JANUARY 2000 Superfund Records Genter SITE: BREAK: 2<& OT'RER: MONTHLY STATUS REPORT PURSUANT TO CONSENT DECREE FOR GE-PITTSFIELD/HOUSATONIC RIVER SITE GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS SDMS DocID 158783

Upload: others

Post on 21-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

JANUARY 2000

Superfund Records Genter SITE: BREAK: 2<& OT'RER:

M O N T H L Y S T A T U S R E P O R T

P U R S U A N T T O C O N S E N T D E C R E E F O R

G E - P I T T S F I E L D / H O U S A T O N I C R I V E R S I T E

GENERAL ELECTRIC COMPANY

PITTSFIELD, MASSACHUSETTS

SDMS DocID 158783

Page 2: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv

February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O

Bryan Olson J. Lyn Cutler EPA Project Coordinator State Project Coordinator U.S. Environmental Protection Agency Section Chief, Special Projects Region I Bureau of Waste Site Cleanup One Congress Street Department of Environmental Protection Suite 1100 436 Dwight Street Boston, MA 02114-2023 Springfield, MA 01103

Re: GE-Pittsfield/Housatonic River Site Monthly Report for January 2000

Dear Mr. Olson and Ms. Cutler:

Enclosed are copies (five for EPA and four for MDEP) of General Electric's monthly progress report for January 2000 for activities conducted by GE at the GE-Pittsfield/Housatonic River Site (as defined in the Consent Decree lodged on October 7, 1999). Now that the Consent Decree has been lodged, we have revised the format of the monthly report to apply to the various areas of the Site defined in the Consent Decree and to conform to the requirements of Paragraph 67 of the Consent Decree.

The enclosed monthly report follows this revised format. However, since GE is still continuing, prior to entry of the Consent Decree by the Court, to conduct some activities at the Site under prior authorities (i.e., the RCRA Corrective Action Permit from EPA and the 1990 Administrative Consent Orders with the MDEP), we have included such activities in this monthly report where such activities were conducted at the Consent Decree Site. To distinguish those activities from the activities conducted pursuant to the Consent Decree, the latter are marked with an asterisk. GE will be submitting a separate monthly report to MDEP, with a copy to EPA, describing the activities conducted at properties outside the Consent Decree Site (e.g., activities conducted under the off-site fill property program).

The enclosed monthly report includes, where applicable, tables that list the samples collected during the subject month, summarize the analytical results received during that month from sampling or other testing activities (excluding data from miscellaneous soil sampling activities conducted pursuant to GE's Excavation Protocols), and summarize j other groundwater monitoring and oil recovery information obtained during that month, j Also enclosed for each of you, pursuant to Paragraph 67 of the Consent Decree, is a ( diskette that contains in electronic form the same analytical data and monitoring

i

Page 3: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Bryan Olson J. Lyn Cutler February 9, 2000 Page 2

information contained in those tables, as described above. Sampling results from miscellaneous soil sampling conducted pursuant to GE's Excavation Protocols are included in final excavation completion reports submitted to the Agencies during the subject month and also are attached to this monthly report and referenced under the appropriate areas.

Please call John Ciampa or me if you have any questions.

Yours truly,

GE Project Coordinator

cc: (w/o diskette) James Milkey, MA AG Charles Fredette, CT DEP Field Supervisor, US FWS, DOI Kenneth Finkelstein, Ph.D., NOAA Thomas LaRosa, MA EOEA Mayor Gerald Doyle, City of Pittsfield Director, Pittsfield Economic Development Authority Pittsfield Department of Health Pittsfield Conservation Commission Michael Carroll GE Andrew Thomas, GE John Ciampa, GE Richard Gates, GE William Home, GE John Novotny, GE James Nuss, BBL James Bieke, Shea & Gardner Samuel Gutter, Sidley & Austin Public Information Repositories

Page 4: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Background

The General Electric Company (GE), the United States Environmental Protection Agency (EPA), the Massachusetts Department of Environmental Protection (MDEP), and other governmental entities have entered into a Consent Decree which was lodged in federal District Court on October 7, 1999. The Consent Decree is currently subject to public comment and review by the Court prior to final entry. In accordance with Paragraph 67 of the Consent Decree, GE has prepared the following monthly report that summarizes the status of activities conducted at the GE-Pittsfield/Housatomc River Site ("Site") (as defined in the Consent Decree).

The enclosed report covers activities in the areas listed below (as defined m the Consent Decree and/or the accompanying Statement of Work for Removal Actions Outside the River (SOW)). Only those areas that have had work activities for the month subject to reporting are included. However, prior to entry of the Consent Decree by the Court, where work activities were conducted in a particular area at the Site pursuant to the 1994 RCRA corrective action permit from EPA and/or the 1990 Administrative Consent Orders executed by GE and MDEP, such activities are included in this report. For a particular area, those activities conducted pursuant to or in connection with the Consent Decree are noted with an asterisk.

General Consent Decree Activities

GE Plant Area (non-groundwaterl 1. 20s, 30s, 40s Complexes 2. East Street Area 2 - South 3. East Street Area 2 - North 4. East Street Area 1 - North 5. Hill 78 and Building 71 Consolidation Areas 6. Hill 78 Area -Remainder 7. Unkamet Brook Area

Former Oxbow Areas (non-groundwatert 8. Former Oxbow Areas A & C 9. Lyman Street Area 10. Newell Street Area I 11. Newell Street Area II 12. Former Oxbow Areas J & K

Housatonic River 13. Upper '/2 Mile Reach 14. 1 Zi Mile Reach (only for activities, if any,' conducted by GE) 15. Rest of the River

Housatonic River Floodplain 16. Current Residential Properties Adjacent to 1 Zi Mile Reach (Actual/Potential Lawns) 17. Non-Residential Properties Adjacent to 1 'A Mile Reach (excluding banks) 18. Current Residential Properties Downstream of Confluence (Actual/Potential Lawns)

Other Areas 19. Allendale School Property 20. Silver Lake Area

Groundwater Management Areas IGMAsl 21. Plant Site 1 22. Former Oxbows J & K 23. Plant Site 2 24. Plant Site 3 25 Former Oxbows A&C

Page 5: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

GENERAL CONSENT DECREE ACTIVITIES

GE-PITTSFIELD/HOUSATONIC RIVER SITE JANUARY 2000

a. Activities Undertaken/Completed

Attended EPA public information meeting in Connecticut on the Consent Decree on January 4 and the Citizens Coordinating Council (CCC) meeting on January 5.*

b. Sampling/Test Results Received

Not applicable

c. Work Plans/Reports/Documents Submitted

Submitted GE's Field Sampling Plan /Quality Assurance Project Plan (FSP/QAPP) for EPA review and approval.*

d. Upcoming Scheduled Activities (next six weeks!

Attend public meetings as appropriate.

e. General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

f. Proposed/Approved Work Plan Modifications

None

Page 6: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 1

PLANT AREA 20s, 30s, 40s COMPLEXES

JANUARY 2000

Activities Undertaken/Completed

- Conducted removal and off-site disposal of three 500,000-gallon fuel oil tanks.

- Sent the Building 31 brick chimneystack debris off-site for disposal.

- Conducted sampling in Building 45 (located outside the Consent Decree Site, across Woodlawn Avenue from the GE Plant) for potential building refurbishment.

Sampling/Test Results Received

See attached tables.

Work Plans/Reports/Documents Submitted

- Submitted letter to EPA on January 27 producing a document relating to a threat of release of oil that was previously reported to the Agencies.

- Submitted Pre-Design Investigation Work Plan.*

Upcoming Scheduled Activities (next six weeks)

- Continue demolition activities for the powerhouse stacks and the Building 31 Fuel Oil and Water Tank Farm. Debris will be sent for off-site disposal.

- Submit protocol for building demolition activities and associated characterization of building materials.

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 7: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

20s, 30s, AND 40s COMPLEXES

DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name

inkling 31 Powerhouse Demo Middle Tank Sand Sampling

inkling 31 Powerhouse Demo Middle l ank Sand Sampling

inkling 31 Powerhouse Demo Middle lank Sand Sampling

inkling 31 Powerhouse Demo Middle lank Sand Sampling

inkling 3| Poweihouse Demo Middle I ank Sand Sampling

Building ' I lank I aim - I ank Pad Sand Sampling

Building 31 lank I arm - lank Pad Sand Sampling

Building 31 I ank I arm - I ank Pad Sand Sampling

Building 31 I ank I'arm - I ank Pad Sand Sampling

Building 31 I ank 1 arm - I ank Pad Sand Sampling

Building 31 1 ank I arm - I ank Pad Sand Sampling

Building 31 lank Turin - I ank Pad Sand Sampling

Building 31 Water lank Sand Sampling

Building 45 Roof Repair Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Building 45 Sampling Program

Sampie-II)

311F-MT-DUP-1

31 IT-MI-SAND-1

31 11 -M I -SAND-2

3111 -M I -S AND-3

31 11 -M I -1 C I P-l

1 ANK-1-( PS-1

I ANR-1 -CP5-2

I ANK.-I-CPS-3

TANK.-3-CPS-1

IANK-3-CPS-2

IANK-3-CPS-3

1ANK-CPS-DUP-1

3I-WIS-2

45-DUCT-l

B45-C1

B45-C2

B45-C3

B45-C4

B45-C5

B45-C6

B45-D1

B45-W1

B45-W2

B45-W3

B45-C7

Date Sampled

1/26/00

1/26/00

1/26/00

1/26/00

1/26/00

I/(>'<)()

1/6/00

1/6/00

1/6/00

1/6/00

1/6/00

1/6/00

12/17/99

12/17/99

1/17/00

1/17/00

1/17/00

1/17/00

1/17/00

1/17/00

1/17/00

1/17/00

1/17/00

1/17/00

1/20/00

Depth Range

NA

NA

NA

NA

NA

0 - 1

0 - 2

0 - 1

0 - 1

0-2

0-1

0-1

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA

Matrix

(SAND-2)

Sand

Sand

Sand

Sand

Sand

Sand

Sand

Sand

Sand

Sand

TANK-1-CPS-

Sand

Duct Work

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

(B45-C2)

Wipe

Wipe

Wipe

Concrete

Laboratory

CTF.

CTT CTF.

CI F

CI I I II C II CI I

CTF

C I F

CTF

CTF

CI F

CTF

CTE

CTF

CTE

CTE

C'TF

CTE

CTE

CTE

CTE

CTE

CTE

Analyses

1'CB. Metals

I'CB Metals

I'C'B Metals

I'CB. Metals

ICI.P

PC B.Metals

PC B.Metals

I'CB Metals

PCB Metals

I'C'B.Metals

PCB.Metals

PCB.Metals

ICFP-Pb

PCB

PCB

PCB

PCB

PCB

PCB

PCB

PCB

PCB

PCB

PCB

PCB

Date Received

1/28/00

1/28/00

1/28/00

1/28/00

1/28/00

1 / 1 0 / 0 0

1/10/00

1/10/00

1/10/00

1/10/00

1/10/00

1/10/00

1/5/00

1/11/00

1/19/00

1/19/00

1/19/00

1/19/00

1/19/00

1/19/00

1/19/00

1/19/00

1/19/00

1/19/00

1/24/00

Field duplicate sample locations are presented in parenthesis 2/8/00 1 of 2

Page 8: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

20s, 30s, AND 40s COMPLEXES

DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

B45-C8 1/20/00 NA Concrete CTE PCB 1/24/00

42/43-2-APP-W1 12/27/99 NA Wipe CTE PCB 1/20/00

42/I3-2-APP-W2 12/27/99 NA Wipe C I E PCB 1/20/00

42/43-2-APP-W3 12/27/99 NA Wipe CLE PCB 1/20/00

42/43-2-APP-W4 12/27/99 NA Wipe CTE PCB 1/20/00

42 43-2-APP-W5 12/27/99 NA Wipe CIE PC B 1/20/00

42/43-2-APP-W6 12/27/99 NA Wipe C IE PCB 1/20/00

42/43-2-CI 12/27/99 NA Concrete CIL PCB 1/20/00

42/43-2-C2 12/27/99 NA Concrete C IF. PCB 1/20/00

42/43-2-C3 12/27/99 NA Concrete CIE PCB 1/20/00

42/43-2-C4 12/27/99 NA Concrete CTE PCB 1/20/00

42/43-2-CAR-l 12/27/99 NA Carpet CTE PCB 1/20/00

42/43-2-CAR-2 12/27/99 NA Carpet CTE PCB 1/20/00

42/43-2-CA R-3 12/27/99 NA Carpel CLE PCB 1/20/00

42/43-2-WAL1.-W 1 12/27/99 NA Wipe CTE PCB 1/20/00

42/43-2-WA1.I.-W2 12/27/99 NA Wipe CLE PCB 1/20/00

42/43-2-W ALL.-W3 12/27/99 NA Wipe CPE PCB 1/20/00

42-DUP-l 12/27/99 NA (42/43-2-C1) CTE PCB 1/20/00

42/43-2-CAR-4 12/28/99 NA Carpet CTE PCB 1/20/00

42/43-2-CAR-5 12/28/99 NA Carpet CTE PCB 1/20/00

42/43-2-CAR-6 12/28/99 NA Carpet CTE PCB 1/20/00

42/43-2-WALL-W4 12/28/99 NA Wipe CTE PCB 1/20/00

42/43-2-WALL-W5 12/28/99 NA Wipe CTE PCB 1/20/00

42/43-2-WALL-W6 12/28/99 NA Wipe CTE PCB 1/20/00

Project Name

Building 45 Samp

DA Office Area Sc

DA Office Area S.

DA Office Area S;

DA Office AieaS

I) \ Office \rea Si

D A Office \rea S

DA Office Area S.

DA Office Area S,

DA Office Area S

DA Office Area S

DA Office Area S,

DA Office Area S;

IDA Office Aiea Si

.DA Office Area Sa

DA Office Area Si

.DA Office Area Si

DA Office Area Sa

DA Office Area Si

DA Office Area S

IDA Office Area S.

.DA Office Area S<

•.DA Office Area S;

g Program

pling Program

plmg Program

pling Program

pling Program

plmg Program

plmg Program

pling Program

pling Program

pling Program

plmg Program

pling Program

pling Program

pling Program

plmg Program

plmg Program

pling Program

pling Program

pling Program

pling Program

plmg Program

plmg Program

pling Program

PDA Office Area Sampling Program

Field duplicate sample locations are presented in parenthesis

2/8/00 2 of 2

Page 9: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATIONTABLE 1

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

20s, 30s AND 40s COMPLEXES

BUILDING 42 CONCRETE AND CARPET SAMPLE DATA RECEIVED DURING JANUARY 2000

(Results in ppm, dry weight)

Date Aroclor-1016, 1221,

Sample ID Collected 1232, & 1248 Aroclor-1242 Aroclor-1254 Aroclor-1260 Total PCBs

42/43-2-CI 12/27/99 ND(0 033) rND(0 033)] ND(0 033) [ND(0 033)] 0 34 [0 62] ND(0 033) [ND(0 033)] 0 34 [0 62] 42/43-2-C2 12/27/99 ND(0 033) 0 051 0 74 0 19 0 98 42/43-2-t 3 12/27/99 Nl)(0 33) Nl)(() 33) 5 2 2 0 7 2 42/43-2-C4 12/27/99 NO(() 033) 0 070 0 85 0 42/43-2-C AR-1 12/27/99 Nl)(() 18) 2 0 2 9 ND(0 18) 4 9 42/43-2-C AR-2 12/27/99 NI)(0 16) 6 8 Nl)(() 16) 9 3 42/43-2-CAR-3 12/27/99 NI)(() 20) 2 5 78 1 7 12 42/43-2-CAR-4 12/28/99 NI)(0 18) 6 1 NI)(0 18) 79 42/43-2-CAR-5 12/28/99 ND(0 13) 2 8 5 8 ND(0 13) 8 6 42/43-2-CAR-6 12/28/99 ND(0 14) 4 0 ND(0 14) 5 6

Notes

1) Samples were collected by Blasland Bouck & Lee. Ine . and were submitted to CT&h bnvironmenlal Services, lne for analysis of PCBs

2) ND - Analste was not detected The value in parentheses is the associated detection limit

3) Duplicate results are presented in brackets

4) 1 teld Sample IDs have been changed as follows. 42-1- updated to 42/43-2- (e g . 42/43-2-C 1 was formerly 42-1-C1)

Plant \ls Page I of 1 2/8/00

Page 10: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATIONTABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

20s, 30s AND 40s COMPLEXES

BUILDING 42 WIPE SAMPLE DATA RECEIVED DURING JANUARY 2000

(Results in ug/100cmJ)

