Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING 1 ST FLOOR RESEARCH LABORATORY RENOVATION 1 Hospital Drive Columbia, MO 65212 PGAV Project #53474-00 MU Project #CP171091 ADDENDUM #2 November 27, 2017 This addendum is hereby made part of the Contract Documents for the above named project. It supplements and modifies the drawings and specifications dated November 6, 2017 prepared by Peckham Guyton Albers & Viets, Inc. (PGAV) and their consultants. This addendum is part of the Bid Documents and Contract Documents and shall govern in the performance of the work. Receipt of this addendum shall be acknowledged on the Bid Form. GENERAL Bidder’s questions (Q.) that have been received to date along with responses (R.) are as follows: Q. What are the requirements for the construction of the temporary walls noted on sheet A100? R. Temporary construction barriers noted as by GC on sheet A100 shall be constructed as ‘3G1/A-1’ partitions, with one layer of gypsum board on the public side of the partition. ¾” fire retardant treated plywood may be substituted for 5/8” drywall at these locations at contractor’s option. The temporary partitions need not be painted. Please refer to Special Conditions Paragraph 2.C.(1) for additional information regarding temporary protection requirements. Q. Which of the lockers shown on sheet A301 are new, and which are existing to remain? R. Only the lockers noted as ‘F1’ on sheet A301 are new, the others are existing to remain. Q. On sheets M601 and E401, AHU-1 does not show a VFD nor motor starter for control of the ECM motor. All I see is a disconnect. Is this correct? R. These are ECM motors and no VFD is required. The disconnect is correct. Q. Drawing M101 says all ductwork located in exposed ceiling space shall be double wall construction, but it also says it is to be jacketed. The spec section 230700 3.11 note B states that exposed ductwork is to receive fiberglass duct board. Please clarify what type of insulation is required in these areas (if any). R. Sheet M101, Ductwork General Notes 2 and 4 have been modified for clarity. Refer to the attached revised sheet M101. Specification section 230700 has not been modified. Q. The field applied jacket schedule says that all ducts and plenums are to receive a .016 smooth aluminum jacket unless that are concealed above a ceiling. Is this correct? Will all of the duct work and louvers in the mechanical room require .016 smooth aluminum?

Upload: others

Post on 21-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 1 of 7

UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING 1ST FLOOR RESEARCH LABORATORY RENOVATION 1 Hospital Drive Columbia, MO 65212 PGAV Project #53474-00 MU Project #CP171091 ADDENDUM #2 November 27, 2017 This addendum is hereby made part of the Contract Documents for the above named project. It supplements and modifies the drawings and specifications dated November 6, 2017 prepared by Peckham Guyton Albers & Viets, Inc. (PGAV) and their consultants. This addendum is part of the Bid Documents and Contract Documents and shall govern in the performance of the work. Receipt of this addendum shall be acknowledged on the Bid Form. GENERAL Bidder’s questions (Q.) that have been received to date along with responses (R.) are as follows:

Q. What are the requirements for the construction of the temporary walls noted on sheet A100?

R. Temporary construction barriers noted as by GC on sheet A100 shall be constructed as ‘3G1/A-1’ partitions, with one layer of gypsum board on the public side of the partition. ¾” fire retardant treated plywood may be substituted for 5/8” drywall at these locations at contractor’s option. The temporary partitions need not be painted. Please refer to Special Conditions Paragraph 2.C.(1) for additional information regarding temporary protection requirements.

Q. Which of the lockers shown on sheet A301 are new, and which are existing to

remain? R. Only the lockers noted as ‘F1’ on sheet A301 are new, the others are existing to

remain. Q. On sheets M601 and E401, AHU-1 does not show a VFD nor motor starter for

control of the ECM motor. All I see is a disconnect. Is this correct? R. These are ECM motors and no VFD is required. The disconnect is correct. Q. Drawing M101 says all ductwork located in exposed ceiling space shall be

double wall construction, but it also says it is to be jacketed. The spec section 230700 3.11 note B states that exposed ductwork is to receive fiberglass duct board. Please clarify what type of insulation is required in these areas (if any).

R. Sheet M101, Ductwork General Notes 2 and 4 have been modified for clarity. Refer to the attached revised sheet M101. Specification section 230700 has not been modified.

Q. The field applied jacket schedule says that all ducts and plenums are to receive a

.016 smooth aluminum jacket unless that are concealed above a ceiling. Is this correct? Will all of the duct work and louvers in the mechanical room require .016 smooth aluminum?

Page 2: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 2 of 7

R. Specification section 230700 3.16 has been revised. Refer to Project Manual modifications below.

Q. Can you confirm that domestic water piping going through exposed areas require

no field applied jacket? R. A field jacket is not required for the domestic water piping in the exposed areas. Q. 233113-2.9 Shop Prime Paint. By the time this is applied, delivered, hung, etc

there will be little primer left. This is just an added cost. R. 233113-2.9 Shop Prime Paint has been deleted. Note 233113-2.6 C still remains

“All exposed ductwork shall be provided with paint grip finish to accept field applied paint.”

Q. 233113-3.3R, duct cleanliness-intermediate and LEED requirements sometimes

conflict. Please confirm which is required. R. Protect duct interiors per SMACNA’s “Duct Cleanliness for New Construction”

Intermediate Level. LEED is not required for this project. Q. 233113-3.8 is this required? If we follow duct cleanliness per spec can this be

eliminated? R. Specification requirements shall remain. Q. There appears to be some dual wall rectangular required. Please confirm. R. Please refer to attached revised M101 and M201 sheets for clarifications.

Double wall ductwork shall be round or flat oval. Q. Note EP016 on sheet E301 show the electrical to provide 120v power and a

disconnect switch in 7 locations. Detail 1 on sheet M703 says Div 26 is providing 120v and transformer in 18 locations. This is not shown on the electrical drawings. Is Div 26 providing 120v in each room needed and the controls taking low voltage wire to the phoenix devices?

R. See revisions to sheet E401 attached. Four total Phoenix valve power supplies (same as VAV power supplies) were added.

Q. There seems to be some discrepancies between the plans and site concerning

stainless steel cabinets. Are we responsible for surveying the quantity of work or is some of it still going to be removed by the Owner since some items on the drawing are no longer there?

R. Drawings indicate existing stainless steel cabinets to be salvaged and reinstalled, or salvaged and returned to Owner. Owner reserves the right to salvage any of these existing stainless steel cabinets themselves at their discretion, apart from the construction contract. Any existing stainless steel cabinets remaining in the project area at the time of demolition shall be removed by the Contractor and either reinstalled or returned to Owner per the drawings. Any existing stainless steel cabinets removed by Owner prior to submitting bids need not be included in the bid. Bidders are strongly encouraged to visit the project site prior to preparing their bid to familiarize themselves with existing conditions.

Q. The exterior guardrail on the stoop wall is not shown on A201 but is on A301.

A301 says reinstall removed guardrail. Is it up to contractor to determine if it is in the way of the hvac unit that must be removed or the new window unit? Also, the rail post is cast in place. Can you provide details as to how to remove and reinstall?

R. Yes, if the existing window replacement and mechanical equipment demo can be accomplished without removing the rail, then the existing rail can remain in place. If the rail is in conflict with either the window replacement or the mechanical equipment demo, then the rail shall be saw cut flush at the base and salvaged for

Page 3: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 3 of 7

reinstallation. Once the adjacent work is complete, the post holes shall be cored out a minimum of 1.5" greater than the post diameter. The rail posts shall be extended with galvanized steel pipe and epoxied into place at the cored post holes with a minimum 4” embedment.

Q. Please clarify the scope of work for the spec section 055000. R. Specification 055000 shall govern the exterior guardrail post extension (if

needed), and any other miscellaneous steel fabrications required throughout the course of the work.

Q. The only note saying to remove the suspended plaster ceiling is on B1/A501 but

field investigation shows it in M126 thru M131. Does it all have to be removed? R. Refer to Addendum 1 for clarification on suspended plaster ceiling demolition. Q. Some of the corridor walls have clay or salt glazed tile. Are these to be removed

as well as metal stud drywall? R. All existing partitions indicated to be removed on demolition plans shall be

removed, regardless of material. As noted at the prebid and in Addendum 1, Bidders are strongly encouraged to visit the project site prior to preparing their bid to familiarize themselves with existing conditions. Change orders will not be considered for work associated with conditions that are readily observable during the bid period.

The following requests for substitution were received, but were determined to not meet specification requirements, and are therefore NOT APPROVED for use on this project: 096723 - Florock FloroChip Epoxy Flake Flooring 224000 - Bradley Model S19-280D Emergency Eyewash Fixture PROJECT MANUAL Revise the following specification sections as described below: Section Modification 1.E Add paragraph 17.A.(4) to read “Upon completing demolition of existing ceilings

and overhead systems indicated to be removed, a pre-installation meeting shall be held on site to coordinate the work of the various trades. Attendees shall include the Architect, MEP Engineers, General Contractor, and all Subcontractors responsible for installing new work overhead including Mechanical, Electrical, Plumbing, and Fire Protection. The GC shall be responsible for documenting the discussion and distributing meeting minutes to the Owner and all attendees for record. MEPF coordination will be a standing agenda item for OAC meetings until the level of coordination deemed necessary by the General Contractor and the design team has been achieved.”

Revise paragraph 17.B. to indicate “Within sixty (60) days of Notice to

Proceed…” rather than “Within thirty (30) days of Notice to Proceed…” The timeline for coordination drawings has been extended to allow more time for demolition of existing ceilings and overhead systems indicated to be removed and the pre-installation meeting noted above.

Add paragraph 17.B.(4) to read “Coordination drawings may be compiled as

either a two-dimensional plan view or as a three-dimensional model.” Add paragraph 17.B.(5) to read “Representation of existing conditions may be

limited to major existing systems identified at the pre-installation meeting as

Page 4: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 4 of 7

representing a potential conflict with new work. Existing systems which do not represent a potential conflict with new work need not be represented.”

Add paragraph 17.B.(6) to read “Coordination drawings are intended to

demonstrate that the work of the various trades have been coordinated with each other and with existing conditions prior to installation. Each MEPF subcontractor shall review and sign-off on the coordination drawings prior to submitting to the design team for review.”

115313 Replace specification 115313 dated 11/06/17 in its entirety with revised

specification 115313 dated 11/27/17 attached. Subject to compliance with all other provisions of the specification, Bedcolab’s Vanguard Fume Hood, Hamilton Lab Solutions’ Concept Fume Hood, and Mott Manufacturing RFV2 Fume Hood are approved as equal to the specified manufacturers.

123553 Add paragraph 2.2A.6. to read “Hamilton Lab Solutions”. Hamilton Lab Solutions’

MAX Lab Bench System is approved as equal to the Basis of Design. 123554 Renumber paragraph 2.1A.a. and 2.1A.b. as “2.1A.2.” and “2.1A.3.” respectively. Add paragraph 2.1A.4. to read “Custom Stainless Products, inc.”. Subject to

compliance with all other provisions of the specification, Custom Stainless Products, inc. is approved as equal to the specified manufacturers.

Add paragraph 2.1A.5. to read “Kloppenberg.” Subject to compliance with all

other provisions of the specification, Kloppenberg Stainless Steel Lab Furnishings is approved as equal to the specified manufacturers.

123653 Add paragraph 2.1A.4. to read “American Epoxy Scientific.” Subject to

compliance with all other provisions of the specification, American Epoxy Scientific is approved as equal to the specified manufacturers.

Revise paragraph 2.3A. to read “Drop-in sinks molded from modified

thermosetting epoxy resin, specially compounded and oven cured and set with epoxy cement. Color shall match adjacent countertop. Physical properties shall be as described for epoxy resin countertops. Cove inside corners and pitch bottom to threaded drain outlet.” Sinks have been changed from undermount to drop-in installation.

Revise paragraph 2.3A.1. to read “SK-1: Size 25” long, 15” wide, 10” deep with

end outlet.” Revise paragraph 2.3A.2. to read “SK-2: Size 25” long, 15” wide, 10” deep with

end outlet.” 224000 Add paragraph 2.1F. to read “Emergency Eyewash”

1. Water Saver model #EWBF849R 2. Guardian Equipment model #GBF1849.”

230100 Delete paragraph 1.5A.15. which was added in Addendum #1. This paragraph

was interpreted as requiring a BIM model of all new and existing conditions, which was not the intent. See revisions to 1.E. Special Conditions section 17. “Project Coordination” above for further clarification on coordination requirements.

230700 Add paragraph 3.16D.2 to read “Ductwork located in Mechanical Room M130.”

Page 5: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 5 of 7

233113 Delete paragraph 2.9 Shop Prime Paint in its entirety. PROJECT DRAWINGS Revise the following Drawing Sheets as described below: Sheet Modification A150 Replace sheet A150 dated 11/06/17 in its entirety with revised sheet A150 dated

11/27/17 attached. Details E3 and C4 have been added to illustrate signage locations and installation requirements.

A201 Add a note at the existing exterior stair near Room M148A to read as follows:

“Existing guard rail to removed and salvaged for reinstallation if in conflict with window replacement or mechanical equipment demo indicated.”

A601 Revise detail A1 Level 1 RCP as per Sketch XA07 attached. RCP has been

revised to show Owner Furnished, Owner Installed Surgical Light Fixture. GC to coordinate new ceiling installation with OFOI fixture.

Add detail D5 as per Sketch XA09 attached. Exhaust piping tie-in in room M134A

has been clarified. A710 Revise detail C4 – Typ island casework U.C. lighting/ Pre installed electrical

outlets as per sketch XA05 attached. Elevation has been revised to coordinate lighting and power outlets on island casework.

Revise detail E6 – Typ island casework U.C. lighting/ Pre installed electrical

outlets as per sketch XA10 & XA11 attached. Elevation has been revised to coordinate lighting and power outlets on island casework.

A803 Revise detail E4 – North Elevation M144 as per Sketch XA08 attached. Elevation

has been revised to indicate Owner Furnished, Owner Installed control panel location for Owner Furnished, Owner Installed Surgical Light Fixture.

FPD103 Replace sheet FPD103 dated 11/06/2017 in its entirety with revised sheet

FPD103 dated 11/27/2017. Drawing has been revised to show the existing ceiling to remain, and adds General Note #1.

FP102 Replace sheet FP102 dated 11/06/2017 in its entirety with revised sheet FP102

dated 11/27/2017 attached. Relocation of an existing 6” Fire main will be required for renovation of Research Lab M148.

FP103 Add General Note #1 as follows: “1. The Contractor shall see Division #1 Special

Conditions for phasing of work schedule for this Alternate #2 Construction.” M101 Replace sheet M101 dated 11/06/17 in its entirety with revised sheet M101 dated

11/27/17 attached. Ductwork General Notes have been modified. Ductwork sizes have been added in Flex Research Lab M114.

M201 Replace sheet M201 dated 11/06/17 in its entirety with revised sheet M201 dated

11/27/17 attached. Ductwork General Notes have been modified. M602 Replace sheet M602 dated 11/06/17 in its entirety with revised sheet M602 dated

11/27/17 attached. General Exhaust Air Control Valve Schedule, Fume Exhaust Air Control Valve Schedule, and Supply Air Control Valve Schedule have been modified.

Page 6: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 6 of 7

M702 Replace sheet M702 dated 11/16/17 in its entirety with revised sheet M702 dated

11/27/17 attached. AHU 1-01 Control Diagram has been modified. M703 Replace sheet M703 dated 11/06/17 in its entirety with revised sheet M703 dated

11/27/17 attached. Laboratory Airflow Control System Schematic has been modified.

E301 Replace sheet E301 dated 11/06/17 in its entirety with revised sheet E301 dated

11/27/17 attached. Added note EP028 “Replacement of panel to occur after-hours during evenings, week-ends or during class break times listed elsewhere in the special conditions” to Panel P5. Removed note EP016 and device related to fume hoods phoenix controls from plan.

E401 Replace sheet E401 dated 11/06/17 in its entirety with revised sheet E401 dated

11/27/17 attached. Added device related to fume hood phoenix controls to plan. Added (2) Phoenix Valve Power Supply panels to Mechanical M130. Added (1) Phoenix Valve Power Supply panel to Mechanical M120. Added (1) Phoenix Valve Power Supply panels to existing electrical room adjacent to M148.

Revised note EH008: “PROVIDE 1 HP RATED TOGGLE STYLE, 120 V, 1

POLE, NEMA 1 SWITCH AS DISCONNECTING MEANS FOR PHOENIX VALVE POWER. PROVIDE ALL FINAL CONNECTIONS TO CONTROLLERS. REFER TO DETAIL 2, SHEET M703 FOR ADDITIONAL INFORMATION ON POWER SUPPLY.

Added note EH014 to fume hoods for phoenix controls: “PROVIDE TOGGLE

STYLE SWITCH AS DISCONNECTING MEANS AND MAKE FINAL CONNECTION TO PHOENIX VALVE CONTROLS. CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PHOENIX CONTROL PANEL PRIOR TO ROUGH-IN.”

Added note EH015 to differentiate between VAV power and phoenix valve power

supplies: “PROVIDE 1 HP RATED TOGGLE STYLE, 120 V, 1 POLE, NEMA 1 SWITCH AS DISCONNECTING MEANS FOR VAV UNITS. PROVIDE ALL FINAL CONNECTIONS TO CONTROLLERS. REFER TO DETAIL 2, SHEET M703 FOR ADDITIONAL INFORMATION.”

E801 Replace sheet E801 dated 11/06/17 in its entirety with revised sheet E801 dated

11/27/17 attached. Added approved equals to Luminaire Schedule for Fixture types C, XA, XB, XC, XD.

E802 Replace sheet E802 dated 11/06/17 in its entirety with revised sheet E802 dated

11/27/17 attached. Added circuit 35 to Panel 1PP-M148 E803 Replace sheet E802 dated 11/06/17 in its entirety with revised sheet E802 dated

11/27/17 attached. Added circuits 12, 14, and 16 to Panel 1PPA. ATTACHMENTS Specifications 115313 – Laboratory Fume Hoods Drawing Sketches (8.5x11) Sketch XA05 – Revise detail C4/A710 Sketch XA07 – Revise detail A1/A601 Sketch XA08 – Revise detail E4/A803

Page 7: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Page 7 of 7

Sketch XA09 – New detail D5/A601 Sketch XA10 – Revise detail E6/A710 Sketch XA11 – Revise detail E6/A710 Drawing Sheets (30x42) A150 – Typical Partitions, Signage & Interior Details FPD103 – Level 1 – East Zone Teaching Lab – Demolition Alternate Bid #2 FP102 – Level 1 – West Zone Fire Protection – New Work M101 – Level 1 Ductwork Plan – New Work M201 – Enlarged Mechanical Room Plans – New Work M602 – Schedules M702 – Controls M703 – Controls E301 – Level One – Power Floor Plan E401 – Level One – HVAC Power Floor Plan E801 – Lighting Schedules E802 – Panelboard Schedule E803 – Panelboard Schedule END OF ADDENDUM #2

Page 8: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 1/9

SECTION 115313 – LABORATORY FUME HOODS

PART 1 - GENERAL

1.1 SUMMARY A. Section Includes:

1. Bench-top High-Performance Laboratory Fume Hoods. 2. Service fixtures (ie. water, gas, etc.) and electrical service fittings in fume hoods. 3. Piping and wiring within service fittings, light fixtures, switches, and other electrical devices. 4. Fume hood base support. Including acid storage and solvent storage cabinets. 5. Work Surfaces within fume hoods. 6. Laboratory sinks and cup sinks in fume hoods. 7. Filler panels for fume hoods.

B. Related Sections: 1. Division 22: Furnish and installation of plumbing utilities and final connections to fume hoods. 2. Division 23: Furnishing and installation of exhaust duct work and equipment, and final connection of

hoods. 3. Division 26: Furnishing and installation of electrical utilities and final connections to hoods.

C. This specification covers the requirements for the purchase of bench mounted laboratory fume hoods for use with remote exhaust blower systems.

1.2 SCOPE AND CLASSIFICATION 1. Bench-mounted laboratory fume hoods in widths as indicated on plans, minimum internal depth of

26.5”, and maximum external depth of 34.0” is required. 2. This specification sets the intent for quality, performance and appearance.

