MANAGEMENT PLANMANAGEMENT PLAN
Lekoa Vaal Metropolitan
Council
Gauteng DeptTransport &
Public WorksEngineeringDepartments
of substractures
StakeholderTask Team
CSIR
Project management team
Road building units
Level 1 Level 5
Training Materials Equipment Clerical Supervision procurement
Co-ordinating
committee
![Page 3: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/3.jpg)
Levels of development of emerging contractorLevels of development of emerging contractor
COMPETENCY
EMERGING CONTRACTOR LEVEL
1 2 3 4 5
Supervision of labour
√ √ √ √ √
Payment of workers √ √ √ √
Construction management
√
Simple prog. Of work
√ √
Possesses hand tools
√ √ √ √
Vehicle for transport √ √ √
Material procurement
√
To a limited degree
√ √
Plant procurement √
To a limited degree
√ √
Surety, insurance √
![Page 4: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/4.jpg)
THE PARTNERS
MANAGEMENT PLAN
OBJECTIVES
PROJECT CHARACTERISTICS
CONCLUSIONS
UNITY
IN
DIVERSITY
![Page 5: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/5.jpg)
PROJECT CHARACTERISTICSPROJECT CHARACTERISTICS
PROJECT PROJECT CHARACTERISTICSCHARACTERISTICS
![Page 6: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/6.jpg)
POVERTY IMPACT
MEMBERS OF THE THREE ROAD BUILDING UNITS (7 PER UNITS)
SELECTED FROM PREVIOUSLY UNEMPLOYED RESIDENTS
RECEIVES COMPETATIVE ALLOWANCES RELATED TO LEVEL OF OUTPUT DURING TRAINING
EMPLOYMENT OF RESIDENTS IN CLOSE PROXIMITY OF PROJECT
EACH UNIT EMPLOYS EIGHT PEOPLE (IE. 24 IN TOTAL)
HOUSE KEEPING BY SURROUNDING RESIDENTS
SUBSTANTIAL IMPROVEMENT IN HOUSE KEEPING OF ROADWAY & SIDEWALKS
GRASSING OF SIDEWALKS BY RESIDENTS
SUBSTANTIAL DROP IN LITTERING
![Page 7: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/7.jpg)
EFFECTIVENESS
THE MEASURES OF SUCCESS / FAILURE:
* CONSISTENT QUALITY
- ROAD BUILDING UNITS ACHIEVED CONSISTENTLY ACHIEVED QUALITY WORKMANSHIP WITH RELATIVELY UNSKILLED LABOUR
* LOW CONSTRUCTION AND MAINTENANCE COST
- MATERIAL COSTS == R200 PER LINEAR METER
- LOW MAINTENANCE ROAD SURFACING
* PRODUCTION RATE
- EACH ROAD BUILDING UNIT (CONSISTING OF 7 STUDENTS & 8 LOCALLY EMPLOYED PEOPLE) HAS PROVEN THAT IT CAN CONSTRUCT UP TO 40 Meters OF FINAL BASE COURSE PER DAY
* SUSTAINABLE EMPLOYMENT
- DEDICATED FUNDING ESSENTIAL
EFFECTIVENESSEFFECTIVENESS
![Page 8: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/8.jpg)
INNOVATION
- UNIQUE TOOLS AND EQUIPMENT
ROAD BUILDING UNITS HAVE BEEN EQUIPPED AT RELATIVELY LOW COST WITH CAREFULLY DESIGNED TOOLS & EQUIPMENT TO ENSURE A HIGH QUALITY AND CONSISTENT END PRODUCT.
TAILORMADE EQUIPMENT INCLUDE INTERLOCKING SHUTTERING, UNIQUE SIDE DRAIN PROFILES AND VOLUME BATCHING CONTAINERS FOR EASY HANDLING AND MIX DESIGN.
- INNOVATIVE ROAD BUILDINGTECHNIQUES
TECHNIQUES WHICH EFFECTIVELY INCORPORATES WASTE MATERIALS FROM LOCAL INDUSTRIES (SUCH AS ISCOR SLAG AND SASOL ASH) HAVE BEEN DEVELOPED AS PART OF THE PROJECT TO REDUCE CONSTRUCTION COSTS
![Page 9: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/9.jpg)
INNOVATION CONTINUED
- UINQUE CROSS SECTION
SIDE DRAIN CROSS SECTION DESIGNED TO SERVE AS EXTENDED ROADWAY, STORMWATER FACILITY & MOUNTABLE CURB
ROADWAY SERVES AS EXTENTION STORMWATER FACILITY IN FLOODING CONDITIONS
EFFECTIVE ROAD WIDTH (INCLUDING SIDE DRAIN) == 5 Meters
SIDE DRAIN CROSS SECTION DESIGNED TO SERVE AS EXTENDED ROADWAY STORMWATER FACILITY & MOUNTABLE CURB
ROADWAY SERVES AS EXTENTION STORMWATER FACILITY IN FLOODING CONDITIONS
INNOVATION CONTINUEDINNOVATION CONTINUED
![Page 10: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/10.jpg)
REPLICATION
TRAINING MATERIAL IS WELL DOCUMENTED
DETAILED DRAWINGS OF TAILOR-MADE EQUIPMENT ARE AVAILABLE
PROGRAMMES BASED ON THIS PROJECT IMPLEMENTED IN COUNTRIES AS FAR AS
MALAYSIA
![Page 11: UNITY IN DIVERSITY LEKOA VAAL ROAD BUILDING UNIT DEVELOPMENT PROGRAMME](https://reader036.vdocument.in/reader036/viewer/2022082712/56649eb25503460f94bb9519/html5/thumbnails/11.jpg)
SUSTAINABILITY
SOME 900 KILOMETRES OF POORLY MAINTAINED DIRT ROAD IN VAAL METRO
SCOPE TO SUSTAIN SEVERAL ROAD BUILDING UNITS
LEKOA VAAL METROPOLITAN COUNCIL TO ENSURE FINANCIAL SUSTAINABILITY
ALLOCATE PORTION OF ROADMAINTENANCE BUDGET TO PROGRAMME
ENGINEERING DEPARTMENTS OF SUBSTRUCTURES
TO BE THE DRIVING FORCE
DECIDE ON PRIORITIES
SUPERVISE IMPLEMENTATION
AGREE ON RATES OF WORK
CSIR TRANSPORTEK
AVAILABLE FOR ONGOING TECHNOLOGICAL & MANAGEMENT ASSISTANCE TO COUNCILS