united states army corps of engineers engineering manual em … 1601... · 2008-10-27 · 3 riprap...

113
1 United States Army Corps of Engineers Engineering Manual EM 1110-2-1601

Upload: others

Post on 29-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

1

United States Army Corps of Engineers

Engineering Manual EM 1110-2-1601

Page 2: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

2

Riprap Protection

Chapter 3

Page 3: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

3

Riprap Protection

• Section 1 – Introduction to Riprap• Section 2 – Channel Characteristics• Section 3 – Design Guidance for Stone Size• Section 4 – Revetment Toe Scour

Estimation and Protection• Section 5 – Ice, Debris and Vegetation• Section 6 – Quality Control

Page 4: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

4

Introduction

• Guidelines applicable for:– Open channels not immediately

downstream of a stilling basin– Areas that are not highly turbulent– Channels with bed slopes of < 2%

Page 5: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

5

Introduction

• Successful design dependent on:– Stone shape– Stone size– Stone weight– Durability– Gradation– Layer thickness– Channel alignment– Channel slope– Velocity distribution

Page 6: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

6

Riprap Characteristics

• Stone shape– Predominately angular– a/c ratios

Page 7: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

7

Page 8: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

8

a

c

a = long axisb = intermediate axisc = short axis

Page 9: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

9

Riprap Characteristics

• Stone shape– Predominately angular– a/c ratios

• Not more than 30% > 2.5• Not more that 15% > 3.0• No stone greater than 3.5 a

c

Page 10: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

10

Riprap Characteristics

• Relation between stone size and weight– Design guidance typically is given as D%

• % indicates the percentage of the total specified gradation weight that contains stones of less weight

– Weight and size can be interchanged by:

Page 11: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

11

Riprap Characteristics

WhereD% = equivalent volume spherical stone diameter, ftW% = weight of individual stone of diameter D%

s = unit weight of stone

1/ 3

%%

6

s

WDπγ

⎛ ⎞= ⎜ ⎟

⎝ ⎠

3%

% 6sDW πγ⎛ ⎞

= ⎜ ⎟⎝ ⎠

and

Page 12: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

12Plate 31

Page 13: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

13

Riprap Characteristics

• Unit weight– Typically ranges from 150 to 175 pcf– Equations are sensitive to assumption of

unit weight– Common assumption is 165 pcf

• What if unknown??

Page 14: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

14

Riprap Characteristics• Gradation

– Should be determined from a quarry test AND an in-place field test

– Upper and lower limits typically specified• W100

– Lower limit ≥ 2 times lower limit of W50– Upper limit ≤ 5 times lower limit of W50

• W50– Lower limit > specified stone diameter– Upper limit ≤ 5 times lower limit of W15

• W15– Lower limit ≥ 1/16 upper limit of W100– Upper limit < upper limit of properly designed filter

Page 15: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

15

Page 16: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

16

Riprap Characteristics• Layer thickness

– the upper limit of D100

– 1.5 times the upper limit of D50

– Thickness should be increased by 50% if riprap is placed underwater

– Oversized stones not contained within the prescribed layer can cause voids within the layer that inhibit interlocking and induce particle movement

Page 17: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

17

Riprap Protection

• Section 1 – Introduction to Riprap• Section 2 – Channel Characteristics• Section 3 – Design Guidance for Stone Size• Section 4 – Revetment Toe Scour

Estimation and Protection• Section 5 – Ice, Debris and Vegetation• Section 6 – Quality Control

Page 18: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

18

Channel Characteristics

• Side slope– Slopes should not be greater than 1.5:1– For constant hydraulic conditions, rock

size increases with increasing side slope– Erosion protection, NOT slope stability

Page 19: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

19

Channel Characteristics

• Roughness– Form of Strickler’s equation

[ ]1/ 690(min)n K D=

WhereD90(min) = size where 90% is finer from lower limit of gradationK = 0.034 for velocity and stone sizing calculationsK = 0.038 for capacity and freeboard calculations

* For wet placement, n is increased ~ 15%

Page 20: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

20

Riprap Protection

• Section 1 – Introduction to Riprap• Section 2 – Channel Characteristics• Section 3 – Design Guidance for Stone Size• Section 4 – Revetment Toe Scour

