THE INFINITY GROUP. United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS. Problem. Large Lifts – are always well organized and equipped managed with a detailed, formal “Lift Plan” Resulting in no problems Everyday, Routine Crane Operations – - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

United Electrical & Instrumentation

Safety Task Evaluation Process

CRANE OPERATION ANALYSIS

THE

INFINITY GROUP

Page 2: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

Problem

Large Lifts –• are always well organized and equipped• managed with a detailed, formal “Lift Plan”• Resulting in no problems

Everyday, Routine Crane Operations – • cause most of our heartaches due to lack of adequate planning.

Page 3: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

Mission

To have those employees involved in the hoisting operation to analyze the task, plan the lift, and complete the hazard assessment card as a group to establish good communications and assure job scope understanding.

Page 4: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

Expectation

• To analyze all lifts• Choose wire rope slings where possible rather

than fiber or chain• Mechanical devices should not be used in a

load bearing leg• When “fitting the load”, load may transfer

CG may shift• Operators and signalmen must maintain

continuous and undivided communication

Page 5: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

Safety Task Evaluation Process CRANE OPERATION ANALYSIS

"our plan for a safe job"

Crane: Date: Time:

Crane has been inspected/ safe condition:.YesNoJob Location:

Job Description:

The weight of the load is:

The swing radius of the lift is:

Net crane capacity at this radius is:

Is operator qualified to operate this crane? Yes NoIs operator’s certification card current? Yes NoCritical lift permit required for this lift? Yes No Crane level/outriggers fully extended? Yes NoIs the rigger qualified for this task? Yes NoIs sling/hardware in safe condition? Yes No Sling sizing/hookup reviewed? Yes NoDo sharp edges have softeners? Yes NoTag lines needed to help control load? Yes NoCenter of gravity of load located? Yes No

EMERGENCY INFORMATIONWhat is the wind direction?

Reviewed emergency alarms/phone numbers YesEscape route(s):

Location of eyebath/shower station:

Our evacuation assembly point is:

Operator Signature:

Rigger Signature:

Signalman Signature:

Foreman Signature:

Page 6: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

RIGGING PLAN

Sketch all components of the rigging and devices

CRANE SET-UP DIAGRAM

Identify all known hazards and safe clearance distances

With hitches having more than two legs on a rigid load, figure the safe working load based on a two leg bridle hitch only. ________________________________________________________________________________________________________________________________________________________________________________________

Page 7: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

RIGGING COMPONENTSList each component

Slings

Type Hitch Cap. Sling Angle Actual Cap.

Sling 1

Sling 2

Sling 3

Sling 4

Shackles

Size Capacity

Shackle 1

Shackle 2

Shackle 3

Shackle 4

Other Devices:

Description Capacity

How has the lifting area been restricted? _____________________________________________________________________________________________________________________________________________________________________________________________

Page 8: United Electrical & Instrumentation Safety Task Evaluation Process CRANE OPERATION ANALYSIS

DESCRIBE EACH TASK

1.Access/Egress to location-

2.Set-up-

3.Lift operation-

4. Positioning/Fitting load-

5.Loading/unloading float-

LIST THE HAZARD(S) FOUND FOR THE FOLLOWING

1a.Overhead

1b.Lateral

1c.Underground

2a.Outriggers and mats

2b.Swing radius

2c.Process/electrical lines

3a.Working at elevations

3b.Connecting rigging

3c.Shifting/swinging load

3d. Falling objects

3e. Communications

4a.Mechanical devices

4b.Stored energy

4c.Load transfer

5a.Working at elevations

5b.Swinging load

5c.Materials on surface

5d.Disconnecting rigging