updated list 5-19-2010 - · pdf fileupdated list 5-19-2010 subject id pdf? ... 587 no wyoming...

25
UPDATED LIST 5-19-2010 SUBJECT Title Year Consultant ID PDF? CIP CIP 1979-1981 1979 COA PWD 779 No CIP 1989 CLEANUP REQUESTS 1989 COA PWD 774 No CIP CLEAN UP 1987 1987 COA PWD 391 No CIP CLEANUP 1988, STORM DRAINAGE PROGRAM STATUS REPORT 1988 COA PWD 770 No CIP PROGRAM, PWD, RESULTS APRIL 1988 CLEANUP, 1988 COA PWD 771 No CIP PROGRESS REPORT 1983 1983 COA PWD 773 No CIP PROJECT TRANSFERS 1987 1987 COA PWD 264 No CIP, DISCUSSION REPORT OCTOBER 1988 CLEANUP 1988 COA PWS 800 No CIP, OCTOBER 1988 CLEANUP 1988 COA PWS 801 No CIP, PROJECT TRANSFERS JUNE 1987, COA PWS 1987 COA PWS 799 No CIP, PROJECT TRANSFERS NOVEMBER 1988 1988 COA PWS 802 No CIP, PWD, PROJECT TRANSFERS 1988 1988 COA PWD 772 No CIP, RESULTS APRIL 1987 CLEANUP, COA PUBLIC WORKS 1987 COA 798 No CLOSE OUT PACKAGE DOMINGO BACA ARROYO PH 2, CLOSE OUT PACKAGE, PROJECT # 6258.92, CERTIFIED PAYROLL REPORTS 2001 SMITH ENGINEERING 646 No DOMINGO BACA ARROYO PH 2, CLOSE-OUT PACKAGE, PROJECT # 6258.92, VOL 1 2005 SMITH ENGINEERING 724 No DOMINGO BACA ARROYO PH 2, CLOSE-OUT PACKAGE, PROJECT # 6258.92, VOL 2 2005 SMITH ENGINEERING 725 No DOMINGO BACA ARROYO PH 2, CLOSE-OUT PACKAGE, PROJECT # 6258.92, VOL 3 PHOTOS 2005 SMITH ENGINEERING 726 No DOMINGO BACA, APPLICATIONS FOR PAYMENT 2001 SMITH ENGINEERING 643 No DOMINGO BACA, BID TABS AND AWARDA 2001 SMITH ENGINEERING 636 No DOMINGO BACA, BIDDING 2001 SMITH ENGINEERING 635 No DOMINGO BACA, CHANGE ORDERS 2001 SMITH ENGINEERING 642 No DOMINGO BACA, DAILY REPORTS 2001 SMITH ENGINEERING 641 No DOMINGO BACA, LOW STRENGTH CONCRETE 2001 SMITH ENGINEERING 645 No DOMINGO BACA, MEETING MINUTES 2001 SMITH ENGINEERING 639 No DOMINGO BACA, PRE CONSTRUCTION CONFERENCE 2001 SMITH ENGINEERING 637 No DOMINGO BACA, PROJECT FILES 2001 SMITH ENGINEERING 638 No DOMINGO BACA, SUBMITTALS 2001 SMITH ENGINEERING 640 No DOMINGO BACA, TEST RESULT 2001 SMITH ENGINEERING 644 No MECHEM STORM DRAIN & DETENTION BASIN CLOSE-OUT-PACKAGE PROJECT # 6825.91, VOL 1 2005 SMITH ENGINEERING 727 No MECHEM STORM DRAIN & DETENTION BASIN CLOSE-OUT-PACKAGE PROJECT # 6825.91, VOL 2 2005 SMITH ENGINEERING 728 No NORTH 2ND STREET STORM DRAIN IMPROVEMENTS, PROJECT # 4271-92, CLOSEOUT PACKAGE, VOL 1 2005 LARKIN GROUP 756 No Page 1 of 25

Upload: truongnhan

Post on 26-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

UPDATED LIST 5-19-2010SUBJECT Title Year ConsultantID PDF?CIP

CIP 1979-1981 1979 COA PWD779 NoCIP 1989 CLEANUP REQUESTS 1989 COA PWD774 NoCIP CLEAN UP 1987 1987 COA PWD391 NoCIP CLEANUP 1988, STORM DRAINAGE PROGRAM STATUS REPORT 1988 COA PWD770 NoCIP PROGRAM, PWD, RESULTS APRIL 1988 CLEANUP, 1988 COA PWD771 NoCIP PROGRESS REPORT 1983 1983 COA PWD773 NoCIP PROJECT TRANSFERS 1987 1987 COA PWD264 NoCIP, DISCUSSION REPORT OCTOBER 1988 CLEANUP 1988 COA PWS800 NoCIP, OCTOBER 1988 CLEANUP 1988 COA PWS801 NoCIP, PROJECT TRANSFERS JUNE 1987, COA PWS 1987 COA PWS799 NoCIP, PROJECT TRANSFERS NOVEMBER 1988 1988 COA PWS802 NoCIP, PWD, PROJECT TRANSFERS 1988 1988 COA PWD772 NoCIP, RESULTS APRIL 1987 CLEANUP, COA PUBLIC WORKS 1987 COA798 No

CLOSE OUT PACKAGEDOMINGO BACA ARROYO PH 2, CLOSE OUT PACKAGE, PROJECT # 6258.92, CERTIFIED PAYROLL REPORTS 2001 SMITH ENGINEERING646 NoDOMINGO BACA ARROYO PH 2, CLOSE-OUT PACKAGE, PROJECT # 6258.92, VOL 1 2005 SMITH ENGINEERING724 NoDOMINGO BACA ARROYO PH 2, CLOSE-OUT PACKAGE, PROJECT # 6258.92, VOL 2 2005 SMITH ENGINEERING725 NoDOMINGO BACA ARROYO PH 2, CLOSE-OUT PACKAGE, PROJECT # 6258.92, VOL 3 PHOTOS 2005 SMITH ENGINEERING726 NoDOMINGO BACA, APPLICATIONS FOR PAYMENT 2001 SMITH ENGINEERING643 NoDOMINGO BACA, BID TABS AND AWARDA 2001 SMITH ENGINEERING636 NoDOMINGO BACA, BIDDING 2001 SMITH ENGINEERING635 NoDOMINGO BACA, CHANGE ORDERS 2001 SMITH ENGINEERING642 NoDOMINGO BACA, DAILY REPORTS 2001 SMITH ENGINEERING641 NoDOMINGO BACA, LOW STRENGTH CONCRETE 2001 SMITH ENGINEERING645 NoDOMINGO BACA, MEETING MINUTES 2001 SMITH ENGINEERING639 NoDOMINGO BACA, PRE CONSTRUCTION CONFERENCE 2001 SMITH ENGINEERING637 NoDOMINGO BACA, PROJECT FILES 2001 SMITH ENGINEERING638 NoDOMINGO BACA, SUBMITTALS 2001 SMITH ENGINEERING640 NoDOMINGO BACA, TEST RESULT 2001 SMITH ENGINEERING644 NoMECHEM STORM DRAIN & DETENTION BASIN CLOSE-OUT-PACKAGE PROJECT # 6825.91, VOL 1 2005 SMITH ENGINEERING727 NoMECHEM STORM DRAIN & DETENTION BASIN CLOSE-OUT-PACKAGE PROJECT # 6825.91, VOL 2 2005 SMITH ENGINEERING728 NoNORTH 2ND STREET STORM DRAIN IMPROVEMENTS, PROJECT # 4271-92, CLOSEOUT PACKAGE, VOL 1 2005 LARKIN GROUP756 No

Page 1 of 25

SUBJECT Title Year ConsultantID PDF?NORTH 2ND STREET STORM DRAIN IMPROVEMENTS, PROJECT # 4271-92, CLOSEOUT PACKAGE, VOL 1 2005 LARKIN GROUP757 NoSAN PEDRO COLLECTORS CLOSE-OUT PACKAGE PROJECT NO 7168.02, PHOTOS ,VOL 3 2005 SMITH ENGINEERING734 NoSAN PEDRO COLLECTORS CLOSE-OUT PACKAGE PROJECT NO 7168.02, VOL 1 2005 SMITH ENGINEERING732 NoSAN PEDRO COLLECTORS CLOSE-OUT PACKAGE PROJECT NO 7168.02, VOL 2 2005 SMITH ENGINEERING733 NoVALLEY GARDENS DAILY REPORTS SUBMITTALS ENTRY PERMIT / TEMP WORK, PROJECT # 6238.92 2002 SMITH ENGINEERING718 NoVALLEY GARDENS STREET TICKETS, PROJECT # 6238.92, PART 1 2002 SMITH ENGINEERING720 NoVALLEY GARDENS STREET TICKETS, PROJECT # 6238.92, PART 2 2002 SMITH ENGINEERING721 NoVALLEY GARDENS TEST RESULTS, PROJECT # 6238.92 2002 SMITH ENGINEERING719 NoVALLEY GARDENS TREES PLANT REPLAT INFO SHEET, PROJECT # 6238.92 2002 SMITH ENGINEERING722 No

CONTRACT DOCUMENT/PROJECT MANUALAMOLE DEL NORTE DIVERSION FACILITY CHANNEL AND CHANNEL CROSSING STRUCTURES 1982 BOYLE ENGINEERING532 NoBRYN MAWR STORM DRAIN IMPROVEMENTS, PROJECT MANUAL FOR, PROJECT NO. 781505 2007 SMITH ENGINEERING568 NoCHANNEL REPAIR MAINTENANCE, DRAINAGE , CONTRACT DOCUMENTS DRAWINGS 1983 DMD64 NoCLAREMONT, CANDELARIA, AND 2ND STREET NORTH STORM DRAINAGE IMPROVEMENTS PHASE 1 PROJ NO. 4271.90 1993 SCANLON & ASS510 NoCOMMERCIAL, CANDELARIA, CLAREMONT & BROADWAY STORM DRAIN IMPROVEMENTS 1998 ANDREWS, ASBURY & ROBERT52 NoEUBANK DRAINAGE (AMDS 360-01) PHASE II SPECIFICATIONS AND CONTRACT DOCUMENTS PROJECT # 737802 2004 URS496 NoEUBANK,SOUTH, COCHITI RD TO BELL AVENUE 1999 SMITH ENGINEERING198 NoHAHN ARROYO UPGRADE PROJECT NO. 676709, CONTRACT DOCUMENTS FOR 2005 DMJM270 NoI-40 / SAN MATEO INTERCHANGE, SUPPLEMENTAL DETAILED EVALUATION OF ALTERNATIVES STUDY FOR 2006 BOHANNAN-HUSTON367 NoLAND PROTECTION PLAN PETROGLYPH NATION MONUMENT 1991 NATIONAL PARK SERVICES & C415 NoLOUISIANA BICYCLE PEDESRRIAN OVERCROSSINGB AND TRAILS, CAQ - ( I ) - 040 - 3(135)163 CONTROL BNO 3655, PRELIMINARY, NOT FOR CONSTRUCTION

1998 GANNETT FLEMING WEST788 No

LOWE'S OF NW ALBUQUERQUE DRAINAGE AND ROADWAY IMPROVEMENTS PROJECT NO. 676691, PROJECT MANUAL FOR

2002 WILSON & COMPANY791 No

NORTH 2ND STREET STORM DRAIN IMPROVEMENTS, PROJECT # 4271-92 2004 LARKIN498 NoPUMP STATION 37 REHABILITATION,CONTRACT DOCUMENTS FOR STORM WATER, 2002 MOLZEN-CORBIN572 NoPUMP STATION REHABILITION PHASE 3, STORM WATER, COA PROJ NO 4682.90, VOL 1 OF 2, MECANICAL AND ELECTRICAL SPECS

2004 INDUSTRIAL ELECTRIC AUTOM525 No

PUMP STATION REHABILITION PHASE 3, STORM WATER, COA PROJ NO 4682.90, VOL 2 OF 2, DRAWINGS 2004 INDUSTRIAL ELECTRIC AUTOM526 NoPUMPING STATION & COLLECTION SYSTEM, ALCALDE STORM WATER, SPECIFICATION AND CONTRACT DOCUMENTS FOR CONSTRUCTION OF,

1982 GORDON HERKENHOFF & ASS22 No

PUMPING STATIONS, REHABILITATION, STORM WATER, PHASE I ,CONTRACT DOCUMENTS AND SPECIFICATION 1985 BOVAY ENGINEERS166 NoSECOND ST & ODELIA PHASE 1, SPECIFICATIONS AND CONTRACT DOCUMENTS 1996 ANDREWS, ASBURY & ROBERT557 NoSECOND ST & ODELIA, STORM DRAIN IMPROVEMENTS, - PHASE 1, SPECIFICATIONS AND CONTRACT DOCUMENTS 1994

1994 ANDREWS, ASBURY & ROBERT556 No

SECOND ST & ODELIA, STORM DRAIN IMPROVEMENTS, - PHASE 1, SPECIFICATIONS AND CONTRACT DOCUMENTS 1997

1997 ANDREWS, ASBURY & ROBERT558 No

SOUTHEAST HEIGHTS STORM DRAINAGE IMPROVEMENTS SYSTEM 206-01A, SPECIFICATION AND CONTRACT DOCUMENTS

1982 ANDREWS, ASBURY & ROBERT749 No

Page 2 of 25

SUBJECT Title Year ConsultantID PDF?SOUTHEAST VALLEY DRAIN STSTEM 1968 GORDON HERKENHOFF & ASS531 NoSPAIN ROAD DRAINAGE CROSSING 1994 KEMPER-VAUGHAN210 NoSTADIUM BLVD STORM DRAIN PHASE 3 CONTRACT 4495.91, CONTRACT DOCUMENTS AND SPECIFICATION 1998 BOHANNAN-HUSTON573 NoTOWER / SAGE PARK DETENTION POND AND OUTFALL PIPE 2001 LARKIN GROUP280 NoTRANSMISSION LINE #2, COA DRINKING WATER PROJECT BURTON PUMP STATION TO OSUNA 2003 ASCG425 NoWELL DRAIN LINES - 1976, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CONSTRUCTION OF, 1976 GORDON HERKENHOFF751 NoWEST BLUFF DRAINAGE OUTFALL 1987 BOHANNAN-HUSTON254 NoWEST BLUFF OUTFALL, PHASE 2A, WEST I-40 DIVERSION 1996 SMITH ENGINEERING501 NoWESTGATE DETENTION DAM, SPECIFICATIONS, WESTERN METROPOLITAN DRAINAGE SYSTEM, AMAFCA, FOR REVIEW ONLY

1976 WILLIAM MATOTAN782 No

WYOMING STORM DRAIN AND LANE WIDENING ASPEN TO NORTHEASTERN PROJECT #576891 2004 URS497 NoWYOMING STORM DRAIN AND LANE WIDENING, VOL 1 OF 2 2005 URS586 NoWYOMING STORM DRAIN AND LANE WIDENING, VOL 2 OF 2 2005 URS587 No

DAMSDAM #15, LADERA, FINAL HYDROLOGY & SEDIMENT ISSUE 1991 BOHANNAN-HUSTON121 NoDAM DESIGN, CONSTRUCTION AND DAM SAFETEY, RULES AND REGULATIONS GOVERNING, 2005 NMOSE764 YesDAM OWNER PROGRAM, A ONE-DAY COURSE TO INTRODUCE DAM OWNERS TO DAM ENGINEERING 2008 ASDASO583 NoDAM OWNER'S GUIDANCE MANUAL,A, NEW MEXICO EDITION 1989 NM STATE ENGINEER OFFICE584 YesDAM SAFETY DESIGN AND OPERATION CRITERIA 2003 NMOSE762 YesDAM SAFETY INSPECTION TRAINING 2008 PAUL OLSON582 YesDAM SAFETY OFFICIAL, ASSOCIATION OF STATE, 2008 ASDSO MEMBERSHIP DIRECTORY 2008 ASDSO690 NoDAM SAFETY OFFICIAL, ASSOCIATION OF STATE, 2009 ASDSO MEMBERSHIP DIRECTORY 2009 ASDOS691 NoDAM SAFETY WORKSHOP FOR DAM OWNERS AND OPERATORS 2006 ASDASO585 NoDAM SAFETY, FEDERAL GUIDELINES FOR,EARTHQUAKE ANALYSES AND DESIGN OF DAMS 2005 FEMA763 YesDAM SAFETY, THE JOURNAL, VOL 7, ISSUE 3, 2009 2009 AOSDSO702 NoDAMS AND PUBLIC SAFETY 1983 US DEPT OF THE INTERIOR707 NoDAMS,PUMPS,PONDS, STORM DRAINAGE FACILITIES, VOL 1 2009 DMD, COA570 YesMANINTENANCE OF EXISTING AND FUTURE STORM WATER CONVEYANCES IN THE MIDDLE RIO GRANDE, NEW MEXICO 2004 SWCA386 NoOPERATION & MAINTENANCE MANUAL FOR CITY OF ALBUQUERQUE JURISIDICTIONAL DAMS - UNAPPROVED DRAFT 2007 DMD564 Yes