1.3 REFERENCES: A. The laboratory hoods must conform to the following regulations and standards.

1. SEFA 1-2010, Scientific Equipment and Furniture Association , Recommended Practices for Laboratory Fume Hoods

2. SEFA 8-2010, Recommended Practices for Laboratory Grade Metal Casework, 8.0 Cabinet Surface Finish Tests

3. NFPA 45-2011, National Fire Protection Association, Fire Protection for Laboratories Using Chemicals 4. ASTM E84-09C, ANSI 2.5, NFPA 255, UL 723, UBC 8-1 (42-1), Standard Test method for Surface

Burning Characteristics of Building Materials 5. ASHRAE 110-2016, American Society of Heating, Refrigerating, and Air-Conditioning Engineers,

Method of Testing Performance of Laboratory Fume Hoods 6. ANSI/AIHA Z9.5-2011, American Industrial Hygiene Association, Laboratory Ventilation 7. OSHA, Federal Register 29 CFR Part 1910, Occupational Safety & Health Administration, U.S.

Department of Labor, Occupational exposures to hazardous chemicals in laboratories. B. The laboratory fume hoods must carry the ETL listed mark for the following.

1. UL 61010-1 (formerly 3101-1), Underwriters Laboratories Inc., Electrical Equipment for Laboratory Use 2. CAN/CSA C22.2 No. 61010-1, Canadian Standards Association, Safety Requirements for Electrical

Equipment for Measurement, Control and Laboratory Use 3. UL 1805, Underwriters Laboratories Inc., Standard for Laboratory Hoods and Cabinets

1.4 PERFORMANCE REQUIREMENTS A. General Design Requirements (See Part 2 for details)

1. Fume hoods shall function as ventilated, enclosed workspaces, designed to capture, contain and exhaust fumes, vapors and particulate matter produced or generated within the enclosure.

2. Fume hood shall be factory designed to function as a variable air volume fume hood. 3. Structure and Materials of construction

a. Hoods are of double-wall construction b. Powder-coated, cold rolled steel exterior c. Galvanized steel support members d. Sheet molded composite panel internal liner

4. Baffles a. Baffle slot pattern designed to optimize face velocity profile. b. Moving or adjustable baffles are not acceptable

5. Sash a. Maximum opening is 28". b. Unobstructed viewing height is 37.5".

6. Airfoil:

Page 9: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 2/9

a. Hoods are provided with an air foil across the bottom of the sash area to allow airflow into the hood regardless of sash position.

7. Besides the exhaust blower, no additional blowers are required for specified containment. 8. Access for maintenance is from both the front, interior, and exterior sides of the hood. 9. Services:

a. Furnishing and delivering all service outlets, accessory fittings, electrical receptacles and switches, as listed in these specifications, equipment schedules or as shown on drawings.

b. Plumbing fittings mounted on the fume hood superstructures shall be pre-plumbed. c. Final plumbing and electrical connections are the responsibility of those contractors fulfilling

requirements of Divisions 22 and 26. d. All electrical services are pre-wired to a single point internal junction box at the top right of the

hood. e. Refer to drawings for location of service fittings ensuring access for future maintenance.

10. Hoods without service fixtures pass through a 38” opening without disassembly.

1.5 CONTAINMENT A. The purpose of this section is to set a standard of performance for the bidder’s laboratory fume hood

before award of contract, and may not necessarily represent the operating conditions of the hoods after installation. Before or after award of contract, owners may require representative witness to said testing at their option, with failure to meet passing criteria as grounds for rejection of the bidder. Test data shall be provided at no cost to the owner.

B. Hood shall be tested to ASHRAE 110 test method. C. Average Face Velocity: Face velocity average shall be 60 fpm, plus or minus 5%. D. Efficiencies

1. The fume hood shall demonstrate a minimization of the volumetric rate of air (CFM) requirement at any given face velocity. Required CFM to achieve desired face velocity shall not exceed that which is noted on sheet M602.

2. The fume hood shall demonstrate a minimization of static pressure loss (inches of H2O) at any given CFM. Refer to sheet M602 for static pressures.

E. Illumination: Shall be a minimum average of 80 foot-candles inside the work area. Work area is defined as the area inside the lined portion of the fume hood, from the face of baffle to sash plane, from interior left to interior right, and from the work surface to a height of 28 inches.

F. Materials of Construction: Interior and Exterior materials of construction and finishes shall meet the requirements in Part 2 of this specification.

1.6 QUALITY ASSURANCE A. Fume hoods shall be designed, including comprehensive engineering analysis, by a qualified, licensed

Professional Engineer. B. Manufacturer’s Qualifications

1. ISO 9001 Certified manufacturing plant and processes. 2. Ten installations of equal or larger size and requirements. Provide contact at each.

C. Manufacturer's warranty against defects in material or workmanship on its fume hoods will be for 1 year from date of installation or 2 years from date of purchase, whichever is sooner, and includes replacement of parts (except lamps) and labor.

1.7 ACTION SUBMITTALS A. Laboratory hood specification sheets and product manuals shall be submitted by the hood manufacturer

upon request, and include safe and proper operation and maintenance information. B. Shop Drawings: Include plans, elevations, sections, and details.

1. Indicate details for anchoring fume hoods to permanent building construction including locations of blocking and other supports.

2. Indicate locations and types of service fittings together with associated service supply connection required.

3. Indicate duct connections, electrical connections, and locations of access panels. 4. Include roughing-in information for mechanical, plumbing, and electrical connections. 5. Provide face opening, volumetric rates, and static pressure drop data.

C. Submit a document detailing the information supplied on the Hood Safety Practices Label to verify compliance to specifications.

1.8 INFORMATIONAL SUBMITTALS A. Product Test Reports: Showing compliance with specified performance requirements, including NEBB

representative test report as defined previously. B. Independent validation:

Page 10: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 3/9

1. Written verification that the laboratory fume hoods carry the ETL listed mark for the following. a. UL 61010-1 (formerly 3101-1), Underwriters Laboratories Inc., Electrical Equipment for Lab Use. b. UL 1805, Underwriters Laboratories Inc., Standard for Laboratory Hoods and Cabinets

2. Written verification that 230 volt model fume hoods carry the CE conformity marking as required by the Council of European Communities.

3. Written verification from an outside testing agency confirming coating compliance to SEFA 8-2010, Recommended Practices for Laboratory Grade Metal Casework, 8.0 Cabinet Surface Finish Tests

C. Documentation of ISO 9001 Certified manufacturing plant and processes. D. List of five installations (of equal or larger size and requirements) is available upon request. Provide

contact at each.

1.9 MATERIAL SUBMITTALS A. Samples for Verification: of the hood exterior wall material, interior liner and baffle material, epoxy work

surface material, and color selection chips are available from the hood manufacturer upon request.

1.10 PROJECT CONDITIONS A. Protect finished surfaces during handling and installation with protective covering of polyethylene film or

another suitable material. B. Schedule delivery of equipment so that spaces are sufficiently complete that equipment can be installed

immediately following delivery. C. Environmental Limitations: Do not deliver or install fume hoods until building is enclosed, wet work and

utility roughing-in are complete, and HVAC system is operating and maintaining temperature and relative humidity at occupancy levels during the remainder of the construction period.

PART 2 - MANUFACTURERS

2.1 Manufacturers: Subject to compliance with the requirements of this specification, available manufacturers offer products that may be incorporated into the Work include:

A. Kewaunee Scientific Corporation, Statesville, North Carolina. B. Labconco XL Hood, Kansas City, Missouri. C. AIR Master Systems Corp. D. CIF Ascent Lab APEX Fume Hoods, Vaughan, Ontario, Canada. E. Mott RFV2 High Efficiency Fume Hood, Brantford, Ontario, Canada. F. Bedcolab Vanguard Fume Hood, Laval, Quebec, Canada. G. Hamilton Laboratory Solutions Concept Fume Hood (no hook & loop), Manitowoc, Wisconsin.

2.2 MATERIALS A. Hood Interior Liner and Baffle

1. Liner material must comply with UL 1805, and be listed within NRTL test report as proof of compliance. 2. General Material Properties

a. Nonflammable, corrosion and chemical-resistant b. Sheet molded homogenous polyester panels c. Minimum thickness is 3/16" d. Smooth, white finish

3. Mechanical Properties a. Tensile Strength: 7,500 PSI b. Tensile Modulus: 1.7 x 10^6 PSI c. Flexural Strength: 21,000 PSI d. Flexural Strength at 130 degrees C: 12,900 PSI e. Compressive Strength: 32,500 PSI f. IZOD Impact Strength (Notched): 8.4 Ft Lb/in (4.5 J/cm)

4. Flame and Smoke Characteristics a. Flame retardant, self-extinguishing, with a flame spread rating of 25 or less in accordance with

ASTM-E84 b. Oxygen Index: 35% c. Smoke Density: 115

5. Physical Properties a. Water Absorption: 0.4% b. Specific Gravity: 4.81 c. Coefficient of Thermal Expansion: 2 In/in/ degree C x 10^-5 d. Thermal Conductivity: 1.9 BTU/Hr/Ft^2/In/degree F

6. Chemical Resistance a. Splash and Spill Resistance:

Page 11: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 4/9

1) Suspend sample panel in a vertical plane 2) Apply five drops of each reagent listed with an eyedropper 3) Apply liquid reagents at top of panel and allow to flow down full panel height

7. Fume Resistance: a. Place 25 milliliters of reagent into 100 milliliters beakers and position panel over beaker tops in the

proper sequence. Ensure beaker pouring lip permits air to enter the interior atmosphere. b. After 24 hours remove panel, flush with water, clean with detergent, rinse, wipe dry and evaluate

8. Evaluation ratings: Change in surface finish and function shall be described by the following ratings a. No Effect: No change in color or gloss b. Excellent: Slight detectable change in color or gloss, but no change to the function or life of the

work surface material c. Good: Clearly discernible change in color or gloss, but no significant impairment of function or life d. Fair: Objectionable change in appearance due to surface discoloration or etch, possibly resulting in

deterioration of function over an extended period e. Failure: Pitting, cratering or erosion of work surface material; obvious and significant deterioration

9. Required minimum results for each reagent (Reagent: Fume Resistance Rating, Splash and Spill Resistance Rating) a. Hydrochloric Acid (37%): 2,1 b. Sulfuric Acid (33%): 2,1 c. Sulfuric Acid (77%): 1,1 d. Sulfuric Acid (96%): 1,2 e. Formic Acid (90%): 2,1 f. Nitric Acid (20%): 2,2 g. Nitric Acid (30%): 1,2 h. Nitric Acid (70%): 3,2 i. Hydrofluoric Acid (48%): 2,2 j. Phosphoric Acid (85%): 1,1 k. Chromic Acid (60%): 1,4 l. Acetic Acid (98%): 1,1 m. Ammonium Hydroxide (20%): 1,1 n. Sodium Hydroxide (10%): 1,1 o. Sodium Hydroxide (20%): 1,3 p. Sodium Hydroxide (40%): 1,3 q. Sodium Hydroxide Flake: 1,- r. Sodium Sulfide: 1,1 s. Zinc Chloride: 2,1 t. Tincture of Iodine: 3,3 u. Silver Nitrate: 2,1 v. Methyl Alcohol: 1,1 w. Ethyl Alcohol: 1,1 x. Butyl Alcohol: 1,1 y. Benzene: 1,1 z. Xylene: 1,1 aa. Toluene: 1,1 bb. Gasoline: 1,1 cc. Dichloro Acetic Acid: 2,2 dd. Dimethyl Formanide: 2,2 ee. Ethyl Acetate: 1,1 ff. Amyl Acetate: 1,1 gg. Acetone: 1,1 hh. Chloroform: 1,1 ii. Carbon Tetrachloride: 1,1 jj. Phenol: 2,2 kk. Cresol: 1,1 ll. Formaldehyde: 1,1 mm. Trichloroethylene: 1,1 nn. Ethyl Ether: 1,1 oo. Furfural: 1,3 pp. Methylene Chloride: 1,1 qq. Mono Chloro Benzene: 1,1 rr. Dioxane: 1,1

Page 12: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 5/9

ss. Methyl Ethyl Ketone: 1,1 tt. Acid Dichromate: 1,2 uu. Hydrogen Peroxide: 1,1 vv. Napthalene: 1,1

B. Sheet Steel 1. Side panels and access panels 20-gauge (or heavier) sheet steel. 2. Hood corner posts are 16-gauge sheet steel. 3. Ceiling enclosure panels are 18 gauge sheet steel. 4. Cold-rolled, commercial steel (CS) sheet, complying with ASTM A 1008/A 1008M.

C. Chemical Resistant Finish 1. General: Prepare, treat, and finish welded assemblies after welding. Prepare, treat, and finish

components that are to be assembled with mechanical fasteners before assembling. 2. Chemical and Physical Resistance of Finish System: Finish complies with acceptance levels of cabinet

surface finish tests in SEFA 8. Third party validation required. 3. Powder-coat process required. Paint processes that release Volatile Organic Compounds (VOC) are

not acceptable 4. Color for Fume Hood Finish:

a. To be selected from manufacturer’s full range of standard colors. D. Safety Glass

1. Tempered a. Clarity and temper test to be as specified in latest edition of Glass Tempering Association,

Engineering Standards Manual, Section 8.1. b. Surface and interior visible quality to be as specified per ASTM C 1036, Standard Specification for

Flat Glass, Table 4, Quality level Q3. E. Superstructure:

1. Self-supporting, rigid structural assembly, to support inner wall consisting of fume hood liner and outer wall of sheet metal exterior.

2. Fabricated from galvanized steel. 3. Space shall accommodate fume hood wiring and plumbing components for service fixtures. 4. Access to fixture valves concealed in wall provided by exterior removable access panels, gasket

access panels on the inside liner walls, or through removable access panels on the front posts. F. Exterior

1. Fabricate from steel sheet with component parts screwed together. 2. Apply chemical-resistant finish to interior and exterior surfaces of component parts before assembly. 3. Interchangeable side panels shall lift off without the use of tools to allow access to plumbing lines,

service fittings, electrical wiring, counterbalance sash weights, and light fixtures. Exposed fasteners or hardware, and Velcro type fasteners, are not acceptable.

4. Corner posts a. Pre-punched and plugged to accommodate up to 4 service fixtures per side b. All services are accessible from the front of the hood. c. Aerodynamic shape d. Accommodate two electrical duplexes per side. e. Right hand corner post includes electrical switches and pre-cut for Airflow monitor installation. f. Un-used penetrations shall be plugged.

5. Top and sides of face opening to provide an aerodynamic shape to ensure smooth, even flow of air into fume hood.

6. Panel above header shall be removable without the use of tools to allow access to mechanical connection, electrical wiring, counterbalance sash weights, and light fixtures. Exposed fasteners or hardware, and “hook-and-loop” type fasteners, are not acceptable.

G. Dimensions 1. Overall exterior dimensions are as follows:

a. 6 foot nominal width: 72” w x 59” h x 34” max 2. Overall interior dimensions are as follows:

a. 6 foot nominal width: 62.1” w x 48” h x 26.5” min H. Hood Liner

1. Adhere interior liner components to superstructure. 2. Stainless steel fasteners shall be used on the interior ceiling for structural integrity. 3. Fasteners exposed to chemical environment are not acceptable. 4. Punch fume hood lining side panels to receive four service fittings, for use with remote controls, per

side. Provide removable plug buttons for holes not used for indicated fittings.

Page 13: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 6/9

5. Each side wall shall include an oval interior access panel to provide access to the side wall of the fume hood for plumbing service access. Access panel material shall be that of the liner, and gasketed to form a vapor proof seal.

I. Hood Baffle 1. Baffle system shall be designed to optimize the face velocity profile, and to capture a wide range of

gaseous densities without adjustment or moving components. 2. Shall provide a continuous horizontal slot at the work surface. Baffle panels shall have multiple

horizontal slots, with a chamfered entry. Slot pattern shall be proven to optimize face velocity profile. 3. The baffle system shall be constructed with the same material as the fume hood liner. 4. The baffles shall be removable for cleaning. The primary baffles shall be three pieces to allow removal

without the use of tools. 5. Exposed components to be non-metallic. Metal components exposed to chemical environment are not

acceptable. 6. Moving parts or adjustment of any kind is not acceptable.

J. Exhaust Connection 1. 316 stainless steel with Chemical-Resistant Finish 2. 12.81" ID to accommodate any 12” nominal duct without the need for a transition adapter. Additional

components required to accommodate 12” nominal mechanical system are not acceptable. 3. Ducting shall go inside the duct collar to ensure condensate travels into the hood and evaporates. Duct

collars that allow duct connection over the collar are not acceptable. K. Airfoil

1. Cold Rolled Steel with Chemical-Resistant Finish. 2. Airfoil shall have an aerodynamic radius to sweep the air into the hood with minimal turbulence. Airfoil

directs airflow across work top to remove heavier-than-air gases. 3. Foil must extend back under the sash to prevent closure of the lower by-pass opening when the sash

is in the fully closed position, directly on top of the airfoil. L. Sash Assembly

1. Glass: Fully tempered safety glass with unobstructed, side-to-side view of fume hood interior and service fixture connections.

2. Dimensions: The full sash opening height is 28", the total unobstructed viewing height is 37.5" measured from the work surface.

3. Sash Tracks: Steel with Chemical Resistant Finish. Shall include bump stops for opening and closing. 4. Sash Handle: extruded aluminum with Chemical Resistant Finish. The handle is ergonomic in design

and is easy to grasp when operating 5. Sash guides: Corrosion resistant extruded poly-vinyl chloride. 6. Sash System

a. Vertical Sash with intelligence b. Hoods have a single vertical sash counterbalanced by a single weight. c. Sash and weight to be connected via #35 chains. d. Rear sprockets shall be connected via timing shaft to prevent sash tilting and permit operation at

any point along full width sash handle. e. Design system to hold sash at any position without creep and to prevent sash drop in the event of

chain failure. f. Sash shall only rise manually. g. Operating height shall be configurable in the field. h. Sash shall automatically close without occupancy after a user set delay period has elapsed. i. Optical sensor shall prevent sash from disturbing an obstruction to the plane of the sash upon

closure. j. Do not include a defeatable, and automatically resetting sash stop on hoods with sash intelligence.

M. Electrical Components 1. Lighting

a. Provide UL Listed, LED lighting systems. b. Vapor-Proof: all electrical components shall be outside of the contaminated air space. Lighting shall

be located behind a laminated safety glass shield, sealed to the top of the hood liner. c. The LED light assemblies shall be serviceable from outside the fume hood cavity, without the use

of tools. 2. Light switch to be included on the lower right corner post, at heights compliant with the Americans with

Disabilities Act (ADA). N. Blower Switch

1. Hoods shall be provided without a blower switch, as they will share a single mechanical system with other hoods.

Page 14: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 7/9

O. Electrical Receptacles 1. The hoods shall accommodate up to four (two per corner post) electrical receptacles. 2. 115 volt, 60 Hz, three-wire polarized and grounded electrical duplex, with Ground Fault Circuit

Interruption (GFCI) 3. Receptacles shall be individually wired to field wiring box, and each rated at 20 Amperes. 4. Cover plates shall be acid resistant thermoplastic.

