Update on Trigger simulation. Spasimir Balev /CERN/ 13.07.2011. Introduction. The rate with ideal CHOD_Q0 signal was 200 kHz. What we learned:. The “default” rate with ideal CHOD_Q0: 200 kHz The “default” rate with realistic CHOD_Q0: 500 kHz - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Update on Trigger simulation

Update on Trigger simulation

Spasimir Balev/CERN/

13.07.2011

Page 2: Update on Trigger simulation

2

Introduction

13/7/2011The rate with ideal CHOD_Q0 signal was 200 kHz

Page 3: Update on Trigger simulation

3

What we learned:• The “default” rate with ideal CHOD_Q0: 200 kHz• The “default” rate with realistic CHOD_Q0: 500 kHz• We can no longer play with simple kinematics signals• Taking into account the interactions in the trigger simulation is important

• All but ~60 kHz of this (500 kHz) rate is junk decays happening after Z = 165 m.• Realistic and not so realistic solutions:

– put SAC and IRC or STRAW at L0 not feasible;– use RICH reconstruction at L0 a drastic improvement which will allow fairly simple cuts in CHOD;– play with CHOD multiplicity complicated signals; interplay between signal and junk triggers losses;

requires well established analysis procedure getting in shape, but still key ingredients missing…

• We can not survive without CHOD: the output L0 rate becomes ~1 MHz, with significant halo contribution (mainly from p+m+ upstream GTK3)

• The purpose of this talk:– to get an idea of optimal CHOD design in terms of trigger rates– quantify the effect on L0 output rate with different signals

13/7/2011

Page 4: Update on Trigger simulation

4

CHOD acceptances

• NA48 CHODNot in |X|,|Y|<130 mm|X|,|Y|<1210 mm+ octragon

• Analysis CHOD150 < R < 1080 mm

• Trigger CHODAnalysis CHODR(350 mm,0) < 1080 mmNot in |Y|<130 mmand -130 < X < 400 mmm

13/7/2011

p+ from pnn @CHOD after all cuts

The trigger CHOD cut costs only0.8% of the signal

Page 5: Update on Trigger simulation

5

CHOD pseudo-digitization• At the moment, no digitization is available in NA62FW for CHOD• In order to check the rates, we need to define signals

– Kinematic signal count every charged particle from K+ decay, or halo muon– Realistic signal see below

• The energy deposits are available for each single hit in NA62MC.• One charged particle can produce many “hits” (single energy deposit), which

are stored separately with their coordinates, energy, time.• This is useful to study any possible design (given that CHOD consists of two

planes with 2 cm thick vinyltoluene)

• Recipe for realistic signal construction:– add each energy deposit within a single channel;– define a signal from this channel if the total energy deposit is Etot>2 MeV.

13/7/2011

Page 6: Update on Trigger simulation

6

Example for the NA48 designOne pp0 event:p+ and one g reach LKrthe other g converts at theend of the RICH

See the backsplashes from LKr:

13/7/2011

x,mm

y,mm

Edep, MeV

Edep, MeV Edep, MeV

Edep, MeV

thit – t0, ns

Page 7: Update on Trigger simulation

7

The backsplashes

13/7/2011

Ehit, MeV

t hit –

t 0, ns

CHOD H and V planesBacksplashes from IRC

Backsplashes from LKr

single charged track pair?

Complicated timeprofile of CHOD hits

Page 8: Update on Trigger simulation

8

Rates calculation• Two designs studied:

– the NA48 CHOD with 2 planes of vertical and horizontal slabs (64 + 64) with varying size: 6.5 cm width in the central area and 9.9 cm in the peripheral;

– tiles design: 6.5x6.5 cm2 in the central area; 6.5x9.9 and 9.9x9.9 cm2 in the peripheral.

• Two types of rates studied:– kinematical rate (for comparison purposes)– real rate (taking into account the interactions)

• All the components simulated:– K+ decays downstream GTK3 (6 main decay modes)– p+ beam (with pm decays enabled) after GTK3– halo and non-halo muons from K± and p± decays upstream GTK3

• Detailed rates by components given at MUV3/CHOD meeting; here – only the summary

13/7/2011

Page 9: Update on Trigger simulation

9

Rates - SummaryKi

nem

atics

sign

als

Real signalskHz kHz

kHzkHz

13/7/2011

Page 10: Update on Trigger simulation

1013/7/2011

CHOD optimal designy CH

OD,

mm

xCHOD, mm

Page 11: Update on Trigger simulation

11

Signal acceptance

• The generated quantities used here (reconstructed in progress)

• Total number of generated pnn events: ~105

• Total number in 105 < Z < 165 m range: 79 5991. 15 < P < 35 GeV 37.5%2. No pm decay 34.7%3. 15 < RCHOD < 108 cm 29.6%4. !LAV, RICH, LKR, !IRC, !SAC acc. 28.9%5. MM2 cut 16.6%

13/7/2011

Page 12: Update on Trigger simulation

12

p+ interactions

8.1% of selected events are with p+

interacting before reaching CHOD13/7/2011

Zint, m

Rint, mm

Page 13: Update on Trigger simulation

13

p+ interaction example

13/7/2011

LKR display

CHOD display

x, mm

y, mm Ecell, MeVEhit, MeV

16 crossing points

The signal event mimics pp0 decay.What the reconstruction will see?