DATAAERIAL VIEW OF ALBUQUERQUE 1988, 300 SHEETS OF 9" X 9" HIGH QUALITY PHOTO PRINTS 1988 KOOGLE & POULS682 NoDIRECTORY, 1996 POLK CROSS-REFERENCE, ALBUQUERQUE CITY AREA WIDE ADDRESS 1996 POLK735 NoFINANCIAL REPORT,COA COMPREHENSIVE ANNUAL, 2005 TO 2006 2006 MOSS-ADAMS542 NoMAPS BOOK, ALBUQUERQUE STORM DRAIN 1989 LARGE SIZE 12 X 18 IN 1989 COA797 NoNEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1990 1991 USGS619 No

Page 3 of 25

SUBJECT Title Year ConsultantID PDF?NEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1994 1995 USGS620 NoNEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1995 1996 USGS621 NoNEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1996 1997 USGS622 NoNEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1997 1998 USGS623 NoNEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1998, VOL 1, THE RIO GRANDE BASIN, THE MIMBRES RIVER BASIN, AND THE TULAROSA VALLEY BASIN

1999 USGS624 No

NEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1999, VOL 1, THE RIO GRANDE BASIN, THE MIMBRES RIVER BASIN, AND THE TULAROSA VALLEY BASIN

2000 USGS625 No

NEW MEXICO, WATER RESOURCES DATA, WATER YEAR 1999, VOL 2, THE ARKANSAS RIVER BASIN, THE SAN JUAN RIVER, THE GILA RIVER BASIN, AND GROUND-WATER WELLS

2000 USGS626 No

NEW MEXICO, WATER RESOURCES DATA, WATER YEAR 2000 2001 USGS627 NoRAINFALL AND RUNOFF DATA FOR THE ALBUQUERQUE METROOLITAN AREA, 1987-88 1993 AMAFCA392 NoRAINFALL AND RUNOFF DATA FOR THE ALBUQUERQUE METROPOLITAN AREA, 1984-88 1993 USGS628 NoRAINFALL AND RUNOFF DATA FOR THE ALBUQUERQUE, METROPOLITAN AREA, 1976 - 83 1984 USGS630 NoRAINFALL, RUNOFF, AND WATER-QUALITY DATA FOR THE ALBUQ. METROPOLITAN AREA, WATER YEAR 2004 2004 USGS377 NoRAINFALL, RUNOFF, AND WATER-QUALITY DATA SUMMARY FOR THE ALBUQUERQUE, WATER YEAR 2001 2002 USGS546 No

DRAINAGE DESIGN/PLAN/REPORT/STUDYEUBANK, SOUTH, AMENDMENT #1 1998 SMITH ENGINEERING195 NoISLETA BLVD PHASE I DRAFT DRAINAGE SCOPING REPORT 2001 LARKIN GROUP109 NoPASEO DEL VOLCAN 1993 BOHANNAN-HUSTON165 NoSAD-215, DRAINAGE ANALYSIS REPORT SPECIAL ASSESSMENT DISTRICT NO. 215 UNSER BLV AND 98TH ST. 1986 GRIENER ENGINEERING178 No

DRAINAGE MANAGEMENT/MASTER PLANAMAFCA DRAINAGE FACILITIES PLANNING REVIEW, DRAFT D 2004 ASCG381 NoAMAFCA DRAINAGE FACILITY AND PLANNING REVIEW, WORK IN PROGRESS REVIEW 2000 LEEDSHILL-HERKENHOFF538 NoAMAFCA PROJECTS SCHEDULE FOR FY 2010 2009 AMAFCA775 YesAMDRS, MASTER DRAINAGE STUDY, RESTUDY OF ALBUQUERQUE VOL 2, EXISTING CONDITION REPORT 1987 BOHANNAN-HUSTON362 NoAMDRS, MASTER DRAINAGE STUDY, RESTUDY OF ALBUQUERQUE , VOLUME 2, FINAL DEVELOPED CONDITIONS 1987 BOHANNAN-HUSTON15 YesAMDS, ALBUQUERQUE MASTER DRAINAGE STUDY VOL 2 1981 BOHANNAN-HUSTON473 NoAMDS, ALBUQUERQUE MASTER DRAINAGE STUDY VOL 3 1981 BOHANNAN-HUSTON474 NoAMDS, ALBUQUERQUE MASTER DRAINAGE STUDY VOL1 1981 BOHANNAN-HUSTON472 YesAMDS, ALBUQUERQUE MASTER DRAINAGE STUDY, SURVEY DATA AREA 2 & 5 1977 BOHANNAN-HUSTON486 NoAMOLE ARROYO REVISIONS TO THE AMOLE-HUBBELL DRAINAGE MANAGEMENT PLAN 2003 ISAACSON & ARFMAN288 NoAMOLE ARROYO WESTGATE DAM DRAINAGE MANAGEMENT 1991 SCALON & ASSOCIATES23 NoAMOLE DEL NORTE STORM DIVERSION FACILITIES TIERRA BAYITA DRAINAGE FACILITIES, PRELIMINARY DESIGN REOPORT FOR

1990 GREINER421 No

AMOLE WATERSHED 1986 HOLMES & NARVER448 NoAMOLE WATERSHED DRAINAGE MANAGEMENT PLAN NOVEMBER EXISTING CONDITION REPORT 1985 HOLMES & NARVER30 No

Page 4 of 25

SUBJECT Title Year ConsultantID PDF?AMOLE WATERSHED DRAINAGE MANAGEMENT PLAN REVISED IMPROVED CONDITION 1986 HOLMES & NARVER31 NoARROYOS, FACILITY PLAN FOR 1986 COA - PLANNING78 NoBEAR CANYON ARROYO CORRIDOR PLAN 1991 COA373 NoBLACK ARROYO DRAINAGE MANAGEMENT STUDY 1986 BOHANNAN-HUSTON44 NoBLACK ARROYO WATERSHED MANAGEMENT PLAN 2002 ASCG399 NoBOCA NEGRA - MARIPOSA ARROYO DRAINAGE MANAGEMENT PLAN 2005 RESOURCE TECHNOLOGY351 NoBOCA NEGRA - MARIPOSA ARROYO DRAINAGE MANAGEMENT PLAN, APPENDICIES 2005 RESOURCE TECHNOLOGY352 NoBOCA NEGRA - MARIPOSA ARROYO DRAINAGE MANAGEMENT PLAN; PRELIMINARY DRAFT 2004 RESOURCE TECHNOLOGY308 NoBOCA NEGRA-MARIPOSA ARROYO DRAINAGE MANAGEMENT PLAN 2005 RESOURCE TECHNOLOGY424 NoCHAMISA PROJECT LYONS DIVERSION/WEST PIEDRAS MARCADAS STORM DRAIN 2003 TIERRA WEST315 NoCHICO AND MORRIS STORM DRAIN DIVERSION PROJECT 2002 HDR ENGINEERING364 NoCLAREMONT DETENTION BASIN IMPROVEMENTS - PHASE 1 1995 ANDREWS, ASBURY & ROBERT298 YesCOORS, NORTH , DRAINAGE MANAGEMENT PLAN VOLUME 1 COST ESTIMATES 1984 SCANLON & ASS145 NoCOORS, NORTH SOUTH, CONNECTION DRAINAGE MANAGEMENT STUDY 1983 DENNEY-GROSS & ASS150 NoCOORS, NORTH, DRAINAGE MANAGEMENT PLAN MIDDLE ARE HYDRAULICS SEDIMENT CONTROL 1997 SMITH ENGINEERING144 NoDOMINGO BACA ARROYOS AND PASEO DEL NORTE CORRIDOR DRAINAGE MANAGEMENT PLAN 1991 RESOURCE TECHNOLOGY60 YesDOMINGO BACA PARK MASTER DEVELOPMENT PLAN, NORTH 2005 DMD348 NoHIGH DESERT DEVELOPMENT CONCEPTUAL DRAINAGE MANAGEMENT PLAN FEBRUARY 1992 REVISED AUGUST 1993 1993 BOHANNAN-HUSTON93 NoHIGH DESERT DEVELOPMENT CONCEPTUAL DRAINAGE MANAGEMENT PLAN TECHNICAL REPORT 1992 BOHANNAN-HUSTON94 NoHIGH DESERT DRAINAGE MANAGEMENT MASTER PLAN 1993 BOHANNAN-HUSTON101 NoHIGH DESERT DRAINAGE MANAGEMENT MASTER PLAN 1993 BOHANNAN-HUSTON96 NoHIGH DESERT SECTOR DEVELOPMENT PLAN, VOLUME 1 1993 HERBERT M. DENISH & ASS603 NoISLETA DRAIN, DRAINAGE MASTER PLAN 1990 WILSON & COMPANY274 NoLA CUEVA AND EL CAMINO ARROYOS DRAINAGE MANAGEMENT STUDY 1983 BOHANNAN-HUSTON119 NoLA CUEVA EL CAMINO & NORTH CAMINO ARROYOS DRAINAGE FACILITY PLAN 1999 RESOURCE TECHNOLOGY120 NoLYON BOULEVARD STORM DRAIN 2002 BOHANNAN-HUSTON464 NoNORTH ALBUQUERQUE ACRES MASTER DRAINAGE PLAN PROJECT NO 5662-01 REVISED DRAFT 1998 RESOURCE TECHNOLOGY398 NoNORTH ALBUQUERQUE ACRES MASTER DRAINAGE PLAN, FINAL - VOL. III LA CUEVA ARROYO, LA CUEVA DIVERSION & LA CUEVA TRIBUTARY (OUTPUT FILES)

1998 RESOURCE TECHNOLOGY326 No

NORTH ALBUQUERQUE ACRES MASTER DRAINAGE PLAN, FINAL - PROJECT NO 5662-01 1998 RESOURCE TECHNOLOGY299 NoNORTH ALBUQUERQUE ACRES MASTER DRAINAGE PLAN, FINAL - VOL. 1 HYDROLOGY FILES (INPUT FILES) INCLUDES 7 (3.5) DISKETTES

1998 RESOURCE TECHNOLOGY324 No

NORTH ALBUQUERQUE ACRES MASTER DRAINAGE PLAN, FINAL - VOL. II NORTH DOMINGO BACA ARROYO (OUTPUT FILES)

1998 RESOURCE TECHNOLOGY325 No

NORTH ALBUQUERQUE ACRES MASTER DRAINAGE PLAN, FINAL - VOL. IV EL CAMINO & N. CAMINO ARROYOS (OUTPUT FILES)

1998 RESOURCE TECHNOLOGY327 No

NORTH ALBUQUERQUE ACRES SANDIA HEIGHTS DRAINAGE STUDY PHASES I & II 1998 RESOURCE TECHNOLOGY140 No

Page 5 of 25

SUBJECT Title Year ConsultantID PDF?NORTH DOMINGO BACA PARK MASTER PLAN DRAINAGE REPORT 2004 SMITH ENGINEERING406 NoNORTH VALLEY DRAINAGE MANAGEMENT PLAN PHASE 2/3 2000 SMITH ENGINEERING151 NoNORTHEAS HEIGHTS, FAR, MASTER DRAINAGE PLAN FINAL PHASEIII FUTURE CONDITIONS AND PROPOSED IMPROVEMENTS

1989 WESTON456 Yes

NORTHEAST HEIGHTS DRAINAGE MANAGEMENT PLAN MAIN REPORT FOR ARROYO DE DOMINGO BACA LA CUEVA ARROYO EL CAMINO ARROYO N EL CAMINO ARROYO

1980 ESPEY-HUSTON & ASS158 No

NORTHEAST HEIGHTS MASTER DRAINAGE PLAN FINAL PHASE I REPORT, FAR 1986 WESTON353 NoNORTHEAST HEIGHTS, FAR, MASTER DRAINAGE PLAN FINAL PHASE II EXISTING CONDITIONS 1987 WESTON455 YesNORTHWEST DRAINAGE MANAGEMENT PLAN, FAR , FINAL REPORT 1986 BOHANNAN-HUSTON79 NoNORTHWEST DRAINAGE MANAGEMENT PLAN, FAR, HYDROLOGIC ANALYSIS COMPUTER OUTPUT 1985 BOHANNAN-HUSTON80 NoNORTHWEST MESA DRAINAGE MANAGEMENT PLAN, FUTURE CONDITIONS AND PROPOSED IMPROVEMENTS 1989 SCANLON & ASS458 NoNORTWEST MESA DRAINAGE MANAGEMENT PLAN, EXISTING REPORTS 1987 SCANLON & ASS459 NoOSUNA RD SECOND ST THROUGH NORTH DIVERSION CHANNEL, REVISED DRAINAGE REPORT FOR 1988 ESP365 NoPIEDRAS MARCADAS DRAINAGE MANAGEMENT PLAN REVISION; DRAFT 1993 MOLZEN-CORBIN & ASS341 NoPIEDRAS MARCADAS WATERSHED AND LYON BLVD. (PASEO DEL NORTE) 2003 BOHANNAN-HUSTON317 NoPIEDRAS MARCADAS WATERSHED AND LYON BOULEVARD 2003 BOHANNAN HUSTON462 NoPUBLIC OPINION SURVEY ON STORM-WATER CONVEYANCE, AMAFCA 1980 HERBERT & ASS500 NoRIO GRANDE AND TRIBUTARIES ALBUQUERQUE AND VICINITY, REVIEW REPORT ON SURVEY FOR FLOOD CONTROL 1953 USACE565 NoRIO GRANDE FLOOD PROTECTION, MIDDLE, BERNALILLO TO BELEN, NM, ENVIRONMENTAL STATEMENT, DRAFT 1978 USACE617 NoRIO GRANDE FLOOD PROTECTION, MIDDLE, BERNALILLO TO BELEN, NM, INTERM FEASIBILITY REPORT, VOL 3, APPENDICES D-E-F, COMMENTS AND RESPONSES, HYDROLOGY AND HYDRULICS, AND FISH AND WILDLIFE CONSIDRATIONS

1979 USACE660 No

SANDIA CONSERVANCY DISTRICT,THE MASTER PLAN REPORT FOR THE, 1955 FREESE & NICHOLS, AND GORD566 NoSNOW VISTA DIVERSION, 98TH AND CENTRAL PONDS 2005 URS346 YesSOUTH BROADWAY SECTOR DRAINAGE MANAGEMENT PLAN DEVELOPED CONDITIONS REPORT 1990 BOHANNAN-HUSTON457 NoSOUTH BROADWAY SECTOR DRAINAGE MANAGEMENT PLAN, DRAFT DEVELOPED CONDITIONS REPORT 1990 BOHANNAN-HUSTON438 NoSOUTHEAST VALLEY DRAINAGE MANAGEMENT PLAN 1986 WILSON AND COMPANY433 NoSOUTHEAST VALLEY DRAINAGE MANAGEMENT PLAN FAR SOUTHEAST VALLEY AND TRIBUTARY AREA TO EAST 1988 WILSON AND COMPANY432 NoSOUTHWEST DRAINAGE MANAGEMENT PLAN, PRELIMINARY INVESTIGATION OF THE ALTERNATES 1991 ANDREWS, ASBURY & ROBERT278 NoTIJERAS ARROYO CORRIDOR PLAN 1990 COA374 NoTIJERAS ARROYO PHASE 1 1987 LEEDSHILL-HERKENHOFF229 NoTIJERAS ARROYO PHASE 2, 1988 DRAFT 1988 LEEDSHILL-HERKENHOFF217 NoTIJERAS ARROYO PHASE 2, 1990 1990 LEEDSHILL-HERKENHOFF230 NoTIJERAS ARROYO PHASE 2, DRAFT DRAINAGE MANAGEMENT PLAN 1988 LEEDSHILL-HERKENHOFF228 NoTIJERAS ARROYO PHASE 2, SUPPLEMENTAL REPORT 1989 LEEDSHILL-HERKENHOFF227 NoTIJERAS ARROYO PHASE 2, SUPPLEMENTAL REPORT & APPENDIX 1989 LEEDSHILL-HERKENHOFF218 NoTIJERAS ARROYO PHASE I APPRENDIX VOL 1 1987 LEEDSHILL-HERKENHOFF231 No