Date Aroclor-1016, 1221,

Sample ID Collected 1232, & 1248 Aroclor-1242 Aroclor-1254 Aroclor-1260 Total PCBs

42/43-2-APP-WI 12/27/99 ND(1 0) ND( 1 0) ND( 1 0) ND( I 0 ND( 1 0)

42/43-2-APP-VV2 12/27/99 NI>( 1 0) ND( 1 0) Nl) 0) ND(1 0 ND( 1 0)

42/43-2-,APP-W3 12/27/99 ND( 1 0) ND( 1 0) NI) 1 0 ) ND( 1 ND( I 0)

42/43-2-APP-W4 12/27/99 Nl)( 1 0) ND( 1 0) Nl) 1 0 ) NI>( 1 NI)( I 0)

42/43-2-APP-W5 12/27/99 NIX 1 0) Nl)( I 0) Nl) I 0) NI)( 1 Nl)( I 0)

42/43-2-APP-W6 12/27/99 NI)( 1 0) NI)( I 0) Nl) I 0) NI)( 1 NI)( I 0)

42/43-2-WA1.E-W1 12/27/99 NI)( 1 0) ND( 1 0) NI) I 0) ND( 1 ND( 1 0)

42/43-2-WA1.L-W2 12/27/99 NI)( 1 0) ND( I 0) Nl) 0 ) ND( 1 NI)( 1 0)

42/43-2-WA1.L-W3 12/27/99 NIX I 0) NI)( I 0) NI) 0 ) Nl)( 1 Nl)(l 0)

42/43-2-WALL-W4 12/28/99 Nl)( 1 0) ND( I 0) ND 1 0 ) ND( 1 ND(1 0)

42/43-2-WALL-W5 12/28/99 ND( 1 0) ND(1 0) ND 1 0) ND(1 0 ND(1 0) 42/43-2-WALL-W6 12/28/99 NI)( 1 0) ND( 1 0) ND 1 0) ND( 1 0 ND(1 0)

Notes

1) Samples were eolleeted by Blasland. Bouck & Lee. Inc and were submitted to CT&E Environmental Services. Inc for analysis of PCBs

2) ND - Analyte was not detected The value in parentheses is the associated detection limit

3) I icld Sample IDs have been changed as follows 42-1- updated to 42/43-2- (e g . 42/43-2-APP-W I was formerly 42-1-API'-W1)

Plant \ls Page 1 of 1 2/8/00

Page 11: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATIONTABLE 3

GENERAL ELEC ERIC COMPANY PITTSFIELD, MASSACHUSETTS

20s, 30s AND 40s COMPLEXES

BUILDING 45 CONCRETE SAMPLE DAI A RECEIVED DURING JANUARY 2000

(Results in ppm, dry weight)

Date Aroclor-1016, 1221, 1232,

Sample ID Collected 1242,& 1248 Aroclor-1254 Aroclor-1260 Total PCBs B45-C1 1/17/00 ND(0 033) ND(0 033) ND(0 033) ND(0 033) B45-C 2 I/17/00 NP(0 033) [NP(0 033)1 NP(0 033) [NP(0 033)1 0 019 J [0 014 I] 0019 [0014] B45-C3 1/17/00 ND(0 033) NP(0 033) 0 0 1 2 0 0 1 2 B45-( 4 1/17/00 NIX0 033) NI>(0 033) 0 015 I 0 015 B45-C 5 1/17/00 Nl>(2 5) Nl)(2 5) NI)<2 5) NP(2 5) B45-C6 1/17/00 ND(4 0) NP(4 0) ND(4 0) NP(4 0) B45-C7 1/20/00 NP(0 035) 0 46 0 37 0 83 B45-C8 1/20/00 NP(0 034) NP(0 034) NP(0 034) ND(0 034)

Notes

1) Samples were collected by Blasland Bouck & Lee. Inc . and were submitted to C f&L Environmental Services, lnc lor analysis of PCBs

2) NP - Analyte was not detected The value in parentheses is the associated detection limit

3) Duplicate results are presented in brackets

Plant \ls Page 1 of 1 2/8/00

Page 12: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATIONTABLE 4

GENERAL ELECTRIC COMPAQ PITTSFIELD, MASSACHUSETTS

20s, 30s AND 40s COMPLEXES

BUILDING 45 WIPE SAMPLE DATA RECEIVED DURING JANUARY 2000

(Results in ug/IOOcm3)

Date Aroclor-1016, 1221, 1232,

Sample ID Collected 1242,& 1248 Aroclor-1254 Aroclor-1260 Total PCBs

B45-W1 1/17/00 ND( I 0) ND( I 0) ND( 1 0) ND( I 0)

B45-W2 1/17/00 NI)( I 0) ND( 1 0) ND( I 0) ND(1 0)

B45-W3 1/17/00 ND( 1 0) Nl)( I 0) ND( I 0) ND(1 0)

Notes

1) Samples were collected b\ Blasland Bonds & I ee. Inc. . and were submitted to t l&l Lin uonmental Set vices Inc for analv sis ol PCBs

2) Nl) - \n,tl_\ te was not delected I he value in paientheses is the associated detection limit

Plant \ls Page 1 of I 2/8/00

Page 13: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PUEI.IMIN VU\ ANAIATK'AI. DATAI ABLE 5 SLBJECT l O VERIFICATION

(.ENERAL ELECTRIC COMI'AM PI ITSFIELI), MASSAC III SETTS

20s, 30s AND 40s COMPLEXES BHILDIV. 31 1 \\K S VND SAMPLE I) VI A REC'EIN ED DLRINCi J VNl' \R\ 2000

(Results in ppm, dry weight) Sample ID: TANK-I-C PS-1 TANK-l-C PS-2 TANK-l-CPS-3 TANK-3-CPS-I TANK-3-CPS-2

Date Collected: 01/06/00 01/06/00 01/06/00 01/06/00 01/06/00 PCUs

Aroclor-1260 0 045 [0 032 J| ND(0 035) ND(0 035) ND(0 035) ND(0 034) I otal PC lis 0 045 [0 032] ND(0 035) ND(0 035) ND(0 035) ND(0 034) Metals

Arsenic 5 60 15 001 3 80 70 1 00 3 20 Barium 13 0 [22 0| 14 0 0 7 90 8 1 0 Cadmium ND(0 160) [ND(0 160)| ND(0 160) Nl)(0 160) ND(0 160) NI)(0 160) Chromium 6 10 [4 90] 3 80 5 70 3 70 3 40 I cad 6 60 [5 70] 5 10 5 90 5 00 4 90

Sample ID: TANK-3-CPS-3 31TF-MT-SAND-1 31TF-MT-SAND-2 31TF-MT-SAND-3 Date Collected: 01/06/00 01/26/00 01/26/00 01/26/00

PCBs

Aroclor-1260 ND(0 035) 0 35 [0 047] 0 27 0 029 J Total PCBs ND(0 035) 0 35 [0 047] 0 27 0 029 Metals

Arsenic 3 30 5 80 [4 80] 2 90 3 80 Barium 17 0 76 0 [40 0] 24 0 1 8 0 Cadmium NI)(0 160) 0 990 [0 6301 0 690 0 520 Chromium 3 50 7 70 [9 30] 6 40 5 60 I ead 5 40 180 [61 0] 76 0 40 0

Notes

1) Samples were collected by Blasland. Bouck & I ee. lite , and were submitted to CT&E Environmental Services. Inc for analysis of PCBs and RCRA 8 Metals 2) ND - Analyte was not detected The value m parentheses is the associated detection limit 3) Duplicate results are presented m brackets

4 ) 1 - I n d i c a t e s a n e s t i m a t e d v a l u e l e s s t h a n t h e C I P - r e q u i r e d q u a n t i t a t i o n l i m i t 5) Only those constituents detected in at least one sample are summarized

Plant xls Page 1 of 1 2/8/00

Page 14: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 2

PLANT AREA EAST STREET AREA 2 -SOUTH

JANUARY 2000

Activities Undertaken/Completed

Work on the relocation of the stormwater diversion structure and other utilities related to the relocation of Merrill Road is on hold pending completion of certain road construction activities.

Sampling/Test Results Received

None

Work Plans/Reports/Documents Submitted

None

Upcoming Scheduled Activities (next six weeksl

Continue Merrill Road related activities, depending on construction schedule.

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 15: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 3

PLANT AREA EAST STREET AREA 2 - NORTH

JANUARY 2000

Activities Undertaken/Completed

- Continued utility relocation activities associated with Merrill Road reconstruction.

- Collected concrete core samples within Building 19 for the Pittsfield Economic Development Authority (PEDA) to assist in its evaluation of potential refurbishment and re-use of that building as interim space under the Definitive Economic Development Agreement.

Sampling/Test Results Received

None

Work Plans/Reports/Documents Submitted

None

Upcoming Scheduled Activities (next six weeks)

Continue Merrill Road utility-related work, depending on construction schedule.

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 16: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

EAST STREET AREA 2 - NORTH DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Bu ilding 19­ Concrete Floor 19-l-FC-l 01/25/00 0-9 Concrete CTE PCB

Bu ildmg 19­ Concrete Floor 19-1-1'C-IO 01/25/00 0 - 1 0 Concrete CTE PCB

Bu ildmg 19­ Concrete Floor 19-l-FC-l I 01/25/00 0 - 1 1 Concrete CTE PCB

Bu ildmg 19­ Concrete Flooi 19-l-FC-l 2 01/25/00 0 - 1 1 Concrete CI E PCB

Bu ilding 19­ Concrete Floor 19-l-FC-l 3 01/25/00 0-7' Concrete CTE PCB

Bu ildmg 19­ Concrete Floor 19-l-FC-l 4 01/25/00 0 - 1 1 Concrete CTE PCB

Bu ilding 19­ Concrete Floor 19-l-FC-l 5 01 /25/00 0 - 1 1 Concrete CTE PCB

Bu llding 19­ Concrete Floor 19-l-FC-l 6 01/25/00 0-9' Concrete CTE PCB

Bu llding 19­ Concrete Floor 19-l-FC-l 7 01/25/00 0 - 1 1 Concrete CTE PCB

Bu dding 19­ Concrete Floor 19-l-FC-l 8 01/25/00 0-1 1 Concrete CTE PCB

Bu ilding 19­ Concrete Floor 19-l-FC-l 9 01/25/00 0-24 Concrete CTE PCB

Bu lldmg 19­ Concrete Floor I9-1-FC-2 01/25/00 0-9' Concrete CTE PCB

Bu ildmg 19­ Concrete Floor 19-1-FC-20 01/25/00 0-1 I Concrete CTE PCB

Bu dding 19­ Concrete Floor 19-I-FC-3 01/25/00 0-9' Concrete CTE PCB

Bu dding 19­ Concrete Floor 19-I-FC-4 01/25/00 0-9' Concrete CTE PCB

Bu dding 19­ Concrete Floor 19- l-FC-5 01/25/00 0-9' Concrete CTE PCB

Building 19­ Concrete Floor I9-I-FC-6 01/25/00 0-5' Concrete CTE PCB

Bu ilding 19­ Concrete Floor I9-1-FC-7 01/25/00 0 - 1 1 Concrete CTE PCB

Bu ilding 19­ Concrete Floor 19-1-FC-8 01/25/00 0-11 Concrete CTE PCB

Bu llding 19­ Concrete Floor 19-I-FC-9 01/25/00 0-9' Concrete CTE PCB

Bu Iding 19­ Concrete Floor 19-I-FC-21 01/26/00 0­ Concrete CTE PCB

Field duplicate sample locations are presented in parenthesis 2/8/00 1 of 4

Page 17: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

EAST STREET AREA 2 - NORTH DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Bu Iding 19 ­ Concrete F oor 19-1-FC-22 01/26/00 0-11" Concrete CTE PCB

Bu lding 19 ­ Concrete F oor 19-1-FC-23 01/26/00 0-14" Concrete CTE PCB

Bu Iding 19 ­ Concrete F oor I9-I-FC-24 01/26/00 0-14" Concrete CTE PCB

Bu Iding 19 ­ Concrete F oor 9-1-1 C-25 01/26/00 0-14" Concrete CTE PCB

Bu Iding 19 ­ Concrete I oor •1-1 C-26 01 /26/00 0-5" Concrete C IF PCB

Bu Iding 19 ­ Conuete I oor •1-1 C-27 01/26/00 0-8" Concrete C IE PCB

Bu Iding 19 ­ Concrete Floor 19-1 -FC-28 01/26/00 0-11' Concrete CTE PCB

Bu lding 19 ­ Concrete F loor 19-1 -FC-29 01/26/00 0-14' Concrete CTE PCB

Bu lding 19 ­ Concrete F loor 19-1-FC-30 01/26/00 0-11' Concrete CTE PCB

Bu lding 19 ­ Concrete Floor 19-1-FC-3 I 01/26/00 o-i r Concrete CTE PCB

Bu Iding 19 ­ Concrete Floor I9-1-FC-32 01/26/00 0-7" Concrete CTE PCB

Bu Iding 19 ­ Concrete Floor I9-I-FC-33 01/26/00 0 - 1 6 ' Concrete CTE PCB

Bu Iding 19 ­ Concrete F oor 19- l-FC-34 01/26/00 0-19' Concrete CTE PCB

Bu lding 19 ­ Concrete F oor 19-1-FC-35 01/26/00 0-15' Concrete CTE PCB

Bu lding 19 ­ Concrete 001 19-1-i'C-36 01/26/00 0-15' Conciete CTE PCB

Bu lding 19 ­ Concrete F oor 19-FC-DI 01/26/00 o-i r (I9-I-FC-21) CTE PCB

Bu Iding 19 ­ Concrete F oor 19-1-FC-37 01/27/00 0 - 1 2 ' Concrete CTE PCB

Bu Iding 19 ­ Concrete T oor 19-1-FC-38 01/27/00 0-17' Concrete CTE PCB

Bu Iding 19 ­ Concrete F oor 19- l-FC-39 01/27/00 0-9" Concrete CTE PCB

Bu Iding 19 ­ Concrete F oor 19-I-FC-40 01/27/00 0-17' Concrete CTE PCB

Bu lding 19 ­ Concrete F oor 19-1-FC-41 01/27/00 0-16' Concrete CTE PCB

Field duplicate sample locations are presented in parenthesis. 2/8/00 2 of 4

Page 18: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

EAST STREET AREA 2 - NORTH DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Building 19­ Concrete Floor 19-1-FC-42 01/27/00 0-11" Concrete CTE PCB

Buiiding 19­ Concrete Floor 19- l-FC-43 01/27/00 0-11" Concrete CTE PCB

Buildmg 19­ Concrete Floor 19-I-FC-44 01 /27/00 0 - 1 1 " Conciete CTE PCB

Buiklmg 19­ Concrete I-loot 19-1-FC-45 01 /27/00 0-4" Concrete CTE PCB

Building 19­ Concrete Hoor 19-I-FC-46 01/27/00 0-7" Conciete CTE PCB

Building 19­ Concrete Floor 19-1-FC-47 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concicte Floor 19-1-FC-48 01/27/00 0-15" Concrete CTE PCB

Building 19­ Concrete Floor 19-I-FC-49 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Floor 19-1-FC-50 01/27/00 0-15" Concrete CTE PCB

Building 19­ Concrete Floor 19- l-FC-51 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Floor 19- l-FC-52 01/27/00 0-9" Concrete CTE PCB

Building 19­ Concrete Floor 19-1-FC-53 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Flooi 19-1-FC-54 01/27/00 0-9" Concrete CTE PCB

Building 19­ Concrete Floor 19-1-FC-55 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Floor 19-1-FC-56 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Floor I9-I-FC-57 01/27/00 0-16" Concrete CTE PCB

Building 19­ Concrete Floor I9-1-FC-58 01/27/00 0-11" Concrete CTE PCB

Building 19­ Concrete Floor 19-1-FC-59 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Floor 19-1-FC-60 01/27/00 0 - 1 1 " Concrete CTE PCB

Building 19­ Concrete Floor 19-FC-D2 01/27/00 0-17" (19-1-FC-38) CTE PCB

Building 19­ Concrete Floor 19-FC-D3 01/27/00 0-16" (19-1-FC-57) CTE PCB

Field duplicate sample locations are presented in parenthesis 2/8/00 3 of 4

Page 19: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELI) MASSACHUSETTS

EAST STREET AREA 2 - NORTH DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

131 Iding 19­ Concrete Floor I9-1-FC-6I 01/28/00 0-12 Concrete CTE PCB

Bi lding 19­ Concrete Floor 19-1-FC-62 01/28/00 0-1 I Concrete CTE PCB

Bi lding 19­ Concrete Floor I9-1-FC-63 01/28/00 0-16 Concrete CTE PCB

Bi Iding 19­ Conciete Floor 19-1-1 C-64 01/28/00 0-1 5 Concrete CTE PCB

Bi Iding 19­ Coneiete 1 loot 19-1-1 C-65 01/28/00 0-1? Conciete C 11-/ PCB

Bi Iding 19­ Concrete Floor 19-1-FC-66 01/28/00 0-1 1 Concrete CTE PCB

Bi Iding 19­ Concrete Floor 19- l-FC-67 01/28/00 0-13 Concrete CTE PCB

Bi Iding 19­ Concrete Floor 19- l-FC-68 01/28/00 0-12 Concrete CTE PCB

Bi Idina 19­ Concrete Floor 19-1-FC-69 01/28/00 0-11 Concrete CTE PCB

Bi Iding 19­ Concrete Floor 19-1-FC-70 01/28/00 0-7' Concrete CTE PCB

Bi lding 19­ Concrete Floor 19-1-FC-7I 01/28/00 0-11 Concrete CTE PCB

Bi Idins 19­ Concrete Floor 19-I-FC-72 01/28/00 0-1 I Concrete CTE PCB

Field duplicate sample locations are presented in parenthesis. 2/8/00 4 of 4

Page 20: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 4

PLANT AREA EAST STREET AREA 1 - NORTH

JANUARY 2000

Activities Undertaken/Completed

None

Sampling/Test Results Received

None

Work Plans/Reports/Documents Submitted

None

Upcoming Scheduled Activities (next six weeks)

Fill manhole associated with former 12F tank farm, pending other Merrill Road construction activities.

