Sassan KhoubyariLead Program ManagerGlobal Powertrain C3PNG(PLM) DeploymentDigital Innovation DepartmentFord Motor [email protected]
Gokul VenkatesanPrinciple PLM ConsultantPLM Ford Program OfficeUGS [email protected]
2Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Introduction
Product Lifecycle Management is a key enabler in achieving operational efficiency and plays a pivotal role in achieving economical and fast-to-market solutions.
Powertrain Organization partners with Global Supplier base to design, assemble and manufacture products, globally and to delivers to the Ford vehicle teams across the world.
Implementation of a PLM solution, which helps grapple with the challenges by managing a multi-CAD, multi-PIM environment, broad-based visualization, regimented workflows and BOM authoring to maximize its collaboration success in a global environment.
This presentation shares the insights of Powertrain’s tacticaland strategic efforts to support global collaboration.
3Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Ford Motor Company
Ford Motor Company, a global automotive industry leader based in Dearborn, Mich., manufactures and distributes automobiles in 200 markets across six continents. With about 300,000 employees and 108 plants worldwide, the company’s core and affiliated automotive brands include Ford, Jaguar, Land Rover, Lincoln, Mazda, Mercury and Volvo. Its automotive-related services include Ford Motor Credit Company.
Source: http://www.ford.com
4Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
GLOBAL FORD POWERTAIN ACTIVITY
EuropeDiesel EnginesV-EnginesI-EnginesManual TransmissionsTransaxlesIron Castings
South AmericaI-EnginesChassis & Engine ComponentsIron CastingsAluminum Castings
Asia-PacificI-EnginesManual TransmissionsAluminum & Iron CastingsChassis Components
AfricaI-Engines
North AmericaV-EnginesI-EnginesN.A. DieselAutomatic Transmissions & DrivelineContinuously Variable TransmissionsIron and Aluminum Castings & Forging
Draft
5Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Evolution of theFord Product Creation Process
Evolution of theFord Product Creation Process
CTCCTC WCPWCP FPDSFPDS GPDSGPDS
43 MBJ#143 MBJ#1
WCTWCT
19851985
Conceptto
Customer
Conceptto
Customer
19921992
World Class
Process
World Class
Process
Global Product Development
SystemAn Enterprise-wide process
built from Global Best Practices
World Class
Timing
World Class
Timing
19931993Since 1996Since 1996
72 MBJ#172 MBJ#1 68 MBJ#168 MBJ#1 65 MBJ#165 MBJ#1
Ford Product Development
System
Ford Product Development
System
MBJ#1*
** <KO> equivalent timing for S4/P4 program<KO> equivalent timing for S4/P4 program
2005+2005+
For Joint Programs
6Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
PDM Metaphase
CADIDEAS
Supplier
PDM VPM
CADCATIA V4
Supplier
PDM Metaphase
CADIDEAS
SupplierVolvo
FOE
PDM VPM
CADCATIA V4
Supplier Land Rover
Jaguar
Manual Processes
and Resources
Manual Processes
and Resources
Manual Processes and
Resources
Manual Processes and
Resources
Manual Processes
and Resources
Manual Processes
and Resources
PDM Metaphase
CADIDEAS
Supplier FNA
PDM VPM
CADCATIA V5
Supplier
PDM Metaphase
CADIDEAS
SupplierMazda
CADGNC
Manual Processes and
Resources
Manual Processes and
Resources
Manual Processes and
Resources
Manual Processes and
ResourcesCurrent Situation:•Different PDM•Different Product Structure•Different CAD
Requirements:•Common PDM•Common Product Structure•Common CAD
Key Business Drivers –Commonality (Before C3PNG)
Our current Methods/Tools/Data environment inhibits cross brand Our current Methods/Tools/Data environment inhibits cross brand programsprograms
7Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business Challenges
Ford Global Powertrain Operations serves the following organizations & Joint ventures
North America• VEE• ATO• Mfg
Europe• IGEE• EU Diesel• FFA / R&A• GFT
8Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
C3P Classic
CAT
IA V
5I-D
eas
IMI 2IMI 2
Business Challenges (Contd.) – Learning curve effects with a large scale technology transformation
Business Challenges (Contd.) – Learning curve effects with a large scale technology transformation
Teamcenter Engineering Teamcenter Enterprise
CA
D
auth
orin
g
CAD to JT
ETS (Engineering Translation Services)
I-Dea
s
•Migration to Single PDM•Dual CAD Authoring Managed in Team Center Engineering•Supplier Access via Next Generation Environment
Supplier
SupplierTDM TDM
C3P NG
9Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business challenges (Contd.)
Powertrain suppliers are located in geographically disparate locations (Europe, India, China)
Suppliers are connected to the Tce sites which are in their proximity. For eg. suppliers in Germany are connected to Tce in Merkenich / Cologne depending on their proximity to these sites.