Page 6 of 25

SUBJECT Title Year ConsultantID PDF?TIJERAS ARROYO PHASE I, APPENDIX VOL 2 1987 LEEDSHILL-HERKENHOFF232 NoTIJERAS ARROYO, DRAINAGE MANAGEMENT PLAN AMAFCA 1981 BOVAY ENGINEERS215 NoTOWER / SAGE DRAINAGE MASTER PLAN; AMOLE DEL NORTE STORM DRAINAGE FACILITIES 1995 ANDREWS, ASBURY & ROBERT336 NoTRAILHEAD SUBDIVISION, REVISED REPORT 1994 BOHANNAN-HUSTON234 NoTRAMWAY EAST S CENTRAL N OF I-40 TO LOMAS 1975 BOHANNAN WESTMAN HUSTON233 NoTRAMWAY EAST, PRELIMINARY PLANS FOR STORM DRAINAGE FACILITIES 1975 BOHANNAN WESTMAN HUSTON281 NoUNSER BLVD NORTH 1990 LEEDSHILL-HERKENHOFF242 NoUPTOWN AREA, APPENDICES 1 THRU 8 1990 LEEDSHILL-HERKENHOFF247 NoUPTOWN AREA, DRAINAGE REPORT 1990 LEEDSHILL-HERKENHOFF246 NoUPTOWN, INDIAN SCHOOL STORM DRAIN DIVERSION 1987 LEEDSHILL-HERKENHOFF245 NoWEST BLUFF DRAINAGE PLAN PHASE 1 REVISED MARCH 23, 1984 1984 ANDREWS, ASBURY & ROBERT776 NoWEST I- 40 DIVERSION DRAINAGE MANAGEMENT PLAN DRAFT 2000 BOHANNAN-HUSTON307 NoWEST I-40 DIVERSION 1996 BOHANNAN-HUSTON259 NoWEST I-40 DIVERSION 1999 BOHANNAN-HUSTON449 NoWEST I-40 DMP VOL 2 AMAFCA, FINAL HYDROLOGY 2000 BOHANNAN-HUSTON443 NoWESTERN ALBUQUERQUE METROPOLITAN AREA DRAINAGE MANAGEMENT PLAN 1974 WILLIAM MATOTAN & ASS284 NoWESTERN ALBUQUERQUE METROPOLITAN AREA, APPENDIX , PRELIMINARY 1974 WILLIAM MOTOTAN & ASS261 NoWESTERN ALBUQUERQUE METROPOLITAN AREA, VOLUME 1 1975 WILLIAM MATOTAN & ASS260 NoYALE FROM STADIUM TO GIBSON DRAINAGE STUDY 1984 WILLIAM MATOTAN & ASS263 No

DRAINAGE STUDIES/ANALYSIS/REPORTAHYMO (AHYMO_97) COMPUTER PROGRAM USER'S MANUAL ( AN ARID-LAND HYDROLOGIC MODEL) A PROGRAM BASED ON THE A.R.S. HYMO COMPUTER PROGRAM

1997 ANDERSON-HYDRO139 Yes

AHYMO (AHYMO_S4) COMPUTER PROGRAM USER'S MANUAL ( AN ARID-LAND HYDROLOGIC MODEL) A PROGRAM BASED ON THE A.R.S. HYMO COMPUTER PROGRAM

2009 ANDERSON-HYDRO760 Yes

ALAMEDA & RIVERSIDE DRAINS ENGINEERING ANALYSIS 1991 DRAFT,TECHNICAL APPENDICES, VOL 2 1991 LEEDSHILL-HERKENHOFF7 YesALAMEDA & RIVERSIDE DRAINS ENGINEERING ANALYSIS, 1990 DRAFT VOL 1 1990 LEEDSHILL-HERKENHOFF2 YesALAMEDA & RIVERSIDE DRAINS ENGINEERING ANALYSIS, 1990 DRAFT VOL 2 1990 LEEDSHILL-HERKENHOFF3 YesALAMEDA & RIVERSIDE DRAINS SYSTEMS DESIGN REPORT 1992 ISAACSON & ARFMAN9 YesALAMEDA & RIVERSIDE DRAINS TO CONTROL URBAN STORMWATER FLOWS 1987 WEISS-HINES ENGINEERING10 YesALAMEDA & RIVERSIDE DRAINS, ENGINEERING ANALYSIS, VOL 1, LARGE SIZE REPORT 1991 LEEDSHILL-HERKENHOFF590 NoALAMEDA & RIVERSIDE DRAINS, PROPOSAL TO PROVIDE ENGINEERING ANALYSIS TO 1988 LEEDSHILL-HERKENHOFF1 YesALAMEDA AND RIVERSIDE DRAINS ENGINEERING ALALYSIS, MENUAL / MILDRED DRAINAGE IMPROVEMENTS, SUPPLEMENT DRAFT

1991 LEEDSHILL-HERKENHOFF305 No

ALAMEDA AND RIVERSIDE DRAINS ENGINNERING ANALYSIS, ENVIORNMENTAL ASSESSMENT FOR, 1993 DRAFT VOL 3 1993 LEEDSHILL-HERENHOFF454 NoAMAFCA PROJECTS SCHEDULE FOR FY2008 2007 AMAFCA484 NoAMDRS, ALBUQUERQUE MASTER DRAINAGE RESTUDY, VOL 2 A - M, DEVELOPED CONDITIONS, HYMO OUTPUT 1987 BOHANNAN-HUSTON650 NoAMDRS, ALBUQUERQUE MASTER DRAINAGE RESTUDY, VOL 2 A-M, EXISTING CONDITIONS, HYMO OUTPUT 1986 BOHANNAN-HUSTON648 No

Page 7 of 25

SUBJECT Title Year ConsultantID PDF?AMDRS, ALBUQUERQUE MASTER DRAINAGE RESTUDY, VOL 2 MM - Z, DATA FOR HYMO CALIBRATION 1986 BOHANNAN-HUSTON652 NoAMDRS, ALBUQUERQUE MASTER DRAINAGE RESTUDY, VOL 2 MM - Z, DEVELOPED CONDITIONS, HYMO OUTPUT 1987 BOHANNAN-HUSTON651 NoAMDRS, ALBUQUERQUE MASTER DRAINAGE RESTUDY, VOL 2 MM - Z, EXISTING CONDITIONS, HYMO OUTPUT 1986 BOHANNAN-HUSTON649 NoAMDRS, MASTER DRAINAGE STUDY, RESTUDY OF ALBUQUERQUE, EXISTING CONDITIONS HYMO OUTPUT 1986 BOHANNAN-HUSTON225 YesAMDS CHANNEL CROSS SECTION DATA 1978 BOHANNAN-HUSTON504 NoAMDS STORM MANHOLES VOL 1 1977 BOHANNAN-HUSTON502 NoAMDS STORM MANHOLES VOL 2 1979 BOHANNAN-HUSTON503 NoAMDS, ALBUQUERQUE MASTER DRAINAGE STUDY 76-145 SURVEY DATA 1977 BOHANNAN-HUSTON505 NoAMOLE DEL NORTE STORM DIDERSION FACILITIES, CALCULATIONS FOR - PHASE IIIA & B 1993 GREINER355 NoAMOLE DEL NORTE STORM DIVERSION FACILITY ENGINEERS REPORT 1980 BOYLE ENGINEERING24 NoAMOLE DEL NORTE STORM DIVERSION FACILITY FEBRUARY RE-EVALUATION 1985 BOYLE ENGINEERING25 NoAMOLE DEL NORTE STORM DIVERSION FACILITY FINAL DESIGN, TIERRA BAYITA DRAINAGE 1998 URS GREINER26 YesAMOLE DEL NORTE STORM DIVERSION FACILITY FROM AMOLE BASIN TO BRIDGE 1986 BOYLE ENGINEERING27 NoAMOLE DEL NORTE STORM DIVERSION FACILITY PHASES 1 & 2 DESIGN ANALYSIS REPORT 1985 BOYLE ENGINEERING28 NoAMOLE DEL NORTE STORM DIVERSION FACILITY RE-EVALUATION STUDY 1984 BOYLE ENGINEERING29 NoAMOLE HUBBER VOLUME I 1998 LEEDSHILL-HERKENHOFF16 NoARENAL ROAD STORM DRAIN SYSTEM, REVISED DESIGN REPORT 1997 ISAACSON & ARFMAN588 NoARROYOS PROTECTION SYSTEM, EAST SIDE, PHASE 1, PRELIMINARY DESIGN 1975 BOHANNAN-HUSTON67 NoARROYOS FEASIBILITY STUDY, ALBUQUERQUE 1995 USACE AND AMAFCA266 NoARROYOS, ALBUQUERQUE, FLOOD PLAIN INFORMATION, PART 1 1970 USACE613 NoARROYOS, ALBUQUERQUE, FLOOD PLAIN INFORMATION, PART 1, REVISED FEB 1974 1974 USACE614 NoARROYOS, ALBUQUERQUE, FLOOD PLAIN INFORMATION, PART 2 1971 USACE615 NoARROYOS, ALBUQUERQUE, FLOOD PLAIN INFORMATION, PART 3 1976 USACE616 NoARROYOS, ALBUQUERQUE, FLOOD PLAIN INFORMATION, PART 5 1975 USACE657 NoARROYOS, EAST SIDE - PHASE V, PRELIMINARY DESIGN 1981 BOHANNAN-HUSTON66 NoARROYOS, FACILITY PLAN FOR 1986 COA375 NoATRISCO AREA PLAN REVIEW OF DRAINAGE CRITERIA, EL RANCHO 1980 TRINITY ENTERPRISES70 NoBEAR ARROYO DRAINAGE REPORT 1986 BOHANNAN-HUSTON35 NoBEAR ARROYO TRIBUTARY E. TRAMWAY DRAINAGE REPORT 1984 TOM MANN & ASS36 NoBEAR ARROYO TRIBUTARY PRELIMINARY ENGINEERING REPORT 1983 MSM / SP GROUP37 NoBEAR CANYON ARROYO AT EUBANK. DIVERSE DRAINAGE IMPROVEMENTS 1997 LEEDSHILL-HERKENHOFF38 NoBEAR CANYON ARROYO CHANNEL IMPROVEMENTS CONCEPT DESIGN REPORT 1987 LEEDSHILL-HERKENHOFF39 NoBEAR CANYON ARROYO CORRIDOR PLAN 1991 COA PLANNING DEP40 NoBEAR CANYON ARROYO FLOOD INUNDATION ANALYSIS 1992 ATC ENGINEERING42 No

Page 8 of 25

SUBJECT Title Year ConsultantID PDF?BEAR CANYON ARROYO FROM WYOMING TO EUBANK DRAINAGE ANALYSIS 1989 RESOURCE TECHNOLOGY43 NoBLACK ARROYO GOLF COURSE ROAD N. COUNTY LINE, AMAFCA 1990 BOHANNON-HUSTON45 NoBOCA NEGRA - MARIPOSA ARROYO DRAINAGE MANAGEMENT PLAN PRELIMINARY REPORT 2005 RESOURCE TECHNOLOGY490 NoBOCA NEGRA - MARIPOSA ARROYOS 2002 RESOUCE TECHNOLOGY265 NoBOSQUE RESTORATION MIDDLE RIO GRANDE RECONNAISSANCE STUDY SECTION 905(B) ANALYSIS 2002 BOHANNAN-HUSTON411 NoBROADWAY BLVD. STORM DRAIN KINLEY TO MOUNTAIN 1990 GANNETT FLEMING WEST48 NoBROADWAY, SOUTH, DETENTION BASIN ANALYSIS PHASE REPORT 1991 RESOURCE TECHNOLOGY193 NoCACTUS HILLS SUBDIVISION, DRAINAGE REPORT FOR 1993 MARK GOODWIN790 YesCALABACILLAS ARROYO BANK STABILITY STUDY 1986 LEEDSHILL-HERKENHOFF49 NoCAMPUS WASH DRAINAGE BASIN 2008 SMITH ENGINEERING465 NoCAMPUS WASH DRAINAGE BASIN APENDIX VOL 1 2008 SMITH ENGINEERING466 NoCAMPUS WASH DRAINAGE BASIN APPENDIX VOL 2 2008 SMITH ENGINEERING467 NoCAMPUS WASH DRAINAGE BASIN APPENDIX VOL 3 2008 SMITH ENGINEERING468 NoCAMPUS WASH DRAINAGE BASIN APPENDIX VOL 4 2008 SMITH ENGINEERING469 NoCAMPUS WASH STORM SEWER 1977 GORDON HERKENHOFF & ASS50 NoCANDELARIA-HAHN DRAINAGE REPORT 2004 SMITH ENGINEERING279 YesCENTRAL - CHURCHILL DIVERSION PROJECT 2004 LARKIN GROUP314 NoCENTRAL-ATRISCO DRAINAGE IMPROVEMENTS PROJECT 2003 LARKIN GROUP51 NoCHANNEL MAINTENANCE PROGRAM JOINT REPAIR, DRAINAGE , REVIEW ONLY 1983 DMD65 NoCHANNEL REHABILITATION FINAL REPORT, STORM DRAINAGE, PROJECT NO. 4171 1991 GREINER342 NoCHANNEL REHABILITATION, STORM DRAINAGE 1992 GREINER ENGINEERING211 NoCIP, STORM DRAINAGE, CAPITAL IMPROVEMENTS PROGRAM, 1989 MULTI-YEAR, DECADE PLANNING 1989 TO 2000 1988 COA553 NoCLAREMONT, CANDELARIA AND 2ND ST NORTH STORM DRAIN IMPROVEMENTS, PHASE 1, DESIGN ANALYSIS REPORT 1991 SCALON & ASSOCIATES754 NoCLAREMONT, CANDELARIA AND 2ND ST NORTH STORM DRAIN IMPROVEMENTS, PHASE 2, DESIGN ANALYSIS REPORT 1992 SCALON & ASSOCIATES755 NoCLAREMONT, CANDELARIA AND 2ND ST NORTH STORM DRAIN IMPROVEMENTS, PROJECT NO 4271, PROPOSAL TO PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR

1991 SCALON & ASSOCIATES753 No

CLAREMONT, CANDELARIA AND 2ND ST NORTH STORM DRAIN IMPROVEMENTS, PROPOSAL 1991 LEEDSHILL-HERKENHOFF752 NoCOMANCHE PARK PH 1, DRAINAGE REPORT FOR 2003 SMITH ENGINEERING511 NoCOMMERCIAL, CANDELARIA, CLAREMONT & BROADWAY STORM DRAIN IMPROVEMENTS, DRAINAGE ANALYSIS FOR, REVISED JUNE 30, 1997

1997 ANDREWS, ASBURY & ROBERT740 No

COORS & PASEO DEL NORTE, NORTHEAST CORNER , STORM WATER DRAINAGE REPORT 1995 SMITH ENGINEERING157 NoCOORS BLVD. DRAINAGE REPORT 1986 BOHANNAN-HUSTON53 NoCOORS COORS NM45 DRAINAGE, DRAFT 2007 URS716 NoCOORS CORRIDOR OURAY TO WESTERN TRAILS DRAINAGE STUDY 1988 BOHANNAN-HUSTON54 NoCOORS, NORTH , DRAINAGE MANAGEMENT PLAN 1985 SCANLON & ASS143 NoCOORS, NORTH, DRAINAGE CALABACILLAS OUTLET 1989 AMAFCA142 No