Estimation and Protection• Section 5 – Ice, Debris and Vegetation• Section 6 – Quality Control

Page 21: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

21

Design Guidance for Stone Size

• Design Considerations• Stone Size• Revetment Top and End Protection

Page 22: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

22

Design Considerations

• Lift and drag forces• Undermining by scour• Stone weight• Stone interlocking• Critical flow conditions

Page 23: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

23

Rock Sizing

• Utilizes depth averaged velocity and flow depth

• Resisting forces– Rock size and weight

• Based on laboratory data and “verified”with prototype data

• Incorporates wide range of gradations• Applicable for side slopes of 1.5:1 or

flatter

Page 24: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

24

Velocity estimation

• Vss – characteristic velocity for side slopes– Depth averaged velocity at point 20% of

the slope length, measured from the toe– Typically determined in relation to Vavg

Page 25: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

25

Velocity estimation

• Vavg – Average channel velocity– Expressed as function of R/W– Computed at upstream end of bend– For locations away from bends (>5W),

assume large value of R/W– Channel width/depth ratios important in

defining Vavg

• Plates 33 - 36

Page 26: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

26Plate 33

Page 27: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

27Plate 34

Page 28: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

28Plate 35

Page 29: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

29Plate 36

Page 30: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

30

USACE Method

2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Page 31: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

31

USACE Method2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Where:

D30 = stone size (ft)

Sf = safety factor (minimum of 1.1 recommended)

Cs = stability coefficient for incipient failure where layer thickness is 1 D100(max) or 1.5 D50(max), and D85/D15 between 1.7 and 5.2

Cs = 0.30 for angular rockCs = 0.36 for rounded rock

Page 32: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

32

USACE Method2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Where:

Cv = vertical velocity distribution coefficient

= 1.0 for straight channels, inside bends

= 1.283 – 0.2 log (R/W), outside bends

= 1.25 downstream of concrete channels

= 1.25 for the end of dikes/groins

Ct = thickness coefficient

= 1.0 for 1*D100 or 1.5*D50 otherwise use Plate 40

Page 33: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

33

USACE Method2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Where:

d = local depth of flow (ft)

γs = unit weight of stone (lbs/ft3)

γW = unit weight of water (lbs/ft3)

V = local depth averaged velocity (ft/s)

g = gravitational constant (ft/s2)

Page 34: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

34

USACE Method2.5

gd1KV

0.5

wγsγwγdtCvCsCfS30D

⎟⎟⎟⎟⎟

⎜⎜⎜⎜⎜

⎟⎟⎟

⎜⎜⎜

−=

Where:

K1 = side slope correction factor= 1.0 for bottom riprap

or =

whereθ = side slope angleΦ = angle of repose

0.5

2sinθ2sin1

⎟⎟⎟

⎜⎜⎜

⎛−

φ

Page 35: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

35

Safety Factor

• Basic value is 1.1• Should be increased for:

– Potential of impact forces– Uncertainty of velocity, depth and rock weight

estimations– Potential for vandalism– Uncertainty of gradation and/or placement

quality control (stockpiling)– If freeze/thaw is expected

Page 36: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

36

Applications

• Plate 37 developed assuming:– Straight channel– Thickness = 1D100(max)– Rock weight of 165 pcf– Sf = 1.1

Page 37: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

37Plate 37

Page 38: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

38

Applications

• Variable thickness– Utilize Plate 38

Page 39: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

39Plate 38

Page 40: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

40

Applications

• Varying side slope– Equation 3-4 and Plate 39

Page 41: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

41

Plate 39

EQ. 3-4

Page 42: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

42

Applications

• Variations in vertical velocity distribution in bends– Use Plate 40

Page 43: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

43Plate 40

Page 44: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

44

Design Procedure

• Determine average channel velocity Vavg• Calculate Vss using Plate 33• Find D30 from Equation 3-3 or Plate 37• If needed, correct for:

– Unit weight– Side slope– Vertical velocity distribution– Layer thickness

• Compute gradation having D30(min) > computed D30

Page 45: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

45

USACE Method-Limitations

• Method based on lab data from late 80’s– D50: 0.5 – 2.0 inches– Thickness: 0.75 – 2 inches– Average velocity: 0.6 – 6.6 ft/s– Discharge: 15 – 100 cfs– Bed slope: 0.00087 – 0.015– Max side slope: 1.5:1

