United Nations Statistics Division
Implementation of ISIC Implementation of ISIC Rev.4 Rev.4
Institutional setupInstitutional setup
![Page 2: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/2.jpg)
Overview Implementation of ISIC Rev.4 is a
complex and resource intensive process
An implementation plan that outlines timeline, activities and responsibilities should be developed to ensure a successful operation
The Implementation Guide to ISIC Rev.4 provides information This presentation follows the Guide
![Page 3: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/3.jpg)
Component project The overall implementation process can be
separated into three distinct components, which will depend on each other Classifications project Register project Statistics project
We will discuss elements of each of these today
Following is an overview
![Page 4: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/4.jpg)
Classifications project
Goal: Creation of a new national standard
industrial classification Determination of needs Determination of new structure Development of explanatory notes, indexes,
correspondence tables
![Page 5: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/5.jpg)
Register project
Goal: Switchover of the business register from
the old to the new national classification
![Page 6: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/6.jpg)
Statistics project
Goal: Co-ordination of the (simultaneous)
switchover in statistics from the old to the new version of the classification
Conversion of existing time series to the new classification (backcasting)
Control of the quality of the resulting time series
![Page 7: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/7.jpg)
Project Action and Product
Explanatory notes
Criteria to determine national version of ISIC Rev.4
Inventory of need for national version
Structure of NSIC
Indexes Correspondence tables
ISIC Rev.4
Population falling in 1:N and M:N classes
Inventory of sources for recoding each class
Inventory of available info within NSI
Inventory of external registers
Information from surveys
Profiling
Strategy for dual coding in the register
Statistical data in new version of the classification at scheduled time
Time schedule for implementation into each statistics
Approval/Authorization
Strategy for back casting: period and methods
Strategy for double reporting: period and methods
Logistic planning of data flows following old and new NSIC structure
Recoded register
Classifications project
Register project
Statistics project
Population falling in 1:1 and M:1 classes
Probabilistic methods
![Page 8: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/8.jpg)
Organizational structure
To ensure a successful operation, a formal organization structure should be in place that: Delineates and assigns responsibilities
for the project components Coordinates work between the project
components Ensures quality
![Page 9: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/9.jpg)
Organizational structure A recommended setup is as follows:
![Page 10: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/10.jpg)
Organizational structure Project managers are responsible for
work within their designated project groups
They are coordinated by the Programme manager, who works under guidance from the Programme Board
Quality control mechanisms should be in place, reporting back to the Programme Board Quality control covers work by all project
groups
![Page 11: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/11.jpg)
Organizational structure Communication is an important element of
the organizational structure Information needs to be exchanged between the
different projects, in particular during preparations for the next phase
Information also needs to be made available to key users out side of the statistical office, e.g. operators of external registers, main users
The Programme manager has a key function in ensuring that communication is working
![Page 12: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/12.jpg)
Resources
Resource allocation and estimation is required for work force, equipment and information
The resource plan should cover when, how many, what kind of and where the resources are required
![Page 13: United Nations Statistics Division Implementation of ISIC Rev.4 Institutional setup](https://reader035.vdocument.in/reader035/viewer/2022072006/56649f3f5503460f94c5f8b3/html5/thumbnails/13.jpg)
National legislation If the use of the national activity
classification is embedded in national legislation, additional steps have to be taken that the relevant laws be adjusted This will require additional time that needs to be
considered in the process time table Communication with users/entities that are
affected by the change in classification and depend on the enactment of the law, should be maintained