General Progress/Unresolved Issues/Potential Schedule Impacts

None

Proposed/Approved Work Plan Modifications

Received EPA/DEP approval of Proposed Manhole Abandonment East Street Area 1/USEPA Area 3, November 17, 1999 proposal.

Page 21: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 5

PLANT AREA HILL 78 & BUILDING 71 CONSOLIDATION AREAS

JANUARY 2000

*A11 activities described below for this item were conducted pursuant to the Consent Decree.

a. Activities Undertaken/Completed

Conducted weekly inspections of the Allendale School temporary TSCA stockpile. Also placed additional tarps/covers on stockpile.

b. Sampling/Test Results Received

None

c. Work Plans/Reports/Documents Submitted

None

d. Upcoming Scheduled Activities (next six weeks!

Conduct weekly inspections of Allendale School temporary TSCA stockpile.

e. General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

f. Proposed/Approved Work Plan Modifications

In a letter dated January 5, 2000, EPA granted an extension of storage time for the temporary TSCA storage stockpile near Building 71 Consolidation Area.

Page 22: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 7

PLANT AREA UNKAMET BROOK AREA

JANUARY 2000

a. Activities Undertaken/Completed

- Conducted monthly inspection of outfalls.

- Performed inspection of upper beaver dam and boom; brook was covered by ice and snow.

- Completed debris inspection along the portion of Unkamet Brook through the former landfill area. No debris was noted. See attached summary.

b. Sampling/Test Results Received

None

c. Work Plans/Reports/Documents Submitted

Submitted final excavation completion reports/notification letters on January 12 and January 25 for several facility-related excavations conducted in the Unkamet Brook Area pursuant to GE's Excavation Protocols. Copies of these reports are attached to this monthly report as Attachments A and B.

d. Upcoming Scheduled Activities (next six weeksl

Continue monthly inspections of beaver dam area and outfalls.

e. General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

f. Proposed/Approved Work Plan Modifications

None

Page 23: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

BLASLAND. BOUCK 8c LEE, INC. e n g i n e e r s & s c i e n t i s t s

To: John Ciampa (GE) Date: January 20,2000 cc: Files

From: Bruce Eulian Project#: 101.95.120

Re: Unkamet Brook Quarterly Debris Inspection

The Unkamet Brook Quarterly Debris Inspection was completed on January 20, 2000. There was no debris observed at Unkamet Brook on January 20, 2000.

BEE/AEG January 20. 2000

U \WPDOCS\AEG0342 WPD Page 1 ot 1

Page 24: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 10

FORMER OXBOW AREA NEWELL STREET AREA I

JANUARY 2000

Activities Undertaken/Completed

Initiated and completed soil sampling at Parcel J9-23-17.

Sampling/Test Results Received

None

Work Plans/Reports/Documents Submitted

Submitted summary report on sampling results for soils excavated by property owner at 221/229 Newell Street.

Upcoming Scheduled Activities (next six weeks!

- Prepare Pre-Design Investigation Work Plan for the Newell Street Area I Removal Action (to be submitted by March 7).*

- Submit the results of the soil sampling at Parcel J9-23-17 (will be included in Pre-Design Investigation Work Plan).

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

On January 24, verbal approval was received from MDEP for a minor modification to the approved sampling plan at parcel J9-23-17 MDEP agreed (after consulting with EPA) that the surface samples at three locations (IA-91, -93, -100) could start at a depth immediately below the existing cap on the parcel.

Page 25: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELI) MASSACHUSETTS

NEWELL STREET AREA I DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Italian American Club IA-102 01/24/00 1-3 Soi CTE APPEN-IX

Italian American Club 1A-9I 01/24/00 1-3 Soi CTE APPEN-IX

Italian American Club IA-92 01/24/00 1-3 Soi CTE APPEN-IX

Italian American Club IA-96 01/24/00 0-1 Soi CTE APPEN-IX

Italian American Club IA-102 01/24/00 10-15 Soi CTE PCB

Italian American Club IA-102 01 /24/00 0 - 1 SOI CTE PCB

Italian American Club I A-102 01/24/00 6 - 1 0 Soi CTE PCB

Italian American Club IA-102 01/24/00 1-3 Soi CTE PCB

Italian American Club IA-102 01/24/00 Soi CTE PCB

Italian American Club IA-91 01/24/00 Soi CTE PCB

Italian American Club IA-91 01/24/00 0 - 1 Soi CTE PCB

Italian American Club IA-91 01/24/00 6 - 1 0 Soi CTE PCB

Italian American Club IA-91 01/24/00 3-6 Soi CTE PCB

Italian American Club IA-91 01/24/00 10-15 Soi CTE PCB

Italian Anieiican Club IA-92 01/24/00 10-15 Soi C IE PCB

Italian American Club IA-92 01/24/00 3-6 SOI CTE PCB

Italian American Club IA-92 01/24/00 1-3 Soi CTE PCB

Italian American Club IA-92 01/24/00 0 - 1 Soi CTE PCB

Italian American Club IA-92 01/24/00 6-10 Soi CTE PCB

Italian American Club IA-96 01/24/00 0-1 Soi CTE PCB

Italian American Club IA-96 01/24/00 1-3 Soi CTE PCB

Field duplicate sample locations are presented in parenthesis. 2/8/00 of 4

Page 26: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

NEWELL STREET AREA I DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Italian American Club IA-96 01/24/00 3-6 Soil CTE PCB

Italian American Club IA-96 01/24/00 6-10 Soil CTE PCB

Italian American Club IA-96 Ol/24'OO 10-15 Soil CTE PCB

Italian American Club IA-DUP-1 01/24/00 6-10 (IA-92) CTE PCB

Italian American Club I A-103 01/25/00 0 - 1 Soil CTE APPEN-IX

Italian American Club I A-107 01/25/00 6-15 Soil CTE APPEN-IX

Italian Amei ican Club I A-107 01/25/00 3-6 Soil CTE APPEN-IX

Italian American Club I A-109 01/25/00 1-3 Soil CTE APPEN-IX

Italian Amci ican Club IA-98 01/25/00 6-15 Soil CTE APPEN-IX

Italian American Club IA-98 01/25/00 3-6 Soil CTE APPEN-IX

Italian American Club IA-DUP-2 01/25/00 6-15 (IA-98) CTE APPEN-IX

Italian American Club I A-103 01/25/00 0-1 Soil CTE PCB

Italian American Club IA-103 01/25/00 1-3 Soil CTE PCB

Italian American Club IA-103 01/25/00 3-6 Soil CTE PCB

Italian American Club IA-103 01/25/00 6-10 Soil CTE PCB

Italian American Club IA-103 01/25/00 10-15 Soil CTE PCB

Italian American Club IA-107 01/25/00 0 - 1 Soil CTE PCB

Italian American Club IA-107 01/25/00 10-15 Soil CTE PCB

Italian American Club IA-107 01/25/00 6-10 Soil CTE PCB

Italian American Club IA-107 01/25/00 1-3 Soil CTE PCB

Italian American Club IA-107 01/25/00 3-6 Soil CTE PCB

Field duplicate sample locations are presented in parenthesis 2/8/00 2 of 4

Page 27: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

NEWELL STREET AREA I DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Italian American Club IA-109 01/25/00 3-6 Soil CTE PCB

Italian American Club IA-109 01/25/00 6 - 1 0 Soil CTE PCB

Italian American Club I A-109 01/25/00 1-3 Soil C 1 E PCB

Italian American Club IA-109 01/25/00 0 - 1 Soil C IT. PCB

Italian American Club IA-109 01/25/00 10-15 Soil C I E PCB

Italian American Club IA-98 01/25/00 6 - 1 0 Soil CTE PCB

Italian American Club IA-98 01/25/00 3-6 Soil C IE PCB

Italian American Club IA-98 01/25/00 0 - 1 Soil CTE PCB

Italian American Club IA-98 01/25/00 1-3 Soil CTE PCB

Italian American Club IA-98 01/25/00 10-15 Soil CTE PCB

Italian American Club 1A-DUP-3 01/25/00 10-15 (IA-109) CTE PCB

Italian American Club I A-100 01/26/00 0-1 Soil CTE APPEN-IX

Italian American Club I A-108 01/26/00 0-1 Soil CTE APPEN-IX

Italian American Club IA-93 01/26/00 0-1 Soil CTE APPEN-IX

Italian American Club IA-95 01/26/00 0 - 1 Soil CTE APPEN-IX

Italian American Club IA-99 01/26/00 0-1 Soil CTE APPEN-IX

Italian American Club IA-100 01/26/00 0 - 1 Soil CTE PCB

Italian American Club I A-101 01/26/00 0-1 Soil CTE PCB

Italian American Club I A-104 01/26/00 0-1 Soil CTE PCB

Italian American Club 1 A-105 01/26/00 0-1 Soil CTE PCB

Italian American Club I A-106 01/26/00 0-1 Soil CTE PCB

Field duplicate sample locations are presented in parenthesis 2/8/00 3 of 4

Page 28: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

NEWELL STREET AREA I DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

Italian American Club I A-108 01/26/00 0 - 1 Soil CTE PCB

Italian American Club IA-93 01/26/00 0 - 1 Soil CTE PCB

Italian American Club IA-94 01/26/00 0 - 1 Soil CTE PCB

Italian American Club IA-95 01/26/00 0 - 1 Soil CTE PCB

Italian American Club IA-97 01/26/00 0 - 1 Soil CTE PCB

Italian American Club IA-99 01/26/00 0 - 1 Soil CTE PCB

Italian American Club IA-DUP-4 01/26/00 0 - 1 (IA-97) CTE PCB

Field duplicate sample locations are presented in parenthesis 2/8/00 4 of 4

Page 29: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 13

HOUSATONIC RIVER AREA UPPER 1/2 MILE REACH

JANUARY 2000

*A11 activities described below for this item were conducted pursuant to the Consent Decree.

a. Activities Undertaken/Completed

- Completed sheetpiling installation m Cells C and D.

- Dewatered Cells C and D.

- Observed and reported an oil sheen on January 6, 2000 during sheetpile installation.

- Continued excavation in Cell C. GE, with concurrence from EPA, decided to remove an additional two feet of black oily river sediment in front of the permanent sheetpiling (approximately 160 CY of TSCA material).

- Completed bank removal activities adjacent to the unstable excavation areas in the upstream section of Cell C Stabilized the upstream end of Cell C where "boiling" occurred.

- Completed sediment removal (except for the downstream end) and began restoration activities m Cell C.

- Continued verification of excavated and restored elevations in Cell C

- Restored an approximate 120 foot section of Cell C, upstream end, including fabric, sand fabnc/geognd, and rock.

- Backfilled area in front of source control sheetpiles where an additional two feet of material was removed.

- Began grouting operations at source control sheets. Remobihzed at upstream end to avoid DNAPL area.

- Encountered pocket of DNAPL at the downstream end of Cell C near the Cell D interface, which resulted in the following action:

- Notification of MDEP, EPA, EPA Region 1 spill response and the NRC of the new oil sheen and visible DNAPL on January 24, 2000.

- Immediate isolation of oil source from other excavated areas.

- Recovered approximately 66 gallons of oil as of January 31, 2000.

- Excavated area where oil source was observed, with further isolation from Cell C.

- Revised containment and product recovery plan based on excavation results

- Maintained stockpiled material in Building 65 and Building 33X (TSCA and non-TSCA).

Page 30: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 13 (cont'd)

HOUSATONIC RIVER AREA UPPER 1/2 MILE REACH

JANUARY 2000

- Conducted air particulate and PCB monitoring.

- Conducted water column (PCB and TSS) monitoring.

b. Sampling/Test Results Received

- Water column results for TSS from January 3 to January 31, 2000 (see attached table).

- Water column results for PCB on January 7 and January 20, 2000 (see attached table).

- Particulate air monitoring results from January 3 to January 31,200 (see attached table).

- PCB air monitoring results from January 12-13,2000 (see attached table).

- Backfill soil sampling results (see attached table).

- DNAPL sampling results (see attached table).

- Effluent priority pollutant sampling (see attached table).

c. Work Plans/Reports/Documents Submitted

- Estimated planning timetable for the entire project revised January 7.

- Monthly report for work completed in December 1999.

- Meeting Summaries for project status meetings held weekly.

- Miscellaneous construction material specification submittals.

d. Upcoming Scheduled Activities (next six weekst

- Develop and submit a DNAPL investigation work plan for EPA review and approval and implementation by GE.

- Evaluate results of DNAPL investigation for the effects on other operations.

- Evaluate engineering options for addressing DNAPL in Cell C.

- Continue communication between GE, EPA and DEP on a regular basis to provide updates on the DNAPL situation and discuss various alternatives for collection and containment.

- Continue air and water column monitoring.

Page 31: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 13 (cont'd)

HOUSATONIC RIVER AREA UPPER 1/2 MILE REACH

JANUARY 2000

General Progress/Unresolved Issues/Potential Schedule Impacts

GE is currently discussing scheduling issues with EPA, including final completion date. Encountering DNAPL has delayed completion of Cell C as well as excavation of Cell D. The grouting subcontractor has been placed on hold pending results of the DNAPL investigation plan. GE has notified EPA and MDEP that the finding of DNAPL in Cell C, together with the necessary response measures, may potentially delay completion of the Upper 1/2-Mile Reach Removal Action and, if so. would constitute a "force majeure" event under the Consent Decree.