• Verified with some field data

5.2

1

5.0

30 )( ⎟⎟

⎜⎜

⎛⎟⎟⎠

⎞⎜⎜⎝

⎛−

=gdK

VdCCCSDws

wtvsf γγ

γ

Page 46: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

46

USACE Method-Steep Slopes

WhereS = bed slopeq = unit discharge

0.555 2 / 3

30 1/ 3

1.95* S qDg

=

Page 47: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

47

USACE Method-Steep Slopes

Limitationsthickness = 1.5 D100angular rockunit weight = 167 pcf1.7 < D85/D15 > 2.7Bed slope from 2 – 20 %uniform flow with NO tailwater

0.555 2 / 3

30 1/ 3

1.95* S qDg

=

Page 48: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

48

Design Procedure

• Estimate unit discharge• Apply flow concentration factor of 1.25 to

unit discharge• Compute D30• Specify uniform gradation where D85/D15 <

2, as in Table 3.1• Restrict use to straight channels with side

slopes of 2.5:1 or flatter• Specify filter fabric beneath rock

Page 49: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

49

Revetment Top and End Protection

• Revetment Top– How far upslope should be protected?

• Waves• Debris• Calculation uncertainties• Return flows• Site specific conditions

Begin 13 OCT

Page 50: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

50

Page 51: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

51

Page 52: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

52

Page 53: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

53

Balance between

and

$$

Page 54: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

54

Revetment End Protection

• Upstream and downstream ends protected by– Increasing thickness– Extending protection to area of low

velocity• Three proposed methods

Page 55: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

55Plate 41

Page 56: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

56Plate 41

Page 57: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

57

Revetment End Protection

• Method A– For revetments 12

inch thick, or less extend to area of non-erodible velocity

Page 58: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

58

Revetment End Protection• Method B

– > 12” thick, one or more reductions in stone size and thickness may be incorporated

– Extend to a location of non-eroding velocity

Page 59: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

59

Revetment End Protection• Method C

– For revetments not terminating in non-eroding velocities

– a = min of 3 times layer thickness

– b = 2 times layer thickness

Page 60: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

60

Page 61: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

61

Length of Revetment

• Typically placed too far upstream and not far enough downstream of bends

• Should determine where flow crosses back across channel from site visit

• Rule of thumb– 1.5 channel widths downstream of bend

Page 62: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

62

Page 63: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

63

Riprap Protection

• Section 1 – Introduction to Riprap• Section 2 – Channel Characteristics• Section 3 – Design Guidance for Stone Size• Section 4 – Revetment Toe Scour

Estimation and Protection• Section 5 – Ice, Debris and Vegetation• Section 6 – Quality Control

Page 64: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

64

Revetment Toe Scour Estimation and Protection

• Revetment Methods• Revetment Design• Delivery and Placement

Page 65: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

65

Toe Scour Estimation and Protection

• Most frequent cause of revetment failure

• Result of several factors– Meandering channels

• Change in section after bank is protected• Scour at high flows

– Braided channels• Scour at intermediate flows due to angle of

attack

Page 66: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

66

Toe Scour Estimation and Protection

• Need to account for both components of scour– Local scour– Degradation

• Plate 42

Page 67: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

67Plate 42

Page 68: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

68

Toe Protection Methods

• Two methods to provide protection– Extend protection to maximum scour depth

• Preferred method• Can utilize bedrock• Can be difficult and/or expensive for underwater

placement• Must be able to accurately determine scour depth

Page 69: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

69

Toe Protection Methods

• Two methods to provide protection– Launchable stone

• Used extensively on sand bed streams• Stone placed longitudinally above the expected

scour area• As scour progresses, stone slides into scour hole

and halts progression• Three main types

Page 70: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

70

Toe Protection Methods

• Launchable stone– Windrow revetments

Page 71: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

71

Toe Protection Methods

• Launchable stone– Trench-fill revetments

Page 72: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

72

Toe Protection Methods

• Launchable stone– Weighted riprap toes

Page 73: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

73

Toe Protection Design

• Plate 43 gives guidance for 4 of the most common approaches

Page 74: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

74

Toe Protection Design

• Method A– Excavation in the dry– Extend riprap layer

below existing invert a distance greater than the anticipated depth of scour

Page 75: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

75

Toe Protection Design

• Method B– If channel bottom is

nonerodible, riprap is keyed in at streambed level

Page 76: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

76

Toe Protection Design

• Method C– Underwater placement– Little or no toe scour– Extend rock across bottom

of channel a height “a” and length “c”

