Preliminary Design of Bank Management Areas South River Phase 1A 1 Update – Preliminary Design of Phase 1A Bank Management Areas Clay Patmont, Anchor QEA August 2015

Upload: others

Post on 23-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 1

Update – Preliminary Design of Phase 1A Bank Management Areas

Clay Patmont, Anchor QEA August 2015

Page 2: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 2

Overview

• Phased implementation • Pre-design data collection • Primary and secondary BMAs • Preliminary design concepts • Next steps

Page 3: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 3

Planned Interim RCRA Corrective Actions

In-channel Sediments

Consumers

Corrective Actions to

Address Site Outfalls

Risk Assessments and Relative Risk Modeling

Incorporated into Adaptive Management

IHg

IHg MeHg

MeHg MeHg

Bank Management Areas (BMAs)

Food Web Recent Legacy

IHg Site Outfalls

Near-bank Sediments

Bank Soils

Notes: IHg – inorganic mercury MeHg – methylmercury

Page 4: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 4

Phased Implementation in Upper 2 Miles

Roughly 90% of total mercury load to first 2 river miles attributable to 25% of banks

• Phase 1A – City of Waynesboro-owned

bank management areas (BMAs) in upper 2 miles

– Pre-design data collection – Ongoing discussions with

City of Waynesboro on remedy scope

• Phase 1B – Non-City owned BMAs in

upper 2 miles – Remedy scope informed

by outcome of Phase 1A

Page 5: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 5

Pre-Design Data Collection

• Objectives: – Refine extent of Phase 1A BMAs – Optimize remedy elements

• Supplemental core sampling • Geotechnical analyses • Tree surveys • Utility surveys

Page 6: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 6

BMA Remedies Based on Mercury Loading

• Primary BMAs – Approximately 5% of banks

represent roughly 50% of total Hg loading from banks

– Localized removal and replanting

• Secondary BMAs – Approximately 20% of banks

represent roughly 40% of total Hg loading from banks (i.e., 90% from Primary + Secondary)

– Enhanced vegetative stabilization

Cumulative total mercury loading from banks to first 2 river miles

Page 7: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 7

Bank Remediation Areas in Upper 2 Miles

Page 8: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 8

Constitution Park BMA Remediation Areas

Page 9: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 9

Constitution Park Primary BMA Removal Section

• Gravel Bed

Page 10: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 10

Constitution Park Primary BMA Restoration Section

Page 11: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 11

Constitution Park Secondary BMA Section

Page 12: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 12

WWTP BMA Remediation Areas

Page 13: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 13

WWTP Primary BMA Removal Section

• Gravel Bed • Bedrock

Page 14: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 14

WWTP Primary BMA Restoration Section

Page 15: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 15

WWTP Secondary BMA Section

Page 16: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 16

Path Forward • Ongoing conceptual design

refinement with stakeholders • Mid-September – preliminary

Phase 1A design report – Follow-on City/Agency reviews

• Late September – pre-application permit meeting – Permit applications submitted by

late 2015

• Early 2016 – final design, access agreements, and permitting – Begin construction in spring 2016

Page 17: Update – Preliminary Design of Phase 1A Bank Management Areas · Update – Preliminary Design of Phase 1A Bank Management Areas . Clay Patmont, Anchor QEA . August 2015 . Preliminary

Preliminary Design of Bank Management Areas South River Phase 1A 17

Questions/Discussion