P. Wiring 1. Every electrical component shall be individually wired to a single point internal field wiring box

(including individual duplexes/receptacles). 2. Field wiring box to be 7” x 4” x 2.5”, grounded, and have (12) 7/8” diameter knock out penetrations. 3. Final wiring and circuit dedication is to be by others. 4. Each receptacle circuit shall accommodate being wired to a dedicated building circuit rated at 20A, or

the receptacles ganged together on a building circuit with the total load not exceeding 20 Amperes. Q. Fume hood to have third party validation of compliance to UL 1805 and UL 61010-1 by a Nationally

Recognized Testing Laboratory (NRTL) R. By-Pass Opening

1. Shall offer a significant restriction to the by-pass opening to allow the use of a VAV mechanical system. S. Hood Safety Practices Label: Corrosion resistant plate attached to the left corner post of the fume hood

with the following Hood Safety Practices: 1. For use with substances that produce hazardous levels of airborne chemicals: gas, fumes, vapors,

dust 2. Do not put your head in the hood. 3. Minimize drafts and sudden movements in front of the hood. 4. Work a minimum of six inches inside the hood. 5. Elevate equipment above the work surface. 6. Keep sill and baffle unobstructed. 7. Do not use the hood for storage. 8. Adjust the sash to smallest opening possible when in use. 9. Close sash when unattended. 10. Do not remove any of the hood components. 11. Do not place flammable solvents near heat, flame or sparks. 12. Do not evaporate large amounts of flammable liquids. 13. Wipe up spills immediately. 14. Routinely validate airflow. 15. If the ventilation system malfunctions, or airflow alarm indicates unsafe condition, close sash and

discontinue hood operation immediately-call for help. 16. Do not use with Biohazards or Perchloric Acid

2.3 FUME HOOD ACCESSORIES A. Service Fixtures: Color-coded hose nozzle outlets and valves mounted inside the fume hood and

controlled from the exterior with color-coded index handles 1. The hoods are equipped with cold water gooseneck on the left, and vacuum and air on right. 2. Hose connectors located inside the fume hood cavity are chemically-resistant, glass-filled

polypropylene with 6 serrations. 3. Service lines shall be factory installed from valve to outlet

a. Copper tubing unless otherwise noted b. Connections shall be made with quick-connect compression fittings on the inlet and outlet of the

valve body, soldered and brazed connections not easily disassembled are not acceptable. c. Services pre-piped to the top of the hood d. Refer to A710 for location of service fittings. Place services on end with access for maintenance –

see plans. 4. Valves

a. Extruded brass valve and rotating seat, TFE-coated silicone bronze stem and TFE packing. b. Fixture handles are plastic and color coded as well as labeled for the designated type of service. c. Fixtures are rated at maximum pressure of 200 psi. d. Coefficient of flow for the valve, Cv=0.43. e. Valves are front loaded, located on the fume hood corner post for remote use, and include:

1) Cold tap water with gooseneck (flow rate 3.5 GPM or 13.25 LPM at 67 psi at full open 2) Air (theoretical flow rate of 59 CFM at 100psi) 3) Vacuum (theoretical flow rate of 6 CFM at 10 psi)

Page 15: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 8/9

B. Tissue Screen: Provide epoxy-coated, stainless-steel screen at bottom baffle opening to prevent paper from being drawn into the exhaust plenum behind baffles.

C. Ceiling Enclosure Panels: 1. Provide filler panels matching fume hood exterior to enclose space above fume hoods at front and

sides of fume hoods and extending from tops of fume hoods to ceiling. 2. Exposed fasteners are not acceptable. 3. Height adjustment to be within the following range.

a. 11.0” - 14.0” D. Face Velocity Monitor/Alarm

1. Variable Air Volume (VAV) Prepared a. Fume hoods shall come factory prepared with the proper cutouts and brackets to field mount air

flow monitor alarm provided and installed by Division 26.

2.4 WORK SURFACE A. 1.25” thick, molded from solid modified epoxy resin, with smooth, non-specular, black finish. B. One inch radius front edge for optimal fume hood performance. C. 3/8” dished area to match the fume hood interior work space and form a water tight pan for spill

containment. D. Include a 2.5” diameter hole on each side for service pass-through and piping. Hole to be covered by

hood superstructure upon installation. E. Include two 1.5” diameter penetrations to accommodate base cabinet venting. Holes to be located outside

of dished area and under the fume hood baffles. Include plugs. F. Physical Properties:

1. Flexural Strength: Not less than 10,000 psi. 2. Modulus of Elasticity: Not less than 2,000,000 psi. 3. Hardness (Rockwell M): Not less than 100. 4. Water Absorption (24 Hours): Not more than 0.02 percent. 5. Heat Distortion Point: Not less than 260 deg F (127 deg C). 6. Flame-Spread Index: 25 or less per ASTM E 84.

G. Cupsink 1. 3” x 6” dimension, polypropylene construction 2. Provide with strainers and tailpieces, NPS 1-1/2 (DN 40)To sit flush with dished area of work surface 4. Cupsink to be located:

a. Refer to A710 for location of services.

2.5 SUPPORTING BASE CABINETS A. Base cabinets shall be in depths of 22", widths, quantities, and types called out in the drawings, and meet

the requirements of this specification. B. Construction requirements for all cabinets

1. Exterior construction is 18 gauge (or heavier) cold rolled sheet steel with Chemical Resistant Finish. 2. Hinges are 10 gauge (or heavier) plate with self-clinching pilot pin. Knuckle, bullet, or piano type hinges

are not accepted. 3. The rear panel will feature a 12" x 8" removable plumbing access panel. 4. Units 24" wide or less have only one door. 5. Each cabinet includes four leveling feet. 6. Capable of supporting up to 800 pounds. 7. A filler panel is required to increases the cabinet depth to work surface depth.

C. Acid Storage 1. Overall exterior dimensions:

a. 36" w x 22" d x 34” max. 2. Completely lined with a polyethylene corrosion resistant liner. The liner is 3/16" thick, with a vacuum

formed PVC liner pan at the bottom to contain spills. Each door has a 3/16" sheet polyethylene liner. 3. The cabinet is labeled: "ACID". 4. Flush pull handles are ABS, low gloss black. 5. Each cabinet is vented into the fume hood with a 1-1/2" vent pipe. It should provide a positive airflow

directly into the fume hood exhaust system. 6. Supply an epoxy coated steel shelf with PVC liner pan if indicated in the schedule. 7. Acid cabinets with louvers are not acceptable

D. Solvent Storage 1. Overall exterior dimensions:

a. 36" w x 22" d x 34” max. 2. Solvent storage cabinets are specifically designed for the storage of flammable & combustible liquids.

Page 16: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MU Medical Science Building Addendum 2 First Floor Research Laboratory Renovation November 27, 2017 CP171091

LABORATORY FUME HOODS 115313 - 9/9

3. Solvent Storage Cabinet must be compliant with NFPA 30 “Flammability and Combustible Liquids Code.”

4. Cabinets 30" wide and greater shall be tested and approved by Factory Mutual to meet Factory Mutual Approval Standard 6050.

5. The bottoms, top, sides, and doors are fabricated of 18 gauge steel and are all double panel construction with a 1-1/2" air space between panels.

6. All joints are welded or screwed to provide a rigid enclosure. A 2" deep liquid tight pan that covers the entire bottom of the cabinet is furnished to contain liquid leaks and spills.

7. A full-depth, 18 gauge steel, adjustable shelf is also provided. Shelves are sealed leak tight. 8. Two diametrically opposed flame arrestor vents with spark screens are provided in the back of the

cabinet, as well as a grounding screw. 9. The cabinet has an interior finish same as the exterior. 10. The cabinet is labeled: "FLAMMABLE - KEEP FIRE AWAY". 11. The right hand door shall have a three point latching device. 12. Door handles include a key lock. Handles are locking lever handles with bright chrome finish.

PART 3 - EXECUTION

3.1 EXAMINATION A. Examine areas, with installer present, for compliance with requirements for installation tolerances and

other conditions affecting performance of fume hoods. B. Coordinate with other trades for the proper and correct installation of plumbing and electrical rough-in and

for rough opening dimensions required for the installation of the hood. C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION A. General: Install fume hoods according to shop drawings and manufacturer's written instructions. B. Install level, plumb, and true; shim as required, using concealed shims, and securely anchor to building

and adjacent laboratory casework. C. Securely attach access panels, but provide for easy removal and secure reattachment. Where fume

hoods abut other finished work, apply filler strips and scribe for accurate fit, with fasteners concealed where practical.

D. Neighboring splash blocks shall not be attached directly to the hood. E. Install according to standards required by authority having jurisdiction. F. Sequence installations to ensure utility connections are achieved in an orderly and expeditious manner. G. Touch up minor damaged surfaces caused by installation. Replace damaged components as directed by

Architect.

3.3 FIELD QUALITY CONTROL A. NFPA 45 requires that fume hoods be field tested when installed. B. Field test installed fume hoods according to ASHRAE 110 to verify compliance with performance

requirements. C. Adjust fume hoods, hood exhaust fans, building's HVAC system, and make other corrections until tested

hoods perform as specified in fume hood schedule. D. After making corrections, retest fume hoods that failed to perform as specified. E. Coordinate commissioning/field testing sequence with control valve programmer and Owner to ensure

fume hood sash settings and control valves are operating as intended.

3.4 ADJUSTING AND CLEANING A. Adjust moving parts for smooth, near silent, accurate sash operation with one hand. Adjust sashes for

uniform contact of rubber bumpers. Verify that counterbalances operate without interference. B. Clean finished surfaces, including both sides of glass; touch up as required; and remove or refinish

damaged or soiled areas to match original factory finish, as approved by Architect. C. Clean adjacent construction and surfaces that may have been soiled in the course of installation of work in

this section. D. Provide all necessary protective measures to prevent exposure of equipment and surfaces from exposure

to other construction activity. E. Advise contractor of procedures and precautions for protection of material and installed equipment and

casework from damage by work of other trades.

END OF SECTION 115313

Page 17: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

123553 FIXED PANEL FOR OUTLETS

123553PATHWAY INSIDE CASEWORK FOR U.C.LIGHTING TOPLUG INTO NEW OUTLET.

123553 FIXED PANEL FOR OUTLETS

123553 POWER WIREMOLD

123553 REAGENT SHELVING

MEPELECTRICAL POWER TO BE RUN TO OUTLETS,COORDINATE WITH ELECTRICAL DRAWINGS 1&2 ONE301 FOR CIRCUITS

123553REMOVEABLE AS REQUIRED TO ACCESS CHASE BEHINDCASEWORK

1

MEP

ELECTRICAL RACEWAY WITH PREINSTALLEDELECTRICAL OUTLETS - INCLUDES CORD AND PLUGDOWN UNDER COUNTER TOP TO KNEE SPACE.ELECTRICAL CONTRACTOR TO PROVIDE OUTLETSUNDER COUNTER TOP.

123553 FRONT LIP, NO BACK

12355312" WIDE VERTICAL SUPPORT. SUPPORT NOTREQUIRED TO GO TO FLOOR.2'

-0"

123553MIRROR THIS SIDE FOR OUTLETS, U.C. LIGHTS, POWERPLUGS, ETC...

2

2

1

1

1

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/27/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 02

XA05

1" = 1'-0" C4/A710PRE INSTALLED ELEC OUTLETS

Page 18: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

ANATOMY

CADAVER LAB

M144

2' x 2' ACT

+8'

- 0

"

439

438

OW

NE

R F

UR

NIS

HE

D, O

WN

ER

INS

TA

LLE

D S

UR

GIC

AL

LIG

HT

FIX

TU

RE

. G

.C. T

O C

OO

RD

INA

TE

NE

W C

EIL

ING

INS

TA

LLA

TIO

NW

ITH

OF

OI F

IXT

UR

E A

ND

AN

Y N

EW

/ EX

IST

ING

ME

P IT

EM

ST

HA

T IM

PE

DE

ST

RU

CT

UR

E F

OR

LIG

HT

.

1

CO

NT

RO

LLE

R, R

E: E

LEV

AT

ION

1

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/27/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 02

XA07

3/1

6"

= 1

'-0"A

1/A

601

LE

VE

L 1

RC

P P

LA

N

OFOI

OFOI

NOTE: PICTURES FORREFERENCE OFEXISTING LIGHT

Page 19: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

FREEZE

R A

OFO

I

123554

RELO

CATED S.S. C

ASEWORK FROM 148

TV, O

FOI

MEP

NEW ELE

CTRICAL RACEWAY

123554

NEW S.S. C

SWK & COUNTERTOP (6'-3")

123554

NEW S.S. C

SWK

123554

NEW S.S. C

OUNTERTOP - F.V. E

XISTING

A710

B6

CONTROLLER, R

E:

PICTURE BELO

WCOORDINATE W

/ELE

CTRICAL

1

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/27/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 02

XA08

1/4

" =

1'-0"E

4/A

803

NO

RT

H E

LE

VA

TIO

N -

M144

Owner Furnished, Owner

Installed (OFOI) control panel

location for Owner Furnished,

Owner Installed (OFOI)

Surgical Light Fixture

1

Page 20: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

M

7

8

* NOTE EXISTING EXHAUST SHAFTSSCOPE OF WORK:

1. EXHAUST DUCTWORK TO BESECURED AT FLOOR AS REQUIREDFOR NEW INSTALLATION. RE:MECH FOR MORE INFORMATION.2. REMOVE WALL AS REQUIRED TOINSTALL NEW MEP WORK.3. PATCH/ REPAIR EXISTING WALLBACK TO MATCH EXISTING.4. PAINT BACK WALL FROMCORNER TO CORNER AT NEW WORK.

M250

OFFICE

M250

514

436

1

EXHAUST PIPINGTIE-IN - 1STFLOOR NEWROOM M134A

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/27/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 02

XA09

3/16" = 1'-0" D5/A601LEVEL 2 - EXHAUST PIPING TIE IN

Page 21: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

C4A710

6"1/2"

LA

LV

123553LED U.C.LIGHTING BY CASEWORK MANUFACTURER,PLUG IN PER DIAGRAM.

MEP

ELECTRICAL RACEWAY WITH PREINSTALLEDELECTRICAL OUTLETS - INCLUDES CORD AND PLUGDOWN UNDER COUNTER TOP TO KNEE SPACE.ELECTRICAL CONTRACTOR TO PROVIDE OUTLETSUNDER COUNTER TOP.

MEPELECTRICAL POWER TO BE RUN TO OUTLETS,COORDINATE WITH ELECTRICAL DRAWINGS 1&2 ONE301 FOR CIRCUITS

45"WD

PNL

123553REMOVEABLE AS REQUIRED TO ACCESS CHASE BEHINDCASEWORK, TYP AT ISLAND CASEWORK

123553 FIXED PANEL FOR OUTLETS

2

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/27/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 02

XA10

1" = 1'-0" E6/A710TYP ISLAND CASEWORK

NOTE: OUTLETS AND CORDS FOR LIGHTING REMOVED ATTHIS LOCATIONS, RE: XA11 FOR LOCATION OF OUTLETFOR LIGHTING. LIGHTING TO HAVE ROCKER SWITCHFOR INDIVIDUAL ABILITY TO TURN ON AND OFF LIGHTS

AT ALL EACH REAGENT SHELVING SECTION.

Page 22: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

123553SERVICE CHASE

LA

LV

LG

123553LED U.C.LIGHTING BY CASEWORK MANUFACTURER,PLUG IN PER DIAGRAM.

MEPELECTRICAL POWER TO BE RUN TO OUTLETS,COORDINATE WITH ELECTRICAL DRAWINGS 1&2 ONE301 FOR CIRCUITS

MEP

ELECTRICAL RACEWAY WITH PREINSTALLEDELECTRICAL OUTLETS - INCLUDES PRE WIRING DOWNUNDER COUNTER TOP TO KNEE SPACE ELECTRICALOUTLEY/ CONNECTION BOX / HARD WIRES

MEPELECTRICAL POWER TO BE RUN TO JUNCTION BOX,COORDINATE WITH ELECTRICAL DRAWINGS

123553PATHWAY INSIDE CASEWORK FOR U.C.LIGHTING TOPLUG INTO NEW OUTLET. DAISY CHAIN LIGTHS ANDPROVIDE ROCKER SWITCH AT EACH SECTION.

42"WD

PNL

123553REMOVEABLE AS REQUIRED TO ACCESS CHASE BEHINDCASEWORK, TYP AT ISLAND CASEWORK

123553 FIXED PANEL FOR OUTLETS

2

PROJECT NUMBER:

1900 W. 47th PlaceSuite 300Westwood, Kansas66205p: 913.362.6500www.pgav.com

Plumbing and Mechanical Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

(816) 421-0950

11/27/1753474

Medical Science First Floor Research Laboratory Renovation

UNIVERSITY OF MISSOURIFOR: The Curators of the University of Missouri - Project No: CP171091

ADDENDUM 02

XA11

1" = 1'-0" E6/A710TYP ISLAND CASEWORK

NOTE: OUTLETS AND CORDS FOR LIGHTING REMOVED ATTHIS LOCATIONS, RE: XA11 FOR LOCATION OF OUTLETFOR LIGHTING. LIGHTING TO HAVE ROCKER SWITCHFOR INDIVIDUAL ABILITY TO TURN ON AND OFF LIGHTS

AT ALL EACH REAGENT SHELVING SECTION.

Page 23: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

CYLCYL

CFH

01

CYL

CFH

02

CYLCF

H 01

CYL

CYL

CFH 01

CFH 01

CYL

CYL

CYLCYL

CYLCYL

CYLCYL

CYLCYL

1/2"

NOTE: CONTROL JOINTS ONLY SHOWN ON PLANS &ELEVS. WHERE LOCATION-CRITICAL. REFER TO SPECSFOR PRESECRIPTIVE REQUIREMENTS FOR PLACEMENTOF ADDITIONAL CONTROL JOINTS.

GYP. WALL DETAIL - CONTROL JOINT "CJ"

092216 WALL PER TYPE

079200 PAINTABLE SEALANT, PAINT TOMATCH WALL U.N.O.

092216 1/2" CONTROL JOINT SIM. TOUSG #093

092216 FRAMING PER WALL TYPE

PERSPEC.

PER

SPEC

.

GYP. WALL DETAIL - CORNER GUARD "CG"

079200SEALANT

10260042" SS CORNER GUARD,ADHERE WITH SILICONEADHESIVE

102600MILLED EDGE

092900WALL FINISH CONTINUESUNDER C.G.

102600 MILLED EDGE

092216 WALL PER TYPE

079200 SEALANT

6" M

IN.

TYP. FOR HEAD CONDITION "A"

092216 WALL PER TYPE

095113 CEILING PER RCP'S

092116 DEFLECTION TRACK

HEAD DETAIL - WALL UP TO STRUCTURE ABOVE

092116 WALLTYPE PER PLAN

092116 DEFLECTION TRACK092900WHERE EXPOSED TO VIEW,PROVIDE CONT.J-MOLDFINISHED EDGE

STRUCTURE ABOVE

079200ACOUSTIC CAULK EA SIDECONTINOUS (PER PARTITIONTYPE)

HEAD CONSTRUCTIONA - EXTEND TO 6" ABOVE CEILING HEIGHT.B - FULL-HEIGHT WALL, EXTEND TO DECK OR BEAM ABOVE.C - FULL-HEIGHT WALL, FRAMED WITH COLD-FORMED METAL STUDS PER SPEC. 054000.P - PARTIAL-HEIGHT WALL. HEIGHT AS NOTED ON PLAN OR ON DETAIL.R - FULL-HEIGHT, FIRE-RATED WALL, SEALED TO STRUC. ABOVE PER FIRE ASSEMBLY.S - SPECIAL HEAD CONDITION, PER DETAIL.

WALL ADDITIONS (WHERE APPLICABLE)1 - ACOUSTIC ASSEMBLY W/ BATT INSULATION & SEALANT (TOP & BTM OF WALL)2 - THERMAL INSULATION, FULL-DEPTH OF STUD CAVITY U.N.O.3 - SMOKE PARTITION, SEAL WALL PERIMETER & PENETRATIONS.4 - SPECIAL TREATMENT, PER NOTES.

PARTITION DESIGNATIONS

3G2X-#

3G13G1A

4 1/4"4 7/8"

WALL VARIANTSPECIFIC VARIANT (1, 2, 3... ETC.)

WALL MATERIALCONCRETE - C

GYP. BOARD ON METAL STUDS - GCONC. MASONRY (CMU) - M

GYP. BOARD ON SHAFTWALL - S

WALL CORE THICKNESSTHICKNESS PER WALL TYPEEXAMPLES: 3 = 3-5/8" STUD

3G2X-#

PARTITION TAG

'G' PARTITIONS3G2

3G2 / R

4 7/8"

RATED 1-HRPER UL-U419

'G' PARTITIONS6G16G1A

6 5/8"7 1/4"

6G26G2 / R

7 1/4"

RATED 1-HR PER UL-U419

2G1

'S' PARTITIONS

4S1 / R

4 5/8"

4S2 / R

5 1/4"

RATED 2-HRPER UL-U415

2S1 / R2S2 / R

3 3/4"

RATED 2-HRPER UL-U415

3 1/8"

GYPSUM BOARD

GYPSUM BOARD IS TYPICALLY 5/8" TYPE 'X', UNLESS NOTED OTHERWISE.

PROVIDE MOISTURE-RESISTANT OR CEMENTITOUS BOARDS WHERE REQUIREDIN GYPSUM BOARD SPECIFICATION 092900 AND WHERE NOTED IN THE DRAWINGS.

