Planning Organization further agrees to the following responsibilities with respect to its programs and activities:  1. Designate a Title VI Liaison that has a responsible position within the organization and 

access to the Recipient’s Chief Executive Officer. 2. Issue a policy statement signed by the Chief Executive Officer, which expresses its 

commitment to the nondiscrimination provisions of Title VI. The policy statement shall be circulated throughout the Recipient’s organization and to the general public. Such information shall be published where appropriate in languages other than English. 

3. Insert the clauses of Appendix A of this agreement in every contract subject to the Acts and the Regulations. 

4. Develop a complaint process and attempt to resolve complaints of discrimination against sub‐recipients. Complaints against the Recipient shall immediately be forwarded to the FDOT District Title VI Coordinator. 

5. Participate in training offered on Title VI and other nondiscrimination requirements. 6. If reviewed by FDOT or USDOT, take affirmative action to correct any deficiencies found 

within a reasonable time period, not to exceed ninety (90) calendar days. 7. Have a process to collect racial and ethnic data on persons impacted by your agency’s 

programs.  THIS ASSURANCE is given in consideration of and for the purpose of obtaining any and all federal funds, grants, loans, contracts, properties, discounts or other federal financial assistance under all programs and activities and is binding. The person whose signature appears below is authorized to sign this assurance on behalf of the Recipient.  Authorized Signature:   

____ Jerry Allender __________________   _____5‐8‐14_& 4‐9‐15____________ 

Mr. Jerry Allender           Date Space Coast TPO Chairman   

Page 126: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 118 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

APPENDIX A  During  the  performance  of  this  contract,  the  contractor,  for  itself,  its  assignees  and successors in interest (hereinafter referred to as the “Contractor”) agrees as follows:  (1.) Compliance with Regulations: The Contractor shall comply with the Regulations relative 

to  nondiscrimination  in  Federally‐assisted  programs  of  the  U.S.  Department  of Transportation (hereinafter, “USDOT”) Title 49, Code of Federal Regulations, Part 21, as they may be amended  from  time  to  time,  (hereinafter  referred  to as  the Regulations), which are herein incorporated by reference and made a part of this Agreement. 

(2.) Nondiscrimination:  The  Contractor,  with  regard  to  the  work  performed  during  the contract,  shall  not  discriminate  on  the  basis  of  race,  color,  national  origin,  sex,  age, disability,  religion  or  family  status  in  the  selection  and  retention  of  subcontractors, including procurements of materials and  leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 

(3.) Solicitations for Subcontractors, including Procurement of Materials and Equipment: In all solicitations made by the Contractor, either by competitive bidding or negotiation for work  to  be  performed  under  a  subcontract,  including  procurements  of  materials  or leases or equipment; each potential  subcontractor or  supplier  shall be notified by  the Contractor  of  the  Contractor’s  obligations  under  this  contract  and  the  Regulations relative  to  nondiscrimination  on  the  basis  of  race,  color,  national  origin,  sex,  age, disability, religion or family status. 

(4.) Information  and  Reports:  The  Contractor  shall  provide  all  information  and  reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined  by  the  Florida  Department  of  Transportation,  the  Federal  Highway Administration, Federal Transit Administration, Federal Aviation Administration, and/or the Federal Motor Carrier Safety Administration to be pertinent to ascertain compliance with  such  Regulations,  orders  and  instructions. Where  any  information  required  of  a Contractor  is  in  the exclusive possession of another who  fails or  refuses  to  furnish  this information the Contractor shall so certify to the Florida Department of Transportation, the  Federal  Highway  Administration,  Federal  Transit  Administration,  Federal  Aviation Administration, and/or  the Federal Motor Carrier Safety Administration as appropriate, and shall set for the what efforts it has made to obtain the information. 

(5.) Sanctions for Noncompliance: In the event of the Contractor’s noncompliance with the nondiscrimination provisions of this contract, the Florida Department of Transportation shall impose such contract sanctions as it or the Federal Highway Administration, Federal Transit  Administration,  Federal  Aviation  Administration,  and/or  the  Federal  Motor 

Page 127: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 119 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Carrier Safety Administration may determine to be appropriate, including, but not limited to: 

a. Withholding  of  payments  to  the  Contractor  under  the  contract  until  the Contractor complies, and/or 

b. Cancellation, termination or suspension of the contract, in whole or in part.  

(6.) Incorporation of Provisions: The Contractor shall include the provisions of paragraphs (1) through  (6)  in  every  subcontract,  including  procurements  of materials  and  leases  of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The Contractor shall take such action with respect to any subcontract or procurement as the Florida  Department  of  Transportation,  the  Federal  Highway  Administration,  Federal Transit  Administration,  Federal  Aviation  Administration,  and/or  the  Federal  Motor Carrier  Safety  Administration  may  direct  as  a  means  of  enforcing  such  provisions including sanctions for noncompliance. In the event a Contractor becomes involved in, or is  threatened  with,  litigation  with  a  sub‐contractor  or  supplier  as  a  result  of  such direction, the Contractor may request the Florida Department of Transportation to enter into such litigation to protect the interests of the Florida Department of Transportation, and  in  addition,  the  Contractor  may  request  the  United  States  to  enter  into  such litigation to protect the interests of the United States. 

