Unlocking value from existing utility assetsNARUC Meeting – February 2012

[email protected]

Page 2: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Safe Harbor Disclosure

2

Certain statements in the following presentation regarding AES’s business operations may constitute “forward-looking statements.” Such forward-looking statements include, but are not limited to, those related to future earnings growth and financial and operating performance. Forward-looking statements are not intended to be a guarantee of future results, but instead constitute AES’s current expectations based on reasonable assumptions. Forecasted financial information is based on certain material assumptions. These assumptions include, but are not limited to accurate projections of future interest rates, commodity prices and foreign currency pricing, continued normal or better levels of operating performance and electricity demand at our distribution companies and operational performance at our generation businesses consistent with historical levels, as well as achievements of planned productivity improvements and incremental growth from investments at investment levels and rates of return consistent with prior experience. For additional assumptions see the Appendix to this presentation. Actual results could differ materially from those projected in our forward-looking statements due to risks, uncertainties and other factors. Important factors that could affect actual results are discussed in AES’s filings with the Securities and Exchange Commission including but not limited to the risks discussed under Item 1A “Risk Factors” in the Company’s Annual Report on Form 10-K for the year ended December 31, 2010, as well as our other SEC filings. AES undertakes no obligation to update or revise any forward-looking statements, whether as a resultof new information, future events or otherwise.

Page 3: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Our Mission: Safe, Reliable, Sustainable.

Page 4: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

AES battery-based capacity offering

4

Page 5: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

72 MW, 4 Sites, 3 Markets

5

2009: Los Andes, Chile (12MW)

2010: Johnson City, NY (8MW)

2011: Laurel Mountain, WV (32MW) and Angamos, Chile (20MW)

Page 6: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Storage - Unlocking value for decades...

6FirstEnergy 435 MW Seneca pumped storage facility in PA.

Page 7: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Prudent & Progressive (back then)

7

Page 8: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Gas: Untapped Value & Insurance Policies

8

800 MW Combined Cycle Gas• Efficient (6800 BTU/kWh)• Among cleanest

50 MW Gas Peaker• Inefficient (10500 BTU/kWh)• Higher emissions

<50% utilization* <10% utilization*

*U.S. fleet average capacity factors for similar plants, EIA.

Page 9: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Reliable, but Sustainable?Prudent, but Progressive?

9

Source: FERC, EIA

NYISO Load Curve, July 6th, 2010

40%

Page 10: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Energy Storage: Reliable & Sustainable

10

CapacityEmissions

Profile

Flexibility Profile

Emissions-Free

Emission-bearing

Inflexible Highly Flexible

Nuclear(4%)

Hydro(3%)

Wind Solar

Geothermal

Coal(3%)

Nat. Gas(46%)

Demand Response

Size represents share of planned capacity additions in the U.S. 2010-2025, Source: EER

(42%)

CCS(2%)

absorbs as generated

min

. loa

d su

ppor

t

Page 11: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

11

Page 12: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

AES battery-based capacity offering

12

Page 13: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Energy Storage Capacity: Unlocking Value

Flexible Emissions-Free Capacity

Project Cost/Benefit vs. New LM6000 on LI ($/kW-month)Actual Project Example

AESEmissions

Free Capacity

Modularity /ScalingBenefits

Lower EnergyCost (vs.LM6000)

EnvironmentalBenefits (Solar

Equivalent)

DistributedDeployment

Benefits

EffectiveProject Costs

New on-islandLM6000 (ForComparison)

\

Page 14: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

32 MW, less than 1 acre, no emissions

14

98 MW Laurel Mountain Wind Projectwith 32 MW BESS

Serving PJM Regulation Market

Page 15: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Years of reliable performance…

COD: Dec-2009Size: 12 MWCA: 100%

1:02 am 1:16 am

Pre-programmed digital response when frequency dropped below 50 Hz

Loss of 200 MW in Grid: November 24th

12 MW Los Andes Project, Chile

Page 16: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

Reliable & Sustainable,Prudent & Progressive

16

•No local emissions from the facility.•The most flexibility to support reliability needs and high penetration for renewables at system level.

•Ability to create load to maintain or increase the value of nuclear, wind, and low CF CCGT.

Page 17: Unlocking value from existing utility assets NARUC Meeting – February 2012  chris.shelton@aes.com

© 2011 The AES Corporation, All rights reserved.

More regulatory support is needed…

• Planning: RPS (renewable portfolio standard) programs should consider capacity in addition to energy and plan for coordinated deployment goals.

• Procurement: Regulators should encourage long-term contract structures from markets and utilities for emissions-free, flexible capacity resources.

• Market Updates: Market mechanisms should reward flexibility and precision in “pay-for-performance” models.

• Incentives: Full ITC (investment tax credit) treatment for energy storage to level the playing field with other emissions-free grid resources (such as solar).