TODAY’S WORK PROCESSES IN EPC EXECUTION
Engineering Supply Chain Fabrication & CommissioningProject Management
It’d be better if we change the pump flowrateWhy didn’t you do this earlier? My safety analysis has to be re-run
Now my pipe is undersized
The delivery time on that pump is 6 weeks longer!
We don’t have enough pipe in that size
Our order doesn’t have enough PSVs in that size
Why is my schedule delayed?
What happened to the budget?Those pipes are already installed
I can’t install that pump that lateWe have to re-do the test planning
I don’t have the material for this work pack
Open
Copyright UPEC 2018
TOMORROW’S WORK PROCESSES IN EPC EXECUTION
Engineering Supply Chain Fabrication & CommissioningProject Management
Cross Functional Collaboration Platform
Open
Copyright UPEC 2018
LOOKING BEYOND TYPICAL CAPITAL PROJECT SOLUTIONS
Open
Copyright UPEC 2018
APPLYING “PLM” TO CAPITAL PROJECTS
Open
Copyright UPEC 2018
REAL-TIME REPORTING TO ENABLE ACTION
Open
Copyright UPEC 2018
3D MODEL ENABLED VISUALIZATION
Open
Copyright UPEC 2018
CROSS FUNCTIONAL COLLABORATION
Functionality:• Common Platform for allproject team members• Digital Workflows• Standardized Objects• Object Relationships
Accuracy of Reporting
Improved On-Time Delivery
Transparency
Open
Copyright UPEC 2018
INDUSTRY CHALLENGES – MOVING FROM PAPER TO DIGITAL
• Procedures rarely identify all of thedetails actually required to complete aprocess• Procedures may not define datarequirements to be captured• Procedures typically don’t definereporting requirements in detail
Open
Copyright UPEC 2018
INDUSTRY CHALLENGES – IT’S NOT THE TECH
Obstacles to Change:• “This is how we’ve always done it”• Comfort with existing approaches andtools• Fear
Enabling Change:• Why, What, and How• Training and Support• Top-Down• Recognition
Open
Copyright UPEC 2018
INDUSTRY CHALLENGES – CHANGING STANDARDS
CFIHOS• Capital Facilities Information HandOverSpecification for process industries• Standardize the specification ofinformation handover requirements fora project for operators, contractors andequipment manufacturers and suppliers• Consistent IHO standards allowintegration of information requirementsinto systems resulting in more efficientdelivery and improved quality of theinformation