New PLM tools seem to be bringing the suppliers closer to the OEMs ….. but need reasonable amount of process changes for seamless data sharing
NA *
Europe
10Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Business challenges (Contd.) :Process of Data SharingFord/GM Transmission Joint Venture Example
TeamCenter(G-iMAN)
UnigraphicsNX
TeamCenterEngineering
OOtB
NX 3Unix
TDM
I-DEAS
Metaphase
ANX FDX
External
IMI
PC UserJT data
PD & Mfg Eng.
Vehicle DigitalBuck
ServerPDV
DigitaBuck Tool
C3PClassic for
Interop.
References NX data, converts into I-DEAS
JT data in P/T position
Internal
Ford Suppliers
TCe NG
IMI 2
11Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Technical Challenges
Suppliers located in Europe, China, India are connected to the Tce sites in their proximity
Vehicle teams of other brands, needing data from FNA powertrains are connected to Tce sites in their geography.
Data that these teams need from other sites need to be imported or replicated at their sites in a timely fashion.
Manually importing large assemblies is a tedious task and is also subject to latency issues due to data traffic.
Data from suppliers need to be staged
Supplier data has to be tessellated
Data translation from OOTB NX to Ideas so that it can be shared with the vehicle teams that are using C3PNG.
12Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Addressing the challenges
Main Objective:Return on Assets
ApproachProductization approach, by standardizing operations on the portfolio of tools availableRearrangement of the configuration of physical assets and processes in the value chain
DriversMaximize value creation and minimize costs
increase the utilization of the fixed cost components (PLM systems, hardware)Improve dividends (returns) from the capital already invested in the PLM solution
13Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Tactical and Strategic measures
Tactical measures (Interim)
Automated data transfer processes to better utilize the systems (fixed cost components) and minimized manual data pull and push (variable cost components)
to improve data flow with suppliers and other CBGs for the interim and also to
to be positioned to scale up to cater to the data demands until a strategic solution is launched
Strategic measure (for the future)
‘Synergy’ Project
14Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data sharing process for the Suppliers
PT Supplier sourced for an
Engine/Transmission program
Supplier is connected to the proximal Ford-Tce installation
PTO Program needing the data
creates a placeholder to
share data
Transfer group ownership of the
placeholder to the supplier
Multi-site the placeholder to the site where the supplier is
connected
Send reference data in the form
of a Design Solution
Supplier utilizes the data for
background info.
Supplier designs components and adds the data to the placeholder in the FOE site
Powertrain -North America has the data
needed
data sync setup to multisite the
data to sites where data is
needed
15Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Powertrain Supplier Place Holder
PT Program
VSS Node
Node
Node
Supplier_cad
Collaboration
PDN Deliverables
CAE Deliverables
Node
ECS
030100
EBOM
030102
030101
MP (Carry Over Master Package)V
030000
• Every Powertrain supplier has a placeholder that is attached to an associated product structure to store the data
GEN-PSS-PGM-1132100/1-supplier_x
16Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data transfer process with a supplier
FNA Tce environment
FOE Tce environment
FNA TCe
FOE TCe
Supplier 1
Automatic data sync
Ford Environment
Manual data check-in
Background data referenced
17Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data sharing process with other Ford Business Units
Vehicle team needing the
data contacts PTO
The site that the CBG is
connected to is identified
PTO Program
providing the data creates a placeholder
Multi-site the PT-external
placeholder to the site to which the
other CBG is connected
Receive reference data in the form of a
Design Solution
for positioning the powertrain components
PTO designs components and adds the data to the placeholder in the FOE site
Other CBG has the data
needed
data sync setup to multisite the
data to sites where data is
needed
18Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Ford Business Unit Place Holder
PT Program
VSS Node
Node
Node
PT-external
Collaboration
PDN Deliverables
CAE Deliverables
Node
ECS
030100
EBOM
030102
030101
MP (Carry Over Master Package)V
030000
• Every CBG to which Powertrain is providing data has a placeholder that is attached to an associated product structure
GEN-PSS-PGM-1132100/1-CBG_x
PT-CAD
Node
19Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data transfer Process with Other Business Units
Automatic data sync
Background data referenced
CAT
IA V
5
I-Dea
s
FOA TCEFNA Tce
PTO positions components in the context of vehicle data
and attaches it to the placeholder
Automatic data sync
20Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Piloting New Approach
The mentioned implementation has now equipped us with lessons and provides us the opportunity to scale up gradually to enable data sharing with other CBGS and other suppliers in this data sharing approach
Additionally, Powertrain organization is looking into a new approach called ‘synergy’ project, based on jt-only data sharing
21Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Data Flow (Synergy)
1. Create Work Assy2. Export Data
1. Analyze Data2. Import Data
1. Design in Context2. Save to TC2005
C3PNGClient
PTO 2005SR1 ClientExchange
Manager
C3PNGClient
PTO 2005SR1 Client
ExchangeManager
1. Design review1. Export Data2. Analyze Data3. Import Data
1. Evaluate Design from PTO
22Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
The Raw Data
JT: Roughly 10% of CAD data
Double precision NURB geometry included
Single PLMXML structure file
23Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Solution Architecture
TeamcenterRich Client
TeamcenterRich Client
FordC3P-NG
Tce 9.1.3.4Exchange Manager
Server
SupplierTeamcenter
2005 SR1
ExchangeManager
Exchange Manager leverages the existing infrastructure with no required changes to the current C3P-NG certified solution
Exchange Manager client can be run form anywhere within the supplier LAN while still leveraging the most efficient high bandwidth connection to the OEM
6F/6F-Mid Teamcenter is OOTB data model –key metadata is mapped to the proper location based on configurable intelligent table
2005 SR1 will be connected to 6F/6F Mid database
24Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Solution Architecture
TeamcenterRich Client
TeamcenterRich Client
FordC3P-NG
Tce 9.1.3.4Data Exchange
Server
SupplierTeamcenter
2005 SR1
ExchangeManager
Exchange Manager support both in process as well as batched transfer, and structure only vs. structure with geometry
Supplier Teamcenter’s OOTB data model –key metadata is mapped to the proper location based on configurable intelligent table
25Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Benefits to Ford Suppliers
