Page 2: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

MANAGEMENT PLANMANAGEMENT PLAN

Lekoa Vaal Metropolitan

Council

Gauteng DeptTransport &

Public WorksEngineeringDepartments

of substractures

StakeholderTask Team

CSIR

Project management team

Road building units

Level 1 Level 5

Training Materials Equipment Clerical Supervision procurement

Co-ordinating

committee

Page 3: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

Levels of development of emerging contractorLevels of development of emerging contractor

COMPETENCY

EMERGING CONTRACTOR LEVEL

1 2 3 4 5

Supervision of labour

√ √ √ √ √

Payment of workers √ √ √ √

Construction management

Simple prog. Of work

√ √

Possesses hand tools

√ √ √ √

Vehicle for transport √ √ √

Material procurement

To a limited degree

√ √

Plant procurement √

To a limited degree

√ √

Surety, insurance √

Page 4: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

THE PARTNERS

MANAGEMENT PLAN

OBJECTIVES

PROJECT CHARACTERISTICS

CONCLUSIONS

UNITY

IN

DIVERSITY

Page 5: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

PROJECT CHARACTERISTICSPROJECT CHARACTERISTICS

PROJECT PROJECT CHARACTERISTICSCHARACTERISTICS

Page 6: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

POVERTY IMPACT

MEMBERS OF THE THREE ROAD BUILDING UNITS (7 PER UNITS)

SELECTED FROM PREVIOUSLY UNEMPLOYED RESIDENTS

RECEIVES COMPETATIVE ALLOWANCES RELATED TO LEVEL OF OUTPUT DURING TRAINING

EMPLOYMENT OF RESIDENTS IN CLOSE PROXIMITY OF PROJECT

EACH UNIT EMPLOYS EIGHT PEOPLE (IE. 24 IN TOTAL)

HOUSE KEEPING BY SURROUNDING RESIDENTS

SUBSTANTIAL IMPROVEMENT IN HOUSE KEEPING OF ROADWAY & SIDEWALKS

GRASSING OF SIDEWALKS BY RESIDENTS

SUBSTANTIAL DROP IN LITTERING

Page 7: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

EFFECTIVENESS

THE MEASURES OF SUCCESS / FAILURE:

* CONSISTENT QUALITY

- ROAD BUILDING UNITS ACHIEVED CONSISTENTLY ACHIEVED QUALITY WORKMANSHIP WITH RELATIVELY UNSKILLED LABOUR

* LOW CONSTRUCTION AND MAINTENANCE COST

- MATERIAL COSTS == R200 PER LINEAR METER

- LOW MAINTENANCE ROAD SURFACING

* PRODUCTION RATE

- EACH ROAD BUILDING UNIT (CONSISTING OF 7 STUDENTS & 8 LOCALLY EMPLOYED PEOPLE) HAS PROVEN THAT IT CAN CONSTRUCT UP TO 40 Meters OF FINAL BASE COURSE PER DAY

* SUSTAINABLE EMPLOYMENT

- DEDICATED FUNDING ESSENTIAL

EFFECTIVENESSEFFECTIVENESS

Page 8: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

INNOVATION

- UNIQUE TOOLS AND EQUIPMENT

ROAD BUILDING UNITS HAVE BEEN EQUIPPED AT RELATIVELY LOW COST WITH CAREFULLY DESIGNED TOOLS & EQUIPMENT TO ENSURE A HIGH QUALITY AND CONSISTENT END PRODUCT.

TAILORMADE EQUIPMENT INCLUDE INTERLOCKING SHUTTERING, UNIQUE SIDE DRAIN PROFILES AND VOLUME BATCHING CONTAINERS FOR EASY HANDLING AND MIX DESIGN.

- INNOVATIVE ROAD BUILDINGTECHNIQUES

TECHNIQUES WHICH EFFECTIVELY INCORPORATES WASTE MATERIALS FROM LOCAL INDUSTRIES (SUCH AS ISCOR SLAG AND SASOL ASH) HAVE BEEN DEVELOPED AS PART OF THE PROJECT TO REDUCE CONSTRUCTION COSTS

Page 9: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

INNOVATION CONTINUED

- UINQUE CROSS SECTION

SIDE DRAIN CROSS SECTION DESIGNED TO SERVE AS EXTENDED ROADWAY, STORMWATER FACILITY & MOUNTABLE CURB

ROADWAY SERVES AS EXTENTION STORMWATER FACILITY IN FLOODING CONDITIONS

EFFECTIVE ROAD WIDTH (INCLUDING SIDE DRAIN) == 5 Meters

SIDE DRAIN CROSS SECTION DESIGNED TO SERVE AS EXTENDED ROADWAY STORMWATER FACILITY & MOUNTABLE CURB

ROADWAY SERVES AS EXTENTION STORMWATER FACILITY IN FLOODING CONDITIONS

INNOVATION CONTINUEDINNOVATION CONTINUED

Page 10: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

REPLICATION

TRAINING MATERIAL IS WELL DOCUMENTED

DETAILED DRAWINGS OF TAILOR-MADE EQUIPMENT ARE AVAILABLE

PROGRAMMES BASED ON THIS PROJECT IMPLEMENTED IN COUNTRIES AS FAR AS

MALAYSIA

Page 11: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME

SUSTAINABILITY

SOME 900 KILOMETRES OF POORLY MAINTAINED DIRT ROAD IN VAAL METRO

SCOPE TO SUSTAIN SEVERAL ROAD BUILDING UNITS

LEKOA VAAL METROPOLITAN COUNCIL TO ENSURE FINANCIAL SUSTAINABILITY

ALLOCATE PORTION OF ROADMAINTENANCE BUDGET TO PROGRAMME

ENGINEERING DEPARTMENTS OF SUBSTRUCTURES

TO BE THE DRIVING FORCE

DECIDE ON PRIORITIES

SUPERVISE IMPLEMENTATION

AGREE ON RATES OF WORK

CSIR TRANSPORTEK

AVAILABLE FOR ONGOING TECHNOLOGICAL & MANAGEMENT ASSISTANCE TO COUNCILS