US Army Corps of Engineers BUILDING STRONG ® Update March 2017: Juvenile Fish Bypass Construction, Adult PIT Arrays, and Monitoring of Post- construction Temperature Reduction and Sound/Vibration on Adult Salmon Passage through the Lower Granite ladder. Chris Pinney Fish Biologist Tim Wik Project Manager Ryan Laughery Hydraulic Engineer David Trachtenbarg Fish Biologist

Upload: others

Post on 18-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

US Army Corps of Engineers

BUILDING STRONG®

Update March 2017: Juvenile Fish Bypass Construction, Adult PIT Arrays, and Monitoring of Post-

construction Temperature Reduction and Sound/Vibration on Adult Salmon

Passage through the Lower Granite ladder.

Chris Pinney Fish Biologist

Tim Wik Project Manager

Ryan Laughery Hydraulic Engineer

David Trachtenbarg Fish Biologist

Page 2: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Water Temperature Monitoring ~9 locations adjusted from 2013/2014 in 2015/2016

http://www.nwd-wc.usace.army.mil/ftppub/water_quality/tempstrings/

Master Unit

5 sensors @

Surface

5 feet

10 feet

30 feet

80 feet

Page 3: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

0

1

2

3

4

5

6

7

Perc

en

t S

pil

l

Fo

reb

ay t

o T

ailra

ce T

em

pera

ture

D

iffe

ren

tial

Temp. Diff. Percent spill

0

5

10

15

20

25

30

35

40

45

50

17

18

19

20

21

22

23

24

25

26

So

ckeye P

assag

e

Tem

pera

ture

d

eg

C

Sockeye passage Forebay TempC Tailrace TempC

7/14-15/2013 hydraulic survey

for new outfall placement:

7/14 TU2, 50% spill split

7/15 SS5kcfs TU5, 27 kcfs

spill

2013 Lower Granite Dam

Page 4: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

http://www.nwd-wc.usace.army.mil/ftppub/water_quality/tempstrings/LWG_S1_2013_07.html

Page 5: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Lower Granite Dam forebay face circa 1974

Page 6: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 7: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 8: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Lower Granite Juvenile Fish

Bypass System (JFF Upgrade)

Phase 1A

► Turbine gatewell orifices to JFF juvenile fish separator

• Construction began late 2014

• Project Completion - March 2018

Phase 1b

► Primary outfall pipe redesign and relocation

• Construction ~November 2016 to March 2018

Page 9: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Phase 1A

Page 10: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Draft S&V Characterization Report out January 2017.

Final S&V Characterization Report due 30 March 2017.

Draft Adult Salmon Passage Behavior Response Report due 30 March

2017 for ~45 day Review.

Page 11: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Lower Granite Monitoring Locations

Lower Ladder

PIT Antenna

Weir 648

Middle Ladder

Accelerometers

Weirs 691-698

Upper Ladder

Accelerometers

Weirs 734-737

Lower Ladder

Accelerometers

Upper Ladder

Tunnel Pit

Antenna

FEB 2016 install

Temperature structures =

Adult Trap expected 2016

fully operational w/o

closure limits through

JUN-SEP due to

Temperature

Page 12: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 13: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Figure 10

Peak Acceleration Magnitudes Observed in the Upper Section of the Fishway, September 29

Through October 4, 2015

Figure 9

Peak Acceleration Magnitudes Observed in the Middle Section of the Fishway, September 29

Through October 4, 2015

Note:

The salmonid behavioral response threshold (horizontal black line) is 80 dB//1 µm/s2.

Figure 8

Peak Acceleration Magnitudes Observed in the Lower Section of the Fishway, September 29

Through October 4, 2015

Note:

The salmonid behavioral response threshold (horizontal black line) is 80 dB//1 µm/s2.

Table 1

Percent of Peak Acceleration Values that Exceeded the Salmonid Behavioral Response

Threshold by Time, Activity, and Location

Activity Period

Fishway Monitoring Location

Upper Middle Lower

Non-Construction Day 26.52 99.96 0.01

Non-Construction Night 31.53 99.96 0.02

Construction Day 24.38 99.97 0.06

Construction Night 34.53 99.96 0.26

Note:

Salmonid behavioral response threshold is 80 dB//1 µm/s2.