Page 9 of 25

SUBJECT Title Year ConsultantID PDF?COORS, OLD, & CENTRAL TO BRIDGE BLVD FINAL DRAINAGE REPORT 1996 GANNETT FLEMING162 NoCOPPER CHANNEL IMPROVEMENTS DIVERSE STORM DRAINAGE IMPRV 1995 LEEDSHILL-HERKENHOFF55 NoCROSSING AT FOUR HILLS ARROYO, TIJERAS ARROYO 1984 1984 BOVAY ENGINEERING226 NoCROSSING AT WASHINGTON STREET AND DOMINGO BACA ARROYO, DESIGN STUDY FOR THE ALL WEATHER 1998 SMITH ENGINEERING301 NoDAM FILLING NOTIFICATION SYSTEM STUDY REPORT 1994 LEEDSHILL-HERKENHOFF409 NoDIP SECTION CROSSING REPLACEMENT FOR TESUQUE DRIVE AT MARIPOSA ARROYO, FANAL DESIGN COMPUTATIONS FOR,

1990 AVID ENGINEERING357 No

DIP SECTION CROSSING REPLACEMENTS PRELIMINARY DESIGN REPORT 1993 KEMPER-VAUGHAN57 NoDIP SECTION REPLACEMENT AT SAGEBRUSH TRAIL CONCEPTUAL DESIGN REPORT, FOUR HILLS ARROYO 2009 SMITH ENGINEERING579 YesDIP SECTION XING HYDRAULIC ANALYSIS, MOJAVE STREET AT MARIPOSA ARROYO 1990 AVID ENGINEERING136 NoDIVERSION FACILITY PHASES 1 & 2 DESIGN ANALYSIS REPORT 198658 NoDOMINGO BACA DETENTION DAM & DIVERSION SYSTEM, ARROYO DE 1977 WILSON & COMPANY32 NoDOUBLE EAGLE II AIRPORT DRAINAGE REPORT 1987 BOHANNAN-HUSTON62 NoDOUBLE EAGLE II AIRPORT DRAINAGE REPORT 1988 BOHANNAN-HUSTON61 NoDROP INLET, HYDRAULIC GRADE LINE, AND STORM RUNOFF CALCULATIONS FOR THE WINROCK RING ROAD AND LOUISIANA / CONSTITUTION/ SUMMER PROJECT IN ALBUQUERQUE

2002 GANNETT FLEMING WEST444 Yes

EDITH BLVD. DRAINAGE ANALYSIS 1988 BOYLE ENGINEERING68 NoEDITH BLVD. DRAINAGE ANALYSIS 1990 BOYLE ENGINEERING69 NoEMBUDO ARROYO / MONTE LARGO CROSSING DESIGN ANALYSIS REPORT 1989 GRIENER ENGINEERING71 YesEMBUDO ARROYO CHANNEL LINING ENGINEERING ANALYSIS 1989 BOYLE ENGINEERING72 YesEMBUDO ARROYO CHANNEL LINING JUAN TABO BLVD TO TRAMWAY, PRELIMINARY 1988 BOYLE ENGINEERING73 NoEMBUDO ARROYO CHANNEL LINING SUPPLEMENT ENGINEERING ANALYSIS REPORT 1989 BOYLE ENGINEERING74 NoEMBUDO ARROYO SYSTEM AND ITS TRIBUTARIES, STUDY OF 1976 BOHANNAN WESTMAN HUSTON569 YesEMBUDO ARROYO SYSTEM HYDROLOGY REPORT 1975 BOHANNAN-HUSTON75 NoEMBUDO ARROYO WATERSHED ARROYO GRADE CONTROL & WATERSHED TREATMENT: ANALYSIS & RECOMMENDATIONS

1995 RESOURCE TECHNOLOGY333 No

EMBUDO ARROYO, BEAR ARROYO, & PARADISE HILLS AREA'S - JULY 9, 1988, CHARACTERIZATIONS OF STORMS IN THE

1988 EASTERLING & ASS291 No

EUBANK IMPROVEMENTS, KIRTLAND AIR FORCE BASE TO CENTRAL 2002 BOHANNAN-HUSTON430 YesEUBANK BLVD INTERIM ROADWAY IMPROVEMENTS FR. SAN ANTONIO DR. TO HOLLY AVE. 1993 AVID ENGINEERING344 NoEUBANK DRAINAGE COMANCHE TO EMBUDO ARROYO FINAL REPORT 1984 GREINER ENGINEERING SCIEN76 NoEUBANK STORM DRAINAGE SYSTEM 201-03C, DESIGN ANALYSIS REPORT 1983 SCANLON AND ASS482 NoEUBANK STORM DRAINAGE SYSTEM DESIGN ANALYSIS REPORT 1983 SCALON & ASS77 NoEUBANK,SOUTH, AMENDMENT #2 1998 SMITH ENGINEERING196 NoEUBANK,SOUTH, AREA STORM DRAINAGE ANALYSIS 1995 SMITH ENGINEERING197 NoFIVE POINTS ROAD DRAINAGE IMPROVEMENTS PROJECT 1999 BERNALILLO COUNTY81 NoFIVE POINTS ROAD DRAINAGE IMPROVEMENTS SCOPING REPORT FLOOD INSURANCE STUDY 1999 BOHANNAN-HUSTON82 No

Page 10 of 25

SUBJECT Title Year ConsultantID PDF?FLOOD DAMAGE REDUCTION STUDY, SOUTHWEST VALLEY 2000 RESOURCE TECHNOLOGY277 NoFOURTH STREET CORRIDOR DRAINAGE REPORT 2003 WILSON & COMPANY426 NoFOURTH STREET RECONSTRUCTION PART 1 LOMAS BLVD TO ALAMEDA DRAIN DRAINAGE STUDY REPORT 1989 LEEDSHILL-HERKENHOFF86 NoFOURTH STREET RECONSTRUCTION REHABILITATION STORM DRAIN EXTENSION PRELIMINARY ANALYSIS REPORT 1990 BOHANNAN-HUSTON87 NoGOLF COURSE ROAD IMPROVEMENTS DRAINAGE ANALYSIS 1984 BOHANNAN-HUSTON90 NoGRAND AVE REALIGNMENT DRAINAGE REPORT 1987 LEEDSHILL-HERKENHOFF91 NoHAN ARROYO UPGRADE, CONTRACT DOCUMENTS FOR 2005 DMJM368 NoHARWOOD AVE. COMANCHE RD LOUISIANA BLVD STORM SEWER IMPROVEMENTS 1983 TOM MANN & ASS92 NoHIDDEN VALLEY ARROYO FOUR HILLS SUBDIVISION; FLOOD PLAINS RECOMMENDATIONS 1990 MARK GOODWIN & ASS329 NoHIGH DESERT PHASE I FINAL HYDROLOGY & DESIGN DRAINAGE REPORT 1994 BOHANNAN-HUSTON97 NoHIGH DESERT PHASE I PRUDENT LINE ANALYSIS 1993 BOHANNAN-HUSTON98 NoHIGH DESERT PHASE I TECHNICAL APPENDIX HYDROLOGY & DESIGN REPORT 1993 BOHANNAN-HUSTON99 NoHIGH DESERT SUBDIVISION ACADEMY STORM DRAIN FINAL DESIGN REPORT 1994 BOHANNAN-HUSTON100 NoHIGHLAND DETENTION BASIN STUDY INVESTIGATION OF ALTERNATIVES 1983 LEEDSHILL-HERKENHOFF103 YesHIGHLAND DETENTION BASIN STUDY, CALCULATION APPENDIX 1984 LEEDSHILL-HERKENHOFF358 NoHIGHLAND DETENTION BASIN STUDY, FINAL 1984 LEEDSHILL-HERKENHOFF102 YesHILTON PLACE STORM DRAIN DESIGN REPORT 1990 ISAACSON & ARFMAN104 NoI-25 / I-40 INTERCHANGE, THE BIG I PROJECT, ALBUQUERQUE, NM,FINAL DRAINAGE REPORT, AC-MIP-(IM)-(TPU)-025-4(78)227; CN 0586, VOL 1

2000 URS GREINER661 No

I-25 / I-40 INTERCHANGE, THE BIG I PROJECT, ALBUQUERQUE, NM,FINAL DRAINAGE REPORT, AC-MIP-(IM)-(TPU)-025-4(78)227; CN 0586, VOL 2

2000 URS GREINER662 No

I-25 RIO BRAVO BLVD TO GIBSON BLVD DRAFT DRAINAGE REPORT 1999 GANNETT FLEMING WEST107 NoI-25, NORTH, RICHFIELD SECTOR DEVELOPMENT PLAN DRAINAGE MANAGEMENT STUDY 1983 BOHANNON-HUSTON148 NoI-40 - EMBUDO DRAINAGE ANALYSIS FINAL HYDROLOGY REPORT 2005 SMITH ENGINEERING369 NoI-40 / CARLISLE BLVD. INTERCHANGE FINAL DRAINAGE REPORT 1997 BOHANNAN-HUSTON108 NoI-40 EMBUDO DRAINAGE ANALYSIS FINAL HYDROLOGY REPORT 2005 SMITH ENGINEERING441 NoI-40 UNSER TO SIXTH STREET DRAINAGE REPORT, JANUARY 1991 BOHANNAN-HUSTON401 NoI-40 UNSER TO SIXTH STREET DRAINAGE REPORT, JUNE 1991 BOHANNAN-HUSTON405 NoI-40 WIDENING ALTERNATIVE 4 DRAINAGE STUDY 1989 BOHANNAN-HUSTON338 NoINITIAL PLAN AND PROGRAM FOR STORM DRAINAGE MANAGEMENT IN THE RIO GRAND VALLEY (APJ-I) 1973 MRGCOG447 NoISLETA DRAIN DRAINAGE IMPROVEMENTS FEASIBILITY STUDY 1987 RESOURCE TECHNOLOGY110 NoISLETA DRAIN, DRAINAGE MASTER PLAN 1990 WILSON & COMPANY, BOHANN483 NoISLETA WATERSHED STUDY, IMPROVED CONDITIONS REPORT 1986 CH2MHILL589 NoJOHN ROBERT DETENTION BASIN CHANNEL STABILIZATION 1985 BOHANNAN-HUSTON111 NoJUAN TABO DETENTION DAM, DESIGN AND COST OF 1975 SCALON & ASS41 NoJUAN TABO HILLS BLVD IMPROVEMENTS BRIDGE AT TIJERAS ARROYO, DRAINAGE REPORT FOR 2005 MARK GOODWINE & ASS481 No

Page 11 of 25

SUBJECT Title Year ConsultantID PDF?JUAN TABO HILLS BLVD. IMPROVEMENTS BRIDGE @ TIJERAS ARROYO 2005 MARK GOODWIN & ASS450 NoJUAN TABO STORM DRAIN DESIGN ANALYSIS REPORT 1989 HOLMES & NARVER112 NoJUAN TABO STORM DRAIN FINAL ENGINEERING DESIGN REPORT 1990 HOLMES & NARVER113 NoJUAN TABO STORM DRAIN PRELIMINARY ENGINEERING DESIGN REPORT 1989 HOLMES & NARVER114 NoJUAN TABO STORM DRAIN, GEOTECHNICAL ENGINEERING EVALUATION 1989 WESTERN TECHNOLOGIES376 NoKIRTLAND AIR FORCE BASE DETENTION BASIN DESIGN ANALYSIS REPORT SECTION I-IV FINAL DESIGN ANALYSIS SECTION V-VI

1984 LEEDSHILL-HERKENHOFF115 Yes

KIRTLAND AIR FORCE BASE DETENTION BASINS APPENDIX A TO THE DESIGN ANALYSIS REPORT 1982 GORDON HERKENHOFF & ASS116 NoKIRTLAND AIR FORCE BASE DETENTION BASINS SUPPLEMENTAL APPENDIX A TO DESIGN ANALYSIS REPORT 1984 LEEDSHILL-HERKENHOFF117 NoKIRTLAND CHANNEL IMPROVEMENTS DESIGN ANALYSIS MULBERRY STREET TO UNIVERSITY BLVD 1990 MARK GOODWIN & ASS118 NoLA CUEVA, EL CAMINO AND NORTH CAMINO ARROYOS 1998 RESOURCE TECHNOLOGY445 NoLADERA DAM ANALYSIS, AMAFCA 1986 BOYLE ENGINEERING442 YesLADERA DIVERSION TO WEST BLUFF OUTFALL DRAINAGE STUDY 1989 BOHANNAN-HUSTON508 NoLADERA DIVERSION TO WEST BLUFF OUTFALL DRAINAGE STUDY FINAL 1989 BOHANNAN-HUSTON122 NoLADERA STORM DRAINAGE DIVERSION & DETENTION SYSTEM DESIGN REPORT 1979 BOYLE ENGINEERING123 NoLAGUNA L26 ROADWAY PROJECTS, HYDROLOGY REPORT FOR 1999 RESOURCE TECHNOLOGY485 NoLAYTON AVENUE & BEAR TRIBUTARY CROSSING STRUCTURE AND STORM DRAIN 1989 BOHANNAN-HUSTON124 NoLINED CHANNELS AND RELATED HYDRAULIC STRUCTURES, ALTERNATIVES AND DESIGN OF FLEXIBLY, PHASE I 1981 NMSU287 NoLOMAR FOR 12508 YORBA LINDA 2003 SMITH ENGINEERING528 NoLOMAS & NOKOMIS STORM DRAIN DIVERSE DRAINAGE IMPROVEMENTS 1997 LEEDSHILL-HERKENHOFF125 NoLOMAS BLVD STORM DRAIN BROADWAY TO 8TH AVENUE DESIGN ANALYSIS REPORT 1991 ANDREWS, ASBURY & ROBERT126 NoLOMR BETWEEN THE FOLLOWING STREETS: EUBANK BLVD, LOUISIANA BLVD, SOUTHERN AVE AND ZUNI RD. 2004 SMITH ENGINEERING321 NoLOUISIANA BLVD CROSSING SOUTH DOMINGO BACA ARROYO DESIGN ANALYSIS 1990 EASTERLING & ASS127 NoLOUISIANA STORM DRAIN HYDROLOGICAL ANALYSIS PRELIMINARY 1989 FRED DENNY & ASS128 NoLOWE'S OF NW ALBUQUERQUE, DRAINAGE REPORT FOR 2001 WILSON & COMPANY437 NoLYON (UNSER) BOULEVARD/PARADISE BOULEVARD 2000 BOHANNAN-HUSTON463 NoLYON BOULEVARD STORM DRAIN DESIGN ENGINEER'S REPORT 2004 WILSON & COMPANY347 NoMARIPOSA BASIN REGIONAL ATHLETIC COMPLEX 1991 EASTERLING & ASS129 NoMARIPOSA BASIN REGIONAL ATHLETIC COMPLEX ENGINEERING APPENDIX 1988 EASTERLING & ASS130 NoMARIPOSA DIVERSION BOCA NEGRA IMPROVEMENTS AND DETENTION BASIN PART 1 PH.2 1982 DENNY GROSS & ASS131 NoMARIPOSA DRAINAGE AREA CONSERVATION AND STABILIZATION PLAN 1989 EASTERLING & ASS132 NoMARIPOSA STORM DRAINAGE DIVERSION & DETENTION FACILITY 1977 FRED DENNEY & ASS133 NoMASTER PLAN OF DRAINAGE, 1963, CITY OF ALBUQUERQUE 1963 GORDON HERKENHOFF AND A527 NoMENAUL / MILDRED DRAINAGE IMPROVEMENTS 1991 LEEDSHILL-HERKENHOFF135 YesMENAUL DRAINAGE / DETENTION BASIN WATER QUALITY ANALYSIS AND DESIGN STUDY RECOMMENDATIONS VOLUME 2 OF 2

1997 USEPA379 No

Page 12 of 25

SUBJECT Title Year ConsultantID PDF?MENAUL DRAINAGE/DETENTION BASIN WATER QUALITY ANALYSIS AND DESIGN STUDY RECOMMENDATIONS VOLUME 1 OF 2