Page 14: Update on Trigger simulation

14

A glimpse to the trigger ratesDefault signals: CHOD * !MUV3 * RICH5 * !RICH40 * !LKR * !LAV12

13/7/2011

CHOD signal Rate of signal[kHz]

L0 rate[kHz]

Signal loss[%]

Signal lossEout<500 MeV

CHOD_ACC_Q0 9916 212 3.6%

CHOD_ACC_TR_Q0 7928 166 4.5%

CHOD_Q0 11580 489 4.6% 1.9%CHOD_Q1 9309 258 10.2% 4.9%

CHOD_Q0 * !CHOD_QX 9909 314 6.5% 2.5%

CHOD_TR_Q0 9493 402 5.7% 3.1%

CHOD_TR_Q1 7692 214 10.0% 5.0%

CHOD_TR_Q0 * !CHOD_TR_QX 8212 264 7.1% 3.5%

CHOD_X14 10018 286 9.1% 2.9%CHOD_X16 10337 315 8.2% 2.5%

CHOD_NSLABS_10 11496 390 5.8% 1.2%

CHOD_NSLABS_8 10620 324 8.7% 2.2%

Ideal

RealNA48 acc.

Realtrigger acc.

Multiplicitycuts

0 at least 1 quadrant; 1 exactly one quadrant; X two opposite quadrantsX14(X16) number of crossing points between 1 and 4(6)For signal loss: all cuts applied for the normalizationEout < 500 MeV energy in LKr outside a circle with 20 cm radius around the p+ (cell threshold 100 MeV)

Page 15: Update on Trigger simulation

15

Put CHOD time in the game• Italo’s idea [to be presented at MUV3/CHOD meeting]:

– use two planes with horizontal tiles with the same geometry;– in the trigger use the time coincidence of the single tile from the first plane and the corresponding tile in the

second plane, or the neighbouring ones;– suppress the rate from backsplashes or interacting photons.

• Try simple implementation of the idea with the existing tools:– segment CHOD as in the 32 x 32 “tiles” design (much finer segmentation than what we will have only to test

the effect in extreme case);– for each tile count the minimum time of hits above the threshold (1 MeV);– no resolution smearing applied times ideally computed by G4– construct a signal from a given pair of tiles from 1st and 2nd planes (including the neighbouring ones) if Dt < 5 ns

• ~1.5% of the selected pnn are without a signal (8.5% if the 2 neighbouring tiles in the second plane are ignored).

• Multiplicity signals defined:– Nt total number of tile pairs– Nq total number of quadrant with tile pairs giving a signal

13/7/2011

Page 16: Update on Trigger simulation

16

Trigger rates

Default signals: CHOD * !MUV3 * RICH5 * !RICH40 * !LKR * !LAV12

13/7/2011

CHOD signal Rate of signal[kHz]

L0 rate[kHz]

Signal loss[%]

Signal lossEout<500 MeV

0 < Nt < 3 7812 222 6.9% 2.1%

0 < Nt < 4 8133 241 6.0% 2.0%

0 < Nt < 5 8267 259 5.4% 2.0%

Nq = 1 7400 202 6.4% 2.4%

Significantly better separation for signal and background, leading to acceptable rate. However, this is a much finer segmentation than what we will have to be investigated.

No effect from 5 ns 2 ns time difference between the two planesStrong dependency on the Energy threshold due to the way the process of energy loss is simulated.

Page 17: Update on Trigger simulation

17

CHOD multiplicity rates [summary]

13/7/2011

Page 18: Update on Trigger simulation

18

Summary• The design of the new CHOD could be optimized for efficient triggering

purpouses a suitable segmentation can allow to exclude areas, not populated by the signal at high intensities.

• With more complicated CHOD signals it is possible to keep the L0 output rate at 200-300 kHz for the main trigger, without RICH. It is still mainly junk, however…

• This is (almost) the maximum with the tools available at the moment.

• To progress further in trigger simulation it is needed:– Overlay MC– reasonable LKr reconstruction– CHOD digitization and reconstruction– multi-ring RICH reconstruction– MUV1/2/3 reconstruction

13/7/2011

Page 19: Update on Trigger simulation

19

S P A R E S

13/7/2011

Page 20: Update on Trigger simulation

20

CHOD studies for pnn

• 13242 events in analysis cuts:– 1.4% (182 events) with 0 crossings– 92.2% (12208 events) with 1-4 crossings

(80% with 1 crossing point)– 6.4% (852 events) with more than 4 crossings– 9% (1231 events) with Eout > 500 MeV

• 1083 (8.2%) with interactions before CHOD– 0.5% (61 events) with 0 crossings– 2.5% (329 events) with 1-4 crossings– 5.2% (693 events) with more than 4 crossings:

• 0.5% (63 events) are with Eout < 500 MeV• 4.7% (630 events) are with Eout > 500 MeV

– 6.3% (863 events) with Eout > 500 MeV

• Eout is the total LKr energy outside 20 cm around the impact point of p+ if Ecell > 100 MeV

• 12159 (91.8%) w/o interactions before CHOD– 0.9% (121 events) with 0 crossings– 89.5% (11879 events) with 1-4 crossings– 1.2% (159 events) with more than 4 crossings– 2.8% (368 events) with Eout > 500 MeV

• Using 1-4 crossing points or Eout > 500 MeV cut, the signal acceptance goes to 15% (from 16.6%)

• 18% of the good events are with more than 1 crossing point

• To be compared with 30% obtained by Gianluca on 2007 data (1 track + 1 cluster)

13/7/2011