Proposed/Approved Work Plan Modifications

None

Page 32: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1

GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - UPPER 1/2 MILE REACH

DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OE.JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Matrix Laboratory Analyses Date Received

I lousatonic River Soil Sampling 33X-HRS-1 1/20/00 NA Soil Adirondack VOC.SVOC

Ilousatonic Riser Soil Sampling 33X-IIRS-2 1/20/00 NA Soil Adirondack VOC.SVOC

Bushika Sand and Cira\cl Dacklil l Soil Sampling BSG-BF-I 1/5/00 NA Soil C'Ti: APPEN-IX 1/13/00

l iushika Sand and Gravel Backlil l Soil Sampling BSG-D-l 1/5/00 NA (BSG-Bl-I) ("II APPIN-IX 1/13/00

Bushika Sand and Gravel Backfil l Soil Sampling BSG-BI -I 1/5/00 NA Soil NI.A PCB.TPI I 1/13/00

Bushika Sand and (travel Dacklil l Soil Sampling BSG-D-l 1/5/00 NA (BSG-BI-I) Nl A PC B I PI I 1/13/00

I l l lucnt I ' r iori tv I 'olulani Sampling 11R -1 I I - l 'P-2 1/1 1/00 NA Water Nl A PCD PC B(1) VOL SVOC.Metals Phenolics CN 1/15/00

Removal Action DNAI'l Sampling IIR-DNAI'l -1 1/24/00 NA Oil Adirondack PC B VOC SVOC 1/25/00

Upper 1/2 Mile Readi Removal Action HR-12-21-99-DI 12/21/94 NA Water NLA PC B PC'B(Filtered),TSS 1/10/00

Upper 1/2 Mile Reach Removal Action HR-12-21-99-U1 12/21/99 NA Water NLA PC"B,PCB(Filtered),TSS 1/10/00

Upper 1/2 Mile Reach Removal Action HR-I-7-00-UI 1/7/00 NA Water NLA PCB,PCB(0, TSS 1/25/00

Upper 1/2 Mile Reach Removal Action IIR-I-7-00-D1 1/7/00 NA Water NEA PCB,PCB(f)/T SS 1/25/00

Upper 1/2 Mile Reach Removal Action F1R-DUPLICA Fh 1/7/00 NA (I1R-I-7-00-D1) NEA PCB,PCB(f),TSS 1/25/00

Upper 1/2 Mile Reach Removal Action HR-1-20-00-DI 1/20/00 NA (HR-12-21-99-U I) NEA PCB PCB(Filtered).TSS 1/31/00

Upper 1/2 Mile Reach Removal Action HR-1-20-00-UI 1/20/00 NA Water NEA PCB.PCB(Ftltered).TSS 1/31/00

1 leld duplicate .sample locations are presented in parenthesis 2/8/00 1 of I

Page 33: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

JANUARY 2000 PCB AMBIENT AIR CONCENTRATIONS 1/2 MILE REMOVAL ACTION

PITTSFIELD, MASSACHUSETTS

AM-3 AM-1 AM-2 AM-3 AM-4BM-1 co-locatedDate

ug/m3 ug/m3 ug/m3 ug/m3 ug/m3 uq/m3

01/12-01/13/00 ND (0.0003) 0.0005 0.0004 0.0014 0.0015 0.0014 Notification Level 0.05 0.05 0.05 0.05 0.05 0.05

Notes: ND Non detect BM-1 Background monitoring location west of Bldg. 42. AM-1• Air monitoring location east of Bldg. 64V, near current work/staging area, northeast bank. AM-2 Air monitoring location near tennis counts within Lakewood Park, southeast bank. AM-3 Air monitoring location north bank, north of Bldg. 64W. This location is also a co-located site. AM-4. Air monitoring location south bank, at 261 Newell St. behind building fomerly known as F.W. Webb.

Page 1 of 1 Rev. 02/08/2000

Page 34: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Ambient Air Data for Pittsfield, MA General Electric Company

Housatonic River 1/2-Mile Reach

MONTH OF JANUARY, 2000

Average Site BM11 Average Period PredominantDate Sampler Locat on Concentration

(mg/m3) (Hours:Min) Wind Direction(mg/m3)

01/03/2000' AM2 (south side o river

01/04/2000' AM2 (south side o river

01/05/2000 AM2 (south side o 0 006 0.004 9:00 WNW 01/06/2000 AM2 (south side o river 0 010 0.009 9:15

01/07/2000 AM2 (south side o river 0.020 0.024 10:00 Variable

01/10/2000 AM2 (south side o river 0 009 0.014 8.00 ESE

01/11/2000 AM2 (south side o river 0.010 0.011 6:15 SW 01/12/2000 AM2 (south side o river 0.007 0.006 915 WNW

01/13/2000' AM2 (south side o 01/14/2000 AM2 (south side o 0 008 0 006 10:00 WNW 01/17/2000 AM2 (south side o river 0013 0.008 7 45 NW 01/18/2000 AM2 (south side o river 0015 0.010 8 15 NNW

01/19/2000 AM2 (south side o river 0 012 0.009 9:30 NW 01/20/2000 AM2 (south side o river

01/21/2000 AM2 (south side o 0016 0.013 7:00 WNW 01/24/2000 AM2 (south side o 0 023 0.023 10:00 NW 01/25/2000' AM2 (south side o river

01/26/2000' AM2 (south side o

01/27/2000 AM2 (south side o n ver 0015 0.009 9:15 WNW 01/28/2000 AM2 (south side o 0011 0.006 10:15 WNW 01/31/2000' AM2 (south side o river

Notification Level 0 120

BM-1 Background monitoring location west ot Bldg 42. AM-2 Air monitoring location near tennis courts within Lakewood Park, southeast bank

1 Sampling was not performed due to precipitation/threat of precipitation.

" Sampling period was shortened due to precipitation/threat of precipitation.

Page 1 of 1 Rev Date: 02/08/2000

Page 35: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

P R E L I M I N A R Y

TABLE I V

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

JANUARY 2000

UPPER 1/2 MILE REACH REMOVAL ACTION

IIOUSATONIC RIVER PCB/TSS/TURBIDITY MONITORING DURING CONSTRUCTION

Location Date Water Water Flow Turbidity (ntu) Sample ID Total Filtered TSS

Upstream ofNewell St. Bridge Downstream of Lyman St. Bridge Upstream ofNewell St. Bridge Downstream of Lyman St Bridge Upstream ofNewell St. Bridge Downstream of Lyman St Bridge Upstream ofNewell St. Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St. Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge Upstream ofNewell St Bridge Downstream of Lyman St. Bridge Upstream ofNewell St Bridge Downstream of Lyman St Bridge

1/3/00 1/3/00 1/4/00 1/4/00 1/5/00 1/5/00 1/6/00 1/6/00

1/7/00 1/7/00

1/10/00

1/10/00

1 / 1 1 / 0 0

1 / 1 1 / 0 0

1/12/00

1/12/00

1/13/00 1/13/00 1/14/00 1/14/00

Depth

(ft)

2 2 2 5 24 2 7 3 4 3 7 2 7 3 0 2 5 2 9 2 4 2 7 3 5 3 8 3.2 3.5 2.7 3 1 24 2 8

Tentp

(°C)

3 0 3 0 40 40 I 0

1 0 0 0 0 0 0 0 0 0 2 0 2 0 2 0 2 0 2.0 2 0 1 0 1 0 1 0 I 0

(els)

6 1

71 80 82 190 203 98 106

86 87 73 8 1

179 209 128

135 NS NS

High

15 17

1 2

9

NS NS

Low

NS NS

Daily

Composite

14 1 1

NS NS

HR-1-7-00-U1 HR-I-7-00-D1

PCB Concentration

(ug/l)

0.0791 0 0850 [0.0822]

PCB Concentration

(ug/l)

ND(0.0266) 0.0729 [ND(0 0250)]

(mg/l)

2 6 4 1 [3 3]

(See Notes on Page 3) Page 1 of 3 u \hous\monthly\01_00mon.xls

2/8/00

Page 36: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE 1A

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

JANUARY 2000

UPPER 1/2 MILE REACH REMOVAL ACTION

HOUSATONIC RIVER PCB/TSS/TURBIDITY MONITORING DURING CONSTRUCTION

Location

Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St. Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge Upstream of Newell St Bridge Downstream of Lyman St Bridge

Date

1/17/00 1/17/00 1/18/00

1/18/00 1/19/00 1/19/00 1/20/00 1/20/00 1/21/00

1/21/00

1/24/00 1/24/00 1/25/00 1/25/00 1/26/00 1/26/00 1/27/00 1/27/00 1/28/00 1/28/00

Water

Depth

(ft)

2 2 2 8 2.2 2 8

2 2 1 8

2 2 2 8

2 2 2 8

2 0 2 6 1 8

2 4 2 0 2 6 2 5 3 0 24 3.0

Water

Temp

(°C)

0 0 0 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 0 0 0 2 0 2 0 1 0

1 0

1 0

1.0

1.0

1.0

Flow

(cfs)

NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS

Turbidity (ntu) ' '

High

NS NS

Low

NS NS

Daily

Composite

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

10 4

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

NS NS

Sample ID

HR-1-20-00-U1 HR-1-20-00-D1

Total

PCB Concentration

(ug/l)

ND (0.0250) ND (0 0250)

Filtered

PCB Concentration

(ug/l)

ND(0 0250) ND(0 0250)

TSS

(mg/l)

1.3 1.8

(See Notes on Page 3) Page 2 of 3 u:\hous\monthly\0 l_00mon.xls

2/8/00

Page 37: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE 1A

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

JANUARY 2000

UPPER 1/2 MILE REACH REMOVAL ACT ION

HOUSATONIC RIVER PCB/TSS/TURB1DITY MONITORING DURING CONSTRUCTION

Location Date Water Water Flow Turbidity (ntu) Sample ID Total Filtered TSS

Upstream of Newell St Bridge Downstream of Lyman St Bridge

1/31/00 1/31/00

Depth

(ft)

2 5 3 2

Temp

("C) 2.0 2 0

(cfs)

NS NS

High

NS NS

Low

NS NS

Daily

Composite

NS NS

PCB Concentration

(ug/1)

PCH Concentration

(ug/l) (mg/1)

Notes 1 PCB and TSS samples were collected by Blasland, Bouck & Lee, Inc and analyzed by Northeast Analytical, Inc 2 Water depth taken at sampling point (l e middle of river) 3 ft - Feet

4 "C - degrees Celsius 5. cfs - cubic feet per second 6 ntu - nephelometric turbidity units 7. No data obtained 8 ND(0 25) - Compound was analyzed for but not detected at the quantitation limit indicated in parentheses 9 NR - Not yet reported 10 ug/l - micrograms per liter 11 mg/1 - milligrams per liter 12 [ ] - Duplicate sample result 13 Turbidity Action Level = Turbidity downstream < Turbidity upstream + 50 ntu 14. PCB Action Level = PCBs downstream < PCBs upstream + 5 ug/I 15. NS - Not sampled due to frozen river conditions

u:\hous\monthly\01_00mon xls (See Notes on Page 3) Page 3 of 3 2/8/00

Page 38: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE IB

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

HOUSATONIC RIVER PCB/TSS/TURBIDITY MONITORING DURING CONSTRUCTION

DATA RECEIVED DURING JANUARY 2000

UPPER 1/2 MILE REACH

(Results are presented in parts per million, ppm)

Date Aroclor 1016, Sample II) Location Collected 1221,4& 1232 Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 I otaI PC Bs

11R-12-21-99-lJ 1 Upstream of Newell St Bridge 12/21/99 Nl)(() 0000250) Nl)(0 0000250) 0 0000280 PI. 0 0001 15 Al ND(0 0000250) 0 000143 IIR-12-21-99-111 (I II II R| D) Upstream of Newell St Bridge 12/21/99 ND(0 0000250) Nl)(0 0000250) Nl)(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) IR-12-21-99-1)1 Dow nstream of Lyman St Bridge 12/21/99 ND(0 0000250) 0 0000279 I'D Nl)(0 0000250) 0 000173 Al 0 0000469 0 000248

I IR-12-21-99-1)I (1 II. I I ' .Rl.D) Downstream of Lyman St Bridge 12/21 /99 ND(0 0000250) 0 0000356 PD ND(0 0000250) 0 0000258 Al ND(0 0000250) 0 0000614 I IR-1-7-00-11 Upstream ofNewell St Bridge 1/7/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 0000791 ND(0 0000250) 0 0000791 HR-I-7-00-UI (I II. I I.RLD) Upstream ofNewell St Bridge 1/7/00 ND(0 0000266) ND(0 0000266) ND(0 0000266) ND(0 0000266) ND(0 0000266) ND(0 0000266) IIR-I-7-00-D1 Downstream of Lyman St Bridge 1/7/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 0000850 ND(0 0000250) 0 0000850

[ND(0 0000250) |ND(0 0000250) |ND(0 0000250) [0 0000822| fND(0 0000250) [0 0000822] I IR- 1-7-00-DI (I II II Rl.D) Downstream of Lyman St Bridge 1/7/00 ND(0 0000250) 0 0000729 PI) Nl)(0 0000250) ND(0 0000250) ND(0 0000250) 0 0000729

[ND(0 0000250) [ND(0 0000250) [ND(0 0000250) [ND(0 0000250) [ND(0 0000250) [ND(0 0000250) I IR-1 -20-00-111 Upstream ofNewell St Bridge 1/20/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) I IR-1-20-00-U1 (I'lI.TLRLD) Upstream ofNewell St Bridge 1/20/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) 1R-I-20-00-D1 Downstream of Lyman St Bridge 1/20/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250)

I IR-1-20-00-D1 (LII.TI.RLD) Downstream of Lyman St Bridge 1/20/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250)

Notes

1 Samples were collected by Blasland. Bouck & Lee. Ine and submitted to Northeast Analytical Services Inc

for analysis ol filtered and unfiltered PCBs and Total Suspended Solids (TSS)

2 ND(0 10) - Analyte was not detected The value in parentheses is the associated detection limit

3 — - Not analyzed

4 Al - Aroclor 1254 is being icported as the best Aroclor match I he sample exhibits an altered PCB pattern

5 PD - Aroclor 1242 is being used to report an altered PCB pattern exhibited by the sample Actual Aroclor 1242 is not present

in the sample but is tepoiled to more accurately i|uantily PCB piesent in sample that has undergone environmental alteration

6 PL - Aroclor 1248 is being used to report an altered PCB pattern exhibited by the sample Actual Aroclor 1248 is not present

in the sample, but is icported to more accurately quantify PCB present in sample that has undergone environmental alteration 7 Blind duplicate results are presented in brackets

u \hous\monthly\River xls Page I of 1 2/8/00

Page 39: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

BACKFILL SOIL SAMPLE DATA RECEIVED DURING JANUARY 2000 UPPER 1/2 MILE REACH

(Results are presented in dry-weight parts per million, ppm)

Sample ID: BSG-BF-1 Date Collected: 01/05/00

PCBs

None Detected ND(0.0545) [ND(0.0558)]

Volatile Organics Acetone ND(O.Oll) [0.015]

Semivolatile Organics None Detected

Total Petroleum Hydrocarbons None Detected ND(100) [ND(100)] Furans None Detected Dioxins None Detected Inorganics

Bervllium 0 180 [ND(0.160)] Lead 5.60 [3.80] Nickel 9.60 [ND(6.60)] Zinc 30 0 [20 0]

Notes ­1 Samples were collected by Blasland. Bouck & Lee. Inc . 2 PCB and Total Petroleum Hydrocarbons (TPH) analyses were performed by Northeast

Analytical Services. Inc 3 Appendix IX+3 constituents (excluding herbicides and pesticides) analyses were performed by

CT&E Environmental Services. Inc 4 ND - Analyte was not detected The number in parentheses is the associated quantitation limit

for volatiles and semivolatiles and the associated detection limit for other constituents 5 Blind duplicate results are presented in brackets. 6 Only those constituents detected in at least one sample are summarized

Page I of I 2/8/00

Page 40: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE 3

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

DNAPLDATA

RECEIVED DURING JANUARY 2000

UPPER 1/2 MILE REACH

(Results are presented in parts per million, ppm)

Sample ID: HR-DNAPL-1 Date Collected: 01/24/00

PCBs

None Detected

Volatile Organics

Benzene 3400 Ethvlbenzene 10000 Stvrene 1000 Toluene 10000 Xylenes (total) 9300

Semivolatile Organics

2-Methylnaphthalene 26000 Acenaphthenc 3100 Acenaphthylene 18000 Anthracene 6600 Benzo(a)anthracene 3400

Benzol alpyrene 6400 Benzo(b)fluoranthene 1900 Benzol k )fluoranthene 2100 Chrysene 6300 Fluoranthene 8600 Fluorene 12000 Naphthalene 67000 Phenanthrene 25000 Pvrene 25000

Notes

1) Sample was collected by Blasland. Bouck & Lee. Inc . and submitted

to Adirondack l.nvironmental Services. Inc for analysis of PCBs.

volatile organics and semivolatile organics

2) Onl\ those constituents detected in at least one sample are summarized

u vhousvmonthlv River \ls Page 1 of 1 2/8/00

Page 41: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARYTABLE 4

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

PRIORITY POLLUTANT SAMPLE DATA RECEIVED DURING JANUARY 2000 UPPER 1/2 MILE REACH

(Results are presented parts per million, ppm)

Sample ID: HR-EFF-PP-2 Parameter Date Collected: 01/11/00 PCBs Aroclor-1242 ND(0 0000250) Aroclor-1248 0 00884 PE Aroclor-1254 ND(0 0000250) Aroclor-1260 0 0252 AG Total PCBs 0 0340 PCBs-Filtcred Aroclor-1242 0 000618 PD Aroclor-1248 ND(0 0000250) Aroclor-1254 0 0000461 PF Aroclor-1260 ND(0 0000250) fotal PC Bs 0 000664 Volatile Organics Benzene 0 129 Ethvlben/.ene 0 193 Toluene 0 194

Scmivolatile Organics Acenaphthene 0 0439 Acenaphthvlene 0 0160 Fluorene 0 0 1 1 8 Naphthalene 0 983 Phenanthrene 00148 Metals Chromium 0012 Copper 0 033 .cad 0 060

Zinc 0 052

Notes.