PROVIDE IMPACT-RESISTANT BOARDS WHERE REQUIRED IN THE GYPSUMBOARD SPECIFICATION 092900 AND WHERE NOTED IN THE DRAWINGS.

GENERAL PARTITION NOTES

FIRE-RATED & SMOKE-RATED WALLS

FIRE/SMOKE SEALANTS AND/OR FIRE SAFING IS REQUIRED AT RATEDPARTITIONS WHERE THE PARTITION JAMB CONDITIONS INTERFACE WITHDISSIMILAR MATERIALS OR WHERE FIRE TAPING AT THE INTERFACE OFMATERIALS IS NOT POSSIBLE.

FIRE SEALANTS ARE NOT REQUIRED AT THE BASE/SILL CONDITION OFPARTITIONS.

WHERE A FIRE-RATED PARTITION IS ALSO NOTED TO HAVE ACOUSTICALELEMENTS, FIRE SEALANTS AND/OR FIRE SAFING SHALL BE PROVIDED IN LIEU OFACOUSTICAL SEALANTS. ACOUSTICAL SEALANT SHALL BE PROVIDED AT THEBASE/SILL OF PARTITIONS.

APPLIED FINISH MATERIALS

APPLIED FINISHES INCLUDE, BUT ARE NOT LIMITED TO:PAINT, RESINOUS COATINGS, ACOUSTICAL WALL PANELS, AND WOODMILLWORK TRIM.

GENERALLY, WALL TYPES DO NOT INCLUDE OR SHOW ANY APPLIED FINISHES;(WALL TYPES WITH WOOD PANEL AND/OR OTHER VENEERS MAY BE CREATED).SEE FINISH SCHEDULE AND INTERIOR ELEVATIONS FOR MATERIALS TO BEINSTALLED OVER THE BASIC PARTITION ASSEMBLY.

THE CONTRACTOR SHALL COORDINATE DIMENSIONAL LAYOUT WITH APPLIEDFINISH THICKNESS WHERE CLEAR OR MINIMUM CLEAR DIMENSIONS AREREQUIRED

THE CONTRACTOR SHALL COORDINATE ANY ADDITIONAL REQUIREMENTSWITHIN WALL FRAMING NECESSARY FOR APPLIED FINISH MATERIALS.

092900 5/8" TYPE 'X' GYP BD

092216 2 1/2" MTL FRAMING

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

072100ACOUSTIC BATT INSULATIONWHERE NOTED ON PLANS ORSPECIFICATIONS

092900 5/8" TYPE 'X' GYP BD

092216 3 5/8" MTL FRAMING

072100ACOUSTIC BATT INSULATIONWHERE NOTED ON PLANS ORSPECIFICATIONS

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

092900ADDL LAYER OF 5/8" TYPE XGYP BD WHERE SPECIFIED AS'3G1A' WALL

092900 5/8" TYPE 'X' GYP BD

092216 3 5/8" MTL FRAMING

072100ACOUSTIC BATT INSULATIONWHERE NOTED ON PLANS ORSPECIFICATIONS

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

092900 5/8" TYPE 'X' GYP BD

092216 6" MTL FRAMING

072100ACOUSTIC BATT INSULATIONWHERE NOTED ON PLANS ORSPECIFICATIONS

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

092900ADDL LAYER OF 5/8" TYPE XGYP BD WHERE SPECIFIED AS'6G1A' WALL

092900 5/8" TYPE 'X' GYP BD

092216 6" MTL FRAMING

072100ACOUSTIC BATT INSULATIONWHERE NOTED ON PLANS ORSPECIFICATIONS

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

092900 5/8" TYPE 'X' GYP. BD. TYP.

092116 4" C-H SHAFTWALL STUDS

072100 BATT INSUL

079200 SEALANT

096513 BASE FINISH PER SCHED.

092900 1" TYPE 'X' GYP. PANEL

092900 2ND LAYER OF 5/8" TYPE 'X'GYP. BD.

092900 5/8" TYPE 'X' GYP. BD. TYP.

092116 2 1/2" C-H SHAFTWALL STUDS

072100 BATT INSUL

079200 SEALANT

096513 BASE FINISH PER SCHED.

092900 1" TYPE 'X' GYP. PANEL

092900 2ND LAYER OF 5/8" TYPE 'X'GYP. BD.

0G1

092900 5/8" TYPE 'X' GYP BD LAMINATEDTO CMU

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

1G1

092900 5/8" TYPE 'X' GYP BD

092216 1 5/8" MTL FRAMING

079200 ACOUSTIC SEALANT FORACOUSTIC TYPE

096513 BASE PER SCHEDULE

072100ACOUSTIC BATT INSULATIONWHERE NOTED ON PLANS ORSPECIFICATIONS

RATED 1-HRPER UL-U415

RATED 1-HRPER UL-U415

5/8" TYPE "X" GYP BD. (2) LAYERSAROUND INSIDE OF CAB RECESS,ATTACH TO MET STUDS & MET ANGLESW/ #8 SELF-TAP SM SCREWS @ 12" O.C.

RECESSED FLUSH MTD TEL CABINET,COORD SIZE OF FRAMED PNG W/MANUFACTURER

1-1/2" X 3" X 20GA MET ANGLE @ ALL (4)SIDES OF ATED PARTN TYPEOPNG, ATTACH TO MET STUDS W/ #8SELF-TAP SM SCREWS @ 12" O.C.

ACOUSTIC INSULATION,WHERE SCHEDULED

AS S

CHED

ULED

1 HR

PART

N TY

PE

60" U

.N.O

.

48" M

AX.

FEC ELEVATION

ELEVATION

L

PLAN

NON-RATED PARTITION TYPE RATED PARTITION TYPE

C

PARTITION TYPE AS SCHED

SEMI RECESSED METAL FIRE EXTINGUISHER CAB,COORD OPNG SIZE & DEPTH W/ MANUFACTURER

3-5/8" X 20 GA METALSTUDS AROUND FEC OPNG

5/8" GYP BD

100

ROOM NAME/TITLE

IN FIRE EMERENCY,DO NOT USE

ELEVATOR. USE EXITSTAIRS

.. ..

5"

2 1/4"

.. .... ..

3/8"3/8

"3/8

"3/4"

3/8"

7 7/8"

10"

6" M

IN. B

Y CO

DE

STAIRS.. ... ... .

7 7/8"

EQ EQ

7 7/8"TRANSPARENTINSERT

COLORED LENS, T.B.D. ,W/ BRAILLE & TACTILE TEXT

LENS W/ BRAILLE& TACTILE TEXT &GRAPHICS,

8 1/2"

6" M

IN. B

Y CO

DE

8 1/2"

LENS W/ BRAILLE& TACTILE TEXT &GRAPHICS,

.. ... ... . .. ... ... . .. ... ... ... ... ... ... ... ... .

D1

D5D3

PROVIDE ONE AT EACH STAIR ENTRANCE

D1

D1

D1

D5

D1

D1

D1 D1

D3

D1

D1

D1

D1

D1

D1

D1D1

D1

D1

D1

D1

D1 D1D1

5'-0"

TOP

OF

SIGN

TO

FINI

SH F

LOOR

, TYP

.

9"

1'-6" MIN CLR

EQ EQ

1'-6"

MIN

CLR

1'-6"

1'-0"

TACTILE CHARACTERSTO BE RESTRICTED TOTHIS AREA, ADJUST TYP.MOUNTING ELEV ASNEEDED

4'-0"

C.L. OF SIGN TO DOORFRAME, LATCH SIDE

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

0" 1"

Original Size: 1 1/2" Drawing may have been reduced.

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/27

/2017

5:43

:28 P

MC:

\Us e

rs\jas

on. tip

pie\D

ocum

ents\

5347

4 UM

S OM

L1 R

e nov

ation

_j aso

n.tipp

ie .rvt

A150

11/27/2017

53474

TYPICALPARTITIONS,SIGNAGE &

INTERIOR DETAILS

JRT

ADDENDUM #2

04 A

RC

HIT

ECTU

RAL

BID

DO

CU

MEN

TS

University of Missouri -Columbia

1 Hospital Drive, Columbia, MO65212

JRT

CP171091

PGAV

Medical ScienceFirst FloorResearch

LaboratoryRenovation

1 1/2" = 1'-0" C2GYP WALL - CONT. JOINT "CJ" 1 1/2" = 1'-0" C1GYP WALL - CORNER GUARD "CG"

1 1/2" = 1'-0" A4GYP HEAD OF WALL - SUSPENDED CEILING

1 1/2" = 1'-0" A5GYP HEAD OF WALL TO STRUCTURE

1 1/2" = 1'-0" C3RECESSED ELEC CAB.

1 1/2" = 1'-0" B5FIRE EXTINGUISHER CAB

3" = 1'-0" E1SIGNAGE TYPES

# DATE DESCRIPTION1 11/27/2017 Addendum 02

3/32" = 1'-0" C4SIGNAGE PLAN

3/4" = 1'-0" E3SIGNAGE INSTALLATION

1

Page 24: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Q R

5

5.5

7

8

K.2

9

6

10

5.9

525

524

523

423

424

425

FO

R C

ON

TIN

UA

TIO

N,

SE

E S

HE

ET

FP

D101

EX 2 1/2"FEX 2 1/2"F

EX 4"F-UP

EX 4"F

EX 4"F

2

2

2

TYP.

2

TYP.

EX. SPR.PIPING (TYP.)

2

EX 1-1/2" EX 1-1/2"

EX 1-1/2" EX 1-1/2"

3

1

1 EX 4"F

FF

F

F

F

EX 4"F 1

EX 4"S.P.-UP 1

EX. CAPPED2-1/2" SPR. MAIN

STORAGEROOM

STORAGEROOM

CORRIDOR

M122

DRY STORAGE

M126

EXISTING IT CLOSET

M125

DARK ROOM

M128

STORAGE/ RISER

M125B

4

4

4

4

41

1

1

1

1

EXISTING LAY-IN CEILING. CONTRACTORSHALL FIELD VERIFY EXISTING LAYOUT.

1

ALTERNATE BID #2

SCALE: 3/16" = 1'-0"

1 THE CONTRACTOR SHALL SEE DIVISION #1 SPECIAL CONDITIONS FOR PHASING OF WORK SCHEDULEFOR THIS ALTERNATE #2 CONSTRUCTION.

GENERAL NOTE:

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 1

0:37

:10

AM

C:\U

sers

\phe

itert

\Doc

umen

ts\2

45-3

2_P

LUM

B_C

EN

TR

AL_

v16_

phei

tert

. rvt

FPD103

11/06/2017

53474

LEVEL1 – EASTZONE TEACHING

LAB – DEMOLITIONALTERNATE BID #2

PJH

BID DOCUMENTS

University of Missouri -Columbia

1 Hospital Drive, Columbia, MO65212

PJH

CP171091

MSM

Medical ScienceFirst FloorResearch

LaboratoryRenovation

3/16" = 1'-0"1LEVEL1 – EAST ZONE TEACHING LAB – DEMOLITION – ALTERNATE BID #2

KEYED NOTES:

1 THE INSTALLATION OF THE FIRE MAIN IS UNDER CONTRACT AND TO BE INSTALLED. THE CONTRACTOR FORTHIS FIRST FLOOR RESEARCH LAB PROJECT SHALL COORDINATE NEW WORK WITH THE FIRE MAINCONTRACTOR FOR INSTALLATION.

2 THE CONTRACTOR SHALL DISCONNECT AND REMOVE THE EXISTING CAPS ON THE SPRINKLER PIPES. SEERENOVATION DRAWING FOR NEW SPRINKLER HEAD INSTALLATION.

3 THE EXISTING SPRINKLER PIPING SYSTEM WAS DESIGNED AND INSTALLED FOR A LIGHT HAZARD DESIGNAT A 0.10 GPM PER 1500 SQ.FT.

4 EXISTING HARD CEILING TO REMAIN.

#

NORTH

PLA

N

0

SCALE:

0

6' - 0"

12' - 0"

18' - 0"

1" = 6' - 0"

# DATE DESCRIPTION

1 11/27/2017 ADDENDUM 2

1

Page 25: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

F G

H I J

KD.7D.2

5.5

7

8

K.2

9

6

1

10

5.9

504

448

447 444

445

506 507

442

443 446

449

450

501

FIRST FLOOR

WEST SPRINKLER ZONE

FIRST FLOOR

EAST SPRINKLER ZONE

FO

R C

ON

TIN

UA

TIO

N,

SE

E S

HE

ET

FP

101

EX 4"F

EX 4"F

EX 2"F

EX 2 1/2"F

EX FHC

EX 6"F

EX 6"F

EX 4"F

EX 2 1/2"F

ZONE VALVE

IN VERTICAL

4" SPR MAIN BLIND FLANGE

FOR FUTURE CONNECTION ORDINARY HAZARD,

CLASS 2

WEST RESEARCH LAB

M148

ANATOMY CADAVER LAB

M144

HALLWAY

M144

CORRIDOR

M124

CORRIDOR

M124

SPR

F

EX 6"F

SP

RS

PR

SP

R

NEW 4" SPR MAIN

1

2

EX FHC

EX 6"F-UP&DN

EX 6"FEX 6"F

LIGHT HAZARD

LIGHT HAZARD

EX FHC

FF

FF

F

F F

F

INSTALL INSPECTOR'S

TEST AND DRAIN FOR

WEST ZONE FIRST FLOOR.

EX JAN. SINK

IN THIS CORRIDOR, INSTALL

SIDEWALL SPRINKLER HEADS.

2'-0"

INTERIOR WALLRELOCATE EXIST 6"F

MAIN AT 10'-2" BOP

EX. 6"F MAIN

F F

INSTALL AT 10'-2" AFF

TO BOTTOM OF PIPE

EX. 6"F MAIN

EX. 6"F MAIN

1

EX 6"F MAIN

AT 10'-2" BOP

1

SCALE: 3/16" = 1'-0"

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 1

0:37

:59

AM

C:\U

sers

\phe

itert

\Doc

umen

ts\2

45-3

2_P

LUM

B_C

EN

TR

AL_

v16_

phei

tert

. rvt

FP102

11/06/2017

53474

LEVEL 1 -WESTZONE FIRE

PROTECTION –NEW WORK

PJH

BID DOCUMENTS

University of Missouri -Columbia

1 Hospital Drive, Columbia, MO65212

PJH

CP171091

MSM

Medical ScienceFirst FloorResearch

LaboratoryRenovation

3/16" = 1'-0"1LEVEL 1 -WEST ZONE FIRE PROTECTION – NEW WORK

KEYED NOTES:

1 THE CONTRACTOR SHALL FURNISH AND INSTALL A ZONE VALVE SUPERVISORY

SWITCH ON EXISTING VALVE. COORDINATE INSTALLATION WITH ALL

SUB-CONTRACTORS.

2 SEE DIAGRAM ON SHEET FP501 FOR FLOOR CONTROL ASSEMBLY.

#

NORTH

PLA

N

0

SCALE:

0

6' - 0"

12' - 0"

18' - 0"

1" = 6' - 0"

# DATE DESCRIPTION

1 11/27/2017 ADDENDUM 2

Page 26: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

CYLCYL

CF

H 0

1

CYL

CF

H 0

2

CY

L

CF

H 0

1

CY

L

CYL

CFH 01

CFH 01

CY

L

CY

L

CYLCYL

CYLCYL

CYLCYL

CYLCYL

G H I J K L M N P Q R

D.7D.2 N.8M.8L.91.15

5

5.5

7

8

K.2

9

4

3

2

6

1

10

5.9

EX. 12" EA TRANSITEDUCT UP (VR-58)

EX. 12" DIA EATRANSITE UP

EX. 16" DIA EATRANSITE UP(VR-37)

EX. 10" DIA EATRANSITE UP(VR-55)

9

2

FEV

1-04

FEV

1-02

BCU

1-03

FREEZER STORAGE / SUPPORT

M132

TISSUE CULTURE

M134C

EAST RESEARCH LAB

M134

MECHANICAL

M130

DARK ROOM

M128

DRY STORAGE

M126

STORAGE/ RISER

M125B

EXISTING IT CLOSET

M125

CORRIDOR

M122

FLEX RESEARCH LAB

M114

FREEZER STORAGE / SUPPORT

M112

DARK ROOM

M134B

TISSUE CULTURE

M134A

CORRIDOR

M122

CORRIDOR

M145

WEST RESEARCH LAB

M148

TISSUE CULTURE

M148BVAV

1-142

VAV

1-138

VAV

1-141

LSV

1-01

RHC

1-01

GEV

1-01

LSV

1-03

LSV

1-05

LSV

1-07

GEV

1-02

GEV

1-06

VAV

1-140

EAV

1-135

EAV

1-143

EF

1-02

RHC

1-02

RHC

1-03

RHC

1-04

RHC

1-06

RHC

1-07

ELEVATORS

50x20 SA

50x22 SA

26x10 SA

48x14 EA

14ø SA

18x18

26x10 SA

36x14 SA

12ø EA 18x10

18x10 EA

8ø SA

8x8 SA

10x10 EA

24x12 EA

14ø

MECH ROOM M120

M201

1

BCU

1-04

VAV

1-137

LSV

1-06

36x18 EAUP (VR-14)

22x14 EA

24x8 EA

10ø SA

S-2

315

S-2

315S-2

315

S-2

315

12ø EA

S-2

315

S-2

315S-2

315

E-7

710

24x12 EA

E-1

100

S-1

200

6ø EA

GEV

1-0320x8 E

A

E-8

765

20x8 EA

E-8

760

24x12 EA

E-8

635

E-8

630

24x12 EA

VAV

1-136 20x7 SA

S-6

600

S-1

155

7ø SA

7ø EA

8ø SA E-2

155

8ø EA

VAV

1-143

S-4

100

S-4

100

12ø EA

E-4

100

E-4

100

8ø EA

10ø SA

28x14 SA 24x14

S-2

350

S-2

350

S-1

200

E-2

200

8ø EA

12ø EA

S-1

210

E-1

110

E-5

2200

30x18 EA

26x12 EA

EXISTING48x12LOUVER

28x12 EA

24x14 S

A

4ø SA

LSV

1-04

50x14 S

A

S-2

350

12ø EA

32x14 EA

1450 CFM FROMSHOWER/LOCKERROOM

CAP EXISTINGABANDONED DUCT

36x12 RA

6ø EA

8ø EA

GEV

1-04

EAV

1-138

S-1

220

E-1

120

8ø SA

S-3

775

8ø SA

18x8

FEV

1-05

S-2

385

15x12 SA

E-3

530

12ø EA

GEV

1-05

8ø EA

30x15 SA

FEV

1-03

12ø EA

VAV

1-139

12ø SA

EAV

1-139

RHC

1-05

28x14 SA

50x20 S

A

7ø SA

10ø SA

12ø EA

18x18 EA

ANATOMY CADAVER LAB

M144

25x17 SA

S-5

2200

58x29 RA

E-6

475

12ø

12ø EA

12x12 EA

20x8 EA

20x8 EA

12ø EA

S-5

2200

25x17 SA

48x11

28x16 SA

S-1

225 8ø

S-1

225

S-1

225

S-1

225

14x12 SA

12ø EA

SP

2

2

2

2

22x14 SA

R-1

1100

R-1

1100

VENDING

58x29 RA

44x16 RETURN TRANSFERDUCT ABOVE CEILING

R-1

1100

R-1

1100

3

3

4

4

5

EXIST. 24x18EA UP(VR-A)

FEV

1-01

AP

AP

12ø EA

AP

AP

12x9 SA

APAP

AP

12x9 SA12x9 SA

APAP

APAP

S-2

38510ø SA 10ø SA

D

D

D

R

D R

D

DD

RDR

D

DD

D

D

R

R

D D R

R

D

D

R

3

6

1

24x8 EA

FTU

1-446

R

D

10ø SA

D

10ø SA

D

D

10ø SAD

10ø SA

D

12ø EA

10ø SA

E-7

700

10x10 SA8ø SA

AP AP

8ø SA

10ø SA

S-2

35010ø SA

10ø SA

10ø SA

S-2

350

(VR-39)

(VR-38)

12ø SA

SD

1-03

SD

1-02

SD

1-03

FD

1-01

FD

1-02

CWP

1-01

HX

1-01

6

D

24x12 EA

24x18 EA

FD

1-05

FD

1-04

FD

1-06

28x12 EA

AP

FD

1-11

FD

1-12

R

8

12ø

FD

1-03

7

7

12ø EA

12ø EA

GEV

1-07

7

LSV

1-02

10ø SA

10ø

24x12 SA

8ø SA

S-2

350

TYPOF 5

10ø SA

10ø SA

10ø SA

8ø SA

S-2

350

10ø SA

10ø SA

S-2

315

D

R

6ø EA

EAV

1-144

16x12

14ø EA

E-7

710

24x12 EA

24x6 EA

S-3

700

D

25x16 SA

10ø SA

D

R

R-1

700

4

M503

5

M5036

M503

88x8 EA

AP

APAP

GRAVITY BACKDRAFTDAMPER

GRAVITY BACKDRAFTDAMPER

FD

1-07

FD

1-08

AP

AP

AP

FD

1-09

AP

EX.RELOCATEDSA DIFFUSER

R

E-2

300

E-2

300

E-2

300

8ø8ø

8ø8ø

10

18x12 EA

30x15 SA

24x14 SA

22x14

AP

FD

1-10

6ø EA

28x9 SA

BOTTOM OFGRILLE 8" AFF

BOTTOM OFGRILLE 6'-10"AFF

BOTTOM OFGRILLE 8" AFF

36x14 SA

50x14 SA

12ø EA12ø EA

1

1.