Page 14: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 15: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 16: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Average Shower OFFShower ON

1030 to 1030 6/5/2016 6/6/2016

Trap 60.43076 61.41671

TurnPool 61.35462 61.68118

Diffuser 62.62913 61.95598

Exit 62.52031 61.86045

FBExitS 62.9941 62.40244

FBExitN 63.1809 61.80992

Differential 1.165694 0.179268

60

61

62

63

64

65

66

10:0

0

11:0

0

12:0

0

13:0

0

14:0

01

5:0

0

16:0

0

17:0

0

18:0

0

19:0

02

0:0

0

21:0

0

22:0

0

23:0

00

:00

1:0

0

2:0

0

3:0

0

4:0

05

:00

6:0

0

7:0

0

8:0

0

9:0

01

0:0

0

10:5

5

11:5

5

12:5

5

13:5

51

4:5

5

15:5

5

16:5

5

17:5

5

18:5

51

9:5

5

20:5

5

21:5

5

22:5

5

23:5

50

:55

1:5

5

2:5

5

3:5

54

:55

5:5

5

6:5

5

6/5/20166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/5/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/6/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

166/7/20

16

Exit Diffuser Turn Pool

Lower Granite Dam Ladder Exit Test – Day 1 (first 24 hrs)

Response

Page 17: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 18: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 19: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Table 1. Status of PIT‐tagged Chinook, sockeye, and steelhead in the Lower Granite Dam fishway, 2015.

Trapped and tagged Routed through trap Unrestricted passage

Species Name Run Name N Row % N Row % N Row %

Chinook Fall 0 0.0% 1,667 98.0% 34 2.0%

Spring 2,604 58.9% 1,682 38.0% 137 3.1%

Summer 393 40.0% 374 38.1% 215 21.9%

Unknown 0 0.0% 1,151 92.0% 100 8.0%

All 2,997 35.9% 4,874 58.3% 486 5.8%

Sockeye Summer 0 0.0% 6 20.0% 24 80.0%

All 0 0.0% 6 20.0% 24 80.0%

Steelhead N/A 0 0.0% 6 75.0% 2 25.0%

Resident 0 0.0% 2 100.0% 0 0.0%

Summer 4,536 59.6% 2,932 38.5% 146 1.9%

Unknown 0 0.00% 106 84.1% 20 15.9%

All 4,536 58.5% 3,046 39.3% 168 2.2%

All All 7,533 46.7% 7,926 49.1% 678 4.2%

Page 20: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Figure 1. Box plots of passage duration (from entrance to exit) of PIT-

tagged adult Chinook salmon at Lower Granite Dam in 2016 by day of

week prior to August 18. Whiskers represent Q1 – 1.5 × interquartile

range or Q3 + 1.5 × interquartile range; the box encompasses Quartile

1, Quartile 2 (median, shown by transparent line), and Quartile 3.

Positive outliers and maximum values are not shown to focus on a

scale representing a majority of passage events. Delays are

significantly different between weekdays (with trapping) and

weekends (Median Test, p < 0.001).

Figure 2. Box plots of passage duration (from entrance to exit) of PIT-

tagged adult Chinook salmon at Lower Granite Dam in 2016 by day of

week after August 18. Whiskers represent Q1 – 1.5 × interquartile range

or Q3 + 1.5 × interquartile range; the box encompasses Quartile 1,

Quartile 2 (median, shown by transparent line), and Quartile 3. Positive

outliers and maximum values are not shown to focus on a scale

representing a majority of passage events. Delays are not significantly

longer on weekdays than weekends (Median Test, p = 0.098);

although delays are significantly than prior to August 18 (p < 0.001).

Page 21: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®

Page 22: Update March 2017 Annual Meeting... · FEB 2016 install Temperature structures = Adult Trap expected 2016 fully operational w/o closure limits through JUN-SEP due to Temperature

BUILDING STRONG®