1 Samples were collected by Blasland. Bouck & I ee. Inc and submitted to Northeast Analytical Services. Inc for analysis of filtered and unfiltered PC Bs. Volatile Organics. Semivolatile Organics. Metals. Cyanide and Phenohcs

2 ND(0 10) - Analvte was not detected The value in parentheses is the associated detection limit 3 AG - Aroclor 1260 is being reported as the best Aroclor match The sample exhibits an altered PCB pattern 4 PD - Aroclor 1254 is being used to report an altered PCB pattern exhibited by the sample Actual Aroclor 1254 is not present

in the sample, but is reported to more accurately quantify PCB present in sample that has undergone environmental alteration 5 PD - Aroclor 1242 is being used to report an altered PCB pattern exhibited by the sample Actual Aroclor 1242 is not present

in the sample, but is reported to more accurately quantify PCB present in sample that has undergone environmental alteration 6 PF - Aroclor 1248 is being used to report an altered PCB pattern exhibited by the sample Actual Aroclor 1248 is not present

m the sample, but is reported to more accurately quantify PCB present in sample that has undergone environmental alteration 7 Only those constituents detected in at least one sample are summarized

K I \ c i x l s Page I ot I 2/8/00

Page 42: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 14

HOUSATONIC RIVER AREA 1-1/2 MILE REACH

JANUARY 2000

Activities Undertaken/Completed

On January 6, 2000, BBL (on GE's behalf) performed one round of water column monitoring at seven locations along the Housatonic River between Coltsville, MA and Great Barnngton, MA. The one location in the 1Z2 Mile Reach was Dawes Avenue Bridge (Location 6). A composite grab sample was collected at this location and submitted to Northeast Analytical, Inc. (NEA) for PCB, TSS, POC, and chlorophyll-a analysis.

Sampling/Test Results Received

See tabulated data that follow.

Work Plans/Reports/Documents Submitted

None

Upcoming Scheduled Activities fnext six weeksl

- Meet with EPA to discuss EPA's draft Engineering Evaluation/Cost Analysis (EE/CA).*

- Review draft EE/CA.*

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 43: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - 1 1/2 MILE REACH DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name

Monthly Water Column Monitoring

Monthly Watei t olunin Monitoring

I fSI I'A Split I loodplain Sampling

USI I'A Split I loodplain Sampling

I'SI PA Split 1 loodplain Sampling

IJ SI P \ Split I loodplain Sampling

USI PA Split I loodplain Sampling

USI PA Split I loodplain Sampling

USLPA Split 1 loodplain Sampling

USLPA Split I'loodplain Sampling

Sample-ID

LOCA TION 6

LOCA TION 6

II2-BS000105-0-0030

II2-BS000107-0-0040

II2-BS0001 10-0-0050

112-BS0001 14-0-0030

II2-BS0001 16-0-0050

II2-BS000121-0-0050

H2-BS000122-0-0030

II2-BS000126-0-0050

Date Sampled

12/21/99

1/6/00

12/13/99

12/13/99

12/14/99

12/14/99

12/15/99

12/15/99

12/16/99

12/16/99

Depth Range

NA

NA

3-3 5

4-4 5

5-5 5

3-3 5

5-5 5

5-5 5

3-3.5

5-5 5

Matrix

Water

Walei

Soil

Soil

Soil

Soil

Soil

Soil

Soil

Soil

Laboratory

NLA

NLA

Nl A

NLA

Nl A

Nl A

NLA

NLA

NLA

NEA

Analyses Date Received

PCB.TSS.Chlorophyll(a).POC 1/10/00

PCB.TSS.Chlorophyll(a).POC 1/27/00

PCB 1/7/00

PCI1 1/7/00

PCB 1/7/00

PCB 1/7/00

PCB 1/7/00

PCB 1/7/00

PCB 1/7/00

PCB 1/7/00

1 icld duplicate sample locations are presented in parenthesis 2/8/00 1 of 1

Page 44: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PREL1MINARN

TABLE 1

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

SOIL PCB DATA RECEIVED DURING JANUARY 2000 - USEPA SPLIT SAMPLES 1 1/2 MILE REACH

(Results are presented in dry-weight parts per million, ppm)

Depth Date Aroclor 1016, 1221, Sample ID Location (Feet) Collected 1232, 1242, & 1254 Aroclor 1248 Aroclor 1260 Total PCBs

I2-BS000105-0-0030 Deeper EE/CA Bank Samples 3 - 3 5 12/13/99 ND( I 19) 1 76 PE 38 0 AG 39 8

I2-BS000107-0-0040 Deeper LE/CA Bank Samples 4 - 4 5 12/13/99 ND(0 281) ND(0 281) 6 55 AG 6 55

12-BS000110-0-0050 Deeper LE/CA Bank Samples 3-3 3 12/14/99 ND(0 671) ND(() 674) 194 1 9 4

112-BSOOO1 14-0-0030 Deeper LE/CA Bank Samples 3 - 3 5 12/14/99 ND(() 0597) ND(0 0597) 1 24 AG 24

I2-BS000116-0-0050 Deeper LE/CA Bank Samples 3-33 12/15/99 ND(3 22) 3 48 PE 88 9 AG 92 4

I2-BS000121-0-0050 Deeper LE/CA Bank Samples 5 - 5 5 12/15/99 ND(0 360) ND(0 360) 7 68 AG 7 68

H2-BS000122-0-0030 Deeper EE/CA Bank Samples 3 - 3 5 12/16/99 ND(0 291) ND(0 291) 5 95 AG 5 95

H2-BS000126-0-0050 Deeper EE/CA Bank Samples 5 - 5 5 12/16/99 ND(0 0779) ND(0 0779) 1 19 1 19

Notes

Samples represent soil samples split with USEPA on behalf of GE by Blasland. Bouck & Lee. Inc

Samples were analyzed b\ Northeast Analytical. Inc for PCBs

ND(0 10) - Analvte was not detected The value in parentheses ts the associated detection limit

AG - Aroclor 1260 is being reported as the best Aroclor match The sample exhibits an altered PCB pattern

PI - Aioclor 1248 is being used to report an alleied PCB pattern exhibited by the sample Actual Aioclor 1248 is not present

in the sample, but is ieported to moie acuiiulely quantif) PCB piexenl in sample that has mulct gone enviionmental alteration

u \hous\monthly\River xls Page 1 of 1 2/8/00

Page 45: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

SURFACE WATER DATA RECEIVED DURING JANUARY 2000 I 1/2 MILE REACH

(Results <tre presented in parts per million, ppm)

Date Aroclor 1016, 1221, Sample ID Location Collected 1232, 1248, 1254, & 1260 Aroclor 1242 Total PCBs POC TSS Chlorophyll (a)

LOGA I ION 6 Dawes Ave Bridge 12/21/99 ND(0 0000250) 0 0000288 PD 0 0000288 0 51 7 5 0 0019 I OCA I ION 6 Dawes Ave Bridee 1/6/0(1 ND(0 0000252) ND(0 0000252) ND(0 0000252) 0 39 i i 0 0008

N o t e s

1 Samples were collected by Blasland. Bouck & l.ee, Inc and .submitted to Northeast Analytical. Inc and/ot Aquaiec Biological Sciences, for analy sis of unfiltered PCBs.

lotal Suspended Solids ( TSS), Particulate Organic Carbon (POC). and Chlorophyll (a)

2 Sampling methods involved the collection of composite grab samples at each location, representative of three stations (25, 50, and 75 percent of the total river width at each location) at 50 percent of the total river depth at each station

3 ND - Compound was analyzed for. but was not detected The detection limit is presented in parentheses

4 PD - Aroclor 1242 is being used to report an altered PCB pattern exhibited by the sample Actual Aroclor 1242 is not present

m the sample but is reported to more accurately quantify PCB present in sample that has undergone environmental alteration

u \hous\monlhly\River \ls Page 1 of 1 2/8/00

Page 46: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 15

HOUSATONIC RIVER AREA REST OF THE RIVER

JANUARY 2000

a. Activities Undertaken/Completed

On January 6, 2000, BBL (on GE's behalf) performed one round of water column monitoring at seven locations along the Housatonic River between Coltsville, MA and Great Barnngton, MA. The six locations in the Rest of the River are as follows: Hubbard Avenue Bridge (Location 1); Holmes Road Bridge (Location 7); New Lenox Road Bridge (Location 9); Woods Pond Headwaters (Location 10); Schweitzer Bridge (Location 12); and Division Street Bridge (Location 13). Sampling activities were performed downstream to upstream. Composite grab samples were collected at each location and submitted to NEA for PCB (total), TSS, POC, and chlorophyll-a analysis.

b. Sampling/Test Results Received

See attached tables.

c. Work Plans/Reports/Documents Submitted

BBL prepared and submitted to MDEP the Scientific Collectors Permit Annual Report.

d. Upcoming Scheduied Activities (next six weeks!

- Continue Housatonic River monthly water column monitoring.

- Continue split bank soil and sediment sampling with EPA.*

- Continue split floodplam soil sampling with EPA.*

- Meet with EPA to discuss status of EPA's ecological risk assessment studies.*

- Receive and review EPA's revised Supplemental Investigation Work Plan.*

- Attend modeling meeting in Pittsfield in March.*

e. General Progress/Unresolved Issues/Potential Schedule Impacts

Ongoing discussions regarding EPA's modeling and risk assessment activities *

f. Proposed/Approved Work Plan Modifications

None

Page 47: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

HOUSATONIC RIVER - REST OF RIVER

DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OF JANUARY 2000

Project Name Sample-ID Date Sampled Depth Range Laboratory Analyses Date Received Water Column Moil HR-DI 12/21/99 NA (LOCA I ION I) NFA PCB.TSS.Chlorophyll(a).POC 1/10/00

\ V\ ater C olumn Moil I OC A I ION 1 12/21/99 NA Water NLA PCB,TSS,Chlorophyll(a).POC 1/10/00

} Water C olumn Moil 1 OCA I ION 10 12/21/99 NA Watei NLA PCB.TSS.Chloroph) ll(a).POC 1/10/00

W ater C olumn Moil I.OC A I ION 12 12/21/99 NA Watei NLA PCB.TSS.Chloiopliyll(a).POC 1/10/00

Water ( olumn Moil I OCA I ION 13 12/21/99 NA Water NLA PCB. rSS.Chlorophyll(a).POC 1/10/00

\ W alei Column Mon I O C A I I O N 7 1 2 / 2 1 / 9 9 NA Water Nl A PC B ISS.ChloropIn 11(a).POC 1/10/00

\ W atei C olumn Mon I O C A I I O N 9 1 2 / 2 1 / 9 9 NA W alei Nl A PC B. I SS.C hloropln ll(n).POC 1/10/00

W alei C olumn Moil I OCA I ION 13 1/6/00 NA Watei NLA PCB I SS.ChloropIn 11(a) POC 1/27/00

Water C olumn Mon I OCA I ION 12 1/6/00 NA Waiei Nl A PCB. I SS.ChloropIn ll(a).POC 1/27/00

W ater C olumn Mon L OCA I ION 10 1/6/00 NA Watei NLA PCB. I SS.ChloropIn ll(a).POC 1/27/00

Water C olumn Mon I OCA HON 9 1/6/00 NA Water NLA PCB.TSS,Chlorophyll(a).POC 1/27/00

\ Water Column Mon LOCA I ION 7 1/6/00 NA Water NEA PCB,TSS,Chlorophyll(a).POC 1/27/00

Water Column Mon LOCATION I 1/6/00 NA Water NEA PCB.TSS,ChIorophyll(a).POC 1/27/00

s Water Column Mon IIR-DI 1/6/00 NA (LOCA LION 1) NLA PCB.TSS,Ch!orophyll(a).POC 1/27/00

'A Split I loodplain San 113-1 1 001135-0-0000 11/17/99 0-0 5 Soil NLA PCB 1/3/00

Split I loodplain San I13-I-I 001136-0-0000 11/17/99 0-0 5 Soil NEA PCB 1/3/00

'A Split I loodplain San 113-1 I 001 137-0-0000 11/17/99 0-0 5 Soil NLA PCB 1/3/00

)am Soil Hoiing Dru lpling WI'DS-12-45887 12/14/99 NA Soil Adnondack PCB 1/3/00

I leld duplicate sample locations are presented in parenthesis 2/8/00 1 of 1

Page 48: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

TABLE I

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

SURFACE WATER DATA RECEIVED DURING JANUARY 2000 REST OF RIVER

(Results are presented in parts per million, ppm)

Date Aroclor 1016, 1221, Sample ID Location Collected 1232, 1242, & 1248 Aroclor 1254 Aroclor 1260 Total PCBs POC TSS Chlorophyll (a)

I ()( \ I ION I Hubbard Ave Bridge 12/21/99 ND(0 0000250) ND(0 0000250) Nl)(() 0000250) ND(0 0000250) 0 26 2 6 0 0007 |ND(0 0000250)| [Nl)(0 0000250)| |NI)(0 0000250)| |ND(0 0000250)| [0 27| 13 31 |0 0007|

I OCA I ION 7 lolmes Rd Bridge 12/21/99 ND(0 0000250) ND(0 0000250) NI)(0 0000250) ND(0 0000250) 0 39 6 5 0 0016 I.OCAI ION 9 New Lenox Rd Bridge 12/21/99 ND(0 0000250) 0 0000616 AF 0 0000817 0 000143 0 7 1 12 0 0018 LOCAl ION 10 Headwaters of Woods Pond 12/21/99 ND(0 0000250) 0 0000293 AF 0 0000270 0 0000563 0 40 5 3 0 0014 LOCATION 12 Schweitzer Bridge 12/21/99 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 17 2 3 0 0010 LOCATION 13 Division St Bridge 12/21/99 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 16 3 1 0 0013

L.OCA TION Hubbard Ave Bridge 1/6/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 37 1 2 0 0008 [ND(0 0000250)] [ND(0 0000250)] [ND(0 0000250)] [ND(0 0000250)1 [0 27] [1 5] [0 0007]

LOCAl ION 7 lolmes Rd Bridge 1/6/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 42 3 6 0 0015 LOCATION 9 New Lenox Rd Bridge 1/6/00 ND(0 0000269) ND(0 0000269) ND(0 0000269) ND(0 0000269) 0 4 1 3 0 0 0015 LOCATION 10 Headwaters of Woods Pond 1/6/00 ND(0 0000250) ND(0 0000250) 0 0000281 0 0000281 0 33 3 7 0 0015 LOCAl ION 12 Schweitzer Bridge 1/6/00 ND(0 0000250) ND(0 0000250) 0 0000299 0 0000299 0 3 1 3 1 0 0015 .OCA I ION 13 Division St Bridge 1/6/00 ND(0 0000250) ND(0 0000250) ND(0 0000250) ND(0 0000250) 0 26 25 0 0020

Notes

1 Samples weie collected by Blasland, Boutk & Lee. Ine and submitted to Northeast Analytical, lne and/or Aquutcc Biological Sciences, foi analysis of unllllered PCBs.

1 otal Suspended Solids ( TSS). Particulate Organic Carbon (POC). and Chlorophyll (a)

2 Sampling methods involved the collection of composite grab samples at each location, representative of three stations (25. 50. and 75 percent of the total river width at each location) at 50 percent of the total river depth at each station

3 ND - Compound was analy/ed for, but was not detected The detection limit is presented in parentheses

4 Blind duplicate results are presented in brackets

5 Al - Aroeloi 1254 is being reported as the best Aioclor match fhe sample exhibits an altered 1'CB pattern

u \hous\inonthly\River xls Page 1 of I 2/8/00

Page 49: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY

I ABLE 2

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

WOODS POND DAM SOIL BORING DRUM SAMPLING PCB DATA RECEIVED DURING JANUARY 2000

REST OF RIVER (Results are presented in dry-weight parts per million, ppm)

Date Aroclor 1016, 1221, 1232, Sample ID Collected 1242, 1248, 1254, & 1260 Total PCBs

WPDS-12-45887-1 12/14/99 NI)( 1) ND( I

Notes

1 Sample was collected Irom GL Drum #45887 located in Bldg 12 Annex Room by Blasland. Bouck & Lee. Inc

and submitted to Adirondack Environmental Services. Inc for analysis of total PCBs

2 ND(0 10) - Analyte was not detected The value in parentheses is the associated detection limit

u \hous\monthly\River xls Page 1 of 1 2/8/00

Page 50: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 19

OTHER AREAS ALLENDALE SCHOOL PROPERTY

JANUARY 2000

Activities Undertaken/Completed

Pre-certification inspection conducted on January 20.*

Sampling/Test Results Received

N/A

Work Plans/Reports/Documents Submitted

N/A

Upcoming Scheduled Activities (next six weeks)

Submit Final Completion Report and Request for Certification of Completion of this Removal Action.*

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 51: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 21

GROUNDWATER MANAGEMENT AREA PLANT SITE1 JANUARY 2000

Activities Undertaken/Completed

- Continued automated groundwater and oil pumping at East Street Area 1 - North and South. No oil was removed from the caissons. Continued monthly well monitoring and manual oil removal. 0.005 liter of oil was removed from wells 34 and 72. 0.25 and 0.05 liters were removed from wells 105 and 106, respectively. Summary tables follow.