2.

3.

4.

5.

FUME EXHAUST AIR DUCTWORK (INDICATED BY CROSSHATCHING)SHALL BE CONSTRUCTED OF FULLY WELDED STAINLESS STEELPER SPECIFICATIONS.

ALL EXPOSED DUCTWORK SHALL BE ROUND OR FLAT OVALUNLESS OTHERWISE NOTED. EXPOSED SUPPLY AIRDUCTWORK SHALL BE DOUBLE-WALL CONSTRUCTION. REFERTO SPECIFICATIONS FOR MORE INFORMATION. THIS DOES NOTAPPLY TO DUCTWORK LOCATED IN MECHANICAL ROOMS.

ALL AIRFLOW CONTROL VALVES SHALL BE INSTALLED WITHCONTROLS FACING OUTWARD OR DOWNWARD FOR EASY ACCESS.

ALL DUCTWORK LOCATED IN EXPOSED CEILING SPACES SHALL BEPAINTED (REFER TO ARCHITECTURAL CEILING PLANS FOR ALLEXPOSED CEILING SPACES):

- FIELD PAINTING OF DUCTWORK, ASSOCIATED AIRDEVICES, AIR TERMINAL UNITS, AND HANGERS ANDSUPPORTS SHALL BE BY CONTRACTOR AND SHALLMATCH COLOR APPROVED BY ARCHITECT DURINGSHOP DRAWING PROCESS. ALL DUCTWORK ANDEQUIPMENT TO BE PAINTED SHALL HAVE A PAINT GRIPFINISH.

- LABORATORY AIRFLOW CONTROL VALVES SHALL NOTBE PAINTED. CONTRACTOR SHALL PROTECT AIRFLOWCONTROL VALVES THROUGHOUT PAINTING PROCESS.

ALL OPENINGS THROUGH RATED WALLS MUST BE PATCHED ANDSEALED AIR TIGHT TO MEET THE RATING OF THE WALL AND TOMAINTAIN AIR PRESSURE RELATIONSHIPS TO ADJACENT SPACES.

DUCTWORK GENERAL NOTES:

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 3

:03:

59 P

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M101

11/06/2017

53474

LEVEL 1DUCTWORK PLAN

NEW WORK

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

1/8" = 1'-0"1

LEVEL 1 DUCTWORK PLAN - NEW WORK

KEYED NOTES:

1 REMOVE AND REINSTALL CEILING AS REQUIRED TO INSTALL NEWBLOWER COIL UNIT ABOVE EXISTING VENDING ROOM CEILING.

2 TRANSITION AS REQUIRED TO CONNECT TO FUME HOOD OUTLET.

3 SUPPLY AIR DUCT DOWN IN WALL CAVITY TO SIDEWALL DIFFUSER.

4 DASHED LINE INDICATES CLEAR AREA REQUIRED FOR FILTERACCESS.

5 CAP EXISTING TRANSITE EXHAUST DUCT AIR-TIGHT.

6 HATCHING INDICATES EXPOSED CEILING AREA. SEE DUCTWORKGENERAL NOTES FOR ADDITIONAL INFORMATION.

7 CONNECT NEW EA DUCT TO EXISTING TRANSITE EA DUCT.CONNECTION SHALL OCCUR WITHIN EXISTING CHASE ABOVE 2NDLEVEL SLAB. COORDINATE WITH ARCHITECTURAL DRAWINGS.

8 PROVIDE A MINIMUM 12" LONG x 0.060" THICK STEEL SLEEVECENTERED IN EACH DUCT OPENING. THE SLEEVE SHALL BESECURED TO BOTH SIDES OF THE WALL AND ALL FOUR SIDES OFTHE SLEEVE WITH MINIMUM 1 1/2" x 1 1/2" x 0.060" STEEL RETAININGANGLES. THE RETAINING ANGLES SHALL BE SECURED TO THESLEEVE AND THE WALL WITH NO. 10 SCREWS. THE ANNULAR SPACEBETWEEN THE STEEL SLEEVE AND THE WALL OPENING SHALL BEFILLED WITH ROCK (MINERAL) WOOL BATTING ON ALL SIDES. DUCTINSULATION SHALL NOT PENETRATE THE ASSEMBLY.INSTALL DUCT INSULATION OVER THE ASSEMBLY ANDTERMINATE AT WALL.

9 DUCT STATIC PRESSURE SENSOR FOR AHU 1-01.

10 APPROXIMATE LOCATION OF FUTURE SURGICAL LIGHT ANDSUPPORT STRUCTURE ABOVE CEILING. AVOID ROUTING NEWDUCTWORK IN THIS AREA.

KEYPLAN

OPENCOURTYARD

TO CLINICALSUPPORT AND

EDUCATIONBLDG

TO NURSINGSCHOOL

TO HOSPITAL

PLANNORTH

1

04 8 16268

SCALE: 1/8"=1'-0"

# DATE DESCRIPTION

1 11/27/17 ADDENDUM 2

1

1

Page 27: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

Q R

5

4

2

M201

EF

1-01

AHU

1-01

EAV

1-135

VAV

1-135

1 1

/4"L

PR

70x116 OA

50x22 SA

50x22 S

A

30x18 EA

47x42 E

A

30x110 O

A

12ø

EA

EX. 12" DIA EATRANSITE UP

EX. 16" DIA EATRANSITE UP

MECHANICAL

M130

DARK ROOM

M128

FREEZER STORAGE / SUPPORT

M132

MD

1-01

62x36 SA

HWRP

1-01

2 1/2"HWS

2 1/2"HWS

4"C

WS

4"C

WR

L

1-02

L

1-01

100x66 INSULATEDPLENUM BEHINDLOUVER

BLANK OFF UNUSEDPORTION OF LOUVER(APPROX. 92x66) WITHINSULATEDSHEETMETALSANDWICH PANELS.

BLANK OFF UNUSEDPORTION OF LOUVER(APPROX. 47x26) WITHINSULATED SHEETMETALSANDWICH PANELS.

47x42 INSULATED PLENUMBEHIND LOUVER

4"CWS

4"CWR

1 1

/2"C

WR

1 1

/2"C

WS

12ø EA

7ø EA

16ø EA

1"CD

1"C

D

1" CDTO FLDR

S-5

47512x12 SA

E-6

475

E-5

2200

R-1

1100

R-1

1100

3

M201

1

2

3

4

45

INSULATED "WALK-THRU" PLENUM.

11' -

10"

6

7

1 1/4"LPS

4"LPS

4"L

PS

4"L

PS

1 1/4"LPS

1 1/4"LPS

4"L

PS

4"L

PS

8

2"L

PR

9

TVAV 1-135

7ø SA

AP

LEVEL ONE0' - 0"

54

AHU

1-01

EF

1-01

116x70

1 1/4"LPR

FILTER SECTION

OUTSIDE AIR INTAKEPLENUM. SLOPEFLOOR OF PLENUMTOWARDCONDENSATE DRAINCONNECTION.

PREHEAT COIL SECTION

STEAM HUMIDIFIER SECTION

SUPPLY FAN SECTION

COOLING COIL SECTION

MECHANICAL

M130

FREEZER STORAGE / SUPPORT

M132

MD

1-01

22x50 SA

36x62 SA

18x30 EA

1 1/2"CWR

1 1/2"CWS

3

M201

4"LPS4"LPS4"LPS4"LPS

1 1/4"LPS

1 1/4"LPS

1 1/4"LPS

ACCESS SECTION

ACCESS SECTION

ACCESS SECTION

1.

2.

3.

4.

5.

FUME EXHAUST AIR DUCTWORK (INDICATED BY CROSSHATCHING)SHALL BE CONSTRUCTED OF FULLY WELDED STAINLESS STEELPER SPECIFICATIONS.

ALL EXPOSED DUCTWORK SHALL BE ROUND OR FLAT OVALUNLESS OTHERWISE NOTED. EXPOSED SUPPLY AIRDUCTWORK SHALL BE DOUBLE-WALL CONSTRUCTION. REFERTO SPECIFICATIONS FOR MORE INFORMATION. THIS DOES NOTAPPLY TO DUCTWORK LOCATED IN MECHANICAL ROOMS.

ALL AIRFLOW CONTROL VALVES SHALL BE INSTALLED WITHCONTROLS FACING OUTWARD OR DOWNWARD FOR EASY ACCESS.

ALL DUCTWORK LOCATED IN EXPOSED CEILING SPACES SHALL BEPAINTED (REFER TO ARCHITECTURAL CEILING PLANS FOR ALLEXPOSED CEILING SPACES):

- FIELD PAINTING OF DUCTWORK, ASSOCIATED AIRDEVICES, AIR TERMINAL UNITS, AND HANGERS ANDSUPPORTS SHALL BE BY CONTRACTOR AND SHALLMATCH COLOR APPROVED BY ARCHITECT DURINGSHOP DRAWING PROCESS. ALL DUCTWORK ANDEQUIPMENT TO BE PAINTED SHALL HAVE A PAINT GRIPFINISH.

- LABORATORY AIRFLOW CONTROL VALVES SHALL NOTBE PAINTED. CONTRACTOR SHALL PROTECT AIRFLOWCONTROL VALVES THROUGHOUT PAINTING PROCESS.

ALL OPENINGS THROUGH RATED WALLS MUST BE PATCHED ANDSEALED AIR TIGHT TO MEET THE RATING OF THE WALL AND TOMAINTAIN AIR PRESSURE RELATIONSHIPS TO ADJACENT SPACES.

DUCTWORK GENERAL NOTES:

LEVEL ONE0' - 0"

Q R

2

M201

AHU

1-01

HWRP

1-01

4"CWS4"CWR

L

1-01

66x100INSULATEDPLENUM BEHINDLOUVER

30x110 INSULATED "WALK-THRU"PLENUM. SLOPE FLOOR OF PLENUMTOWARD CONDENSATE DRAINCONNECTION.

10" BASE RAIL

2-1/2"HWS/R

MECHANICAL

M130 AREAWAY

1 1/4"LPS

4"LPS

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 3

:04:

00 P

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M201

11/06/2017

53474

ENLARGEDMECHANICAL

ROOM PLANS -NEW WORK

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

1/4" = 1'-0"1

ENLARGED MECHANICAL ROOM PLAN

1/4" = 1'-0"2

SECTION THROUGH MECH ROOM

1/4" = 1'-0"3

SECTION THROUGH MECH ROOM 2

KEYED NOTES:

1 ROUTE 1-1/4" CONDENSATE TO FLOOR DRAIN. SEE PLUMBINGDRAWING FOR LOCATION OF FLOOR DRAIN.

2 EMCS PANEL. MAINTAIN 4'-0" IN FRONT OF PANEL.

3 MAINTAIN MANUFACTURER'S RECOMMENDED SERVICECLEARANCE SPACE ON SIDE OF AIR HANDLING UNIT.

4 PROVIDE 2'-0" WIDE X 7'-0" HIGH INSULATED DOOR IN END OFINSULATED OA PLENUM.

5 UNIT SHALL SIT DIRECTLY ON MANUFACTURER PROVIDED BASERAIL. POSITION UNIT SO THAT COIL PULL SPACE IS IN LINE WITHMECHANICAL ROOM DOOR OPENING.

6 1-1/4' DRAIN FROM OUTSIDE AIR INTAKE PLENUM. ROUTE NEARFLOOR TO FLOOR DRAIN.

7 INSULATE EXISTING STEAM CONDENSATE RETURN PIPING PERSPECIFICATION.

8 CONNECT NEW 1-1/2" LPS TO EXISTING 4" LPS AND ROUTE DOWNTO STEAM HUMIDIFIER IN UNIT.

9 ROUTE NEW 2" LPR FROM HUMIDIFIER IN UNIT AND CONNECT TOEXISTING ?" LPR DOWN THROUGH FLOOR.

02 4 8134

SCALE: 1/4"=1'-0"

02 4 8134

SCALE: 1/4"=1'-0"

02 4 8134

SCALE: 1/4"=1'-0"

PLANNORTH

1

# DATE DESCRIPTION

1 11/27/17 ADDENDUM 2

1

1

Page 28: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 3

:04:

00 P

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M602

11/06/2017

53474

SCHEDULES

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

EXHAUST AIR TERMINAL UNIT SCHEDULEPLAN MARK

MFR. MODEL TYPE SERVICE LOCATIONINLET DUCT

SIZE (IN RND)

PRIMARY AIRFLOW (CFM) DESIGN INLETSTATIC

PRESSURE (INWC)

OUTLET DUCTSIZE WxD (IN)

MAX NC LEVEL @ MAX CFM

NOTESMAX MIN DISCHARGE RADIATED

EAV 1-135 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT MECH ROOM M130 MECH ROOM M130 7 475 105 1.0 12x10 30 30

EAV 1-138 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT DARK ROOM M134B DARK ROOM M134B 4 200 45 1.0 12x8 30 30

EAV 1-139 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT ANATOMY CADAVER LAB M144 ANATOMY CADAVER LAB M144 12 900 325 1.0 16x15 30 30

EAV 1-143 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT DARK ROOM M128 DARK ROOM M128 7 355 105 1.0 12x10 30 30

EAV 1-144 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT EXISTING SHOWER/LOCKER ROOM WEST RESEARCH LAB M148 14 1450 1450 1.0 20x17.5 30 30

SUPPLY AIR CONTROL VALVE SCHEDULEPLAN MARK

MANUFACTURER MODEL TYPE SERVICE SIZE

AIRFLOW

APD NOTES

OCCUPIED UNOCCUPIED

MAX MIN MAX MIN

LSV 1-01 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE TISSUE CULTURE M134C 8" 200 100 200 100 0.3 1, 2, 3,4

LSV 1-02 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE EAST RESEARCH LAB M134 (2) 12" 1750 665 1750 225 0.3 1, 2, 3,4

LSV 1-03 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE EAST RESEARCH LAB M134 (2) 12" 1750 665 1750 225 0.3 1, 2, 3,4

LSV 1-04 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE TISSUE CULTURE M134A 8" 210 105 210 100 0.3 1, 2, 3,4

LSV 1-05 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE TISSUE CULTURE M148A 8" 220 110 220 100 0.3 1, 2, 3,4

LSV 1-06 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE WEST RESEARCH LAB M148 (2) 14" 2520 1250 2520 400 0.3 1, 2, 3,4

LSV 1-07 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE FLEX RESEARCH LAB M114 12" 770 585 770 240 0.3 1, 2, 3,4

GENERAL EXHAUST AIR CONTROL VALVE SCHEDULEPLAN MARK

MANUFACTURER MODEL TYPE SERVICE SIZE

AIRFLOW

APD NOTES

OCCUPIED UNOCCUPIED

MAX MIN MAX MIN

GEV 1-01 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE TISSUE CULTURE M134C 8" 100 0 100 0 0.3 1,2

GEV 1-02 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE EAST RESEARCH LAB M134 (2) 12" 1265 180 1525 0 0.3 1,2

GEV 1-03 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE EAST RESEARCH LAB M134 (2) 12" 1265 180 1525 0 0.3 1,2

GEV 1-04 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE TISSUE CULTURE M134C 8" 110 0 110 0 0.3 1,2

GEV 1-05 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE TISSUE CULTURE M134C 8" 110 0 110 0 0.3 1,2

GEV 1-06 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE WEST RESEARCH LAB M148 (2) 12" 1450 180 2120 0 0.3 1,2

GEV 1-07 PHOENIX CONTROLS ACCEL II PRESSURE INDEPENDENT VENTURI VALVE FLEX RESEARCH LAB M114 8" 185 0 530 0 0.3 1,2

FUME EXHAUST AIR CONTROL VALVE SCHEDULEPLAN MARK

MANUFACTURER MODEL TYPE SERVICE SIZE

AIRFLOW

APD (IN WC) NOTES

OCCUPIED UNOCCUPIED

MAX MIN MAX MIN

FEV 1-01 PHOENIX CONTROLS ACCEL II LOW PRESSURE TISSUE CULTURE M134C 12" 735 735 475 475 0.3 1,2

FEV 1-02 PHOENIX CONTROLS ACCEL II LOW PRESSURE EAST RESEARCH LAB M134 12" 735 735 475 475 0.3 1,2

FEV 1-03 PHOENIX CONTROLS ACCEL II LOW PRESSURE WEST RESEARCH LAB M148 12" 735 735 400 400 0.3 1,2

FEV 1-04 PHOENIX CONTROLS ACCEL II LOW PRESSURE WEST RESEARCH LAB M148 12" 735 735 400 400 0.3 1,2

FEV 1-05 PHOENIX CONTROLS ACCEL II LOW PRESSURE FLEX RESEARCH LAB M114 12" 735 735 390 390 0.3 1,2

AIR DEVICE SCHEDULE

PLAN MARK MFR. MODEL TYPE LOCATION NECK SIZE (IN)FACE SIZE (IN

x IN) MATERIAL FINISHMAX TPD (IN

WC) MAX NOISE (NC)

MAX CFM @LISTED

CONDITIONSMIN THROW(FT) 50 FPM NOTES

S-1 TITUS OMNI SQUARE PLAQUE CEILING 8 24x24 STEEL WHITE 0.1 30 300 12 1, 2, 3, 6

S-2 TITUS OMNI SQUARE PLAQUE CEILING 10 24x24 STEEL WHITE 0.1 30 400 13 1, 2, 3, 6

S-3 TITUS OMNI SQUARE PLAQUE CEILING 15 24x24 STEEL WHITE 0.1 30 775 16 1, 2, 3, 6

S-4 TITUS S301FL LOUVERED FACE DUCT 12x3 14x5 STEEL WHITE 0.1 30 100 15 1, 3, 5, 7, 8

S-5 TITUS 301RL LOUVERED FACE WALL 24x24 26x26 STEEL WHITE 0.1 30 2200 28 1, 3, 6

S-6 TITUS 301RL LOUVERED FACE WALL 18x10 20x12 STEEL WHITE 0.1 30 600 15 1, 3, 6

R-1 TITUS 350RL LOUVERED FACE CEILING 22x22 24x24 STEEL WHITE 0.1 30 1100 -

E-1 TITUS OMNI SQUARE PLAQUE CEILING 6 24x24 STEEL WHITE 0.1 30 175 - 1, 3, 6

E-2 TITUS OMNI SQUARE PLAQUE CEILING 8 24x24 STEEL WHITE 0.1 30 300 - 1, 3, 6

E-3 TITUS OMNI SQUARE PLAQUE CEILING 12 24x24 STEEL WHITE 0.1 30 530 - 1, 3, 6

E-4 TITUS S301FL LOUVERED FACE DUCT 12x3 14x5 STEEL WHITE 0.1 30 100 - 1, 3, 5, 7, 8

E-5 TITUS 350RL LOUVERED FACE WALL 30x18 32x20 STEEL WHITE 0.1 30 2200 - 1, 3, 6

E-6 TITUS 350RL LOUVERED FACE WALL 12x12 14x14 STEEL WHITE 0.1 30 475 - 1, 3, 5, 7

E-7 TITUS 350RL LOUVERED FACE CEILING 22x22 24x24 STEEL WHITE 0.1 30 1065 - 1, 3, 4, 6

E-8 TITUS 350RL LOUVERED FACE CEILING 18x18 24x24 STEEL WHITE 0.1 30 765 - 1, 3, 4, 6

NOTES:1. PROVIDE WITH FACTORY SOUND ATTENUATING "NEUTRALIZER" TO MATCH VALVE SIZE.2. VARIABLE VOLUME VALVE WITH PRESSURE ALARM.3. OCCUPIED MAX IS BASED ON COOLING MAX AIRFLOW.4. PROVIDE WITH HIGH SPEED ACTUATOR.