– a = 1.5 times layer thickness

– c = 5 times layer thickness

Page 77: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

77

Toe Protection Design

• Method D– Used when water

levels prohibit toe excavation or stone is less expensive than excavation

– Useful technique for emergency protection

– Launched thickness should be 1.5 times the thickness (1.75 for underwater and long launch distance)

Page 78: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

78

Toe Protection Design

• Method D– For gradual scour

the height should be 2.5-4.0 times the thickness T

– For rapid scour the stone height should be 2.5-3.0 T

– D85/D15 ≥ 2

Page 79: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

79

Toe Protection Design

• Method D– Proper volume of

stone is crucial to success

– Assume• Launch slope = 2:1• Maximum scour depth• Thickness after

launching is 1.5 times bank layer thickness

Page 80: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

80

Toe Protection Design

• Method D– Incorporating

these assumptions and solving for the volume of rock gives:

Volume = 1.5*T*launch slope length (<15 ft)

Volume = 1.5*T*scour depth*

Volume = 3.35*T*scour depth

5

Page 81: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

81

Toe Protection Design

Page 82: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

82

Summary

Page 83: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Filter DesignFilter Design

Page 84: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Granular filter beneath riprapGranular filter beneath riprap

Page 85: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Geotextile beneath armor layerGeotextile beneath armor layer

Page 86: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Granular Granular filterfilter

GeotextileGeotextile

c) Granular transition layer with c) Granular transition layer with geotextile (composite filter)geotextile (composite filter)

GeotextileGeotextile

Base soilBase soil

FreeboardFreeboard

a) Geotextile filtera) Geotextile filter

Granular filterGranular filter

b) Granular filterb) Granular filter

Page 87: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

a) Normal (a) Normal (baseflowbaseflow) conditions) conditions

Seepage Seepage flowflow

Normal water levelNormal water levelGroundwaterGroundwatertabletable

Page 88: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Seepage Seepage flowflow

Flood water levelFlood water level

b) During flood peakb) During flood peak

Page 89: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

c) After flood recessionc) After flood recession

Seepage Seepage flowflow

Normal water levelNormal water level

Area of high seepage Area of high seepage gradients and uplift pressuregradients and uplift pressure

Page 90: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Types of GeosyntheticsTypes of Geosynthetics

• Geotextiles• Geogrids• Geomembranes• Geosynthetic Clay Liners• Rolled Erosion Control Products• Geonets/Drainage Composites• Geofoam, Geotextile Tubes and Soil Fibers

Page 91: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 92: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

OK for filters under armor layerOK for filters under armor layer::

•• Woven monofilament fabricWoven monofilament fabric•• NonNon--woven needle punched fabricwoven needle punched fabric

Not OKNot OK::

•• Slit film fabrics (e.g., silt fence)Slit film fabrics (e.g., silt fence)•• SpunSpun--bonded fabricsbonded fabrics

Page 93: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

NonNon--woven needle punchedwoven needle punched

Page 94: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

NonNon--woven needle punchedwoven needle punched

Page 95: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Woven monofilamentWoven monofilament

Page 96: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Woven monofilamentWoven monofilament

Page 97: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Placement under waterPlacement under water

Page 98: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 99: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 100: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 101: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 102: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 103: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Minimum riprap thickness t = 3d50 , depth of contraction scour, or depth of bedform trough, whichever is greatest

Filter placement = 4/3(a) from pier (all around)

FLOW

Sand - filled geocontainers

Rock riprap placed flush with channel bed

Pier

Page 104: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics
Page 105: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Granular Filter DesignGranular Filter Design

50 50

50 50

D (filter) D (riprap)< 40 and < 40D (base) D (filter)

15 15

15 15

D (filter) D (riprap)5 < < 40 and 5 < < 40D (base) D (filter)

15 15

85 85

D (filter) D (riprap)< 5 and < 5D (base) D (filter)