1997 USEPA378 No

MENUAL DETENTION BASIN AND STORM DRAIN; DESIGN ALALYSIS REPORT - VOL. 2 1991 SMITH-SCHEUCH ENGINEERING323 NoMENUAL DETENTION BASIN AND STORM DRAIN; DESIGN ALALYSIS REPORT - VOL. I 1991 SMITH-ENGINEERING322 NoMONTGOMERY / EUBANK INTERSECTION IMPROVEMENTS PROJECT, FINAL DRAINAGE DESIGN ANALYSIS REPORT 2009 GANNETT FLEMING WEST596 NoMOON STORM DRAIN, DESIGN ANALYSIS FOR 2007 BOHANNAN-HUSTON431 NoMOUNTAIN RD & MANZANO STREET NE DIVERSE DRAINAGE 1995 LEEDSHILL-HERKENHOFF137 NoMS4 NPDES PERMIT, CITY OF EL PASO 1999 CITY OF EL PASO396 NoNM 45 SOUTH COORS BOULEVARD 2008 URS471 NoNM 528 DIVERSION CHANNEL DRAINAGE STUDY 1999 LEEDSHILL-HERKENHOFF138 NoNORTH CAMINO ARROYO CONCEPTUAL DESIGN & ALIGNMENT STUDY 2004 EASTERLING & ASS328 NoNORTH DOMINGO BACA, STORM DRAIN DESIGN ANALYSIS REPORT 2001 SCANLON & ASS146 NoNORTH I-25 SECTOR PLAN, W2, PRELIMINARY DRAWINGS 1983 BOHANNAN-HUSTON786 NoNORTH VALLEY DRAINAGE SYSTEM IMPROVEMENT FINAL DESIGN ANALYSIS REPORT SYSTEM 1985 SCANLON & ASS152 NoNORTH VALLEY DRAINAGE SYSTEMS 1985 SCANLON & ASS440 NoNORTH VALLEY DRAINAGE SYSTEMS PRELIMINARY DESIGN ANALYSIS REPORT VOLUME I SYSTEM D 1985 SCANLON & ASS153 NoNORTHEAST HEIGHTS DRAINAGE MASTER PLAN PHASE A REPORT, PRELIMINARY 1974 LEONARD RICE534 NoNORTHEAST HEIGHTS DRAINAGE MASTER PLAN PHASE A REPORT, VOL 1 1975 LEONARD RICE535 NoNORTHEAST HEIGHTS DRAINAGE MASTER PLAN PHASE A REPORT, VOL 2 1975 LEONARD RICE536 NoNORTHEAST HEIGHTS, FAR, MASTER DRAINAGE PLAN 10 YEAR FLOOD MODELING HYMO OUTPUT FINAL PHASE II EXISTING CONDITIONS

1987 WESTON491 Yes

NORTHWEST MESA DRAINAGE MANAGEMENT PLAN, FUTURE CONDITIONS AND PROPOSED IMPROVEMENTS, HYMO OUTPUT

1989 SCANLON & ASS354 No

ODELIA DAM OUTFALL EXTENSION DESIGN ANALYSIS REPORT 1990 ESPEY-HUSTON & ASS161 NoOSAGE / LA MEDIA DRAINAGE OUTFALL REVISED HYDROLOGY REPORT 1995 BOHANNON-HUSTON163 NoOSUNA RD STORM DRAIN ,DESIGN ANALYSIS FOR THE, JUNE 12 2006 BOHANNAN-HUSTON434 NoOSUNA RD STORM DRAIN, DESIGN ANALYSIS FOR THE, JUNE 26 2007 BOHANNAN-HUSTON436 NoOSUNA ROAD DRAINAGE REPORT PROJECT M4052 (2) EH&A JOB NO. 6259 1986 ESP366 YesPAJARITO ARROYO 1989 RESOURCE TECHNOLOGY164 NoPASEO DEL NORTE BETWEEN GOLF COURSE AND KIMMICK 2004 WILSON & COMPANY439 NoPASEO DEL NORTE DRAINAGE REPORT 2004 WILSON & COMPANY427 NoPASEO DEL NORTE DRAINAGE REPORT 2004 WILSON & COMPANY387 NoPASEO DEL NORTE DRAINAGE REPORT 2004 WILSON & COMPANY420 NoPEAK DISCHARGE AND MAXIMUM OBSERVED PEAK DISCHARGE IN NEW MEXICO AND SURROUNDING AREAS, ANALYSIS OF THE MAGNITUDE AND FREQUENCY OF

2008 USGS761 Yes

PIEDRAS MARCADAS 1983 TOM MANN & ASS167 NoPIEDRAS MARCADAS 1988 EASTERLING & ASS168 No

Page 13 of 25

SUBJECT Title Year ConsultantID PDF?PIEDRAS MARCADAS WATERSHED AND LYON BOULEVARD 2003 BOHANNAN-HUSTON400 NoPINO ADJACENT TO THE ENCLAVE AT TANOAN SUBDIVISION, ARROYO DEL 1993 BOHANNAN-HUSTON33 NoPINO ARROYO 1983 ANDREWS, ASBURY & ROBERT170 NoPINO ARROYO AND BETA ARROYO 1983 BOHANNAN-HUSTON171 NoPINO, NORTH, ARROYO / BARSTOW CROSSING DESIGN ANALYSIS REPORT 1989 GREINER149 NoPINO, SOUTH, HYDROLOGIC ANALYSIS 1989 BOHANNAN-HUSTON199 NoPRINCESS JEANNE 1992 SMITH-SCHEUCH ENGINEERING172 NoPRINCESS JEANNE STORM DRAIN IMPROVEMENTS FINAL DESIGN ANALYSIS 1993 SMITH ENGINEERING470 NoPROJECTS, STORM DRAINAGE, ALBUQUERQUE AREA WIDE 1997 PWD/HYDROLOGY276 YesPUMP STATION, OSAGE / LA MEDIA - DESIGN CALCULATIONS 1991 BOHANNAN-HUSTON356 NoPUMP STATIONS, STORMWATER, PRELIMINARY FIELD REPORT FOR THE, BERNALILLO COUNTY 1995 GANNETT FLEMING WEST560 NoPUMPING STATION & COLLECTION SYSTEM, ALCALDE STORM WATER, DESIGN ANALYSIS 1982 GORDON HERKENHOFF & ASS21 YesPUMPING STATION, ALCALDE STORM WATER, AND COLLECTION SYSTEM, FINAL ENGINEERING REPORT 1984 LEEDSHILL-HERKENHOFF561 NoPUMPING STATIONS REHABILITATION STUDY, PHASE 1, ALBUQUERQUE STORM WATER, STATIONS: 26, 27, 32, 34, 35, 36, 37, AND ALCALDE (PROPOSED), VOLUM 2

1983 BOVAY ENGINEERS554 No

PUMPING STATIONS REHABILITATION STUDY, PHASE 1, STORM WATER, STATIONS: 30, 31, 33, 40 AND 2ND ST./HEADINGLY (28), VOLUM 1

1983 BOVAY ENGINEERING275 Yes

RECLAMATION PLANT, SOUTHSIDE WASTE 2000 HDR ENGINEERING205 NoRIO GRANDE FLOOD PROTECTION, MIDDLE, BERNALILLO TO BELEN, NM, INTERM FEASIBILITY REPORT, VOL 1, MAIN REPORT AND ENVIRONMENTAL IMPACT STATEMENT, REVISED APRIL 1980

1979 USACE658 No

RIO GRANDE FLOOD PROTECTION, MIDDLE, BERNALILLO TO BELEN, NM, INTERM FEASIBILITY REPORT, VOL 2, APPENDICES A-B-C, PROBLEM IDENTIFICATION, FPRMULATION OF DETAILED PLAN, AND PUBLIC INVOLVEMENT

1979 USACE659 No

SAD-198, DRAINAGE ANALYSIS SPECIAL ASSESSMENT DISTRICT 198 1985 ANDREWS, ASBURY & ROBERT174 NoSAD-201 STORM SEWER SYSTEM HYDRAULIC GRADELINE 1982 MOLZEN-CORBIN & ASS435 NoSAD-202, SPECIAL ASSESSMENT DISTRICT NO. 202 DRAINAGE REPORT 1982 GARDNER, MASON & ASS175 NoSAD-204, DRAINAGE STUDY FOR SPECIAL ASSESSMENT DISTRICT 204 1984 WILLIAM MOTOTAN & ASS176 NoSAD-210, AMENDMENT TO ENGINEER'S DRAINAGE REPORT FOR COA SPECIAL ASSESSMENT DISTRICT NO. 210 1984 WILSON & COMPANY177 NoSAD-216, DRAINAGE ANALYSIS SPECIAL ASSESSMENT DISTRICT 216 1992 ANDREWS, ASBURY & ROBERT179 NoSAD-222 SPECIAL ASSESSMENT DISTRICT 222 DRAINAGE ANALYSIS 2000 LARKIN595 NoSAD-224, SPECIAL ASSESSMENT DISTRICT 224 DRAINAGE REPORT 1998 WILSON & COMPANY290 NoSAD-227 DRAINAGE REPORT 2003 WILSON & COMPANY312 NoSAN ANTONIO - MARIPOSA & BOCA NEGRA ARROYOS PART 1 1980 FRED DENNEY & ASS181 NoSAN JOSE DRAIN OUTFALL TO THE RIO GRANDE 1990 WILSON & COMPANY182 NoSAN MATEO I-40 INTERCHANGE 2001 NMSHD183 NoSAN MATEO / I-40 INTERCHANGE, UPDATED PRELIMINARY DRAINAGE REPORT 2006 BOHANNAN-HUSTON407 NoSAN MATEO I-40 INTERCHANGE, FINAL DRAINAGE REPORT 2007 BOHANNAN-HUSTON494 NoSAN MATEO I-40 INTERCHANGE, FINAL DRAINAGE REPORT ADDENDUM 2007 BOHANNAN-HUSTON495 No

Page 14 of 25

SUBJECT Title Year ConsultantID PDF?SAN MATEO,SOUTH 1985 LEEDSHILL-HERKENHOFF200 NoSAN PEDRO & THE NM STATE FAIRGROUNDS 1995 SMITH ENGINEERING184 NoSAN PEDRO BOULEVARD AND THE NEW MEXICO STATE FAIRGROUNDS, STORM DRAIN INVESTIGATION REPORT FOR 1995 SMITH ENGINEERING412 NoSAN PEDRO COLLECTIONS TO THE NORTH PINO ARROYO, STUDY PHASE LETTER REPORT FOR 2004 THOMPSON ENGINEERING316 NoSAN PEDRO DRIVE CROSSING SOUTH DOMINGO BACA ARROYO 1991 EASTERLING & ASS185 NoSAN PEDRO STORM DRAIN PROJECT 5304.91, DESIGN ANALYSIS REPORT. 2010 THOMPSON ENGINEERING599 YesSANDIA BASE, MASTER PLAN FOR DISPOSAL OF STORM WATER FROM 1971 TURNEY & ASS360 NoSANDIA FOOTHILLS 1972 KEN O'BRIEN & ASS186 NoSANDIA FOOTHILLS DRAINAGE STUDY 1971 KEN O'BRIEN & ASS187 NoSAWMILL AREA IMROVEMENTS 1989 SMITH-SCHEUCH ENGINEERING188 NoSEVEN BAR RANCH SPECIAL ASSESSMENT DISTRICT; PRELIMINARY DRAFT 1990 EASTERLING & ASS340 NoSLOAN'S ACRES SUBDIVISION 1993 WILSON & COMPANY189 NoSOUTH ARROYO DE DOMINGO BACA & I-25 CONCRETE BOX CULVERT IMPROVEMENTS, PRELIMINARY DRAINAGE REPORT

2003 EASTERLING & ASS723 No

SOUTH ARROYO DE DOMINGO, CONCEPTUAL DESIGN REPORT 1985 GREINER ENGINEERING191 NoSOUTH BROADWAY DETENTION BASIN, ANALYSIS PHASE REPORT COA PROJECT 4165.90 1991 RESOURCE TECHNOLOGY515 NoSOUTH BROADWAY DETENTION BASIN, ANALYSIS PHASE REPORT, EVTRAN COMPUTER OUTPUT, CASE 1 OF 3 1991 RESOURCE TECHNOLOGY517 NoSOUTH BROADWAY DETENTION BASIN, ANALYSIS PHASE REPORT, EVTRAN COMPUTER OUTPUT, CASE 2 OF 3 1991 RESOURCE TECHNOLOGY519 NoSOUTH BROADWAY DETENTION BASIN, ANALYSIS PHASE REPORT, EVTRAN COMPUTER OUTPUT, CASE 2 OF 3 1991 RESOURCE TECHNOLOGY518 NoSOUTH BROADWAY DETENTION BASIN, COA PROJECT 4165, EXTRAN INPUT AND OUTPUT FILES FOR FINAL DESIGN HYDRAULIC ANALYSIS

1991 RESOURCE TECHNOLOGY516 No

SOUTH BROADWAY DETENTION BASIN, DESIGN CALCULATIONS, COA PROJECT NO 4165.90 1992 RESOURCE TECHNOLOGY524 NoSOUTH BROADWAY SECTOR DEVELOPMENT AREA 1990 BOHANNAN-HUSTON192 NoSOUTH BROADWAY SECTOR DEVELOPMENT AREA 1990 BOHANNAN-HUSTON194 NoSOUTH BROADWAY SECTOR DRAINAGE PLAN, FINAL DEVELOPED CONDITIONS REPORT 1990 BOHANNAN-HUSTON744 NoSOUTH DOMINGO BACA CHANNEL / PASEO DEL NORTE DRAINAGE OUTFALL; PRELIMINARY ANALYSIS REPORT CONFLUENCE ALTERNATIVES

2001 EASTERLING & ASS339 No

SOUTH EUBANK APPENDIX J VOLUME 2 OF 2 1995 SMITH ENGINEERING461 NoSOUTH EUBANK AREA APPENDIX J 1 OF 2 1995 SMITH ENGINEERING460 NoSOUTH VALLEY ISLETA BLV DRAINAGE PLAN, DESIGN MEMORANDUM 1988 WILSON & COMPANY202 NoSOUTH VALLEY WEST OF THE RIO GRANDE VOLUME I 1981 ANDREWS, ASBURY & ROBERT201 NoSOUTHEAST VALLEY DRAINAGE MANAGEMENT PLAN, AMAFCA 1986 WILSON & COMPANY203 NoSOUTHEAST VALLEY DRAINAGE MANAGEMENT PLAN, FAR SOUTHEAST VALLEY AND TRIBUTARY AREA TO EAST, AMAFCA

1988 WILSON & COMPANY204 No

SOUTHWEST MESA DETENTION AREA 1984 ANDREWS, ASBURY & ROBERT207 NoSOUTHWEST VALLEY DRAINAGE MANAGEMENT PLAN 1990 ANDREWS, ASBURY & ROBERT208 NoSOUTHWEST VALLEY FLOOD DAMAGE REDUCTION STUDY, VOLUME 3 2004 RESOURCE TECHNOLOGY758 Yes