- Continued automated groundwater and oil pumping at East Street Area 2-South. A total of 1,305 gallons of oil was removed from pumping systems 64V, RW-l(S) and 64S. Continued monthly/weekly well monitoring and manual NAPL removal. Summary tables follow.

- Continued automated groundwater and oil pumping at the Lyman Street Area. A total of 2 gallons of LNAPL was removed from the recovery systems. Continued well monitoring and manual NAPL removal. LNAPL was removed from wells LS-2, LS-31, and LSSC-06 m quantities of 0.24, 0.24 and 0.6 liters respectively DNAPL was removed from wells LS­12, LS-30, LS-31, LS-34, LS-34I, LSSC-07 and LSSC-16I in quantities of 0.61, 0.7, 0.7, 0.61, 0.77, 3.5 and 1 1 liters respectively. No seeps were observed during weekly nverbank inspections. Summary tables for well monitoring and oil recovery are attached.

- Continued automated DNAPL recovery at Newell Street Area II with the collection of 777.3 gallons of DNAPL from the two automated collection systems. Continued well monitoring and manual NAPL removal Summary tables follow.

Sampling/Test Results Received

See attached table.

Work Plans/Reports/Documents Submitted

Submitted a January 14 report that summarized DNAPL recovery at Newell Street Area II.

Upcoming Scheduled Activities fnext six weeks!

- Continue ongoing oil recovery and well monitoring activities.

- Prepare semi-annual monitoring report for East Street Area 2 - North and South.

- Begin preparation of Baseline Groundwater Monitoring Proposal, due for submittal in April.*

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 52: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

TABLE 1 GENERAL ELECTRIC COMPANY - PITTSFIELI) MASSACHUSETTS

PLANT SITE I GROUNDWATER MANAGEMEN I AREA DATA RECEIVED AND SAMPLES COLLECTED DURING THE MONTH OK JANUARY 2000

Project Name Sample-ID Dale Sampled Depth Range Matrix I aboratorx Analyses Date Received Reclnirge Pond Semi-Annual (iVV Monitoring 22-GW-3I 12/14/99 N A Water Quantcrra PCB VOC SVOC.TOC.TOX pH Specific Conductance 01/04/00

Recharge Pond Scmi-AnnualGW Monitoring 43-GW-3I 12/14/99 N A Watei Quantcrra PCB VOC SVOC.TOC.'IOX.pH.Specific Conductance 01/04/00

Recharge Pond Semi- Annual GVV Monitoring 44-GW-3I 12/14/99 N A Water Quanterra PCB VOC SVOC.TOC.TOX.pH.Specific Conductance 01/04/00

Recharge Pond Senti-Annual G\V Monitoring P-6-GW-28 12/14/99 N A Water Quanterra PCB VOC SVOC TOC TOX.pH.Specilic Conductance 01/04/00

Recharge Pond Semi-Annual GW Monitoring 22-GW-22 12/21/99 N A Water Quanterra PCB VOC SVOC IOC. FOX pi I.Specific Conductance 01/11/00

Re'ehaige Pond Semi-\nnnal (i\\ Monitoring 43-GW-32 12/21/99 N A Water Quanterra PC B VOC SVOC IOC I OX pll Specific Conductance 01/11/00

Recharge Pond Semi-Annual (i\V Monitoring 44-GU-32 12/21/99 N A Watei Quanterra PC B VOC SVOC IOC IOX pi I Specific C onductance 01/11/00

Recharge Pond Semi-Annual GV\ Monitoring P-6-GW-29 12/21/99 N A Water Quanterra PCB VOC SVOC I Ot I OX pll.Specilk Conductance 01/11/00

I leld duplicate sample locations are presented in parenthesis 2/8/00 1 of 1

Page 53: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

PRELIMINARY ANALYTICAL DATA SUBJECT TO VERIFICATIONTABLE 1

GENERAL ELECTRIC COMPANY PITTSFIELD, MASSACHUSETTS

PLANT SITE 1 GROUNDWATER MANAGEMENT AREA RECHARGE POND SEMI-ANM \I GROUNDW ATER MONITORING DATA RECEIVED DURING JANUARY 2000

(Results in mg/L)

Sample ID: 22-GW -22 43-GVV-32 44-GW-32 P-6-GW-29 Date Collected: 12/21/99 12/21/99 12/21/99 12/21/99

Volatile Organics .2-Dichloroethene (total) 0 0053 ND(0 0050) ND(OOIO) ND(0.0050)

1,3-Dichlorobenzene 0 0033 J ND(0 010) 0 0060 J ND(O.OIO) 1,4-Dichlorobenzene 0 013 0 0042 J 0 0 1 6 0.0029 J Acetone 0 0082 J 0 0099 J 0 0070 J 0.0090 J Benzene 0 0012 J 0 023 0 019 0.0020 J Chlorobenzene 0 068 0 021 0 33 0.0018 J Ethvlbenzenc 0 091 ND(0 0050) 0 0029 J ND(0 0050) Methvlene Chloride 0 0010 J ND(0 0050) ND(0 0I0) 0 0013 J Toluene

nchloroethene 0 0098

00018 I ND(0 0050) ND(0 0050)

ND(0 010) ND(0 010)

ND(0.0050) ND(0 0050)

Xylenes (total) PCBs

0 094 ND(0 0050) ND(OOIO) ND(0.0050)

Aroclor-1254 ND(0 00020) 0 0088 0 0019 0 0064 Aroclor-1260 0 0024 0019 0 0045 0019 I'otal PCBs 0 0024 0 028 0 0064 0 025 Semivolatile Organics !-Chlorophenol 2-Methylnaphthalene Acenaphthene

ND(0 0I0) 0 0080 I 0 0016 I

ND(OOIO) ND(0 010) 0 0071 J

0 0032 I ND(0 0I0)

0 043

ND(O.OIO) ND(O.OIO) 0 0029 J

Anthracene ND(0 0I0) 00018 J ND(0 0I0) ND(OOIO) Benzo(a)anthracene ND(OOIO) ND(OOIO) ND(OOIO) 0 0015 J Chrvsene ND(0 010) ND(OOIO) ND(OOIO) 0 0015 J Dibenzoturan ND(0 010) 0 0024 I ND(0 010) ND(OOIO) Fluoranthcne ND(0 010) 0 0046 J 0 0020 J 0 0033 J Fluorene ND(OOIO) 0 0044 J ND(0 010) 0 0018 J Naphthalene 0 28 D 0 0023 I 0 0041 I 0 0032 J Phenanthrene ND(0 010) 0 0052 J ND(OOIO) 0.0013 J Phenol ND(OOIO) 0 0026 J ND(OOIO) ND(OOIO) Pvrenc ND(OOIO) 0 0037 J 00018 J 0 0036 J 'onvcntionals

Total Organic Carbon 6 9 21 1 0 14 Total Organic Halide 000029 I 0 036 ND(0 030) 0 0011 J Specific Conductance (umhos/cm) 400 850 1300 610 pH (standard pll units)) 6 7 7 I 7 3

Notes.

1) Samples were collected by Blasland. Bouck A I ee. Inc . and were submitted to Quanterra Environmental Services. Inc lor analysis of PCBs. VOCs SVOCs. IOC s. pll and Speclic Conductance

2) ND - Analvtc was not detected The number in parentheses is the associated quantitation limit for VOCs and SVOCs and the associated detection limit for other constituents

"0 I - Indicates an estimated value less than the C I P-required quantitation limit 4) D - Compound quantitated using a secondary dilution 5) Only those constituents detected in at least one sample are summarized

Plant \ls Page I of 1 2/8/00

Page 54: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA 1ACTIVE RECOVERY SYSTEMS MONTHLY SUMMARY

January 2000

Vol. Oil Vol. Water Percent Collected Recovered Downtime

Northside Jan 99 0 20,900 Caisson Feb 99 1 25,900

Mar 99 0 38,200 Apr 99 0 12,900 May 99 0 25,500 Jun 99 0 23,600 Jul 99 0 18,000 Aug 99 2 16,900 Sep 99 0 22,400 Oct 99 0 23,600 0.89 Nov 99 0 21,400 Dec 99 0 30,000 0.36 Jan 00 0 20,100

Southside Jan 99 10 52,690 3.5 Caisson Feb 99 3 70,720

Mar 99 0 91,560 Apr 99 0 71,610 May 99 0 70,010 Jun 99 0 70,910 Jul 99 0 Aug 99 0 Sep 99 15 Oct 99 15 59,020 0.89 Nov 99 10 72,130 Dec 99 15 89,520 0.36 Jan 00 0 64,600

Flow meter not functioning properly

Depth Depth Petro Oil Well to to Thickness Removed

ID Date Water Petro (Ft.) (L) 34 01/06/00 5.81 5.80 0.01 0.005 52 01/06/00 5.35 0.00 0.00 72 01/06/00 6 81 6 80 0.01 0.005

105 01/06/00 7.73 7 34 0.39 0 25 106 01/06/00 7 78 7 70 0.08 0 05 131 01/06/00 Well obstructed, unable to measure

Page 1 of 1

Page 55: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA 2 ACTIVE RECOVERY SYSTEMS MONTHLY SUMMARY

January 2000

64S

64V

RW-1(X)

Month Jan 99 Feb 99 Mar 99 Apr 99 May 99 Jun 99 Jul 99 Aug 99 Sept 99 Oct 99 Nov 99 Dec 99 Jan 00

Jan 99 Feb 99 Mar 99 Apr 99 May 99 Jun 99 Jul 99 Aug 99 Sept 99 Oct 99 Nov 99 Dec 99 Jan 00

Jan 99 Feb 99 Mar 99 Apr 99 May 99 Jun 99 Jul 99 Aug 99 Sept 99 Oct 99 Nov 99 Dec 99 Jan 00

Gal. Oil Collected

1183 1188 687 600 713 280 633 547 688

1156 672

1063 617

703 1594 1380

320 630

1084 708 728 745

1504 717

1326 688

58 85 42

220 47 26 41 53 75 68 33 36 0

Gal. Water Recovered

244,655 525.812 755,120 711,644 550,617 564.813 383,882 218,817 297,272 348,434 430,661 591,113 451,868

886,800 1,019,000 1,326,500 1,062,400 1,004,400 1,106,400

971,200 840,300 979,900 893,400

1,933,100 1,109,200

936,500

1,007,700 789,900 892,600 755,865 743,200 894,100 766,500 825,600 905,100 689,000 654,400 887,800 711,000

Percent Downtime

2.4

0.7

0.25 0.89 0.14 0.3

0.89

0.3

0.89 09 6 0 2.08

Page 1 of 3

Page 56: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA 2 ACTIVE RECOVERY SYSTEMS MONTHLY SUMMARY

January 2000

RW-2(X)

64X

64R

Month Jan 99 Feb 99 Mar 99 Apr 99 May 99 Jun 99 Jul 99 Aug 99 Sept 99 Oct 99 Nov 99 Dec 99 Jan 00

Jan 99 Feb 99 Mar 99 Apr 99 May 99 Jun 99 Jul 99 Aug 99 Sept 99 Oct 99 Nov 99 Dec 99 Jan 00

Jan 99 Feb 99 Mar 99 Apr 99 May 99 Jun 99 Jul 99 Aug 99 Sept 99 Oct 99 Nov 99 Dec 99 Jan 00

Gal. Oil Collected

0 0 0 0 0 0 0 0 0 0 0 0 0

58 85 42

220 47 26 41 53 75 68 33 36

0

461 0 0 0 0

485 0

1812 1406

546 0

450 ' 0

Gal. Water Recovered

403,200 478,600 559,500 289,100 417,300 527,600 437,500 394,200 495,929 414,600 348,600 437,900 329,500

400,700 403,200 489,600 475,200 403,200 504,000 403,200 403,200 517,171 403,200 403,200 504,000 417,600

87,600 198,500 317,400 319,600 183,400 198,700 216,400 160,200 170,200 180,600 117,400

91,600 62,000

Percent Downtime

3.8 0.03 0.7

1.79

0.89 1 .2 0.3

0.7

0.89 0.9 6.0

0.89

0.3

Page 2 of 3

Page 57: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA 2 ACTIVE RECOVERY SYSTEMS MONTHLY SUMMARY

January 2000

Gal. Oil Gal. Water Percent Month Collected Recovered Downtime

#40R Jan 99 461 * Feb 99 0 * Mar 99 0 * Apr 99 0 * May 99 0 * Jun 99 485 * Jul 99 0 * Aug 99 1812* Sept 99 1406 * Oct 99 546 * 0.89 Nov 99 0 * Dec 99 450 * 0.3 Jan 00 0 *

RW-1(S) Jan 99 1183 *** 448,497 2.4 Feb 99 1188 *** 630,853 Mar 99 687 *** 881,773 Apr 99 600 *** 701,478 May 99 713 *** 607,851 Jun 99 280 *** 643,808 Jul 99 633 *** 483,704 Aug 99 547 *** 398,667 Sept 99 688 *** 516,853 Oct 99 1156 *** 499,743 0.89 Nov 99 672 *** 530,384 0.14 Dec 99 1063 *** 703,025 0.3 Jan 00 617 *** 535,994

* oil collected is combination of 64R and 40R ** oil collected is combination of RW-1(X) and 64X *** oil collected is combination of 64S and RW-1(S)

Page 3 of 3

Page 58: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

SLURRY WALL Weekly Well Monitoring

January 2000

MP ELEV OIL DEPTH TO OIL CORRECTED MEASURED WL SAMPLING WELL (FT ABOVE) DEPTH WATER THICKNESS WL ELEV (FT. ELEV (FT.

DATE ID MSL) (FT) (FT) (FT) ABOVE MSL) ABOVE MSL) 01/05/00 42 988 33 0.00 13 83 0 00 974 50 974.50 01/05/00 48 992.39 19 56 21 86 2.30 972 55 970.53 01/05/00 49R 988.71 0.00 1575 0.00 972.96 972.96 01/05/00 49RR 989 80 0 00 16 95 0 00 972 85 972 85 01/05/00 55 989 45 16 62 17 95 1 33 972 67 971 50 01/05/00 56 987.28 16 43 16 80 0.37 970 81 970 48 01/05/00 57 989.80 0 00 13 66 0 00 976 14 976 14 01/05/00 58 985.79 0.00 13 20 0.00 972 59 972 59 01/05/00 59 986 32 0 00 15.06 0 00 971 26 971.26 01/05/00 64X-N 984.83 12 39 12.66 0 27 972.41 972.17 01/05/00 64X-S 981.56 9.39 9 46 0.07 972 16 972.10 01/05/00 64X-W 984 87 12 75 12.86 0 11 972 11 972.01 01/05/00 64V 987.29 22 40 22.90 0.50 964.83 964.39 01/12/00 42 988.33 0.00 13.95 0.00 974.38 974.38 01/12/00 48 992.39 19 69 21.95 2 26 972 43 970.44 01/12/00 49R 988 71 0 00 15.93 0.00 972.78 972.78 01/12/00 49RR 989.80 0.00 17.07 0.00 972 73 972.73 01/12/00 55 989 45 16 84 19 20 2.36 972 33 970.25 01/12/00 56 987.28 16 56 16.81 0.25 970.69 970.47 01/12/00 57 989.80 0 00 13 68 0 00 976.12 976.12 01/12/00 58 985 79 0 00 13.55 0 00 972.24 972 24 01/12/00 59 986.32 0 00 15.27 0 00 971.05 971.05 01/12/00 64X-N 984.83 12.46 12.70 0.24 972 34 972.13 01/12/00 64X-S 981.56 9 60 9.78 0 18 971.94 971.78 01/12/00 64X-W 984 87 12.98 13.10 0.12 971.88 971.77 01/12/00 64V 987.29 22.60 23.00 0.40 964.64 964.29 01/19/00 42 988.33 0.00 14.03 0.00 974.30 974.30 01/19/00 48 992.39 20.11 22.68 2.57 971.97 969.71

Page 1 of 2

Page 59: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

MP ELEV OIL DEPTH TO OIL CORRECTED MEASURED WL SAMPLING WELL (FT ABOVE) DEPTH WATER THICKNESS WL ELEV (FT. ELEV (FT.