Page 106: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

Coefficient of Uniformity (filter)

Cuf = d60f/d10f

Max

imum

A50

= d 5

0f/d

50s

Coefficient of Uniformity (soil) Cus = d60s/d10s

Cuf = 18

Cuf = 14

Cuf = 4

Cuf = 2

Cuf = 1

Cuf = 10

Cuf = 6

Coefficient of Uniformity (filter)

Cuf = d60f/d10f

Max

imum

A50

= d 5

0f/d

50s

Coefficient of Uniformity (soil) Cus = d60s/d10s

Cuf = 18

Cuf = 14

Cuf = 4

Cuf = 2

Cuf = 1

Cuf = 10

Cuf = 6

Granular filter designGranular filter design

Page 107: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

IMPORTANT GEOTEXTILE PROPERTIES:IMPORTANT GEOTEXTILE PROPERTIES:

Permeability, Apparent Opening Size (AOS), Clogging potentialPermeability, Apparent Opening Size (AOS), Clogging potential

Page 108: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

GeotextileGeotextilefilterfilterdesigndesign

FROM SOIL PROPERTY TESTS

MORE THAN 30% CLAY (D30 < 0.002 mm)

LESS THAN 30% CLAY AND MORE THAN 50% FINES

(d30 > 0.002 mm, AND d50 < 0.075 mm)

LESS THAN 50% FINES AND LESS THAN 90% GRAVEL

(d50 > 0.075 mm, AND d90 < 4.8 mm)

MORE THAN 90% GRAVEL (d90 > 4.8 mm)

USE CISTIN – ZIEMS METHOD TO DESIGN A GRANULAR TRANSITION LAYER, THEN DESIGN GEOTEXTILE AS A FILTER FOR THE GRANULAR LAYER

O95 < d50WIDELY GRADED (CU > 5)

O95 < 2.5d50 and O95 < d90

UNIFORMLY GRADED (CU ≤5)

d50 < O95 < d90

WAVE ATTACKOPEN CHANNEL FLOW

Definition of Terms dx = particle size for which x percent is smaller PI = plasticity index of the base soil K = permeability of the base soil O95 = the AOS of the geotextile c = Undrained shear strength Cu = Coefficient of Uniformity, d60/d10

Note If the required O95 is smaller than that of available geotextiles, then a granular transition layer is needed.

O95 ≤ #70 SIEVE (0.2 mm)

YES NO

PI > 5 ?

YES

NO

K < 10-7 cm/s, and c > 10 kPa, and PI > 15 ?

Page 109: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

109

Delivery and Placement

• Placement method can affect required layer thickness and total volume of rock required– Hand placed

• Can incorporate steeper slopes and therefore less rock

– Machine placed• Stone can be broken and therefore layer

thickness may need to be increased

Page 110: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

110

Ice and Debris

• Create greater stresses due to impact and flow concentration

• Ice effects..– Cold Regions Research Engineering

Laboratory, Hanover, NH• Debris..

– Increase thickness, and therefore stone size, by 6-12 inches

– Side slopes no steeper than 2:1

Page 111: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

111

Quality Control

• Sampling and testing of in-place riprap should be conducted

• Deterioration can be caused by: – Loading– Transportation– Stockpiling– Placing

• EM 1110-2-2302, Construction with Large Stone, provides sampling guidance for in-place riprap

Page 112: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

112

Quality Control

No breakage or cracking after on season cycleSet AsideNo breakage or crackingDrop Test

Distinction based on scratch, ring and other characteristics

Field IndexDistinctions based on color and/or sizeField Visual

No major progressive crackingWetting-Drying< 10% loss after 12 cyclesFreeze-Thaw< 20% loss after 500 revolutionsAbrasion

No deterioration except for minor crumbs from surface

Glycol SoundnessLess than 5% lossSulfate SoundnessLess than 1 %AbsorptionDry unit weight > 160 pcfUnit WeightInterlocking crystalline, no clay or soluble mineralsPetrography

Criteria for Evaluating SuitabilityTest

Page 113: United States Army Corps of Engineers Engineering Manual EM … 1601... · 2008-10-27 · 3 Riprap Protection • Section 1 – Introduction to Riprap • Section 2 – Channel Characteristics

113

Special Features and Considerations

Chapter 4