NOTES:

1. VARIABLE VOLUME EXHAUST VALVE WITH PRESSURE ALARM.2. PROVIDE WITH HIGH SPEED ACTUATOR.

NOTES:1. PROVIDE WITH FACTORY SOUND ATTENUATING "NEUTRALIZER" TO MATCH VALVE SIZE.2. PROVIDE WITH HIGH SPEED ACTUATOR.

NOTES:1. REFER TO MECHANICAL PLANS FOR CFM OF INDIVIDUAL DEVICES.2. PROVIDE DIFFUSER WITH FOUR-WAY THROUGH PATTERN UNLESS NOTED ON MECHANICAL PLANS. IF NOTED ON PLAN MANUFACTURER SHALL PROVIDE DIRECTIONAL BLOW CLIPS.3. MAXIMUM NC LEVEL AND MAXIMUM PD INCH W.C. IS SCHEDULED FOR THE RATED CFM RANGE AS SCHEDULED OR RATED CFM LISTED.4. PROVIDE FRAME WITHOUT SCREW HOLES (TO BE MOUNTED AS LAY-IN CEILING DEVICE).5. CONNECT GRILLE DIRECTLY TO DUCTWORK.6. STANDARD WHITE FINISH.7. MILL FINISH.8. PROVIDE WITH MANUFACTURERS OPPOSED BLADE DAMPER. DAMPER SHALL BE CONSTRUCTED OF SAME MATERIAL AS GRILLE. DAMPER SHALL BE ACCESSIBLE THROUGH FACE OF GRILLE.

AIR TERMINAL UNIT SCHEDULEPLAN MARK

MFR. MODEL TYPE SERVICE LOCATIONINLET DUCT

SIZE (IN RND)

PRIMARY AIRFLOW (CFM) DESIGN INLETSTATIC

PRESSURE (INWC)

OUTLET DUCTSIZE WxD (IN)

AUXILIARY HOT WATER HEATNG COIL MAX NC LEVEL @ MAX CFM

NOTESMAX MINMAX HTG AIRFLOW

(CFM)CAPACITY

(MBH) EAT (°F) LAT (°F) EWT (°F) FLOW (GPM)MAX WPD (FT

HD)MAX APD(IN

WC)CONTROL

VALVE DISCHARGE RADIATED

VAV 1-135 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT MECH ROOM M130 MECH ROOM M130 7 475 105 1.0 12x10 300 12.9 55 95 180 0.60 GPM 2.0 0.15 2-WAY 30 30 1

VAV 1-136 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT CORRIDOR M122 CORRIDOR M122 8 600 145 1.0 12x10 300 12.2 55 93 180 0.60 GPM 2.0 0.15 2-WAY 30 30 1

VAV 1-137 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT FREEZER STORAGE SUPPORT M132 FREEZER STORAGE SUPPORT M132 14 2200 450 1.0 20x17.5 0 0 55 55 0 0.00 GPM 0 0 0 30 30 2

VAV 1-138 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT DARK ROOM M134B DARK ROOM M134B 4 200 45 1.0 12x8 100 2.7 55 81 180 0.30 GPM 2.0 0.15 2-WAY 30 30 1

VAV 1-139 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT ANATOMY CADAVER LAB M144 ANATOMY CADAVER LAB M144 12 900 325 1.0 16x15 450 15.4 55 87 180 0.80 GPM 2.0 0.15 2-WAY 30 30 1

VAV 1-140 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT CORRIDOR M145 CORRIDOR M145 8 775 145 1.0 12x10 390 13.9 55 88 180 0.70 GPM 2.0 0.15 2-WAY 30 30 1

VAV 1-141 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT FREEZER STORAGE SUPPORT M112 FREEZER STORAGE SUPPORT M112 14 2200 450 1.0 20x17.5 0 0 55 55 0 0.00 GPM 0 0 0 30 30 2

VAV 1-142 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT CORRIDOR M122 CORRIDOR M122 7 350 105 1.0 12x10 250 10.2 55 93 180 0.50 GPM 2.0 0.15 2-WAY 30 30 1

VAV 1-143 TITUS DESV PRESSURE INDEPENDENT SINGLE DUCT DARK ROOM M128 DARK ROOM M128 7 355 105 1.0 12x10 355 15.8 55 96 180 0.80 GPM 2.0 0.15 2-WAY 30 30 1

NOTES:

1. PROVIDE NUMBER OF COIL ROWS NECESSARY TO MEET SCHEDULED PERFORMANCE.2. COOLING ONLY AIR TERMINAL.

DUCT MOUNTED COIL SCHEDULEPLAN MARK

MFR. TYPE MODEL & SIZE SERVICE AIR FLOW (CFM) APD (IN WC)

HOT WATER HEATING

NOTESCAPACITY

(MBH) EAT/LAT (F) EWT (F) LWT (F) FLOW (GPM) MAX WPD (FT)

RHC 1-01 USA COIL & AIR DUCT-MOUNTED HW58BH 12" L x 7.5" H TISSUE CULTURE M134C 200 0.08 8.5 55/94 180 129 0.3 0.04

RHC 1-02 USA COIL & AIR DUCT-MOUNTED HW58BH 28" L x 13.5" H EAST RESEARCH LAB M134 1750 0.25 71.4 55/92 180 131 3.0 4.79

RHC 1-03 USA COIL & AIR DUCT-MOUNTED HW58BH 28" L x 13.5" H EAST RESEARCH LAB M134 1750 0.25 71.4 55/92 180 131 3.0 4.79

RHC 1-04 USA COIL & AIR DUCT-MOUNTED HW58BH 12" L x 9" H TISSUE CULTURE M134A 210 0.06 9.6 55/97 180 126 0.4 0.05

RHC 1-05 USA COIL & AIR DUCT-MOUNTED HW58BH 12" L x 9" H TISSUE CULTURE M148A 220 0.06 9.6 55/97 180 126 0.4 0.05

RHC 1-06 USA COIL & AIR DUCT-MOUNTED HW58BG 30" L x 18" H WEST RESEARCH LAB M148 2520 0.25 101 55/91 180 140 5.0 4.0

RHC 1-07 USA COIL & AIR DUCT-MOUNTED HW58BH 14" L x 12" H FLEX RESEARCH LAB M114 770 0.24 29.0 55/90 180 134 1.3 0.65

FIRE DAMPER & SMOKE DAMPER SCHEDULEPLAN MARK

MFR. MODEL TYPE LOCATION SLEEVEDUCT SIZEWxH (IN)

DAMPERRATINGS (HR)

FUSIBLE LINKTEMP (°F) NOTES

FD 1-01 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE FREEZER STORAGE M132 STANDARD 22X14 1-1/2 165

FD 1-02 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE MECHANICAL M130 STANDARD 50X22 1-1/2 165

FD 1-03 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE EAST RESEARCH LAB M134 STANDARD 50X20 1-1/2 165

FD 1-04 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE EXIST. MECH ROOM M120 STANDARD 26X10 1-1/2 165

FD 1-05 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE FLEX RESEARCH LAB M114 STANDARD 26X10 1-1/2 165

FD 1-06 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE FREEZER STORAGE M112 STANDARD 28X16 1-1/2 165

FD 1-07 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE FREEZER STORAGE M112 STANDARD 44X16 1-1/2 165

FD 1-08 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE FREEZER STORAGE M112 STANDARD 25X17 1-1/2 165

FD 1-09 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE TISSUE CULTURE M134A STANDARD 28X9 1-1/2 165

FD 1-10 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE FREEZER STORAGE M132 STANDARD 22X14 1-1/2 165

FD 1-11 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE TISSUE CULTURE M148A STANDARD 12X9 1-1/2 165

FD 1-12 RUSKIN DIBD20 DYNAMIC CURTAIN TYPE WEST RESEARCH LAB M148 STANDARD 24X14 1-1/2 165

SD 1-01 RUSKIN SD60 CLASS 1 GALV. AIRFOIL CORRIDOR M122 STANDARD 20X7 1-1/2 0

SD 1-02 RUSKIN SDRS25 CLASS 1 GALV. TRUE ROUND CORRIDOR M122 STANDARD 10" DIA 1-1/2 0

SD 1-03 RUSKIN SD60 CLASS 1 GALV. AIRFOIL CORRIDOR M145 STANDARD 18X8 1-1/2 0

NOTES:1. MOUNTED HORIZONTALLY IN DUCT THROUGH FLOOR.

# DATE DESCRIPTION

1 11/27/17 ADDENDUM 2

1

1

1

Page 29: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MR M130MR M120MR M112

METASYS (SF-C)

SUPPLY FAN CT

R3

METASYS (SF-S)

METASYS (LT-A)

METASYS (HS-A)

R5

R4

R3STATUSRELAY

R2RSF-C

R1RFA

CONTACTS R4

R5

R4HS

RELAY

HIGHSTATICSWITCH

R1R RUNENAB

SF ECM

(SF-O)

LT-A R5LT-A

RELAY

R2R

SAFETY

24 VAC

HTG

RELAY

CONTACTS

ON R3DMP

RELAY

2MA ECM START CIRCUITNO SCALE 3

FC BUS SCHEMATIC DIAGRAMNO SCALE

R1RR2RR3R4R5DMP RELAYHTG RELAY

24VAC RIB1UC24VAC RIB1UC24VAC CONTROL RELAY -2POLE24VAC CONTROL RELAY -2POLE24VAC CONTROL RELAY -2POLE24 VAC CONTROL RELAY -2POLE24 VAC CONTROL RELAY -2POLE

1.

2.

3.

4.

5.

KEEP ALL LOW VOLTAGE CONTROL WIRING

(UNDER 25V) AND LOW VOLTAGE POWER WIRING

(OVER 25V) SEPARATED. (RUN IN SEPARATE

CONDUIT.)

PROVIDE RELAYS WITH MULTIPLE CONTACTS AS

REQUIRED.

ANY DISCONNECT WITH AUX CONTACTS WILL BE

ADDED TO SAFETY CIRCUIT

CURRRENT TRANSFORMER REQUIRED FOR

STATUS

R1, R2, AND R4 MOUNTED ON/NEAR I/O PANEL.

COORDINATE WITH OWNER REPRESENTATIVE.

FC BUS TO BE CONTINUOUS DAISY CHAIN. SEE PLANS FOR QUANTITY

AND LOCATIONS OF VAV/FCU CONTROLLERS.

OWNER WILL MAKE TERMINATION CONNECTIONS AT PANELS. LOCATE

PANELS IN SAME ROOM AS EQUIPMENT SERVED.

FC COMMUNICATION BUS WIRE SHALL BE 22 AWG, PLENUM RATED,

TWISTED SHIELDED, 3 CONDUCTOR, WITH BLUE OUTER CASING,

DESCRIPTED AS 22-03 OAS STR PLNM NEON BLU JK DISTRIBUTED BY

WINDY CITY WIRE, CONSTRUCTED BY CABLE-TEK, OR APPROVED

EQUIVALENT.

COORDINATE FIELD ROUTING WITH OWNERS REPRESENTATIVE.

KEEP EXISTING FC BUS INTACT THROUGHOUT CONSTRUCTION.

1.

2.

3.

4.

5.

FIRST FLOOR

SECOND FLOOR

VAVVAV PHOENIX

RMIAH85

2PIPE

1

INSTALL J-BOX ABOVE CEILING IN ROOM M112 FOR FC BUS SPLICEWHERE EXISTING 2-PIPE SYSTEM CONTROLLER WAS REMOVED.

1

(SEE SPECS):DEVICES

GENERAL NOTES:

KEYED NOTES:

GENERAL NOTES:

113

SF

-S

ECM

M

115

HWS

HWR

NC

LT

-A

SMK

111

PH

T-O

M

118114

PH

P-S

PH

P-C

110

CLG

-O

CO

OL

ING

CWS

CWR

NC

CO

IL

35 F

102

PH

T-T

SF

-C

DM

109

SF

-O

FILTERS

117

PR

EH

EA

T

CO

IL

OUTSIDEAIR

116

HS

-A

DPS

SEE AHU START CIRCUIT DETAIL ON SHEET THIS SHEET.

LOCATE AS SHOWN ON MECHANICAL DRAWINGS.

1. SEE SPECIFICATIONS FOR DEVICE SPECIFICATIONS.

2.ANY DEVICE REQUIRING POWER MUST BE POWERED BY

CONTRACTOR.

GENERAL NOTES:

KEYED NOTES:1

1

1

112

ST

M-O

ST

EA

M

LPS

NC

HU

MID

IFIE

R

SF

108

SA

-PR

S

DPT

SUPPLY

AIR

2

103

CLG

-T

119

ST

M-I

SO

2

TAG #100101102103104105106107108109110111112113114115116117118119

TYPEAIAIAIAIAIAIAIAIAIAOAOAOAOBIBIBIBIBOBOBO

POINT NAMEZN-H3OA-TPHT-TCLG-TSA-TSA-RHZN-H1ZN-H2SA-PRSSF-OCLG-OPHT-OSTM-OSF-SPHP-SLT-AHS-ASF-CPHP-CSTM-ISO

DESCRIPTIONZONE AIR HUMIDITYOUTSIDE AIR TEMPHEATING AIR TEMPCOOLING AIR TEMPSUPPLY AIR TEMPSUPPLY AIR HUMIDITYZONE AIR HUMIDITYZONE AIR HUMIDITYSUPPLY AIR STATIC PRESSURESUPPLY FAN SPEED OUTPUTCOOLING OUTPUTHEATING OUTPUTSTEAM OUTPUTSUPPLY FAN STATUSPREHEAT PUMP STATUSLOW TEMP ALARMHIGH STATIC ALARMSUPPLY FAN COMMANDPREHEAT PUMP COMMANDHUMIDIFIER ISOLATION VALVE

DEVICEHUMIDITY SENSORSOFTWARE INPUTRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGHUMIDITY SENSORHUMIDITY SENSORHUMIDITY SENSORDIFF PRESSURE TRANSMITTERECMELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNCURRENT SWITCHCURRENT SWITCHFREEZE STATDIFF PRESS SWITCHCONTROL RELAYCONTROL RELAYELECT ACTUATOR W/SPRING RETURN

106

ZN

-H1

107

ZN

-H2

WALL MOUNTEDWALL MOUNTED

HUM

105

SA

-RH

104

SA

-T

117

SF

-C

ESHHL

100

ZN

-H3

WALL MOUNTED

2

2

NOTES

FRONT VIEW

DDC CONTROLLERS ARE SUPPLIED BY OWNER AND MOUNTED BY

CONTRACTOR.

KEEP ALL LOW VOLTAGE CONTROL WIRING ( UNDER 25V) AND LOW

VOLTAGE POWER WIRING (OVER 25V) SEPARATED. (RUN IN SEPARATE

CONDUIT).

PLYWOOD SIZE IS BASED ON THE NUMBER OF CONTROLLERS IN EACH

LOCATION. COORDINATE WITH OWNERS REPRESENTATIVE.

4/0 BOX WITH PULL CHAIN.18W LED LIGHT WITH GUARD.

4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND

ENDS MACHINE GRAY.)

1-1/2" UNISTRUTCHANNEL (2)

1.

2.

3.

6" x 6" WIRE TROUGH

FLOOR

3/4" CONDUIT

120 VAC INPUT POWER

DEDICATED 15A CIRCUIT

1" CONDUITMINIMUM

I/O

6"x6" WIRETROUGH

FLOOR

EXP. ANCHORS

1-1/2" UNISTRUTCHANNEL (2)

4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND ENDSMACHINE GRAY)

3/4" CONDUIT

4/0 BOX WITHPULL CHAIN. 18WLED WITH GUARD.

WA

LL

ASC ASC

BY DIVISION 16

2" MIN. CONDUIT (2)

3'-6

" T

YP

ICA

L

3' MIN DISTANCE

POSTBASE (2)

BRACEFITTING (2)

OPTIONAL FLOOR MOUNT

SIDE VIEW

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 3

:04:

01 P

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M702

11/06/2017

53474

CONTROLS

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

NTS1

AHU 1-01 CONTROL DIAGRAM

NTS4

ASC PANEL MOUNTING DETAIL1

# DATE DESCRIPTION

1 11/16/17 ADDENDUM 1

2 11/27/17 ADDENDUM 2

Page 30: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

2

OCCUPANCYSENSOR

S

T

KEYED NOTES:

1

2 OCCUPANCY SENSORS PROVIDED AND INSTALLED BY DIV. 26 CONTRACTOR. CONTROL WIRING

BETWEEN OCCUPANCY SENSOR AND LACS BY DIV. 23 CONTRACTOR. NOTE THAT MULTIPLE OCCUPANCY

PRESSURE INDEPENDENT CONTROL VALVE.3

3

6

5

4

SERVICE DISCONNECT/SWITCH. LOCATED WITHIN EYESIGHT OF LACS CONTROL PANELS.

ACTUATOR. COORDINATE FUSE SIZE WITH DIV. 26 CONTRACTOR AND LACS SUPPLIER.

INLINE FUSE ON SECONDARY OF 24VAC TRANSFORMER. LOCATED WITHIN EYESIGHT OF ELECTRIC

COIL DISCHARGE.

VAV SUPPLY TEMP SENSOR PROVIDE BY LACS SUPPLIER, LOCATED APPROX. 8 FT. FROM REHEAT

T4

SA

GE

A

FE

A

FE

A

HWS

HWR

VAV FUME

EXHAUST

AIR VALVE

PSPS

GENERAL

EXHAUST

AIR VALVE

SUPPLY

AIR VALVE

24VAC TRANSFORMER, PROVIDED AND INSTALLED BY DIV. 26 CONTRACTOR.

DAISY CHAIN WITH OTHER

DEVICES ON THE SAME

ROOM LEVEL NETWORK,

COORDINATE EXACT QUANTITY

OF DEVICES PER ROOM LEVEL

NETWORK WITH LABORATORY

AIRFLOW CONTROL SYSTEM

SUPPLIER

65

1

LINE VOLTAGE

WIRE (TYPICAL)

VAV FUME

EXHAUST

AIR VALVE (TYPICAL)

VAV

FUME

HOOD

VAV

FUME

HOOD

COORDINATE ALL

CABLING WITH LACS

SUPPLIER (TYPICAL)

PROVIDE LACS REPEATERS

IN COMMUNICATION NETWORK

AS NECESSARY (TYPICAL)

LACS COMMUNICATION

NETWORK, TWISTED

SHIELDED PAIR 22 AWG

CAT-4 CABLE (TYPICAL)

DAISY CHAIN WITH OTHER

ROUTERS IN BUILDING

ZONE SENSOR, WITH CAPABILITY

TO ACCESS ALL LACS POINTS

IN A GIVEN ZONE THROUGH

ZONE SENSOR RJ45 CONNECTOR

FC BUS REFERTO DETAIL 3SHEET M702

FUME HOODMONITOR MOUNTEDON FUME HOOD(TYP)

FUME HOODMONITOR POWERSUPPLY (TYP)

SENSORS WILL BE INSTALED IN LABS.

AIR VALVEDIFFERENTIALPRESSURE SWITCH(TYPICAL)

SASH SENSOR,COORDINATE WITHFUME HOODREQUIREMENTS(TYP)

LABORATORY AIRFLOW CONTROL DIAGRAM TYPICAL PER LAB ROOM.NOT INTENDED TO BE DAISY CHAINED TO MULTIPLE ROOMS. NOTE:

ALL VALVES ARE HIGH SPEED ACTUATORS AND SHALL BE INSTALLEDIN A HOME RUN CONFIGURATION. NO OTHER VALVES CAN BE DAISY-

CHAINED FROM THIS POWER. BUS POWER CONFIGURATIONS ARENOT ALLOWED BETWEEN HIGH-SPEED VALVES. FOR LOADS UP TO 96VA, USE A DEDICATED 14 AWG CABLE WITH A MAXIMUM LENGTH OF

110 FEET (33 METERS) HOME-RUN BETWEEN THE TRANSFORMER ANDTHE VALVE.

RMI

ROOM INTEGRATOR (RIM) LACSCONTROL PANEL (LCP).LOCATE ABOVE ACCESSIBLECEILING. PROVIDE MINIMUMONE ROUTER PER VAVPRESSURIZATION ZONE.