Page 15 of 25

SUBJECT Title Year ConsultantID PDF?SOUTHWEST VALLEY PHASE I 1991 ANDREWS, ASBURY & ROBERT209 NoSTADIUM BLVD HYDROLOGIC REANALYSIS 1991 BOYLE ENGINEERING574 NoSTADIUM BLVD STORM DRAINAGE IMPROVEMENT ENGINEERING ANALYSIS REPORT 1993 BOHANNAN-HUSTON717 NoSTADIUM BLVD STORM DRAINAGE IMPROVEMENT ENGINEERING ANALYSIS REPORT 1994 BOHANNAN-HUSTON567 NoSTADIUM BLVD. STORM DRAIN OUTLET ALTERNATIVES DRAFT 1993 BOHANNAN-HUSTON334 NoSTADIUM BLVD. STORM DRAINAGE IMPROVEMENTS ENGINEERING ANALYSIS REPORT 1993 BOHANNAN-HUSTON335 NoSTORM, ASSESSMENT OF THE JULY 9, 1988 , AND THE CITY OF ALBUQUERQUE FLOOD CONTROL SYSTEM 1989 WRIGHT WATER ENGINEERS271 NoSUNPORT RENT-A-CAR FACILITY DRAINAGE, ALBUQUERQUE INTERNATIONAL 2000 MOLZEN-CORBIN & ASS14 NoSUNPORT TRANSPORTATION CORRIDOR STUDY 1991 MOLZEN-CORBIN213 NoSUNPORT, ALBUQUERQUE INTERNATIONAL / UNIVERSITY GOLF COURSE DRAINAGE STUDY 1982 TOM MANN & ASS13 NoTIJERAS ARROYO 1985 BOHANNAN-HUSTON224 NoTIJERAS PUMP STATION REPORT SUMMARY 1987 LEEDSHILL-HERKENHOFF220 NoTRAMWAY BLVD CORRIDOR 1972 BOHANNAN WESTMAN HUSTON223 NoTRAMWAY BLVD IMPROVEMENTS MONTGOMERY BLVD. TO TRAMWAY RD. 1987 RESOURCE TECHNOLOGY221 NoTRAMWAY BLVD, DRAINAGE REPORT FOR 1979 BOHANNAN-HUSTON285 NoTRAMWAY CHANNEL 1975 BOHANNAN WESTMAN HUSTON222 NoTRAMWAY CHANNEL, HYDROLOGY OF THE 1975 BOHANNAN WESTMAN HUSTON105 NoTRAMWAY EAST DRAINAGE IMPROVEMENTS, PRELIMINARY DESIGN FOR, PHASE II 1975 BOHANNAN WESTMAN HUSTON282 NoTRAMWAY EAST EMBUDO DAM, STORM DRAINAGE FACILITIES 1977 BOHANNAN-HUSTON475 YesTRAMWAY EAST, STORM DRAINAGE FACILITIES 1974 BOHANNAN-HUSTON212 NoTVI, ALBUQUERQUE, PRELIMINARY DRAINAGE ANALYSIS FOR TRACT B OF APS CENTRAL OFFICE ADDITION 2002 LARKIN GROUP806 NoUNIVERSITY / RIO BRAVO EXTENSION, SCOPING REPORT FOR, DRAFT 2004 BOHANNAN-HUSTON428 NoUNIVERSITY BLVD EXTENSION PROJECT, PRELIMINARY DRAINAGE REPORT 2002 BOHANNAN HUSTON289 NoUNIVERSITY CENTER, GLENBOROUGH, DRAINAGE REPORT FOR 1988 LEEDSHILL-HERKENHOFF563 NoUNM HOSPITAL NORTH DIVERSION CHANNEL DRAINAGE STUDY 2003 BOHANNAN-HUSTON311 NoUNSER FROM OURAY TO SAN ANTONIO, FINAL DRAINAGE ANALYSIS REPORT, REV A 1989 GREINER235 NoUNSER DETENTION DAM & WEST I-40 DIVERSION CHANNEL; DESIGN ANALYSIS REPORT 2003 WILSON & COMPANY332 NoVALLEY AREAS, ANALYSIS OF THE AHYMO PROGRAM FOR FLAT 1995 BOHANNAN-HUSTON337 YesVINEYARD CHANNEL WEST OF I-25 1992 GREINER248 NoVISTA ALTA ADDITION 1983 ESPEY-HUSTON & ASSOCIATES249 NoWEST BLUFF DRAINAGE OUTFALL ENERGY DISSIPATOR CRITICAL REVIEW 1993 HEGGEN AND MARTIN507 NoWEST BLUFF DRAINAGE PLAN PHASE 3 1985 ANDREWS,ASBURY & ROBERT251 NoWEST BLUFF OUTFALL PHASE II I-40 STORM INTERCEPTOR 98TH STREET TO COORS BOULEVARD 1990 SCALON & ASS250 NoWEST BLUFF OUTFALL, PHASE 2A COORS ROAD TO ESTANCIA DRIVE 1990 SCALON & ASS253 No

Page 16 of 25

SUBJECT Title Year ConsultantID PDF?WEST BLUFF STORM SEWER OUTFALL 1987 BOHANNAN-HUSTON252 NoWEST I-40 DIVERSION DMP; PRELIMINARY COST ESTIMATES 1999 BOHANNAN-HUSTON306 NoWEST MESA DIVERSION PROJECT DRAINAGE ANALYSIS 1997 SMITH ENGINEERING453 NoWEST MESA DIVERSION PROJECT; DRAFT 1997 SMITH ENGINEERING258 NoWEST MESA INTERCEPTOR ENERGY DISSIPATOR, HYDRAULIC MODEL STUDY OF THE 1968 COLORADO STATE UNIV372 NoWEST MESA INTERCEPTOR ENERGY DISSIPATOR, HYDRAULIC MODEL STUDY OF THE, ADDENDUM TO CER68-69MMS-SK15

1969 COLORADO STATE UNIV371 No

WEST SIDE DRAINAGE STUDY - 1977, PRELIMINARY ENGINEERING REPORT 1977 BOVAY ENGINEERS255 NoWEST SIDE DRAINAGE STUDY - 1977, VOL 1 OF 2 - TEXT 1978 BOVAY ENGINEERS256 NoWEST SIDE DRAINAGE STUDY - 1977, VOL 2 OF 2I - EXHIBITS 1978 BOVAY ENGINEERS257 NoWESTBLUFF OUTFALL DESIGN REPORT 1988 BOHANNAN-HUSTON506 NoWESTERN ALBUQUERQUE DRAINAGE, BIBLOGRAPHY AND RECOMMENDATIONS FOR DRAINAGE PLANNING 1983 LEVERTON-EASTERLING545 NoWESTGATE DIVERSION CHANNEL, PRELIMINARY DESIGN ANALYSES 1980 GORDON HERKENHOFF780 NoWESTGATE DIVERSION CHANNELS, DESIGN CONCEPTS MEMORANDUM, SNOW VISTA CHANNEL PH 2, POWERLINE CHANNEL PH 2, POWERLINE CHANNEL PH 3

1981 GORDON HERKENHOFF781 No

WESTREN ALBUQUERQUE METROPOLITAN AREA, DRAINAGE MANAGEMENT PLAN, AMAFCA 1975 WILLIAM MATOTAN & ASS766 NoWESTREN ALBUQUERQUE METROPOLITAN AREA, DRAINAGE MANAGEMENT PLAN, AMAFCA, SUPPLEMENT 1975 WILLIAM MATOTAN & ASS767 NoWYOMING STORM DRAIN NORTHEASTERN BLVD. TO EMBUDO CHANNEL 2001 MARK S. HOLSTAD262 NoYALE BETWEEN CENTRAL AND STADIUM DRAINAGE 1993 WILSON & COMPANY269 No

EASEMENT ACQUISITIONSSANDIA HEIGHTS S. & N. ALBUQ. ACRES, HYDROLOGIC, HYDRAULIC & PLATTING REVIEWS OF 1994 HDR ENGINEERING331 NoSOUTH BROADWAY DETENTION BASIN PROJECT, PROPOSED,VACANT LAND AND RESIDENTAL APPRAISAL REPORT 1991 SHIPMAN - FOLEY & ASS513 NoWEST BLUFF OUTFALL, FEE SIMPLE AND EASEMENT ACQUISITIONS LOCATED IN H-11, BASIC DATA BOOK 1991 COA PWD777 No

ENVIRONMENTAL REPORTALAMEDA & RIVERSIDE DRAINS ENGINEERING ANALYSIS, 1989 DRAFT, ENVIRONMENTAL ASSESSMENT 1989 LEEDSHILL-HERKENHOFF5 YesALAMEDA & RIVERSIDE DRAINS ENGINEERING ANALYSIS, 1991 DRAFT, ENVIRONMENTAL ASSESSMENT VOL 3 1991 LEEDSHILL-HERKENHOFF6 YesALAMEDA & RIVERSIDE DRAINS ENGINEERING ANALYSIS, 1993 DRAFT, ENVIRONMENTAL ASSESSMENT VOL 3 1993 LEEDSHILL-HERKENHOFF4 YesALAMEDA & RIVERSIDE DRAINS STORM WATER IMPROVEMENTS, 1994 DRAFT ENVIRONMENTAL ASSESSMENT 1994 LEEDSHILL-KERKENHOFF8 YesALAMEDA & RIVERSIDE DRAINS STORMWATER IMPROVEMENTS 1994 LEEDSHILL-HERKENHOFF451 NoALAMEDA AND RIVERSIDE DRAINS STORMWATER IMPROVEMENTS, ENVIRONMENTAL ASSESSMENT FOR, 1994 DRAFT APPENDIX

1994 LEEDSHILL-HERKENHOFF452 No

ALBUQUERQUE RIVERSIDE DRAIN STORM WATER TESTING PROGRAM FOR OIL AND GREASE, 1985 LEEDSHILL-HERKENHOFF363 NoBROADWAY AND MENAUL, ENVIRONMENTAL PROPERTY EVALUATION OF THE NW PORTION OF TRACT 1A LOCATED NW OF

1991 WT ENVIRONMENTAL730 No

BROADWAY AND MENAUL, TRACTS 1A-1 AND 1A-2, ENVIRONMENTAL PROPERTY EVALUATION 1989 WESTON TECHNOLOGIES729 NoCAPITAL IMPROVEMENTS PROGRAM 1989 - 2000 DECADE PLAN 1988 CIP297 NoCROSS CONNECTION STUDY, EXISTING STORM SEWER SYSTEM REVIEWS AND, VOLUMES I AND II, PROJ# 5343 1999 URS GREINER272 No

Page 17 of 25

SUBJECT Title Year ConsultantID PDF?I-25, NORTH, INDUSTRIAL RECYCLING PROJECT DRAFT ENVIRONMENTAL ASSESSMENT 1999 PARSONS ENGINEERING SCIEN147 NoLOS ANGELES LANDFILL, SITE DEVELOPMENT PLAN FOR THE FORMER 1999 HOLMES & NARVER302 NoMAINTENANCE OF EXISITING AND FUTURE STORM WATER CONVEYANCES IN THE MIDDLE RIO GRANDE 2003 SWCA ENVIRONMENTAL268 NoMRGCG FOCUS 2050 REGINONAL PLAN 2000 MRGCG410 NoNEW MEXICO NONPOINT POLLUTION SOURCE MANAGEMENT PROGRAM 1999 NMED550 NoNORTH VALLEY RIVER CROSSING VOLUME 1, IMPACT STATEMENT ENVIRONMENTAL STATEMENT 1990 FHA & NMSHD156 NoNORTH VALLEY RIVER CROSSING VOLUME 2 OF 3 ALIGNMENT STRIP MAPS ENVIRONMENTAL IMPACT STATEMENT 1990 FHA & NMSHD154 NoNORTH VALLEY RIVER CROSSING, VOL 3, ALIGNMENT NOISE CONTOUR MAPS ENVIRONMENT IMPACT STATEMENT DRAFT

1990 FHA & NMSHD155 No

NPDES STORM WATER PROGRAM PART 2 APPLICATION REPORT, SECTION 3-SUPPLEMENTAL INFORMATION, ANNUAL LOADING FPR PRIORITY POLLUTANTS, BOOK 1 OF 2 , (SUPPLEMENT #2)

1993 USGS345 No

OIL RECYCLING PROGRAM EVALUATION, USED, ALBUQUERQUE METROPOLITAN AREA 1997 COA552 NoPOLLUTION PREVENTION / PRETREMENT PROGRAM 1998 COA551 NoRIO GRANDE IN THE ALBUQUERQUE METROPOLIS, THE, 1-PLAN RECOMMENDATIONS 1975 CHAMBERS-CAMPBELL-ISAACS529 NoRIO GRANDE IN THE ALBUQUERQUE METROPOLIS, THE, 2- DATA VOLUME 1975 CHAMBERS-CAMPBELL-ISAACS530 NoSAN JOSE OUTFALL TO THE RIO GRANDE, DRAFT ENVIRONMENTAL ASSESSMENT, PROJ # 4060 1992 MARRON TASCHEK KNIGHT748 NoSAN PEDRO COLLECTOR PROJECT COA PROJECT NO 716802, LANDFILL GAS SURVEY 2005 VINYARD & ASS731 NoSECOND ST NORTH TRANSPORTATION CORRIDOR STUDY; DRAFT ENVIRONMENTAL ASSESSMENT 1998 BOHANNAN-HUSTON & TASCHE330 NoSILVERY MINNOW, PROPOSED DESIGNATION OF CRITICAL HABITAT FOR THE RIO GRAND,COMMENTS BY COA ON THE 1999 COA173 NoSOUTH BROADWAY DETENTION BASIN, SITE ENVIRONMENTAL AUDIT 1992 COA EHD523 NoSOUTH UNIVERSITY INDUSTRIAL PARK,WATER, SEWER AND ACCESS FACILITIES, DRAFT ENVIRONMENTAL IMPACT STATEMENT

1980 COA750 No

UNSER MIDDLE TRANSPORTATION CORRIDOR STUDY, UNSER FROM DELLYNE TO PARADISE & PASEO DEL NORTE FROM GOLF COURSE TO UNSER, FINAL EIS, APPENDIX A

1992 LEEDSHILL-HERKENHOFF240 No

UNSER MIDDLE TRANSPORTATION CORRIDOR STUDY, UNSER FROM DELLYNE TO PARADISE & PASEO DEL NORTE FROM GOLF COURSE TO UNSER, FINAL EIS, APPENDIX B

1992 LEEDSHILL-HERKENHOFF243 No

UNSER MIDDLE TRANSPORTATION CORRIDOR STUDY, UNSER, FROM DELLYNE TO PARADISE & PASEO DEL NORTE FROM GOLF COURSE TO UNSER, FINAL EIS

1992 LEEDSHILL-HERKENHOFF241 No

WATER QUALITY AND NONPOINT POLLUTION SOURCES IN THE MIDDLE RIO GRANDE VALLEY WATERSHED,EVALUATION OF THE, NEW MEXICO : DEVELOPING POSSIBLE SOLUTIONS

1993 UNM361 No

WATER QUALITY AND WATER POLLUTION CONTROL IN NM 1992 STATE OF NM629 NoWATER QUALITY AND WATER POLLUTION CONTROL IN NM 1994 1994 STATE OF NM631 No

FEASIBILITY STUDYAIRPORT, WEST MESA, LAND USE AND ZONING RECOMMENDATIONS FOR THE AREA ADJACENT TO THE PROPOSED, 1973 HERKENHOFF - PARSONS759 NoALAMEDA & RIVERSIDE DRAINS TO CONTROL URBAN STORMWATER FLOWS, FEASIBILITY, IMPACTS, AND COSTS OF USING THE

1987 WEISS-HINES ENGINEERING414 No

ALCALDE & BARELAS DRAINAGE BASINS, PRELIMINARY FINDINGS REPORT.MULTI-USE RECREATIONAL FACILITY, FLOOD CONTROL

2007 WILSON & COMPANY597 No

BROADWAY DRAINAGE BASIN, PRELIMINARY FINDINGS REPORT 2007 WILSON & COMPANY598 YesBROADWAY PUMP STATION DESIGN ANALYSIS REPORT, FINAL 2008 COA380 NoMARIPOSA BASIN REGIONAL ATHLETIC COMPLEX FEASIBILITY STUDY 1989 WAYNE SMITH AND EASTERLIN273 No

Page 18 of 25

SUBJECT Title Year ConsultantID PDF?NORTH ALBUQUERQUE METROPOLITAN AREA UTILITY AIRPORT SITE STUDY VOLUME I 1984 CH2MHILL141 NoPUMP STATIONS, ALCALDE AND BARELAS, POWER SUPPLY ANALYSIS 1983 BOVAY ENGINEERS555 NoQUAKER HEIGHTS INFRASTRUCTURE STUDY 2008 WILSON & COMPANY787 YesRIO GRANDE FLOOD PROTECTION, MIDDLE, BERNALILLO TO BELEN, NM, INTERIM FEASIBILITY REPORT, APPENDICES DRAFT