DATE ID MSL) (FT) (FT) (FT) ABOVE MSL) ABOVE MSL) 01/19/00 49R 988 71 0 00 16 40 0 00 972.31 972.31 01/19/00 49RR 989.80 0.00 17.51 0.00 972 29 972.29 01/19/00 55 989 45 17 28 19 51 2 23 971 90 969.94 01/19/00 56 987 28 16.91 17.10 0 19 970 35 970.18 01/19/00 57 989 80 0.00 13 70 0 00 976 10 976.10 01/19/00 58 985 79 0.00 14.10 0 00 971 69 971 69 01/19/00 59 986 32 0 00 16 30 0 00 970 02 970 02 01/19/00 64X-N 984 83 12 78 12 98 0 20 972 03 971 85 01/19/00 64X-S 981 56 9 99 10 08 0 09 971 56 971.48 01/19/00 64X-W 984.87 13 31 13.45 0 14 971.54 971.42 01/19/00 64V 987.29 22 80 23.10 0.30 964.45 964.19 01/26/00 42 988 33 0.00 14 57 0.00 973 76 973.76 01/26/00 48 992 39 20.63 23 65 3 02 971 40 968 74 01/26/00 49R 988.71 0 00 17.05 0 00 971.66 971.66 01/26/00 49RR 989 80 0 00 18.05 0.00 971 75 971.75 01/26/00 55 989.45 17 90 20.60 2.70 971.23 968.85 01/26/00 56 987 28 * 17.35 01/26/00 57 989 80 0 00 14.02 0.00 975 78 975.78 01/26/00 58 985.79 0.00 12 82 0.00 972.97 972 97 01/26/00 59 986 32 0 00 16.22 0.00 970 10 970.10 01/26/00 64X-N 984.83 13 87 14.01 0.14 970.94 970.82 01/26/00 64X-S 981 56 11 18 11.35 0.17 970 36 970.21 01/26/00 64X-W 984 87 14.54 14.60 0.06 970 32 970.27 01/26/00 64V 987.29 22.60 23.00 0.40 964 64 964.29

Well 56 appears to have collapsed

Page 2 of 2

Page 60: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

GROUNDWATER ELEVATIONS - AREA II

SAMPLING DATE

01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00 01/04/00

WELL NO 02 05 06 08 28 29 32 35 36 37 38 43 44 47 51 64 P-3

P-3D P-7

POND ES2C-25

MP ELEV (FT ABOVE

MSL) 995 24 992 94 991 34 985 39 991 81 991 57 990 81 982 81 982 94 980 37 980 77 989 69 988.38 991.09 985.42 985.00 987 87 988.54 989.10

997 06

January 2000

OIL DEPTH (FEET)

18.98 15 95

0 00 11 73

0.00 18 75 0.00 0 00 0.00 0 00 0 00 0 00 0.00

18.30 0.00 0.00 0.00 0.00 0.00

0.00

H20DEPTH (FEET)

19 66 16.80 14 19

No water in well

13.22 18 80 13.24 9 40 9.69 6.88 6.10

15.43 13 59 19 39 12.60 12.97

4 87 9.71

14.08 1.12

20.40

OILTHICK (FEET)

0.68 0.85 0.00 0 85 0 00 0 05 0 00 0.00 0 00 0.00 0.00 0.00 0.00 1.09 0 00 0.00 0 00 0.00 0.00

0.00

CORRECTED WL ELEV

(FT ABOVE MSL) 976 19 976 90 992 10 972.17 978.59 972.81 977.57 973.41 973.25 973 49 974 67 974 26 974.79 972.67 972.82 972.03 983 00 978.83 975.02

Page 1 of 1

976.66

Page 61: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA II RIVERBANK Weekly/Monthly Well Monitoring & Oil Removal

January 2000

Depth Depth Well ID

PZ-1S

PZ-6S

WP-1

WP-6

WELL 53

WELL 54

WELL E2SC-23

WELL E2SC-24

WELL 63

Date 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00 01/06/00 01/13/00 01/20/00 01/27/00

to Water 17.84 17 90 18 .16 19 45 12.35 12.48 12.75

Dry at 13 27' 7 34 7 44

13.51

17 36 17 34 17 33 17 62 16.07 16.93 17 38 18.07 14 28 14 40 14 68 15 78

to Petro 0.00 0.00 0.00

19.24 0 00 0.00 0.00

0 00 0.00

0.00

0.00 0.00 0.00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Petro Thickness

0.00 0.00 0.00 0.21 0.00 0.00 0.00

0.00 0.00

0 00

0.00 0.00 0 00 0 00 0.00 0 00 0.00 0.00 0.00 0 00 0 00 0 00

Page 1 of 2

Page 62: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA II RIVERBANK Weekly/Monthly Well Monitoring & Oil Removal

January 2000

Depth Depth Oil Well to to Petro Removed ID Date Water Petro Thickness (L)

RB-1 01/06/00 13.51 13.40 0.11 ES2-1 01/04/00 12.86 0.00 0.00

ES2-2A ES2-6

01/04/00 01/04/00

7 60 *

0.00 0.00

ES2-7 01/04/00 7.42 0.00 0.00 PZ-2S 01/04/00 13 36 13.35 0.01 PZ-4S 01/06/00 8 55 0 00 0.00

* Unable to monitor because of construction activities ** Removed due to construction activities

Page 2 of 2

Page 63: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA 2 WELLS WEEKLY MEASUREMENT AND REMOVAL

OF RECOVERABLE DNAPL January 2000

DEPTH TO DEPTH TO DNAPL DNAPL WELL SAMPLING DNAPL WATER THICKNESS REMOVED

DATE (FEET) (FEET) (FEET) (L)

01/05/00 0 00 24 65 <0.01 01/12/99 0.00 24.77 <0.01 01/19/99 0 00 24.80 <0.01 01/26/99 0.00 24.70 <0.01

E2SC-17 01/06/00 45.68 12.70 3.82 0.10 01/13/00 47 83 13.27 1 67 0.10 01/20/00 46.66 13.69 2.84 01/27/00 42 90 14 62 6.60

E2SC-3I 01/06/00 37 81 9 75 9 51 6 00 01/13/00 37.67 10.52 9.65 01/20/00 38 02 11.32 9.30 01/27/00 34 92 12 .16 12.40

ES2-17 01/05/00 0 00 13.80 <0.01 01/12/99 0 00 13.66 <0.01 01/19/99 0 00 13.83 <0.01 01/26/99 0 00 14.07 <0.01

RW-3X 01/06/00 38.95 8.33 5.55 15.00 01/13/00 36.55 8.81 7.95 18.90 01/20/00 37.29 8.66 7.21 18.90 01/24/00 37.60 9 24 6 90 01/27/00 38.20 9.55 6.30 19 00

E2SC-3S 01/24/00 0.00 11.89 0 00 3-6C-EB-25 01/03/00 25.14 14.03 0.01

01/10/00 0 00 13.92 0.00 01/17/00 0 00 13.86 0.00 01/24/00 0 00 14 11 0.00 01/31/00 0.00 14.21 0 00

3 -6C-EB-26 01/03/00 0 00 14.90 0 00 3-6C-EB-28 01/03/00 0.00 13.78 0.00

01/10/00 0 00 13.67 0 00 01/17/00 0 00 13.60 0.00 01/24/00 0 00 13 83 0.00 01/31/00 0 00 13.92 0.00

3-6C-EB-29 01/03/00 0 00 13.92 0 00 64V 01/27/00 0.05 0 00

* Pump lines frozen, could not be cleared

Page 1 of 1

Page 64: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

EAST STREET AREA 2 WELLS WEEKLY MEASUREMENT AND REMOVAL

OF RECOVERABLE LNAPL January 2000

DEPTH DEPTH LNAPL LNAPL WELL SAMPLING TO TO THICKNESS REMOVED

ID DATE WATER LNAPL (FT.) (L) BLDG. 42 01/03/00 20.20 0 00 <0.01 ELEVATOR 01/10/00 20.23 0.00 < 0.01

01/17/00 20.35 0 00 <0.01 01/24/00 20.50 0.00 <0.01 01/31/00 20 25 0.00 <0.01

WELL 01/06/00 18.75 18.10 0.65 0.40 13 01/13/00 18.60 17.95 0.65 0.36

01/20/00 19.03 18.16 0.87 0.52 01/27/00 19 41 18.36 1.05 0.65

WELL 01/06/00 19.02 18.36 0.66 0.40 14 01/13/00 18.85 18.20 0.65 0.36

01/20/00 19.28 18.41 0.87 0.52 01/27/00 19.59 18.60 0.99 0.61

WELL 01/06/00 16.73 16.17 0.56 0.30 15R 01/13/00 16.30 16.15 0.15 0.02

01/20/00 16.57 16.35 0.22 0.13 01/27/00 17.55 16.46 1.09 0.67

WELL 01/06/00 10.71 10.70 0.01 50 01/13/00 10.63 10.61 0.02

01/20/00 10 72 10.69 0.03 01/27/00 10 97 10.96 0.01

WELL 01/06/00 17 58 0 00 0.00 66 01/13/00 17.76 0.00 0.00

01/20/00 18.16 0.00 0.00 01/27/00 18.77 0.00 000

WELL 01/06/00 19.81 0.00 0.00 TMP-1 01/13/00 20.01 0.00 0.00

01/20/00 20.48 0.00 0.00 01/27/00 21 11 0.00 0.00

Page 1 of 1

Page 65: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

LYMAN STREET OPERATIONAL SUMMARY January 2000

Total Vol. RW-1/1RLNAPL RW-1 DNAPL RW-3 LNAPL Sampling Wtr. Pumped Recovered Recovered Recovered

Month (gal) (gal) (gal) (gal) Jan 1998 298,359 5 - 30 Feb 1998 225,452 - 5 19 Mar 1998 284,690 5 1 30 Apr 1998 369,526 -- 4 25 May 1998 256,523 15 - 24 June 1998 296,248 10 - 19.5 July 1998 279,085 5 5 21 Aug 1998 179,426 - 4 10 Sept 1998 258,164 -- 2 19 Oct 1998 176,023 -- - 32 Nov 1998 152,718 4 5 5 Dec 1998 216,534 -- -- 17 Jan 1999 225,797 4 5 -- 15 Feb 1999 308,512 -- - 20 Mar 1999 322,310 - - 10 Apr 1999 281,237 2 -- 11 May 1999 254,277 2 - 10 June 1999 247,640 -- -- 3 July 1999 177,891 7 -8 Aug 1999 152,886 2 -5 Sep 1999 184,642 4.5 - 10 Oct 1999 213,379 4 - 25 Nov 1999 208,897 - - 5 Dec 1999 283,768 2 - 20 Jan 2000 189,541 2

Volume of water pumped is total from Wells RW-1, RW-2 and RW-3. As of September 9, 1998 RW-1 was replaced by RW-1(R). There was no downtime in January.

Page 1 of 1

Page 66: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

LYMAN STREET Weekly Well Monitoring/Oil Recovery

January 2000

Depth Depth Petro Depth to DNAPL Measured Corrected Well to to Thickness DNAPL Thickness Water Elev. Water Elev. Name Date Water Petro (feet) (feet) (feet) (feet) (feet)

RW-1 (R) 01/05/00 16 60 16.48 0.12 968.47 968 58 RW-2 01/05/00 19 80 0.00 0 00 968 02 968 02 RW-3 01/05/00 16 34 16 33 0 01 967 74 967 75 LS-11 01/06/00 Dry at 6 6' LS-12 01/06/00 13 04 0 00 0 00 26 52 0 01 972 45 972 58 LS-2 01/06/00 12 90 12 53 0 37 970 42 970 76

LS-20 01/06/00 13 60 0 00 0 00 972 04 972 04 LS-21 01/06/00 11.66 11 52 0.14 971 76 971 89 LS-23 01/06/00 12.67 12 65 0.02 972.72 972 74 LS-24 01/06/00 14.75 0 00 0.00 971.83 971.83 LS-30 01/06/00 14.49 0 00 0.00 21 05 1.18 971.95 971.95 LS-31 01/06/00 14 77 14.38 0.39 22.11 1.21 972 32 972.68 LS-32 01/06/00 14 30 0 00 0.00 971.37 971 37 LS-33 01/06/00 14 85 0.00 0.00 971.49 971 49 LS-34 01/06/00 13 45 0.00 0 00 27 93 0.63 972 34 972.34 LS-35 01/06/00 15 17 15 16 0.01 971.63 971.64 LS-38 01/06/00 1521 0.00 0.00 24.97 0.01 971.74 971.74 LS-4 01/06/00 12.72 12.71 0.01 17.85 0.30 971.79 971.80

LS-41 01/06/00 15 92 0 00 0.00 970.49 970.49 LS-43 01/06/00 8.91 0 00 0.00 972.47 972 47 LS-44 01/06/00 9.01 0 00 0.00 972.29 972.29 LS-45 01/06/00 8.55 0 00 0.00 972.00 972.00

P-1 01/06/00 6 81 0 00 0.00 971 50 971.50 P-2 01/06/00 4.71 0.00 0.00 971.49 971.49 P-3 01/06/00 8.78 0.00 0.00 971.53 971.53 P-4 01/06/00 5.46 5.38 0.08 971.68 971.75 P-5 01/06/00 8.80 0.00 0.00 971.47 971.47 P-6 01/06/00 9.58 0.00 0.00 971.39 971.39

Page 1 of 5

Page 67: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Depth Depth to to

Water Petro 6 83 0 00

13 95 12 95 10 38 0 00 11.60 0.00 8 69 0 00

15 46 0 00 8 74 0 00 8.55 0 00

12 81 0.00 13.08 0.00

16.90 16.50 18 86 0.00 16 65 16.45 12 94 0 00 12.43 12 40 11.65 11 48 14 37 0.00 14.43 14 27 14.18 0 00 14.83 0.00 13.32 0 00 15.10 0 00 12.64 0 00 15.84 0.00 8 84 0 00 8.94 0.00 8.46 0.00 6.75 0.00 8.70 0.00 5.50 5.37

Petro Thickness

(feet) 0.00 1.00 0.00 0 00 0.00 0 00 0.00 0.00 0.00 0 00

0 40 0.00 0.20 0.00 0.03 0.17 0.00 0.16 0.00 0.00 0.00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.13

Depth to DNAPL (feet)

24 40

28 19

27 60

26.46 16.75

21.55 22 75

27.45 24.88 17 62

DNAPL Thickness

(feet)

0 68

0 35

0.90

0.07 0 80

0.68 0 58

1 09 0.09 0.53

Measured Water Elev.

(feet) 971.54 970 96 972.10 971 51 972 19 971 86 971 94 971.94 971 93 971 93 972.34 968.17 968.96 967.43 972 55 970.89 971.77 972.07 972 66 971.49 971.51 972.47 971.85 971 87 970.57 972.54 972.36 972.09 971.56 971.61 971.64

er Elev. feet) 971.54 971 89 972 10 971.51 972 19 971 86 971 94 971 94 971.93 971.93 972.34 968.54 968.96 967.62 972.71 970.92 971.93 972.07 972.81 971.49 971.51 972.47 971 85 971.87 970.57 972.54 972.36 972.09 971.56 971.61 971.76

Page 68: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Depth Depth Petro Depth to DNAPL Measured Corrected Well to to Thickness DNAPL Thickness Water Elev. Water Elev.

Name Date Water Petro (feet) (feet) (feet) (feet) (feet) P-6 01/13/00 9.50 0 00 0.00 971.47 971.47 P-7 01/13/00 6 74 0 00 0 00 971 63 971 63

LSSC-07 01/13/00 10 33 0.00 0.00 24 58 0 51 972 15 972.15 LSSC-08S 01/13/00 11 53 0.00 0 00 971.58 971.58 LSSC-161 01/13/00 8 62 0.00 0 00 28 00 0.54 972.26 972.26 LSSC-18 01/13/00 15 38 0 00 0 00 971.94 971.94 LSSC-32 01/13/00 8 64 0 00 0.00 972.04 972 04 LSSC-33 01/13/00 8 49 0 00 0.00 972 00 972 00 LSSC-34I 01/13/00 12.73 0 00 0.00 27.12 1 37 972 01 972.01 LSSC-34S 01/13/00 12 99 0 00 0.00 972.02 972 02

River 01/13/00 971 42 971.42 RW-1 (R) 01/19/00 15.30 15.26 0.04 969.77 969 81

RW-2 01/19/00 19.50 0 00 0.00 968 32 968 32 RW-3 01/19/00 16.50 16.32 0.18 967.58 967.75 LS-12 01/20/00 13.66 0.00 0.00 26 35 0.18 971.83 972.04 LS-2 01/20/00 12.73 12 70 0 03 16.85 0.70 970.59 970.62

LS-21 01/20/00 12 15 11 92 0.23 971 27 971.48 LS-30 01/20/00 14 63 14 62 0.01 21.43 0 80 971.81 971.82 LS-31 01/20/00 14.58 14.40 0.18 22 74 0.59 972 51 972.68 LS-32 01/20/00 14.46 0.00 0.00 971.21 971.21 LS-33 01/20/00 15.26 0.00 0.00 971 08 971.08 LS-34 01/20/00 1381 0 00 0.00 28.15 0 39 971.98 971.98 LS-38 01/20/00 15.64 0 00 0.00 24 97 0.02 971 31 971.31 LS-4 01/20/00 13.07 0 00 0.00 17.58 0.57 971.44 971.44

LS-41 01/20/00 16.06 0 00 0 00 970.35 970.35 LS-43 01/20/00 9.35 0 00 0.00 972.03 972.03 LS-44 01/20/00 9.47 0.00 0.00 971.83 971.83 LS-45 01/20/00 9.00 0.00 0 00 971.55 971.55

P-1 01/20/00 7.28 7.27 0.01 971.03 971.04 P-3 01/20/00 9 16 0.00 0.00 971.15 971.15 P-4 01/20/00 6.22 6.11 0.11 970.92 971.02

Page 3 of 5

Page 69: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Depth Depth Petro Depth to DNAPL Measured to to Thickness DNAPL Thickness Water Elev. jr Elev.