POWER - 14 AWG FROM500 VA POWER SUPPLY.REFER TO DETAIL 2 ONTHIS SHEET.

POWER - 14 AWG FROM500 VA POWER SUPPLY.REFER TO DETAIL 2 ONTHIS SHEET.

POWER - 14 AWG FROM500 VA POWER SUPPLY.REFER TO DETAIL 2 ONTHIS SHEET.

POWER - 14 AWG FROM500 VA POWER SUPPLY.REFER TO DETAIL 2 ONTHIS SHEET.

PROXIMITY SENSOR(TYP)

FUME HOOD MONITOR POWER SUPPLY PROVIDED AND INSTALLED BY DIV. 26 CONTRACTOR.7

100 VA

PSH500A

100 VA

100 VA

100 VA

100 VA

DISCONNECT

SWITCH

24V

COM

24V

COM

24V

COM

24V

COM

24V

COM

480

277

240

120

COM

OFF

ON

OFF

ON

OFF

ON

OFF

ON

OFF

ON

RIB AC

BREAKER

SWITCH

ENCLOSED AC POWER SUPPLY

POWER

SUPPLY/TRANSFORMER

(FUSE)

GENERAL NOTES: KEYED NOTES:EACH SECONDARY OUTPUT LINE CAN POWER 3-5 VAV CONTROLLERS

MAXIMUM. (100 VA).

PRIMARY LINE INFO: 480/277/240/120 Vac, #12 AWG MINIMUM.

SECONDARY LINE INFO: 24 Vac, #12-26 AWG, 100 VA. MAX LENGTH 175 FEET

USING #14 AWG.

DISCONNECT SWITCH REQUIRED, EXTERNALLY MOUNTED WITHIN 12

INCHES OF RIB POWER SUPPLY.

500VA POWER SUPPLY - RIB MODEL# PSMN500A OR APPROVED

EQUIVALENT.

ALL SECONDARY LINES MUST BE LABELED IN ENCLOSURE AS TO WHICH

VAV'S THEY POWER PRIOR TO ENERGIZING POWER SUPPLY.

A SEPARATE 3 AMP FUSE IS REQUIRED WITHIN 3 FEET OF EACH VAV.

1. SECONDARY LINE CAN BE RAN IN SAME CONDUIT AS FC.

2. ENCLOSED POWER SUPPLY MUST BE LOCATED IN ELECTRICAL ROOM,

MECHANICAL ROOM, OR JANITOR'S CLOSET AND BE ACCESSIBLE. ANY OTHER

LOCATION MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE.

1

2

3

4

5

6

7

5

67

3

2

4

1

FAN RELAY AND CONTROL VALVE WIRING SHALL BE CONNNECTED TO A TERMINALSTRIP IN THE BCU AT THE FACTORY.

8 CONDUCTOR, 22 GAUGE, TWISTED, SHIELDED, STRANDED WIRE. ROUTE FROMBCU TERMINAL STRIP TO THE VAV BOX CONTROLLER SERVING SAME ROOM.

XXX XX X X X

CWR

CWS

AIR

OU

T

XX

RE

TU

RN

AIR

IN

BLOWERCOILUNIT (BCU)

M

KEYED NOTES:1

2

1

2

TYPEAOBIBO

POINT NAMECLG-OFAN-SFAN-C

DESCRIPTIONCOOLING VALVE OUTPUTFAN STATUSFAN COMMAND

DEVICENC MOD ELECT ACTUATORCURRENT SWITHCCONTROL RELAY

LOCATE DPT AS SHOWNON MECH PLANS

DPT

H L

NORTH FACING WALL

DAMPENER

ROUTE TO SPACE

12X12X6 J-BOX

REQUIRED POWER BY TCC

OA PRESSURE STATION

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

11/2

7/20

1 7 3

:04:

01 P

MC

:\Use

rs\r

diem

er\D

ocum

ents

\245

-32_

ME

CH

_CE

NT

RA

L_v1

6_rd

iem

er.r

vt

1 Hospital Drive, Columbia, MO65212

M703

11/06/2017

53474

CONTROLS

NLP

BID DOCUMENTS

University of Missouri -Columbia

NLP

CP171091

RJD

Medical ScienceFirst FloorResearch

LaboratoryRenovation

12" = 1'-0"1

LABORATORY AIRFLOW CONTROL SYSTEMSCHEMATIC1

NO SCALE2

500 VA POWER SUPPLY DIAGRAM

NTS3

BLOWER COIL UNIT DETAIL

NTS4

SPACE DIFF PRESSURE TRANSMITTER1

# DATE DESCRIPTION

1 11/27/17 ADDENDUM 2

1

Page 31: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

CR

WAP

WAP

WAP

WAPWAP

WAP

WAP

WAP

WAP

WAPWAPWAP

WAP WAP

WAPWAP

WAPWAP WAP

WAP

CR

CR

CR

CR

CRCR

CR

WAPWAPWAPWAP

WAP

WAP

J

J

J J

J

J

J

J

J

J

JJ

J

3

4

5

5.5

7

8

9.1

RPN

MLKJIHGF

2

Q

PANEL 1EPA

PANEL 1PPA

PANEL 1PPC

XFRMR T-1EPA

PANEL 1HPA

EXISTINGPANEL LP-144

PANEL P5

EXISTINGPANEL PL21E

CORRIDOR

M122

EAST RESEARCHLAB

M134

FREEZERSTORAGE /SUPPORT

M132

DRY STORAGE

M126

TISSUE CULTURE

M134A

EXISTING ITCLOSET

M125

FREEZERSTORAGE /SUPPORT

M112

FLEX RESEARCHLAB

M114

TISSUE CULTURE

M148B

WEST RESEARCHLAB

M148

TISSUE CULTURE

M134C

DARK ROOM

M134B

DARK ROOM

M128

MECHANICAL

M130

STORAGE/ RISER

M125B

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCIGFCI

GFCI

GFCI

E301

2

GFCI

E301

4

E301

3

EP005EP005

EP003ETRETRETR

ETRETRETR

ETR

ETR

ETR

CORRIDOR

M145

CORRIDOR

M122

ETR

EP005

EP005

EP005

EP005

EP005

1PP-M148

2

1PP-M148

6 8 10

1PP-M148

4

12

43

1PP-M148

34/36

1PP-M148

26/28

1PP-M148

30/32

1PP-M14818

1PP-M148

24

1PP-M14822 1PP-M14820

51535557

59

61

63

71

1PP-M148

69

1PP-M148

67

1PP-M148

65

1PPB

31

1PPB

27

1PPB

25

1PPB

21

1PPB

23

1PPB12

1PPB6

1PPB

14/16

1PPB

10

1PPB8

1PPC

2

1PPC

6

1PPC

4

1PPC

8

1PPB

18

1PPB

201PPB

34/36

1PPB32

1PPB30

1PPB28

1PPB26

1PPC

10

1PPC

46

1PPC

44

1PPC 14

1PPC16

1PPC

18

1PPC

20/22

1PPC

12

1PPC

41

1PPC

39

1PPC

24

1PPC

38

1PPC

36

D1

D1

D1

D1

D1

1PPC

40

1PPC

34

1PPA

1

1PPA

3

1PPA

5

1PPA

7

1PPB

1

1PPB

3

1PPB

13

1PPB11

1PPB

17/19

PANEL1PP-M148

PANEL 1PPB

1PP-M148 1PP-M148 1PP-M148

1PP-M148

1PP-M148

1PP-M148

1PP-M148 1PP-M148 1PP-M148

1PP-M148

1PP-M148

1PP-M148

1PP-M148

PANELCIRCUIT #

1PP-M148135

PANELCIRCUIT #

1PP-M1489

111315

PANELCIRCUIT #

1PP-M14817192123

PANELCIRCUIT #

1PP-M14825272931

EP009

EP008

PANELCIRCUIT #

1PPC1357

PANELCIRCUIT #

1PPC9

111315

PANELCIRCUIT #

1PPC17192123

PANELCIRCUIT #

1PPC25272931

PANELCIRCUIT #

1PPC333537

45

1PP-M14844

1PP-M14846

1

S T

10

D1

1PPB

15

D1

1PPB

9

D1

1

E301

EXISTINGTRANSFORMER

T41W-T4

EXISTINGPANEL EP21W

EXISTINGPANEL D41W

EXISTINGPANEL D21W

VAV POWERSUPPLY

ETR

ETR

ETR

ETR

ETR

ETR

ETR

EP010

EP010

EP015

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETRETR

ETR

ETRETR ETR

ETR

ETR

ETR

D1

LP-144

2

LP-144

15

LP-14417

EP008

EP005

LP-14418/20

ETR

LP-144

4

LP-144 12

EP014

EP014EP014

EP014

EP014

EP014

P5

13

ETR

1PP-M148

33

EP002ANATOMY

CADAVER LAB

M144

EP020

EP021

EP021

EP021

EP021

EP021

EP021

EP021

1PPB

42

1PPB

40

1PPB38

1PPB37

1PPB

39

1PPB

41

EP022EP022

EP024

EXISTING FIREALARMPOWER

EXTENDERPANEL

ELECTRICAL ROOM M159

+36"+36"

+36"

+36"

+36"

+36"

+36"

+36"

+36"

+36"

+36"+36"

+36"

MECHANICALROOM

M120

+36"

+36"

+36"

+36"

+36"

6"x

4"

12"x4"

6"x

4"

+36"

+36"+36"

+36"

+36"

+36"

+36"

+36"

GFCI

GFCI

LP-144

LP-144

12

14

EP031EP031

METASYSPANEL

1PPB2

LP-14419

GFCI

LP-144

21

LP-144

23

EP032

EP033EP034

EP023

EP023

EP023

EP023

EP023

1PPB43

EP023

EP023

EP023

1PPC

43

1PPC45

EP026

EP027

EP0281

1

1

1

1

1

1

PHOENIXVALVE POWER

SUPPLY

PHOENIXVALVE POWER

SUPPLY

PHOENIXVALVE POWER

SUPPLY

PHOENIXVALVE POWER

SUPPLY

1PP-M148

16

47

1PP-M148

1PPB

33

1PPB

7

1PPB

22

1PPC

26

1PPC

32

EP007

EP007

EP007

EP007

EP007

EP007

EP007

5.5

7

EP001EP001

EP001 EP001

EP001

EP001

VUUU

(TYP)(TYP)

UUU

Y

(TYP) (TYP)

(TYP)

(TYP)

LEGEND:

UUU - DENOTES PANELBOARD NAME

V - DENOTES 1ST CIRCUITW - DENOTES 2ND CIRCUITX - DENOTES 3RD CIRCUITY - DENOTES 4TH CIRCUIT

PANELCIRCUIT #

PANELCIRCUIT #

UUUVWXY

1

E301

UUU

X

UUU

W

EP011 EP011

EP011

EP011

EP018

EP018

EP018

EP025

9.1

M

EP005

EP005

EP005

EP005

GFCIEP006D1

1EPA

29/31

1EPA

33/35

1EPA23

1EPA25

1EPA21

1EPA19

1EPA11/13

1EPA15/17

1EPA1

1EPA3

1EPA5

1EPA7

1EPA9

1EPA27

1EPA

37GFCI

(TYP)

EP004

EP019

EP019

GFCI

EP023

EP023

EP023

EP0233EP005

EP005

EP005

EP005

1EPA20

1EPA22

1EPA24

1EPA26

1EPA28

1EPA

30/32

1EPA

16/18

1EPA

12/141EPA2

1EPA4

1EPA6

1EPA8

34/361PPA

11

1EPA

1EPA38

(TYP)EP019

EP019

EP004

+18"

EP023

EP023

EP023

EP023

5.57 65.9

LEVEL ONE0' - 0"

LEVEL TWO13' - 8"

5.57 5.57 65.9 5.57 65.9

UUUY

UUUX

UUUW

EP011

EP012

EP013

EP014(TYP)

(TYP)EP011

EP017EP030

MONICASANTOYOSANTOS

NUMBERE-2000174546

IRU

OSSIMFO

ET

AT

S

PROFE

SSIONAL EN

G

INEER

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

0" 1"

Original Size: 1 1/2" Drawing may have been reduced.

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

MONICA S. SANTOS - ELECTRICALMO# E-2000174546

11/06/2017

11/2

7/20

1 7 5

:10:

03 P

MC

:\Use

rs\B

en.A

nder

son\

Doc

umen

ts\A

217-

13 E

LEC

v16

_ban

ders

onT

T9 L

U.r

vt

E301

11/06/2017

53474

LEVEL ONE -POWER FLOOR

PLAN

BP

A

BID DOCUMENTS

University of Missouri -Columbia

1 Hospital Drive, Columbia, MO65212

BPA

CP171091

MSS

Medical ScienceFirst FloorResearch

LaboratoryRenovations

PLAN NOTESEP018 PLUG INTO OUTLET WITH MATCHING CIRCUIT NUMBER.

EP019 PROVIDE JUNCTION BOX WITH EMPTY 3/4" CONDUIT EXTENDED TO PANEL 1EPA FOR FUTURECIRCUIT. PROVIDE WITH PULL STRING AND LABEL FUTURE.

EP020 PROVIDE ALL REQUIRED FITTINGS TO RE-ARRANGE WIREMOLD IN A LINEAR CONFIGURATION.CONNECT TO EXISTING SECTION.

EP021 PROVIDE ROUGH-IN FOR CARD READER. CONTRACTOR SHALL PULL WIRING FOR CARDREADER. OWNER SHALL INSTALL CARD READER AND MAKE FINAL TERMINATIONS. REFER TODETAIL 4 ON SHEET E602 FOR ADDITIONAL INFORMATION.

EP022 MOUNT DEVICES TO CEILING PANEL.

EP023 PROVIDE 3 #10 AWG AND 1 #10 GROUND IN 3/4" CONDUIT.

EP024 MOUNT BOTTOM OF CABLE TRAY AT 7'-11" AFF.

EP025 EXTEND DATA CONDUIT FROM DESKTOPS THROUGH PIPE CHASE UP TO ACCESSIBLE CEILINGAND BUSH FOR WIRING PATHWAY. PROVIDE EITHER INDIVIDUAL HOMERUNS OR CONDUITSIZED FOR NUMBER OF CABLES PER TABLE ON SHEET E001. COORDINATE MOUNTING WITHOTHER TRADES USING SAME PIPE CHASE.

EP026 PROVIDE HOUSEKEEPING PAD FOR TRANSFORMER. REFER TO DETAIL 7 ON SHEET E601 FORADDITIONAL INFORMATION.

EP027 RE-CONNECT NEW WIREMOLD TO EXISTING WIREMOLD CIRCUIT.

EP028 REPLACEMENT OF PANEL TO OCCUR AFTER-HOURS DURING EVENINGS, WEEK-ENDS ORDURING CLASS BREAK TIMES LISTED ELSEWHERE IN THE SPECIAL CONDITIONS.

EP030 REFER TO PLANS FOR CIRCUIT TO OUTLET SERVING REFRIGERATOR.

EP031 RE-CONNECT NEW RECEPTACLE TO EXISTING CIRCUIT SERVING WIREMOLD. FIELD VERIFYCIRCUIT ASSIGNMENT IN EXISTING PANELBOARDS.

EP032 PROVIDE POWER CONNECTION FOR SURGICAL LIGHT IN CEILING. COORDINATE EXACTREQUIREMENTS WITH OWNER PRIOR TO ROUGH-IN.

EP033 PROVIDE POWER CONNECTION TO SURGICAL LIGHT COMPUTER. COORDINATE EXACTREQUIREMENTS WITH OWNER PRIOR TO ROUGH-IN.

EP034 EXTEND 2" CONDUIT FROM 18" AFF TO ABOVE ACCESSIBLE CEILING AND BUSH FOR OWNERINSTALLED SURGICAL LIGHT CONTROLS. COORDINATE EXACT REQUIREMENTS WITH OWNERPRIOR TO ROUGH-IN.

PLAN NOTESEP001 WIREMOLD TO BE PROVIDED WITH WHIP AND PLUG TO BE PLUGGED INTO RECEPTACLE

MOUNTED BELOW COUNTER. REFER TO TYPICAL LAB WORKSTATION ELEVATION, THISSHEET, FOR LOCATION OF OUTLET AND CIRCUITING.

EP002 FEED WIREMOLD FROM NEW WALL. PROVIDE CONDUIT SIZED AS REQUIRED TOACCOMMODATE CABLE FILL.

EP003 PROVIDE DUAL CHANNEL ALUMINUM RACEWAY (WIREMOLD AL4000 SERIES ORPRE-APPROVED EQUAL) AND REQUIRED ACCESSORIES FOR MOUNTING DEVICES. PROVIDEGRAY DEVICES TO MATCH. CONTRACTOR TO VERIFY CABLE FILL DOES NOT EXCEED RATINGOF RACEWAY. MOUNT AT 36" AFF.

EP004 MOUNT DEVICES IN FREEZER STORAGE AT 36" AFF UNLESS NOTED OTHERWISE.

EP005 PROVIDE NEMA 6-30R RECEPTACLE.

EP006 POWER CONNECTION FOR POLISHER. CONFIRM MOUNTING HEIGHT AND INSTALLATIONREQUIREMENTS WITH ARCHITECT PRIOR TO ROUGH-IN.

EP007 MOUNT JUNCTION BOX ABOVE FUME HOOD ON WALL. MAKE FLEXIBLE CONNECTION TO THETOP OF THE FUME HOOD. COORDINATE CONNECTION WITH HOOD MANUFACTURER ANDINSTALLER.

EP008 EXISTING EQUIPMENT WITHIN THIS AREA TO REMAIN UNLESS NOTED OTHERWISE. MAINTAINCONTINUITY OF CIRCUITS TO ENSURE DEVICES ARE FULLY FUNCTIONAL.

EP009 REMOVE EXISTING PANEL AND REPLACE WITH NEW IN THE SAME LOCATION. RECONNECTALL EXISTING CIRCUITS TO NEW BREAKERS AND UPDATE PANELBOARD DIRECTORY WITHCIRCUITS BEING SERVED.

EP010 EXISTING WIREMOLD TO REMAIN. MAINTAIN CONTINUITY OF CIRCUIT TO ENSURE DEVICESARE FULLY FUNCTIONAL.

EP011 MOUNT DATA ON VERTICAL POST OF LAB WORKSTATION. REFER TO ARCHITECTURALELEVATION A1 ON SHEET A801 FOR ADDITIONAL INFORMATION.

EP012 PRE-WIRED WIREMOLD WHIP PROVIDED WITH FURNITURE. REFER TO ARCHITECTURALDRAWINGS FOR ADDITIONAL INFORMATION.

EP013 WIREMOLD PROVIDED WITH FURNITURE. REFER TO ARCHITECTURAL DRAWINGS FORADDITIONAL INFORMATION.

EP014 RECEPTACLE TO BE MOUNTED ON 6" FIXED SECTION OF FURNITURE BACKPLATE. REFER TOARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

EP015 PROVIDE NEW WIREMOLD TO MATCH EXISTING. PROVIDE ALL REQUIRED FITTINGS TOATTACH TO REMAINING LINEAR SECTION. RECONNECT ALL CIRCUITS AND ENSURE ALLDEVICES ARE ENERGIZED.

EP017 PROVIDE OUTLET TO BE CONTROLLED BY MOTION SENSORS. OUTLET DEDICATED TO TASKLIGHTING. REFER TO LIGHTING PLANS FOR CIRCUITRY.

POWER GENERAL NOTES1 DEVICES SHALL BE ALIGNED VERTICALLY. REFER TO TYPICAL WALL MOUNTING DEVICE

DETAIL 6 ON SHEET E601.