1. Provides local data management solution
Unlimited
Comprehensive
Multi-CAD capable
Latest generation
2. Enables asynchronous data transfer work flow enhanced with JT (Data Manager/Release Analyst Role)
3. Provides platform for supplier internal PLM processes and workflows
4. Greatly reduce costs related to bandwidth for OEM connectivity.
26Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Benefits to Ford
1. No need to upgrade to a new release.2. Eliminates load on the ETS server to tessellate supplier data3. Jt reduces the disk space required for supplier data4. Greatly reduces the time a supplier needs to go from source to
productively supporting the program5. Throughput increase as supplier data no longer needs to be:
StagedTranslated, Cleaned and Re-validated prior to delivery
6. Decreases the scope/risk involved with each C3PNG upgrade7. Broadens the supplier market with more entrants in both
infrastructure and geography
27Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Results
improved collaboration and increased utilization of the fixed cost components (PLM systems, hardware) andShortened time needed to collaborate data between suppliers and the powertrain programs shorter setup times to prepare data that has to be shared along the value chain Improved operational efficiency and increased throughput with out the need for huge resource requirements.Utilization of down time by making sure these automated processes are scheduled during low load on the servers (physical assets)Reduced operational complexity from automation of the data transfer (using data sync and data lists)Increased flexibility while lowered costs.Directly affects profits by controlling the cost side of the equationTaken together it shows the management team's decision to improve return by optimizing the logistics and the collaboration processes.
28Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Q & A
29Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Appendix
30Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Synergy Pilot at Powertrain
Data Sharing (PLMXML)Item can be replicated only with JTLoad into CAD with JT only componentsLoad IDEAS assembly containing parts that have JT only datasetsLoad CATIA v5 assemblies containing parts that have JT only datasetsLoad UG-NX assemblies containing parts that have JT only datasetsLoad IDEAS assemblies containing sub assemblies that have JT only for componentsLoad UG-NX assemblies containing sub assemblies that have JT only for componentsLoad CATIA v5 assemblies containing sub assemblies that have JT only for componentsSave in CAD with JT only componentsSave IDEAS assembly containing parts that have JT only datasetsSave UG-NX assembly containing parts that have JT only datasetsSave CATIA v5 assembly containing parts that have JT only datasetsSave IDEAS assembly containing sub assemblies that have JT only for componentsSave UG-NX assembly containing sub assemblies that have JT only for componentsSave CATIA v5 assembly containing sub assemblies that have JT only for components
31Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Synergy Pilot
NG Actions on Hybrid AssembliesFreeze New Revision on a Item that has only JT datasetCreate New Revision on a Item that has only JT datasetFreeze on Hybrid I-DEAS assembly with components that contain only JTFreeze on Hybrid CATIA v5 assembly with components that contain only JTCreate New Revision on Hybrid IDEAS/Catia V5 assembly with components that
contain only JTConstrain assembly in I-DEAS/CATIA V5 using JT created from UG-NXWorking on Hybrid assembly in the publication workflow
ETS Handling of an Hybrid AssemblySending Hybrid IDEAS assembly for on-demand JT tessellationSending Hybrid CATIA v5 assembly for on-demand JT tessellationSending Hybrid IDEAS assembly for on-demand CAD2CAD translationSending Hybrid CATIA v5 assembly for on-demand CAD2CAD tessellation
32Unraveling Data Sharing Challenges to Improve Collaboration at Global Ford Powertrain
Synergy Pilot
Working with WorkflowsEstablish workflow with 6F/6F Mid supplier Items containing JT only
Follow workflow process for at least one complete cycle
Log any issues / concerns
Working with End Item ConfigurationsIdentify limitations of JT only usage Identify any business requirements related to geometry requirementsLog any issues / concerns Identify any improvements required
Working with Positional / Motion FilesComplete a transfer of JT data in and out of Ford TcEng with PositionIdentify any limitations of Positional data received from 6F/6F-MidIdentify any limitations of Positional data sent to 6F/6F-Mid supplierDefine assembly constraints and save into TcEng for reuseIdentify any improvements required for Positional dataIdentify any limitations of Motion data received from Engine