1978 USACE618 No

SECOND ST & ODELIA, STORM DRAIN IMPROVEMENTS, PHASE 2, TRAFFIC IMPACT ANALYSIS 1996 ANDREWS, ASBURY & ROBERT404 NoSOUTH BROADWAY DETENTION BASIN SITE, SITE ASSESSMENT FOR THE, 1991 1991 RESOURCE TECHNOLOGY521 NoSOUTH BROADWAY DETENTION BASIN SITE, SITE ASSESSMENT FOR THE, 1992 1992 RESOURCE TECHNOLOGY522 NoSOUTH BROADWAY DETENTION BASIN, ENGINEERING SERVICES FOR 1990 RESOURCE TECHNOLOGY514 NoSOUTHWEST VALLEY, PROJECT STUDY PLAN FOR ALBUQUERQUE, BERNALILLO CTY 1998 BERNALILLO COUNTY313 NoWEST BLUFF STORM SEWER OUTFALL FEASIBILITY REPORT OF ALTERNATIVES 1987 BOHANNAN-HUSTON509 NoWEST BLUFF STORM SEWER OUTFALL, COMMENTS FROM THE PUBLIC 1987 BURTON295 NoWEST MESA PHASE 2, ENGINEER'S FEASIBILITY STUDY 1978 BOYLE ENGINEERING765 NoYALE / GARFIELD GENEVA'S ARROYO, STOR DRAIN FEASIBILITY STUDY 1991 GANNETT FLEMING WEST736 No

GEOTECHNICAL REPORTSBEAR CANYON - JUAN TABO DAM, FOUNDATION AND MATERIALS INVESTIGATION REPORT 1975 SERGENT, HAUSKING & BECKW283 NoHAHN ARROYO CROSSING, HYDRAULIC CALCULATIONS FOR THE 1988 TIERRA ENGINEERING309 NoHIGH DESERT DEVELOPMENT PRELIMINARY GEOTECHNICAL INVESTIGATION 1993 BOHANNAN-HUSTON95 NoPARK DESIGN GUIDELINES 2004 ED ADAMS422 YesPIEDRA LISA ARROYO BRIDGE, PILE LOAD TEST PROGRAM 1989 BARCUS359 NoPIEDRAS MARCADAS ARROYO 1985 COMMUNITY SCIENCES169 NoSAN ILDEFONSO DR. AT THE LA BOCA NEGRA ARROYO 1987 TIERRA ENGINEERING310 NoSOUTH BROADWAY DETENTION BASIN AND STORM SEWERS, GEOTECHNICAL ENGINEERING EVALUATION 1991 WESTERN TECHNOLOGIES & R520 NoSTADIUM STORM DRAIN, GEOTECHNICAL INVESTIGATION 1993 GEO TEST746 NoTIJERAS ARROYO CROSSING AT FOUR HILLS ROAD 1985 1985 BOVAY ENGINEERS216 NoTRACE METAL VALUES IN WATER ALONG THE RIO GRANDE, COMPILATION OF 1989 NM BUREAU OF MINES & MINE402 NoWESTGATE DIVERSION CHANNELS, INTERM DESIGN REPORT 1980 GORDON HERKENHOFF768 No

LAWS, REGULATIONS,ORDINANCESNMSHD RIGHT OF WAY MANUAL RAILROAD AND UTILITY UNIT 1977 NMSHD805 NoORDINANCES, CITY OF ALBUQUERQUE CODE OF,VOL 1 2002 COA663 NoORDINANCES, CITY OF ALBUQUERQUE CODE OF,VOL 2 2002 COA664 No

LOMARCLOMAR, APPLICATION FOR A,FOR THE COMMERCIAL, CANDELARIA, CLAREMONT AND BROADWAY STORM DRAIN IMPROVEMENTS

1997 ANDREWS, ASBURY & ROBERT742 No

CLOMAR, SOUTH PINO ARROYO 1997 BOHANNAN-HUSTON741 NoCLOMAR, SOUTH PINO ARROYO 2001 BOHANNAN-HUSTON743 No

Page 19 of 25

SUBJECT Title Year ConsultantID PDF?FIRM, FLOOD INSURANCE RATE MAP COMMUNITY-PANEL, CITY OF ALBUQUERQUE, NM, BERNALILLO COUNTY, REVISED SEPTEMBER 26, 2008, PANELS 1 TO 39 ( INDEX TO 317G)

2008 FEMA680 No

FIRM, FLOOD INSURANCE RATE MAP COMMUNITY-PANEL, CITY OF ALBUQUERQUE, NM, BERNALILLO COUNTY, EFFECTIVE DATE OCTOBER 14, 1983, PANELS 1 TO 50

1983 FEMA678 No

FIRM, FLOOD INSURANCE RATE MAP COMMUNITY-PANEL, CITY OF ALBUQUERQUE, NM, BERNALILLO COUNTY, REVISED NOVEMBER 19, 2003, PANELS 1 TO 69

2003 FEMA679 No

FIRM, FLOOD INSURANCE RATE MAP COMMUNITY-PANEL, CITY OF ALBUQUERQUE, NM, BERNALILLO COUNTY, REVISED SEPTEMBER 26, 2008, PANELS 40 TO 77 ( 319G TO 555G)

2008 FEMA681 No

FLOOD INSURANCE STUDY, COA 1982 BERNALILLO COUNTY83 NoLOMR, APPLICATION FOR,FOR THE COMMERCIAL, CANDELARIA, CLAREMONT, AND BROADWAY STORM DRAIN CASE NO 97-06-1047R

1999 LARKIN GROUP715 No

VOLCANO HEIGHTS, LOMAR FOR 2009 WILSON & COMPANY612 NoLOMR

LOMR, HIGH DESERT SUBDIVISION, ADDENDUM NO 1 1999 BOHANNAN-HUSTON795 NoLOMR, HIGH DESERT SUBDIVISION, ADDENDUM NO 2 2000 BOHANNAN-HUSTON796 NoLOMR, HIGH DESERT SUBDIVISION, VOL 1 FORMS AND FLOODPLAIN MAPS 1999 BOHANNAN-HUSTON792 NoLOMR, HIGH DESERT SUBDIVISION, VOL 2 APPENDICES 1 1999 BOHANNAN-HUSTON793 NoLOMR, HIGH DESERT SUBDIVISION, VOL 3 APPENDICES 2 1999 BOHANNAN-HUSTON794 No

PARKSBIOLOGICAL PARK MASTER PLAN APPENDICES, ALBUQUERQUE 1991 CAMPBELL OKUMA PERKINS12 NoBIOLOGICAL PARK MASTER PLAN, ALBUQUERQUE 1991 CAMPBELL OKUMA PERKINS11 NoPETROGLYPH STUDY, ALBUQUERQUE WEST MESA 1987 USDOI20 NoZOOLOGICAL PARK, RIO GRANDE, MASTER PLAN 1979 JERRY TORR769 No

PLANNINGBARELAS SECTOR DEVELOPMENT PLAN DRAFT 2006 SITE SOUTHWEST419 NoDOWNTOWN ACTION PLAN DRAFT 1986 DMD63 NoINFRASTRUCTURE STUDY , NORTH I-40 BETWEEN PASEO DEL VOLCAN AND 98TH ST, DRAINAGE, WATER SUPPLY , TRANSPORTATION, AND WASTEWATER COLLECTION

1986 COA - PLANNING106 No

LOS GRIEGOS NEIGHBORHOOD DEVELOPMENT PLAN 1987 COA300 NoNOB HILL HIGHLAND SECTOR DEVELOPMENT PLAN DRAFT 2006 SITE SOUTHWEST418 NoNORTHWEST MESA AREA PLAN 1981 DMD159 NoNORTHWEST MESA ESCARPMENT PLAN 1987 COA446 NoNORTHWEST MESA ESCARPMENT PLAN, PUBLIC HEARING DRAFT 1987 SOUTHWEST LAND RESEARCH160 NoSAFETY STUDY, CITY WIDE VOL 1 ARROYOS 1985 BECK292 NoSAFETY STUDY, CITY WIDE VOL 2 BRIDGES 1985 BECK293 NoSOUTHWEST AREA PLAN VOLUME 4 1988 BERNALILLO COUNTY206 NoTRANSPORTATION PROJECTS, PROPOSED, QUARTER CENT PLAN, VER 1 1988 COA803 NoTRANSPORTATION PROJECTS, PROPOSED, QUARTER CENT PLAN, VER 2 REVISED 1988 COA804 NoVOLCANO HEIGHTS PLANNING STUDY REPORT 2005 COA493 No

Page 20 of 25

SUBJECT Title Year ConsultantID PDF?PROPOSED ROADWAY/CORRIDOR PLAN/REPORTS

AIRPORT MASTER PLAN, WEST MESA, INTERIM SUMMARY REPORT OF AIRPORT PLANS 1972 HERKENHOFF-PARSONS413 NoATRISCO ROADWAY IMPROVEMENTS 1984 RICHARD G. VAUGHAN & ASS34 NoBEAR CANYON ARROYO AND BEAR TRIBUTARY - CORRIDOR PLAN 1987 MIMBRES304 NoBRIDGE BLVD. IMPROVEMENTS, VOLUME I 1979 SCALON & ASS46 NoBROADWAY BLVD. IMPROVEMENTS MARTIN LUTHER KING TO LOMAS 1999 HARDING LAWSON ASS47 NoFOURTH STREET & MENAUL BLVD INTERSECTION RECONSTRUCTION DESIGN ANALYSIS REPORT 1983 LEEDSHILL-HERKENHOFF84 NoFOURTH STREET RECONSTRUCTION PART 1 LOMAS BLVD TO ALAMEDA DRAIN 1989 LEEDSHILL-HERKENHOFF85 NoFOURTH STREET REHABILITATION LEAD AVE TO BRIDGE BLVD DESIGN ANALYSIS 1987 HOLMES & NARVER88 NoGIBSON RECONSTRUCTION REHABILITATION UNIVERSITY TO JACKSON 1996 AVID ENGINEERING89 NoI-40 WASHINGTON STREET OVERPASS 2005 HDR ENGINEERING429 NoSAGE ROAD IMPROVEMENTS 1990 ANDREWS, ASBURY & ROBERT180 NoSAN ANTONIO ARROYO CORRIDOR PLAN - UNAPPROVED DRAFT 1987 RESOURCE TECHNOLOGY303 NoSTADIUM DRAINAGE IMPROVEMENTS, TRAFFIC IMPEDANCE ASSESSMENT 1994 BOHANNAN-HUSTON747 NoSTADIUM STORM DRAIN PHASE 2, TRAFFIC IMPEDANCE ASSESSMENT 1997 BOHANNAN-HUSTON745 NoSUNPORT TRANSPORTATION LOCATION STUDY REPORT 1991 MOLZEN-CORBIN214 NoUNSER FROM DELLYNE AVE TO COUNTY LINE, ALIGNMENT STUDY 1986 GREINER ENGINEERING SCIEN236 NoUNSER FROM LADERA TO DELLYNE, DESIGN ANALYSIS REPORT 1985 GREINER ENGINEERING SCIEN237 NoUNSER, NORTH, FROM PARADISE TO SANDOVAL COUNTY LINE, LOCATION STUDY REPORT 1989 LEEDSHILL-HERKENHOFF238 NoUNSER, NORTH, CORRIDOR ANALYSIS ,PARADISE TO SANDOVAL COUNTY LINE, FINAL 1988 LEEDSHILL-HERKENHOFF239 NoWESTSIDE / MCMAHON CORRIDOR, 1998 DRAFT 1998 PARSONS BRINKEHOFF784 NoWESTSIDE / MCMAHON CORRIDOR, INITIAL CORRIDOR STUDY 1998 PARSONS BRINKEHOFF785 NoWESTSIDE / MCMAHON CORRIDOR, TRANSPORTATION AND LAND USE GUIDE 1999 PARSONS BRINCKERHOFF783 NoWYOMING LANE WIDENING PROJECT MENAUL TO CONSTITUTION CITY PROJECT 2002 URS423 No

PUMPSPUMP STATION NO. 32, BARELAS, BAR SCREEN (HEADWORKS), O & M MANUAL 2007 HEADWORKS580 YesPUMP STATION REHAB PH-3, STORM WATER, INSTALLATION, OPERATION, AND MAINTENANCE MANUAL 2003 JCH606 NoPUMP STATION, BELL / COMMERCIAL , MODIFICATIONS FEASIBILITY REPORT 2009 SMITH ENGINEERING647 YesPUMPING STATIONS REHABILITATION STUDY, STORM WATER PHASE I,PRELIMINARY REPORT, STATIONS: 26,27, 32, 34, 35, 36, 37, AND ALCALDE (PROPOSED)

1981 BOVAY ENGINEERS294 Yes

STORM WATER QUALITYANTIBIOTIC RESISTANCE ANALYSIS OF CONTAMINATION IN STORM WATER FINAL REPORT 2002 CDM320 NoBMP, AUTOMOTIVE REPAIR 1998 COA575 YesBMP, BEST MANAGEMENT PRACTICES, DENVER URBAN STORM DRAINAGE, CRITERIA MANUAL, VOL 3 1992 CITY OF DENVER656 NoCLEAN WATER ACT:NEW DIRECTIONS, THE 1995 EPA694 No

Page 21 of 25

SUBJECT Title Year ConsultantID PDF?FLOATABLE & GROSS POLLUTANA STUDY, AMAFCA / ALBUQUERQUE MS4 2005 ASCG385 NoFLOATABLE AND GROSS POLLUTANT STUDY, AMAFCA / ALBUQUERQUE MS4, TECHNICAL APPENDIX 2005 ASCG384 NoGUIDANCE DOCUMENT FOR DEVELOPMENTAL PLANNING & CONSTRUCTION ACTIVITIES 1997 CITY OF CORPUS CHRISTI390 NoLOUISIANA ROADWAY IMPROVEMENTS, CARMEL TO SIGNAL, SWPPP 2006 STORM H2O739 NoMECHEM STORM DRAIN & DETENTION BASIN, SWPPP 2004 PARADIGM738 NoMIDDLE RIO GRANDE FECAL COLIFORM TMDL, NM NONPOINT SOURCE MANAGEMENT PROGRAM, DRAFT 2000 NMED395 NoMINNESOTA, PROTECTING WATER QUALITY IN URBAN AREAS 2000 MINNESOTA POLLUTION CONT393 NoMS4 ANNUAL REPORT 2004, ALBUQUERQUE MUNICIPAL SEPARATE STORM SEWER SYSTEM 2005 DMD COA476 YesMS4 ANNUAL REPORT 2005, ALBUQUERQUE MUNICIPAL SEPARATE STORM SEWER SYSTEM 2006 DMD COA477 NoMS4 ANNUAL REPORT 2006, ALBUQUERQUE MUNICIPAL SEPARATE STORM SEWER SYSTEM 2007 DMD COA478 NoMS4 ANNUAL REPORT 2007, ALBUQUERQUE MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 DMD COA479 YesMS4 ANNUAL REPORT 2008, ALBUQUERQUE MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 DMD COA480 NoMS4, MUNICIPAL SEPARATE STORM SEWER SYSTEM , STORM WATER PROGRAM PART 2 APPLICATION, ( REVISED MAY2,1997 AND JULY 16, 1997

1997 COA AND AMAFCA548 No

MS4, MUNICIPAL SEPARATE STORM SEWER SYSTEM OPERATORS CONFERENCE, 4TH ANNUAL, HOSTED BY COA, AMAFCA,UNM, NMSHTD , ALBUQUERQUE, NM, JUNE 11-13, 2002

2002 COA408 No

NEPA, NATIONAL ENVIRONMENTAL POLICY ACY, PROCESS, APPLYING THE, WORKSHOP MANUAL, AUGUST 27-28, 1992 1992 SHIPLEY668 NoNPDES GROUP STORM WATER DISCHARGE APPLICATION, PART 1, ALBUQUERQUE INTERNATIONAL AIRPORT AND ASSOCIATED TENANTS

1991 MOLZEN-CORBIN789 No

NPDES PERMIT APPLICATION WORKSHOP FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY 1992 EPA674 NoNPDES PERMIT APPLICATIONS FOR DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS, GUIDANCE MANUAL FOR THE PREPARATION OF PART 1 OF THE,