Date Water Petro (feet) (feet) (feet) (feet) eet) 01/20/00 10.08 0 00 0.00 970.89 970.89 01/20/00 7 51 0.00 0 00 970.86 970 86 01/20/00 10 78 0 00 0 00 24 58 0.51 971.70 971.70 01/20/00 12 07 0 00 0.00 971.04 971 04 01/20/00 9 09 0 00 0.00 27 77 0.77 971.79 971.79 01/20/00 15 88 0 00 0 00 971 44 971 44 01/20/00 9 18 0 00 0 00 971 50 971 50 01/20/00 8 98 0 00 0 00 971 51 971 51 01/20/00 13 25 0 00 0 00 28 23 0 26 971 49 971 49 01/20/00 13 52 0 00 0.00 971 49 971.49 01/20/00 970.72 970 72 01/26/00 16 60 16 50 0.10 968.47 968 56 01/26/00 20.60 0 00 0.00 967.22 967.22 01/26/00 16.70 16 50 0.20 967.38 967.57 01/27/00 13 91 0 00 0 00 26.40 0 15 971 58 971.65 01/27/00 12 93 12 85 0 08 17 30 0.25 970.39 970.46 01/27/00 12 19 12.12 0.07 971.23 971 30 01/27/00 14 79 0.00 0.00 21.52 0 70 971 65 971 65 01/27/00 14.71 0 00 0.00 22.67 0 66 972.38 972.38 01/27/00 14.65 0 00 0.00 971.02 971.02 01/27/00 15 40 0.00 0.00 970 94 970.94 01/27/00 14.07 0 00 0.00 27.92 0 64 971.72 971.72 01/27/00 15 79 0.00 0.00 24 81 0 18 971.16 971.16 01/27/00 13.25 13.24 0 01 17.73 0.43 971.26 971.27 01/27/00 16.19 0.00 0.00 970.22 970.22 01/27/00 9 47 0.00 0.00 971.91 971.91 01/27/00 9.60 0 00 0.00 971.70 971.70 01/27/00 9 12 0.00 0 00 971.43 971.43 01/27/00 7.42 0.00 0.00 970.89 970.89 01/27/00 9.33 0.00 0.00 970.98 970.98 01/27/00 6.27 6.26 0.01 970.87 970.88

Page 4 of 5

Page 70: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Depth Depth Petro Depth to DNAPL Measured Corrected Well to to Thickness DNAPL Thickness Water Elev. Water Elev.

Name Date Water Petro (feet) (feet) (feet) (feet) (feet) FM3 01/27/00 10 31 000 0.00 970.66 970 66 P-7 01/27/00 7 69 0.00 0.00 970.68 970.68

LSSC-07 01/27/00 10 92 0.00 0 00 24.46 0.63 971 56 971.56 LSSC-08S 01/27/00 12 20 0 00 0.00 970.91 970.91 LSSC-161 01/27/00 9 23 0 00 0 00 28.35 0.20 971.65 971.65 LSSC-18 01/27/00 16 03 0 00 0 00 971 29 971 29 LSSC-32 01/27/00 9 31 0 00 0 00 971 37 971 37 LSSC-33 01/27/00 9 07 0 00 0 00 971 42 971 42 LSSC-34I 01/27/00 13 40 0 00 0 00 28 32 0 19 971 34 971 34 LSSC-34S 01/27/00 13 66 0 00 0 00 971 35 971 35

River 01/27/00 970 69 970 69

Page 5 of 5

Page 71: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Well ID Date

LS-2 01/06/00 01/13/00 01/20/00 01/27/00

LS-31 01/06/00 01/13/00 01/20/00 01/27/00

LSSC-06 01/06/00

LYMAN STREET WELLS Weekly Measurement and Removal

of Recoverable LNAPL January 2000

Depth Depth to to

Water LNAPL 12.90 12.53 12 43 12.40 12.73 12.70 12.93 12.85 14.77 14.38 14 43 14.27 14.58 14.49 14 71 0.00 13.95 12.95

LNAPL Thickness

0.37 0.03 0.03 0.08 0.39 0 16 0.09 0.00 1 00

LNAPL Removed

M. 0.24

0.24

0.60

Page 1 of 1

Page 72: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

LYMAN STREET WELLS Weekly Measurement and Removal

of Recoverable DNAPL January 2000

Depth Depth DNAPL Well to to DNAPL Removed

ID Date Water DNAPL Thickness (L) LS-4 01/06/00 12 72 17.85 0.30

01/13/00 12.64 17.62 0.53 01/20/00 13.07 17.58 0.57 01/27/00 13.24 27.92 0.64

LS-12 01/06/00 13.04 26.52 0.01 01/13/00 12.94 26.46 1.09 0.605 01/20/00 13.66 26.35 0 .18 01/27/00 13.91 26.40 0.15

LS-30 01/06/00 14.49 21.05 1.18 0.70 01/13/00 14 37 21 55 0.68 01/20/00 14.63 21.43 0.80 01/27/00 14 79 21.52 0.70

LS-31 01/06/00 14.77 22.11 1.21 0.70 01/13/00 14 43 22.75 0.58 01/20/00 14.58 22.74 0.59 01/27/00 14.71 22.67 0.66

LS-34 01/06/00 13 45 27.93 0 63 01/13/00 13.32 27.45 1.09 0.605 01/20/00 13.81 28.15 0.39 01/27/00 14.07 27.92 0.64

LSSC-07 01/03/00 10.77 24.56 0.52 0.30 01/06/00 10.38 24.40 0.68 0.42 01/07/00 10.46 24.68 0.41 0.25 01/10/00 10 65 24.36 0.73 0 45 01/13/00 01/14/00

10.33 10.40

24.58 24 99

0.51 0.10

0.305 0.06

01/17/00 01/20/00 01/21/00

10.62 10.78 10.83

24.70 24.58 24.94

0.39 0.51 0.15

0.24 0.30 0.09

LSSC-161

01/24/00 01/27/00 01/28/00 01/31/00 01/06/00

10.90 10 92 1091 10 93 8 69

24.60 24.46 24.84 24 61 28.19

0.49 0.63 0.49 0.48 0 35

0.30 0.38 0.15 0.30 0.20

01/13/00 8.62 28 00 0.54 0.31 01/20/00 9.09 27.77 0.77 0.46 01/27/00 9 23 28 35 0 20 0 12

LSSC-34I 01/06/00 01/13/00

12 81 12 73

27 60 27.12

0.90 1.37 0.770

01/20/00 13 25 28.23 0.26 01/27/00 13 40 28.32 0 19

Page 1 of 1

Page 73: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

LEGEND

" EDGE OF WATER

EDGE OF PAVEMENT

FENCE UNE

VEGETATION

MONITORING WELL LOCATION

PUMPING WELL LOCATION

WELL POINT LOCATION

STAFF GAUGE

APPROXIMATE BOUNDARY OF FORMER OXBOW

INTERPRETED GROUNDWATER ELEVATION CONTOURS

Monitoring Point

Groundwater Level

q - ) v . 2 q q i z *oo

q-?/.s3 g n . T s q n / . i 7

S8 VW. o Z ^7. 7S

Page 74: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

NEWELL STREET AREA II Automated DNAPL Recovery

January 2000

Total Gallons

Date Recovered System 1

(Started 3/1/99) March 1999 120.0 April 1999 90.0 May 1999 58.0 June 1999 56.1 July 1999 84.1 August 1999 60.0 September 1999 58.2 October 1999 60.5 November 1999 90.4 December 1999 60.4 January 2000 28.3

System 2 (Started 7/15/99) July 1999 1900

August 1999 2200 September 1999 3291 October 1999 1004 November 1999 1220 December 1999 1300 January 2000 749

Note: System 1 wells are NS-15, NS-30 and NS-32 System 2 well is N2SC-11

Page 1 of 1

Page 75: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

NEWELL STREET AREA II WELLS Weekly Measurement

and Removal of DNAPL January 2000

Depth Depth DNAPL Well to to DNAPL Removed

ID Date Water DNAPL Thickness jy NS-31 01/03/00 14.48 0.00 0.00

01/10/00 14.36 0.00 0.00 01/18/00 14.35 0.00 0.00 01/24/00 14.59 0.00 0.00

NS-34 01/03/00 15.00 0.00 0.00 01/10/00 14.88 0.00 0.00 01/18/00 14.87 0.00 0.00 01/24/00 15 09 0.00 0.00

NS-35 01/03/00 11.19 0.00 0.00 01/10/00 11.07 0.00 0.00 01/18/00 11.07 0.00 0.00 01/24/00 11.30 0.00 0.00

NS-36 01/03/00 13.30 0.00 0.00 01/10/00 13.12 0.00 0.00 01/18/00 13.09 0.00 0.00 01/24/00 13.35 0.00 0.00

NS-37 01/03/00 14.68 0.00 0.00 01/10/00 14.59 0.00 0.00 01/18/00 14.55 0.00 0.00 01/24/00 14.76 0.00 0.00

MW-1S 01/03/00 14.57 24.66 0.60 01/10/00 14.46 24.86 0.41 01/18/00 14.45 24.51 0.78 0.46 01/24/00 14.67 24.93 0.36

MW-1D 01/03/00 15.06 39.39 0.04 01/10/00 14.94 0.00 0.00 01/18/00 14.95 39.40 0.01 01/24/00 15 17 0.00 0.00

NS2C-02 01/03/00 13.36 35.67 4.33 2.60 01/10/00 13.23 36.11 3.88 2.30 01/18/00 13.24 36.00 3.99 2.40 01/24/00 13.44 35.80 4.19 2.582

N2SC-03I 01/03/00 13.38 36.43 3.81 2.30 01/10/00 13 28 36.45 3.79 2.30 01/18/00 13.23 36.50 3.74 2.24 01/24/00 13.48 36.49 3.75 2.31

Page 1 of 2

Page 76: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

Well ID Date

N2SC-03S 01/03/00 01/10/00 01/18/00 01/24/00

N2SC-08 01/03/00 01/10/00 01/18/00 01/24/00

N2SC-09S 01/03/00 01/10/00 01/18/00 01/24/00

N2SC-09I 01/03/00 01/10/00 01/18/00 01/24/00

N2SC-07 01/03/00 N2SC-11 01/03/00 N2SC-12 01/03/00

Depth to

Water 10.95 10.75 10.93 11.24 13.40 13.21 13.23 13.45 14.01 13.83 14.01 14.51 15.15 14.91 14.91 15.15 13.14 13.48 11.74

Depth to

DNAPL 0.00 21.50 0.00 0.00

42.13 41.68 41.85 41.09 17.95 17.93 17.98 18.24 43.29 43.28 43.30 43.25 0.00 0.00 0.00

DNAPL Thickness

0.00 0.01 0.00 0.00 0.45 0.89 0.73 1.49 0.29 0.32 0.27 0.01 0.22 0.25 0.22 0.28 0.00 0.00 0.00

DNAPL Removed

(y

0.43 0.912

Page 2 of 2

Page 77: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

NEWELL STREET AREA II WELLS Weekly Measurement

and Removal of LNAPL January 2000

Well ID Date

NS-10 01/03/00 01/10/00 01/18/00 01/24/00

NS-33 01/03/00 01/10/00 01/18/00 01/24/00

LNAPL Removed

(L)

0.9

0.203

Depth to

Water 10.98 10.89 10.62 11.12 12.91 12.84 12.86 13.10

Depth to

LNAPL 10.63 10.52 10.53 10.79 0.00 0.00 0.00 0.00

LNAPL Thickness

0.35 0.37 0.09 0.33 0.00 0.00 0.00 0.00

Page 1 of 1

Page 78: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 23

GROUNDWATER MANAGEMENT AREA PLANT SITE 2 JANUARY 2000

Activities Undertaken/Completed

Conducted monthly monitonng and oil removal at Building 51/59 oil plume (see following table).

Sampling/Test Results Received

None

Work Plans/Reports/Documents Submitted

None

Upcoming Scheduled Activities (next six weeks!

Continue Building 51/59 oil plume monitonng and recovery activities.

General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

Proposed/Approved Work Plan Modifications

None

Page 79: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

UNKAMET BROOK GE Buildings 51, 59

January 2000

DEPTH DEPTH TO OIL SAMPLING WELL TO OIL WATER OILTHICK REMOVED

DATE NO (FEET) (FEET) (FEET) (L) 01/07/00 34B 0 00 14.92 0.00 01/07/00 35B 0 00 11.86 0.00 01/07/00 51-3 Paved over 01/07/00 51-5 10.67 11 45 0.78 0.42 01/07/00 51-6 0.00 11 23 0.00 01/07/00 51-7 0.00 10.89 0.00 01/07/00 51-8 11 18 12.75 1.57 0.94 01/07/00 51-9 0 00 8.49 0 00 01/07/00 51-11 0 00 9.16 0.00

01/07/00 51-12 0.00 7.30 0 00 01/07/00 51-13 Dry at 10.8' 01/07/00 51-14 0.00 10.94 01/07/00 51-15 10 54 10.99 0.45 01/07/00 51-16 Dry at 9.69' 01/07/00 51-17 10 56 11 18 0.62 0.375 01/07/00 51-18 0.00 11.34 0.00 01/07/00 51-19 10.55 11.33 0.78 0.42 01/05/00 51-21 15.70 15.73 0.03 01/12/00 51-21 0 00 15.77 <0.01 15 Gal. 01/19/00 51-21 15.78 15.83 0.05 01/26/00 51-21 0.00 15.95 < 0.01 01/07/00 59-1 11 92 11.94 0.02 01/07/00 59-3 0 00 11.98 0.00 01/07/00 59-7 1 2 1 8 12.30 0.12 01/07/00 UB-MW-9 Obstructed at 5.36'

01/07/00 UB-MW-10 Dry at 17.02' 01/07/00 UB-PZ-1 Dry at 13.31' 01/07/00 UB-PZ-2 0.00 9.66 0.00 01/07/00 UB-PZ-3 12 40 12.84 0 44

Page 1 of 2

Page 80: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

ITEM 24

GROUNWATER MANAGEMENT AREA PLANT SITE 3 JANUARY 2000

a. Activities Undertaken/Completed

Conducted weekly monitoring and LNAPL removal at well H78B-8R (summary attached).

b. Sampling/Test Results Received

None

c.

d.

Work Plans/Reports/Documents Submitted

None

Upcoming Scheduled Activities (next six weekst

Continue LNAPL monitoring/removal at well H78B-8R.

e. General Progress/Unresolved Issues/Potential Schedule Impacts

No issues

f. Proposed/Approved Work Plan Modifications

None

Page 81: United States Environmental Protection Agency · Cotaois'e inviiunmemsi Ptipia'ii* Ziyi's, Bocnc Comuanv . February 9, 2000 '00 !/Zroaunvn Avenue ,eia I'/uOt/O . Bryan Olson J. Lyn

WELL SAMPLING ID DATE

H78B-8R 01/03/00 01/12/00 01/17/00 01/24/00 01/31/00

HILL 78 WELL MONITORING AND RECOVERY OF LNAPL

January 2000

DEPTH DEPTH LNAPL TO TO LNAPL REMOVED

WATER LNAPL THICKNESS (L) 28.78 28.77 0.01 0.005 28.92 28.87 0.05 0.10 28.96 28.95 0.01 0.005 29.10 29.08 0.02 0.0075 29.26 29.25 0.01 0.005

Page 1 of 1