2 ALL DATA OUTLETS TO BE TERMINATED IN EXISTING IT CLOSET M125.

4'0 8' 16'

NO

RT

H

SCALE: 1/8" = 1'-0"

LEVEL ONE - POWER PLAN

0 2' 4' 8'SCALE: 1/4" = 1'-0"

TYPICAL LAB WORKSTATION2

0 2' 4' 8'SCALE: 1/4" = 1'-0"

M112 - FREEZER STORAGE/SUPPORT3

0 2' 4' 8'SCALE: 1/4" = 1'-0"

M132 - FREEZER STORAGE/SUPPORT4

0 2' 4' 8'SCALE: 1/4" = 1'-0"

TYPICAL LAB WORKSTATION ELEVATION1

# DATE DESCRIPTION

1 11/27/17 ADDENDUM 2

1

Page 32: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

J

J

J

J

J

J

J

3

4

5

5.5

7

8

9.1

RPN

MLKJIHGF

2

Q

CORRIDOR

M122

EAST RESEARCHLAB

M134

FREEZERSTORAGE /SUPPORT

M132

DRY STORAGE

M126

TISSUE CULTURE

M134A

EXISTING ITCLOSET

M125

FREEZERSTORAGE /SUPPORT

M112

FLEX RESEARCHLAB

M114

TISSUE CULTURE

M148B

WEST RESEARCHLAB

M148

TISSUE CULTURE

M134C

DARK ROOM

M134B

DARK ROOM

M128

EAST RESEARCHLAB

M134

MECHANICAL

M130

STORAGE/ RISER

M125B

BCU

1-03

EF

1-01

AHU

1-01

BCU

1-04

EF

1-02

HWRP

1-01

1HPA2/4/6

XFRMR T-1EPA

PANEL 1EPA

PANEL 1PPA

PANEL 1HPAPANEL 1PPC

PANEL 1PPB

EXISTINGPANEL LP-144

PANEL1PP-M148

PANEL P5

EXISTINGPANEL PL21E

EH001

EH002EH002

1PPA

2EH003

1HPA

26/28/30

EH003

EH004

1HPA20/22/24

1HPA

8/10/12

EH009

EH005EH005

EXISTINGPANEL D21W

EXISTINGPANEL D41W

EXISTINGPANEL EP21W

EXISTINGTRANSFORMER

T41W-T4

1

S T

10

EH004

FTU

1-44

EH011

1PP-M148

7

EH005

1PPA

4 EH007

EH015 1PPA

6

VAV POWERSUPPLY

EXISTING FIREALARMPOWER

EXTENDERPANEL

MECHANICALROOM

M120

CWP

1-01

VENDING

M111

1HPA

14/16/18EH006

EH005EH005

EH005EH010

EH010

METASYSPANEL

1PPA10

EH012

SD

1-03

SD

1-02

SD

1-03

1PP-M148

14

1

EH014

49

1PP-M148

1

EH014

1PPB

24

1

EH014

1PPC28

1PPC

30

1

EH014

EH014

1PPB

35

EH014

1

1PPA

8

1PPB

5

EH014

1

PHOENIXVALVE POWER

SUPPLYPHOENIX

VALVE POWERSUPPLY

PHOENIXVALVE POWER

SUPPLY

1PPA

EH008

(TYP)

12

1PPA

14

EH008

1PPA

16

1

1

PHOENIXVALVE POWER

SUPPLYEH008

1PP-M148

35

MONICASANTOYOSANTOS

NUMBERE-2000174546

IRU

OSSIMFO

ET

AT

S

PROFE

SSIONAL EN

G

INEER

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

0" 1"

Original Size: 1 1/2" Drawing may have been reduced.

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

MONICA S. SANTOS - ELECTRICALMO# E-2000174546

11/06/2017

11/2

7/20

1 7 5

:10:

09 P

MC

:\Use

rs\B

en.A

nder

son\

Doc

umen

ts\A

217-

13 E

LEC

v16

_ban

ders

onT

T9 L

U.r

vt

E401

11/06/2017

53474

LEVEL ONE - HVACPOWER FLOOR

PLAN

BP

A

BID DOCUMENTS

University of Missouri -Columbia

1 Hospital Drive, Columbia, MO65212

BPA

CP171091

MSS

Medical ScienceFirst FloorResearch

LaboratoryRenovations

PLAN NOTESEH001 PROVIDE 60 AMP, 480 V, 3 POLE, FUSIBLE DISCONNECT SWITCH FUSED AT 60 AMP IN NEMA 1

ENCLOSURE.

EH002 PROVIDE 3 #6 AWG AND 1 #10 GROUND IN 1" CONDUIT.

EH003 PROVIDE TOGGLE STYLE 1 HP RATED MANUAL STARTER WITH MOTOR THERMAL OVERLOADSIN NEMA 1 ENCLOSURE. MAKE ALL FINAL CONNECTIONS TO EF.

EH004 PROVIDE 30 AMP, 480 V, 3 POLE, FUSIBLE DISCONNECT SWITCH FUSED AT 15 AMP IN NEMA 1ENCLOSURE.

EH005 PROVIDE 3 #12 AWG AND 1 #12 GROUND IN 3/4" CONDUIT.

EH006 PROVIDE 30 AMP, 480 V, 3 POLE, UL/NEMA TYPE 1, NEMA SIZE 0, FUSIBLE, FULL VOLTAGETYPE, NON-REVERSING, COMBINATION STARTER/DISCONNECT SWITCH WITH INTEGRALCLASS 20 SOLID-STATE OVERLOAD RELAY ADJUSTED PER MANUFACTURER'SREQUIREMENTS. FUSE AT 15 AMP. COORDINATE INSTALLATION AND FINAL CONNECTIONWITH THE MECHANICAL CONTRACTOR.

EH007 PROVIDE FINAL CONNECTION TO FACTORY PROVIDED LIGHT FIXTURE(S) AND GFCIRECEPTACLE(S) IN AIR HANDLING UNIT. COORDINATE EXACT WIRING REQUIREMENTS ANDLOCATIONS WITH MECHANICAL CONTRACTOR/EQUIPMENT SUPPLIER PRIOR TO ROUGH-IN.

EH008 PROVIDE 1 HP RATED TOGGLE STYLE, 120 V, 1 POLE, NEMA 1 SWITCH AS DISCONNECTINGMEANS FOR PHOENIX VALVE POWER. PROVIDE ALL FINAL CONNECTIONS TO CONTROLLERS.REFER TO DETAIL 2, SHEET M703 FOR ADDITIONAL INFORMATION ON POWER SUPPLY.

EH009 PROVIDE 30 AMP, 480 V, 3 POLE, UL/NEMA TYPE 1, NEMA SIZE 00, FUSIBLE, FULL VOLTAGETYPE, NON-RESERVING, COMBINATION STARTER/DISCONNECT SWITCH WITH INTEGRALCLASS 20 SOLID-STATE OVERLOAD RELAY ADJUSTED PER MANUFACTURER'SREQUIREMENTS. FUSE AT 15 AMP. COORDINATE INSTALLATION AND FINAL CONNECTIONWITH THE MECHANICAL CONTRACTOR.

EH010 PROVIDE 2 #10 AWG AND 1 #10 GROUND IN 3/4" CONDUIT.

EH011 PROVIDE 1 POLE, 1 HP RATED TOGGLE STYLE SWITCH IN NEMA 1 ENCLOSURE. PROVIDE ALLFINAL CONNECTIONS TO FTU.

EH012 PROVIDE 1 HP RATED TOGGLE STYLE, 120 V, 1 POLE, NEMA 1 SWITCH AS DISCONNECTINGMEANS. PROVIDE ALL FINAL CONNECTIONS TO METASYS PANEL.

EH014 PROVIDE TOGGLE STYLE SWITCH AS DISCONNECTING MEANS AND MAKE FINAL CONNECTIONTO PHOENIX VALVE CONTROLS. CONTRACTOR SHALL COORDINATE EXACT LOCATION OFPHOENIX CONTROL PANEL PRIOR TO ROUGH-IN.

EH015 PROVIDE 1 HP RATED TOGGLE STYLE, 120 V, 1 POLE, NEMA 1 SWITCH AS DISCONNECTINGMEANS FOR VAV UNIT POWER SUPPLY. PROVIDE ALL FINAL CONNECTIONS TOCONTROLLERS. REFER TO DETAIL 2, SHEET M703 FOR ADDITIONAL INFORMATION ON POWERSUPPLY.

4'0 8' 16'

NO

RT

H

SCALE: 1/8" = 1'-0"

LEVEL ONE - HVAC POWER PLAN

# DATE DESCRIPTION

1 11/27/17 ADDENDUM 2

1

1

Page 33: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING

MONICASANTOYOSANTOS

NUMBERE-2000174546

IRU

OSSIMFO

ET

AT

S

PROFE

SSIONAL EN

G

INEER

A

B

C

D

E

6 5 4 3 2 1

1900 w.47th Place, #300, Westwood, KS 66205(913) 362-6500 www.PGAV.COM

DRAWN: CHECKED:

DATE:

PGAV # CLIENT #

SHEET #:

0" 1"

Original Size: 1 1/2" Drawing may have been reduced.

PECKHAM GUYTON ALBERS & VIETS, INC.

Electrical Engineers1600 Genessee St, Suite 260Kansas City, MO 64102

ANTELLA CONSULTING ENGINEERS, INC.

Plumbing, Mechanical & Fire Protection Engineers6 South Old OrchardSt Louis, MO 63119

ROSS & BARUZZINI, INC.

(314) 918-8383

(816) 421-0950

THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TOWHICH THEY ARE AFFIXED, AND EXPRESSLY DISCLAIM ANYRESPONSIBILITY FOR ALL OTHER PLANS, SPECIFICATIONS,

ESTIMATES, REPORTS, OR OTHER DOCUMENTS OR INSTRUMENTSRELATING TO OR INTENDED TO BE USED FOR ANY PART OR PARTS

OF THE ARCHITECTURAL OR ENGINEERING PROJECT.

PECKHAM GUYTON ALBERS & VIETS, INC.MO STATE CERTIFICATE OF AUTHORITY #000086

MO STATE CERTIFICATE OF AUTHORITY #E-2005013590

MO STATE CERTIFICATE OF AUTHORITY #000148

MONICA S. SANTOS - ELECTRICALMO# E-2000174546

11/06/2017

11/2

6/20

1 7 8

:29:

28 P

MC

:\Use

rs\M

onic

a.S

anto

s\D

ocu m

ents

\A21

7-13

ELE

C v

16_M

onic

aSan

tos 5

192.

rvt

E801

11/06/2017

53474

LIGHTINGSCHEDULES

Aut

hor

BID DOCUMENTS

University of Missouri -Columbia

1 Hospital Drive, Columbia, MO65212

Author

CP171091

Checker

Medical ScienceFirst FloorResearch

LaboratoryRenovations

LUMINAIRE SCHEDULETYPE MOUNTING LAMPS LUMENS

COLORTEMP.

CRI WATTS VOLTAGE MANUFACTURER DESCRIPTION EQUALS

A RECESSEDGRID

LED 3800 lm 3500 K 80 44 277 H.E. WILLIAMS - HETHET-G-S14-L38/835-A-DIM-UNVOR PRE-APPROVED EQUAL

1X4 BY 3-5/8" DEEP RECESSED TROFFERWITH FROSTED ACRYLIC SHIELDING0-10V DIMMING

B SURFACEGRID

LED 3400 lm 3500 K 80 32 277 EATON - METALUX22SP-34-35OR PRE-APPROVED EQUAL

2X2 BY 7/8" DEEP SURFACE-MOUNTED TROFFERWITH WHITE FROST LENS0-10V DIMMING

C PENDANT LED 3800 lm 3500 K 80 20 277 H.E. WILLIAMS - 75 LED75S-4-L40/835-DRV-UNVOR PRE-APPROVED EQUAL

4FT SUSPENDED LINEAR DIRECT3" TALL

NULITE - SA LED SERIESSA-4-10L35-UNV-D-SQ

D PENDANT LED 4170 lm 3500 K 80 42 277 COOPER LIGHTING - CORELITERZL-W-B-2-L35-1-D-UNV-A-C-48-ST-4-STD-WOR PRE-APPROVED EQUAL

4FT SUSPENDED LINEAR 85% DIRECT / 15% INDIRECT3-1/2" TALLWITH PRISMATIC LENS WITH MICRO BAFFLE0-10V DIMMING

E8 RECESSEDFLANGE

LED 569 lm 3500 K 80 39 277 NULITE - REGOLORF4-05-L35-UNV-D-1C-ST-F-WH-8'OR PRE-APPROVED EQUAL

8FT RECESSED LINEAR DIRECT5-1/2" TALL0-10V DIMMING

F PENDANT LED 8340 lm 3500 K 80 84 277 COOPER LIGHTING - CORELITERZL-W-B-2-L35-1-D-UNV-A-C-48-ST-8-STD-WOR PRE-APPROVED EQUAL

8FT SUSPENDED LINEAR 85% DIRECT / 15% INDIRECT3-1/2" TALLWITH PRISMATIC LENS WITH MICRO BAFFLE0-10V DIMMING

G RECESSED LED 1900 lm 3500 K 80 22 277 H.E. WILLIAMS - HETHET-G-S12-L19/835-A-DIM-UNVOR PRE-APPROVED EQUAL

1X2 BY 3-5/8" DEEP RECESSED TROFFERWITH FROSTED ACRYLIC SHIELDING0-10V DIMMING

H WALL LED 413 lm 3500 K 80 26 277 IO LIGHTING - LINE .750-03-I-35KVHO-91-102-1-10-12-4OR PRE-APPROVED EQUAL

5FT WALL-MOUNTED LINEAR ASYMMETRIC3/4" TALL0-10V DIMMING

J RECESSED LED 1000 lm 3500 K 80 11 277 EATON - PORTFOLIOLD4B-10-D010-EU4B-1020-80-35-4LB-M-0-HOR PRE-APPROVED EQUAL

4IN RECESSED DOWNLIGHT5-1/2" TALL0-10V DIMMING

K RECESSED LED 1450 lm 3500 K 84 20 277 FINELITE - HP-4HP-4 WW-R-K-4'-HO-3500K-277V-SC-C1OR PRE-APPROVED EQUAL

4FT RECESSED LINEAR WALL WASH4" TALL

XA WALL/CEILING LED 5 277 DUAL-LITE - SE SERIESSE-S-R-W-E-IOR PRE-APPROVED EQUAL

DIE-CAST LED EXIT SIGNSINGLE FACEINTEGRAL BATTERYSELF DIAGNOSTICS

EATON - SURE-LITESCX71WHSD

XB WALL/CEILING LED 5 277 DUAL-LITE - SE SERIESSE-D-R-W-E-IOR PRE-APPROVED EQUAL

DIE-CAST LED EXIT SIGNDOUBLE FACEINTEGRAL BATTERYSELF DIAGNOSTICS

EATON - SURE-LITESCX72WHSD

XC WALL/CEILING LED 652 lm 12 277 DUAL-LITE - EVHCEVHC-12-IOR PRE-APPROVED EQUAL

THERMOPLASTIC LED EMERGENCY LIGHTHIGH MOUNTING APPLICATIONSINTEGRAL BATTERYSELF DIAGNOSTICS

EATON - SURE-LITESSEL60R4SD

XD WALL/CEILING LED 290 lm 4 277 DUAL-LITE - EVHCEV-4-I-02LOR PRE-APPROVED EQUAL

THERMOPLASTIC LED EMERGENCY LIGHTARCHITECTURAL APPLICATIONSINTEGRAL BATTERYSELF DIAGNOSTICS

EATON - SURE-LITESSEL50SD

LIGHTING CONTROL DEVICE SCHEDULETYPE MOUNTING DESCRIPTION MANUFACTURER MODEL COVERAGE COLOR

LD WALL DIGITAL LIGHTING MANAGEMENT SYSTEM (DLM) SWITCHLOW VOLTAGE PUSHBUTTON SWITCH

WATTSTOPPER LMDM-101 - GREY OR ASNOTED BYARCHITECT.

MS-1 CEILING DUAL TECHNOLOGY ULTRASONIC AND PASSIVE INFRARED CEILING SENSOR.IT IS A DIGITAL SENSOR PART OF A DIGITAL LIGHTING MANAGEMENT SYSTEM(DLM) BY WATTSTOPPER.

WATTSTOPPER LMDC-100 1000 SQFT WHITE

MS-2 CEILING DIGITAL PASSIVE INFRARED SENSOR WITH 360 DEGREE PATTERNS.COMPONENT OF DIGITAL LIGHTING MANAGEMENT INTEGRATED CONTROLSYSTEM.

WATTSTOPPER LMPC-100 1000 SQFT WHITE

PS CEILING MULTI-ZONE DAYLIGHT PHOTOSENSOROPEN LOOP WITH CONTINUOUS DIMMINGCOMPONENT OF DIGITAL LIGHTING MANAGEMENT INTEGRATED CONTROLSYSTEM

WATTSTOPPER LMLS-500 - WHITE

RC-D ABOVE ACCESSIBLECEILING

PLENUM RATED CONTROLLER WITH LINE VOLTAGE RELAY(S) AND ON/OFF0-10V DIMMING POWER SUPPLY.COMPONENT OF DIGITAL LIGHTING MANAGEMENT INTEGRATED CONTROLSYSTEM.CONNECT TO COMPONENTS WITH CAT 5E CABLES WITH RJ45 CONNECTORS.PROVIDE WITH ISOLATED RELAY INTERFACE FOR HVAC CONTROL (PROVIDEONE PER ROOM)

(SEE NOTE BELOW)

WATTSTOPPER LMRC-211LMRC-212LMRC-213

LMRL-100

- -

RC-PL ABOVE ACCESSIBLECEILING

PLENUM RATED CONTROLLER WITH LINE VOLTAGE RELAY AND SWITCHINGPOWER SUPPLYCOMPONENT OF DIGITAL LIGHTING MANAGEMENT INTEGRATED CONTROLSYSTEMCOMPONENT OF DIGITAL LIGHTING MANAGEMENT INTEGRATED CONTROLSYSTEMDIGITAL PLUG LOAD ROOM CONTROLLERPLUG INTO COMPONENTS WITH CAT 5ECABLES WITH RJ45 CONNECTORS

WATTSTOPPER LMPL-101 - -

TS WALL TIMER SWITCHTIME-OUT ADJUSTMENTS FROM 5 MIN TO 12 HOURS.STAND ALONE, NOT PART OF DLM

- GREY OR ASNOTED BYARCHITECT.

NOTES:1. PRE-APPROVAL FOR EQUALS MUST BE SUBMITTED PRIOR TO BIDS PER THE FRONT END DOCUMENTATION. SUBSTITUTIONS WILL NOT BE ENTERTAINED POST BIDS.2. CONTRACTOR SHALL SUBMIT INDIVIDUAL PRICING. LOT PRICING WILL NOT BE ACCEPTED.3. CONTRACTOR SHALL COORDINATE ALL LUMINAIRES WITH THE CEILINGS THEY ARE TO BE MOUNTED IN. PROVIDE ALL MATERIAL AND EQUAL AS REQUIRED TO MOUNT IN THE CEILING TYPE WHERE SHOWN. REFER TO ARCHITECTURAL PLANS FOR CEILINGTYPES.4. LIGHT FIXTURE VOLTAGES SHALL MATCH THE CIRCUIT VOLTAGE AS SHOWN PER PLANS.

NOTES:1. PROVIDE REQUIRED NUMBER OF ROOM CONTROLLERS AND RELAYS TO ACCOUNT FOR THE PROPER SWITCHING CONFIGURATION OF LOADS. ONLY ONE SYMBOL IS SHOWN IN PLAN FOR CLARITY.2. CABLING USED TO INTER-CONNECT DLM SYSTEM DEVICES TO BE WHITE (OR PRE-APPROVED COLOR BY OWNER).3. PROGRAM ALL MOTION SENSORS TO BE OCCUPANCY SENSORS. THEY ARE TO TURN ON AUTOMATIC AND SHUT OFF WITHIN 30 MINUTES OF AN OCCUPANT LEAVING SPACE.4. WATTSTOPPER IS A BASIS OF DESIGN. CONTRACTOR SHALL SUBMIT ANY EQUALS PRIOR TO BID FOR PRE-APPROVAL PER FRONT END DOCUMENTS. SUBSTITUTIONS WILL NOT BE ENTERTAINED POSTBIDS.

# DATE DESCRIPTION

2 11/27/17 ADDENDUM 2

2

Page 34: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING
Page 35: UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDINGoperations-webapps.missouri.edu/pdc/adsite/projects... · 2017. 11. 28. · Page 1 of 7 UNIVERSITY OF MISSOURI - MEDICAL SCIENCE BUILDING