Outline
1. UH System Campuses2. Plant Operations Website3. Advertising of Projects4. HUB (MBE, WBE, DBE, SBE)
Participation5. Delivery Methods6. Professional Services7. Selection Process8. Campus Master Plan9. Recently Completed Projects10. Current Projects11. Upcoming Projects
33
UH-System Groups
44
Plant Operations Website
www.uh.edu/plantops
55
Advertising of Projects Advertisements for design services, contractors
and other services are posted on the Texas Market Place.
The website address is http://esbd.cpa.state.tx.us/
On the pull down menu, select : “University of Houston 730” for the Main campus “University of Houston – Clear Lake 759” “University of Houston – System 783” “University of Houston – Downtown 784” or “University of Houston – Victoria 765”
The Texas Market Place is a bid website for all of the Texas state agencies.
66
HUB Participation
The University has a goal of 40% HUB participation on all construction projects and a HUB mix that reflects the cultural diversity of our city.
The University can provide assistance with getting state HUB certification, however certification is not required.
We accept certifications of other state and local agencies.
Outreach to HUB contractors, vendors and professional service providers is made through contact with HUB professional organizations, plan rooms and special events.
77
HUB Participation Contacts Dilip Anketell
Executive DirectorFacilities Planning & Construction
Allison E. Bell Director of Capital Projects AdministrationFacilities Planning & Construction
William P. McKinney HUB Project Manager Facilities Planning & Construction
Diedra Sutton Consultant Procurement Technical Assistance CenterUH Small Business Development Center
Sandra Webb HUB Program ManagerUH Main Campus
88
Delivery Methods
Design Build
Design – Bid – Build (Traditional)
CM – @ Risk
99
A/E and Other Professional Services for Minor Projects
The several design firms are chosen by an RFQ process.
As projects become available, firms are chosen from an approved list as needed.
1010
A/E and Other Professional Services for Major Projects
Design/Build The contractor/design firm is chosen by a
two step RFQ then RFP process.
Other Delivery Methods The design firm is chosen by an RFQ.
1111
Selection Process
The criteria for selection are included in each RFQ or RFP.
A committee of FPC staff reviews the submissions and makes recommendations to a project building committee.
The project building committee interviews a short-listed group of responders and forwards its recommendations to the Vice Chancellor.
1212
Campus Framework Plan
A link to the framework plan is on the Plant Operations website. These items can be viewed from there.
UH Framework Plan Lecture Hall Presentation Calhoun Lofts Presentation
Framework Plan Update BOR Approved Framework Plan
Framework Plan Executive Summary Video Presentation
1313
1414
Open Space
1515
Open Space Framework Preserve and enhance the existing Open
Space Framework of courtyards, lawns, and groves
Respect and extend pedestrian corridors and paths to enhance wayfinding
Utilize existing courtyard scale to develop new campus places
Link the University with the surrounding neighborhood
Extend the Brays Bayou Park System into the campus
Continue Lighting/Security Program
1616
Transportation Framework Develop a loop road connecting
Calhoun Road and Elgin Street
Extend the campus core by closing Cullen Boulevard
Accommodate growth through conveniently located parking structures
Integrate Metro Light Rail, BRT, and buses into campus with an inter-modal station on Scott Street
Incorporate the University Shuttle to link all transportation framework elements
1717
Parking Garage Data
1818
Development Framework
Increase on-campus residential population to 24% and distribute across campus
Allow for growth to 41,000 students and 12.2M SF
Provide limited infill opportunities integrated in the inner campus core
Develop four perimeter precincts for current and future initiatives
Construct mixed use development
unique to each precinct
1919
Arts Precinct
2020
Professional Precinct
2121
Wheeler Precinct
2222
Stadium Precinct
Garage 2
Garage 1
2323
Recently Completed ProjectsUH Main
Welcome Center & Parking Garage (2006) Bayou Oaks Student Housing Expansion (2006) Bayou Oaks Student Housing (2005) Science & Engineering Building (2005) M.D. Anderson Library Expansion (2004) Cullen Oaks Student Housing (2004)
UH Downtown Commerce Street Building (2004) Academic Building & Garage (2007)
UH Clear Lake Student Services & Classroom Building (2004)
2424
Recent major projects
Recently Completed Projects
2525
Current ProjectsUH Sugar Land – Academic Building Architect: Archi*Technics/3 + PageSoutherlandPage Contractor: Skanska USA Building $35M Expected construction started – September 2007
UH Main – Calhoun Lofts Design/Build - Pepper Lawson & Kirksey $100M Expected construction start – October 2007
UH Main – Cemo Lecture Hall & Academic Center Architect: RFQ responses were received October 2007 Contractor: RFQ was posted in August 2007. The
responses are being evaluated. $9M Expected construction start – TBD
2626
Current Projects
Upcoming Major Projects
UH Main Campus New Art Museum - $16M East Parking Garage - $9M Renovation to Science Buildings -
$57.6M Wind Energy Building (Corpus Christi) -
$20M Hilton Hotel Renovation - $11.1M Diesel Training Facility - $11M Science Building(s) Renovations - $57.6 SERC Build Out - $30M
Upcoming Major Projects
UH Downtown One Main Library Expansion - $3.5M
UH Victoria Regional Economic Coalition & Allied Health
Building - $10M
UH Clear Lake Renovation of Arbor Building –
$10.6 M Pearland Campus – $10.8 M Bay Area Houston Economic Partnership
Building - $35M
29
Potential Major Projects
UH Main Engineering Building Optometry Addition College of Business Addition Music Building Cougar Walk Scott Street Development
UH Sugar Land Economic Development Building
3030
Facilities Planning & Construction, better known as FPC, is located at 4211 Elgin on the second floor of the General Services Building.