     

Page 128: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 120 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

          

Agency Comments and Responses to  SCTPO Draft Unified Planning Work Program       

Appendix E – Agency Comments and Responses  

APPENDIX E

Page 129: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 121 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Comments on the SCTPO Draft Unified Planning Work Program and Responses  

Agency  Comment  SCTPO Response Florida Department of Transportation (Planning) 

1. The final UPWP must include an approved signature or TPO resolution and date of action. (Page 18) 

Upon adoption by the TPO Board on May 8, 2014, Resolution 14‐23 was signed and executed and is included as part of the final UPWP. 

Florida Department of Transportation (Planning)   

2. Page 8‐Introduction: Include reference statement that “planning tasks to be performed with funds under 49 Federal Transit Act”. 

Language was added on Page 8 of 

Introduction to include, “Titles 23 and 49 of the Federal Transit Act”. 

Florida Department of Transportation (Planning)  

3. Task 1.2: Use the following reference, “The annual audit shall be performed in accordance with 49 C.F.R. 18.26, OMB Circular A‐133, and Section 215.97, F.S.” 

Language was added to Task 1.2, Audit, Purpose. Language was already included as part of Methodology. 

Florida Department of Transportation (Planning)  

4. Update as appropriate FTA grant change of 5303 to 5305(d), which occurred with MAP‐21. 

References to FTA 5303 grant revised to reflect new MAP‐21 category of 5305(d) throughout UPWP as appropriate 

Florida Department of Transportation (Planning)  

5‐8. In Tables 1A, 1B, 2A, and 2B: Check FTA funding totals to make sure match total allocation estimates. Also make sure amounts in tables correspond to tasks item sheets 

Increased FTA FY 15 funding amount to reflect new estimates and verified totals are correct. All task items utilizing FTA funding also verified to be consistent with amounts listed in tables. 

Florida Department of Transportation (Planning)  

9. Need to add a FTA 5305(d) Deliverables Table. See MPO Handbook, dated February 28, 2011, page 3‐17. 

Added Table 3, FTA 5305(d) Deliverables Table. 

Florida Department of Transportation (Planning)  

10. Final UPWP must include FTA Section 5305(d) Application and all other required forms and certifications. 

FTA FY 14 Application and all required forms and certifications submitted as separate document with final UPWP. 

Florida Department of Transportation (Planning)  

11. Final UPWP must include 2014 Joint Certification and 2014 FHWA Certification. 

2014 Certification is not scheduled until July 9‐10, 2014 and is not available at this time. 2013 Certification is included and will be updated with 2014 when it becomes available. 

Florida Department of Transportation (Planning)  

12. Final UPWP must include Appendix D Statement and Assurances documents fully executed. 

The Assurances documents were executed upon approval by the TPO Board on May 8, 2014 and are included in the Final UPWP.  

Page 130: UNIFIED PLANNING WORK PROGRAM FY THRU FY...PEPP Project Evaluation and Prioritization Process PPP Public Participation Plan SAFETEA‐LU Safe, Accountable, Flexible, Efficient Transportation

 

 UPWP |FY 15 – FY 16    Page | 122 Amended 10‐9‐2014; 2‐12‐2015;3‐12‐2015; 5‐14‐2015; 7‐9‐2015; 10‐8‐2015 Modified 11‐18‐2014; 4‐7‐2015; 6‐22‐2015; 9‐15‐2015  

Florida Department of Transportation (Planning)  

13. The Final UPWP must include Appendix E, Agency Comments and Responses. 

This was included in the draft UPWP and has been updated in final with all comments received and how each was addressed. 

Federal Transit Administration  

When FTA Section 5307 funds are used for transit planning, the UPWP must reference and contain the funds with sufficient detail on what the funds will be used for. 

Additional language was added to Task 7.2, Transit Planning and Studies to clarify which activities will be utilizing Section 5307 funds. 

Federal Highway Administration   

Check the Federal Aid No. for PL grant funds (049), it should be (050) 

Federal Aid No. referenced on cover page changed from (049) to (050) for PL planning grant funds 

Federal Highway Administration  

Consider adding MAP‐21 to the acronym list 

The acronym for MAP‐21 was added to the list on page 6 

Federal Highway Administration  

Review all task pages and ensure work products have a month/year associated with the items listed 

All tasks work products were reviewed to include appropriate schedule when product will be worked on and/or completed  

Federal Highway Administration  

All Agreements or Certifications statements should be signed and dated and included in final document 

Upon adoption by the TPO Board on May 8, 2014, all certifications were signed and are included in final UPWP 

Federal Highway Administration     

Tasks involving consultant participation should include sufficient information on what activities will use federal‐aid funds (scope, schedule, and estimate). Those projects with not enough information at this time will need to forward to FHWA and FDOT when available. 

Products utilizing consultant services were reviewed and edited as appropriate to include as much information as is available at this time. For projects planned in the future without this information, the details will be forwarded to FDOT and FHWA upon development. 

SCTPO Staff    

Need to include in Task 2.0 and Table 1A and 1B, SU funding for Community Characteristics Inventory 

Added $35,000 in SU funding in Task 2.0 and Tables 1A and 1B for Community Characteristics Inventory 

SCTPO Staff    

Update FY 14 FTA Section 5305(d) (listed as 5303) funding to reflect actual allocation to be received 

Updated all Tasks and Tables 1A and 1B to reflect increase in FTA Section 5305(d) to be received