1991 EPA671 No

NPDES PERMIT APPLICATIONS FOR DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS, GUIDANCE MANUAL FOR THE PREPARATION OF PART 2 OF THE,

1992 EPA675 No

NPDES PERMIT APPLICATIONS FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY, GUIDANCE MANUAL FOR THE PREPARATION OR,

1991 EPA672 No

NPDES STORM WATER PERMIT APPLICATION WORKSHOP 1991 EPA673 NoNPDES STORM WATER PROGRAM PART 2 APPLICATION REPORT, SECTION 3-SUPPLEMENTAL INFORMATION, CHARACTERIZATION DATA, BOOK 1 OF 2 , (SUPPLEMENT)

1992 USGS547 No

NPDES STORMWATER MULTI-SECTOR GENERAL PERMIT FOR INDUSTRIAL ACTIVITIES, FACR SHEETS, 2006 PROPOSED REISSUANCE OF

2006 EPA540 No

NPDES STORMWATER WORKSHOP 2002 BOHANNAN HUSTON543 NoNPDES, NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM HANDBOOK 1997 NMSHTD134 NoNPDES, NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM MANUAL, STORM WATER MANAGEMENT GUIDELINES FOR CONSTRUCTION AND INDUSTRIAL ACTIVITES

2002 NMSHTD, COA, AMAFCA576 No

NPDES, NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM MANUAL, STORM WATER MANAGEMENT GUIDELINES FOR CONSTRUCTION AND INDUSTRIAL ACTIVITES, REVISION 1

2003 NMDOT, COA, AMAFCA, SSCAF577 Yes

NPDES, PERMIT FOR THE ALBUQUERQUE MS4, FINAL BILOGICAL EVALUATION, ADDITIONAL PART 2 APPLICATION FOR EPA-REGION 6 FOR THE,

2000 PARSONS549 No

NPDES, POLLUTION PREVENTION PLANS FOR CONSTRUCTION SITES, STORM WATER 2003 AMEC737 NoPESTICIDE FORMULATING, PACKAGING, AND REPACKAGING INDUSTRY, DEVELOPMENT DOCUMENT FOR BEST AVAILABLE TECHNOLOGY, PRETREATMENT TECHNOLOGY, AND NEW SOURCE PERFORMANCE TECHNOLOGY FOR THE,

1985 EPA684 No

Page 22 of 25

SUBJECT Title Year ConsultantID PDF?PESTICIDE, DEVELOPMENT DOCUMENT FOR EFFLUENT LIMITATIONS GUIDELINES AND STANDARDS FOR THE, POINT SOURCE CATEGORY

1985 EPA685 No

PLANT MATERIALS FOR USE ON SURFACE-MINED LANDS IN ARID AND SEMIARID REGIONS 1982 U.S. DEPT OF AGRICULTURE688 NoPOLLUTANT ENTRIES INTO STORM DRAINAGE SYSTEM, INVESTIGATION OF INAPPROPRIATE, A USER'S GUIDE 1993 EPA687 NoPOLLUTION SOURCE, NONPOINT, IMPACT ASSESSMENT REPORT 1990 CH2M HILL689 NoSEDIMENT MANAGEMENT STRATEGY, EPA'S CONTAMINATED, 1994 EPA686 NoSEDIMENT, SELECTING REMEDIATION TECHNIQUES FOR CONTAMINATED, 1993 EPA683 NoSEWER, STORM, SYSTEM REVIEWS AND CROSS CONNECTION STUDY, FINAL REPORT FOR THE PRELIMINARY REPORT PHASE OF EXISTING STORM,

1999 URS GREINER WOODWARD CY417 No

STORM WATER PHASE 2 COMPLIANCE ASSISTANCE GUIDE 2000 EPA512 YesSTORM WATER RUNOFF GUIDE 1991 ISCO676 NoSTORMWATER QUALITY IMPROVEMENT PLAN DRAFT, CITY OF SACRAMENTO 2000 CITY OF SACRAMENTO397 NoSUNTRAN STORM WATER POLLUTION PREVENTION PLAN 2004 COA388 NoSWPPP, SOILS AMENDMENT FACILITY WASTEWATER UTILITY DIVISION 2002 VEDAMANIKAM714 NoSWPPP, SOUTHSIDE WATER RECLAMATION PLANT 1998 BALCH713 NoTIJERAS ARROYO SEDIMENT TRANSPORT 1986 BUTCH GERBRANDT219 NoTMDL,OKLAHOMA, TOTAL MAXIMUM DAILY LOAD PRACTITIONERS GUIDE 2003 OKLAHOMA DEPT OF ENVIRON692 YesTRASH RACKS AND CATTLE GUARDS, STORM DRAINAGE FACILITIES, VOL 2 2009 SERTIL KANBAR571 YesWASTE LOAD ALLOCATIONS, TECHNICAL GUIDANCE MANUAL FOR PERFORMING, BOOK II STREAMS AND RIVERS, CHAPTER 3 TOXIC SUBSTANCES

1984 EPA677 No

WATER POLUTION PREVENTION, SOIL EROSION AND, 1992 NACE695 NoWATER QUALITY - AUSTIN 1989 MEL HENSEN394 NoWATERSHED MODEL USERS MANUAL, TEXAS A & M 1986 TEXAS A&M UNIV-CE DEP296 No

TECHNICAL REFERENCEAHYMO, MODELING AND DRAINAGE CRITERIA, HYDROLOGIC, USING THE AHYMO COMPUTER PROGRAM, TWO SHORT COURSES, MARCH 26-27, AND APRIL 16-17, 1992, AT THE UNIVERSITY OF NEW MEXICO

1992 ANDERSON AND HEGGEN665 No

AHYMO, MODELING USING THE AHYMO COMPUTER PROGRAM, ARID LAND HYDROLOGIC, A TWO DAY SHORT COURSE SPONSORED BY THE AMERICAN COUNCIL OF ENGINEERING COMPANIES OF NM, AT UNM, MAY 22-23, AND 29-30, 2003

2003 ANDERSON, HEGGEN AND CO667 No

AHYMO, MODELING USING THE AHYMO COMPUTER PROGRAM, ARID LAND HYDROLOGIC, A TWO DAY SHORT COURSE SPONSORED BY THE AMERICAN COUNCIL OF ENGINEERING COMPANIES OF NM, AT UNM, OCTOBER 16-17, AND 18-19, 2001

2001 ANDERSON AND HEGGEN666 No

AMAFCA, A HISTORY OF THE ALBUQUERQUE METROPOLITAN ARROYO FLOOD CONTROL AUTHORITY 1992 PETERSON562 NoASTM STANDARDAS FOR PRECAST CONCRETE PIPE 1986 ASTM697 NoATLAS, CITY OF ALBUQUERQUE 1990 1990 COA669 NoATLAS, CITY OF ALBUQUERQUE 1991 1991 COA670 NoAWRA, JOURNAL, AUGUST 1999 1999 AWRA704 NoAWRA, JOURNAL, OCTOBER 1998 1998 AWRA703 NoBRIDGE SCOUR PROCEDURES, PRACTITIONER'S GUIDE TO HEC-18 1994 HDR544 No

Page 23 of 25

SUBJECT Title Year ConsultantID PDF?CATALOG, ENGINEERING, VALVE AND PRIMER, 2008 EDITION 2008 APCO696 NoCOMPUTER SIMULATION OF STORM RUNOFF FOR THREE WATERSHEDS IN ALBUQUERQUE 1994 USGS653 NoDAM SAFETY DESIGN CRITERIA 1999 THOMAS C. TURNEY56 NoDETENTION OF URBAN STORMWATER RUNOFF, PRACTICES IN, 1974 APWA632 NoDPM, DEVELOPMENT PROCESS MANUAL, VOL 3, POLICIES AND PLANS 1982 COA655 NoDPM, SECTION 22.2 HYDROLOGY DEVELOPMENT PROCESS MANUAL, REVISION 1997 BERNALILLO COUNTY & COA383 NoEARTH, UNDERSTANDING THE, 1995 USGS701 NoELECTRIC SERVICE GUIDE, 1995 1995 PNM693 NoEROSION AND SEDIMENT CONTROL, BEST MANAGEMENT PRACTICES 1995 USDOT634 NoFLOOD INSURANCE STUDY, BERNALILLO COUNTY AND INCORPORATED AREAS, VOLUME 1 OF 2 2003 FEMA318 NoFLOOD INSURANCE STUDY, BERNALILLO COUNTY AND INCORPORATED AREAS, VOLUME 2 OF 2 2003 FEMA319 NoFLOW MEASUREMENT HANDBOOK, ISCO OPEN CHANNEL 1995 ISCO705 NoGROUND WATER RECHARGE, DOCUMENTATION OF A DEEP PERCOLATION MODEL FOR ESTIMATING 1987 BAUER & VACCARO59 NoHEC-HMS, HYDROLOGIC MODELING SYSTEM, TECHNICAL REFERENCE MANUAL, VER 2.1, 2001 2001 USACE611 NoHEC-HMS, HYDROLOGIC MODELING SYSTEM, USE'S MANUAL, VER 2.1, 2001 2001 USACE610 NoHEC-RAS, RIVER ANALYSIS SYSTEM, APPLICATION GUIDE, VER 3.0, 2001 2001 USACE609 NoHEC-RAS, RIVER ANALYSIS SYSTEM, HYDRAULIC REFERENCE MANUAL, VER 3.0, 2001 2001 USACE608 NoHEC-RAS, RIVER ANALYSIS SYSTEM, USER'S MANUAL, VER 3.0, 2001 2001 USACE607 NoHYDRAFLOW, STORM SEWERS FOR WINDOWS, USER MANUAL, VER 6.1 1995 INTELISOLVE600 NoHYDROCALC HYDRAULICS, USER'S MANUAL AND PROGRAM REFERENCE 1989 DODSON601 NoHYDROLOGIC STUDIES IN SUPPORT OF PROJECT FUNCTIONS, HYDROLOGY AND HYDRAULICS WORKSHOP, ANGEL FIRE, NM, AUGUST 7-9 , 1990

1990 USACE581 No

HYDROLOGY FOR SMALL WATERSHEDS, URBAN, TR-55 1975 SCS, USDOA533 NoHYDROLOGY FOR SMALL WATERSHEDS,URBAN, TR-55, CLASS MATERIAL 1975 SCS, USDOA604 NoHYDROLOGY OF AREA 62., NORTHERN GREAT PLAINS AND ROCKY MOUNTAIN COAL PROVINCES, NEW MEXICO AND ARIZONA

1984 USGS389 No

INSTALLATION, CONCRETE PIPE MANUAL 1984 ACPA708 NoINSTALLATIONS AND BEDDING FACTORS FOR THE INDIRECT DESIGN METHOD, STANDARD, DESIGN DATA 40 1996 ACPI700 NoINSTITUTIONAL ASPECTS OF URBAN RUNOFF MANAGEMENT 1997 WATERSHED MANAGEMENT IN403 NoINSTRUMENTATION, CONTROL, PROCESS AND ELECTRICAL SYSTEM, DESIGN DOCUMENTATION GUIDELINES FOR,PRELIMINARY DESIGN MEMORANDUM NO 6

1995 CDM559 No

INTERIM SOIL CEMENT GUIDE 1993 AMAFCA488 NoMANHOLES, HEAD LOSSES AT SELECTED SEWER, SPECIAL REPORT NO 52 1985 APWA578 NoNOAA 2, PRECIPITATION-FREQUENCY ATLAS OF THE WESTERN UNITED STATES, VOL 4, NEW MEXICO 1973 NOAA537 NoPARTNERING PROMOTING A CONCEPT FOR SUCCESS 1991 NM PARTNERING COALITION489 NoPIPE DESIGN AND CONSTRUCTION, HANDBOOK OF PVC 1993 UNI-BELL PVC PIPE ASS699 NoPIPE ENGINEERING MANUAL, CLAY 1978 NCPI698 No

Page 24 of 25

SUBJECT Title Year ConsultantID PDF?PROJECT MANAGER HANDBOOK 1993 COA267 NoPROJECTS COMPENSATION NEGOTITATION MANUAL 1991 COA541 NoPROJECTS, NM STATE HUGHWAY DEPARTMENT SYSTEMS PROCEDURES, URBAN 1974 NMDOT778 NoRIPRAP GRADIENT CONTROL STRUCTURES, HYDRAULIC DESIGN OF 1976 USDOA499 NoRIPRAP REVETMENT, DESIGN OF, HEC 11, METRIC VERSION 2002 FHA350 NoSANITARY SEWER SYSTEM SECTIONAL MAPS 1987 COA-MAPS AND RECORDS592 NoSANITARY SEWER DISTRIBUTION SYSTEM SECTIONAL MAPS, COA 1989 COA-MAPS AND RECORDS591 NoSCOUR AT BRIDGES, EVALUATING (FOURTH EDITION) 2001 USDOT349 NoSEDIMENT AND EROSION DESIGN GUIDE, AMAFCA, DRAFT 1992 RESOURCE492 NoSEDIMENTATION INVESTIGATIONS OF RIVERS AND RESERVOIRS 1989 USACE487 NoSOIL CEMENT GUIDE 1993 AMAFCA190 NoSPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, CITY OF ALBUQUERQUE STANDARD, UPDATE 7, 2003 1986 COA654 NoSTORM DRAINAGE CRITERIA MANUAL, URBAN 1999 DENVER FLOOD DIST382 NoSTORM FACILITIES MAPS, 2000 2000 DMD539 NoSTORM WATER MANAGEMENT AND TECHNOLOGY 1993 EPA712 NoSTORMWATER MANAGEMENT SYSTEMS,URBAN, DESIGN AND CONSTRUCTION OF 1992 ASCE711 NoSTORMWATER MANAGEMENT, INTEGRATED 1993 FIELD, O'SHEA, AND CHIN706 NoSTORMWATER RUNOFF FROM NEW DEVELOPMENT, REDUCING THE IMPACTS OF 1992 NEW YORK ENVIRONMENTAL633 NoTIJERAS ARROYO GRADE AND BANK STABILIZATION; PRELIMINARY TECHNICAL REPORT 1993 LEEDSHILL-HERKENHOFF343 NoWATER AND WASTEWATER LABORATORIES, ANALITICAL CONTROL IN, HANDBOOK FOR 1972 EPA602 NoWATER DISTRIBUTION SYSTEM SECTIONAL MAPS, COA 1987 1987 COA-MAPS AND RECORDS593 NoWATER DISTRIBUTION SYSTEM SECTIONAL MAPS, COA 1989 1989 COA- MAPS AND RECORDS594 NoWATER RESOURCES ENGINEERING JOURNAL 1964 LINSLEY AND FRANZINI710 NoWATER SUPPLY AND SEWERAGE 1960 STEEL709 NoWEST BLUFF DRAINAGE PLAN PHASE II, EXISTING CONDITIONS REPORT - CITY PROJECT # 1868 1984 ANDREWS, ASBURY & ROBERT286 No

WATER RESOURCESGROUND-WATER FLOW IN THE ALBUQUERQUE BASIN, CENTRAL NM 1901-1994, WITH PROJECTION TO 2020, SIMULATION OF

1995 USGS AND COA605 No

GROUND-WATER PROTECTION POLICY AND ACTION PLAN 1994 BERNALILLO COUNTY370 NoPROJECTS, USDOI, UPPER RIO GRANDE BASIN ( ALBUQUERQUE OFFICE), ANNUAL OPERATING PLAN 1989 1989 USDOI17 NoPROJECTS, USDOI, UPPER RIO GRANDE BASIN ( ALBUQUERQUE OFFICE), ANNUAL OPERATING PLAN 1990 1990 USDOI18 NoPROJECTS, USDOI, UPPER RIO GRANDE BASIN ( ALBUQUERQUE OFFICE), ANNUAL OPERATING PLAN 1991 1991 USDOI19 NoRECLAIMED WATER, PUBLIC HEALTH STUDY AND ASSESSMENT OF MIDDLE RIO GRANDE AND ALBUQUERQUE'S, 2000 CAMP DRESSER & MCKEE416 NoUPPER RIO GRANDE BASIN PROJECTS 1988 USDOI244 No

Page 25 of 25