page 1 Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 Upgrade of the SPS injection kicker system MKP l Present system l Why do we need a new system? l Presentation of the new system l Status of the PFN l Status of the magnets l Magnetic field measurements l Changes to the layout of BA1 l Work in the coming shutdowns

Upload: others

Post on 11-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 1Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Upgrade of the SPS injectionkicker system MKP

l Present systeml Why do we need a new system?l Presentation of the new systeml Status of the PFNl Status of the magnetsl Magnetic field measurementsl Changes to the layout of BA1l Work in the coming shutdowns

Page 2: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 2Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Model of the present system

0 10 20 30 40 50longitudinal position@mD

-0.1

0

0.1

0.2

latnozirohnoitisop

@m D

Kicker layout: oldsetup Optics: standard Calculated 12-1 -1999 at 11:19Particle = fixedtpEmittance = 0.75 mm mraddpêp =0.0005Size of injected beam is 5 sigma.

HV1 = 26.1kVHV2 = 26.1kVHV3 = 26.1kV

Dx =0. mm

Septum dist. = 35.8 mmSeptum angle = -1.79mradQuad displ. = -4.8 mmThetaMDPH = 0 mrad

Septum

TIDV QDA119MKP1 TO 3

MDPH

TBSJB

Fitted valueAgrees with actuallyused voltages

Clearance:5 σ + 8 mm

Fitted value

Page 3: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 3Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Present MKP system lay-out

Page 4: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 4Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

MKP system requirementsBeam Injection

EnergyRise time Flat top Fall Time Ripple

LHCprotons

26 GeV/c < 220 ns 2.1 [µµs] machine3/11 full

< ±± 0.5 %

FixedtargetProtons

14 GeV/c <1000 ns 10.5 [µµs] 1.0 [µµs] < ±± 1.0 %

LHC ions 12.9GeV/c

< 115 ns 0.5 [µµs] machine3/11 full

< ±± 0.5 %

Fixedtargetions

12.9GeV/c

< 1000 ns 2.0 [µµs] 3.8 [µµs < ±± 1.0 %

Short rise time to keepPS bunch structure

Present kicker rise timeis more than 220 ns

Shorter rise time will beobtained by:- larger magnet impedance- shorter magnets

But:- extra magnets to have sufficient strength

Tighter !!

Page 5: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 5Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Model of the new system for theLHC type proton beam

0 10 20 30 40 50longitudinal position@mD

-0.1

0

0.1

0.2

latnozirohnoitisop

@mD

Kicker layout: tank3two17 Optics: standard Calculated 12-1 -1999 at 14:3Particle = LHCpEmittance = 0.11 mm mraddpêp =0.0011Size of injected beam is 5 sigma.

HV1 = 48.4kVHV2 = 48.4kVHV3 = 48.4kV

Dx=0. mm

Septumdist. = 35.8 mmSeptumangle = -1.62mradQuad displ. = -4.8 mmThetaMDPH = 0 mrad

Page 6: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 6Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

New system for the fixed target protonbeam: don’t use fourth tank!

0 10 20 30 40 50longitudinal position@mD

-0.1

0

0.1

0.2

latnozirohnoitisop

@m D

Kicker layout: tank3two17 Optics: standard Calculated 12-1 -1999 at 12:13Particle = fixedtpEmittance = 0.75 mm mraddpêp =0.0005Size of injected beam is 5 sigma.

HV1 = 49.2kVHV2 = 49.2kVHV3 = 0. kV

Dx =0. mm

Septum dist. = 35.8 mmSeptum angle = -1.96mradQuad displ. = -4.8 mmThetaMDPH = 0 mrad

In this case MKP4has to produce amaximum pulselength of 2.1 µs instead of 10.5 µs

Page 7: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 7Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

New system: dumped ion beamTightest on clearance

0 10 20 30 40 50longitudinal position@mD

-0.1

0

0.1

0.2

latnozirohnoitisop

@m D

Kicker layout: tank3two17 Optics: standard Calculated 12-1 -1999 at 14:20Particle = ionsEmittance = 0.8 mm mraddpêp =0.00015Size of injected beam is 5 sigma.

HV1 = 0. kVHV2 = 0. kVHV3 = 0. kV

Dx =0. mm

Septum dist. = 35.8 mmSeptum angle = -1.96mradQuad displ. = -4.8 mmThetaMDPH = 2.73 mrad

Clearance:5 σ + 3.5 mm

Page 8: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 8Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

New MKP kicker lay-out

Page 9: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 9Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Comparison of Old and NewSystem

l Old System» 6 PFNs

» 8 S-type modules, 12.5 Ω» 4 L-type modules, 12.5 Ω

» 1 spare tank (L*), 4 modules

l New System» 8 PFNs» possibly 6 PFLs

» 12 S-type modules, 16.67 Ω» 4 L-type modules, 12.5 Ω

» 3 different spare tanks: 11 modules

Page 10: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 10Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Status of the MKP PFNsl 1.5 m long test coil made. Impedance checked: within 1 %.

l One PFN assembled with this test coil. Low voltagemeasurements with low power switch.

l Comparison of measurements and calculations» HV measurement of MKA switch characteristics ->

adaptation of the low power switch

» Adaptation of front cells

l Coming soon:» High voltage tests with this PFN» Adaptation of the front cells» Long coils, three different diameters to compensate

for resistive losses

l Still a lot of work to do!

Page 11: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 11Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Status of the MKP magnets I

Page 12: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 12Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Status of the MKP magnets II

l One prototype S-type magnet finished» High voltage measurement with PFL in air» Fast inductive and capacitive probes developed» Will have to be disassembled and modified for final version

l First ‘LS magnet’ should be under vacuum in 4 weeks time» Damping resistors

» Incorporated magnetic field probes →» Outgassing tests of ferrites

l New baseplates, frames etc.

l Production of second LS module started

l Series started, another 18 magnets to go!

Page 13: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 13Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Magnetic field probes

l Fast risetime and small ripple of magnetic fieldrequired

l New probes developed to measure this accurately» Inductive probe (two shielded coax cables) in the aperture:

most accurate, but can’t install this in the machine

» Capacitive pick-ups incorporated in the earth connectionplates

– Stays in the machine to check magnet and PFNs– Calibrated with inductive pick-ups

Page 14: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 14Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Results from the two different types ofmagnetic field probes

Capacitive pick −up incorporated , temporary shielding . Input filter on switch . Scaling factor 1.003Tek00006 .csv measured 4−11−1999 at 17:16Tek00009 .csv measured 4−11−1999 at 17:22Calculated 5−11−1999 at 14:36

-1. ×10 - 7 0 2.5 ×10 - 7 5.×10 - 7

0.92

0.94

0.96

0.98

1

1.02

1.04

Tek00006 .csv − Tek00007 .csv Hred L andTek00008 .csv − Tek00009 .csv Hblue L

-1. ×10 - 7 0 2.5 ×10 - 7 5.×10 - 7

-0.04

-0.02

0.02

0.04

Tek00006 .csv − Tek00007 .csv minusTek00008 .csv − Tek00009 .csv

-1. ×10- 7 0 7.5 ×10

- 81.5 ×10

- 7

0.2

0.4

0.6

0.8

1

Tek00006 .csv − Tek00007 .csvRisetime 1: 83.0004 ns Hbetween 5. % and 96. %L

-1. ×10- 7 0 7.5 ×10

- 81.5 ×10

- 7

0.2

0.4

0.6

0.8

1

Tek00008 .csv − Tek00009 .csvRisetime 2: 79.0004 ns, Hbetween 5. % and 96. %L

Page 15: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 15Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Present layout in BA1

Page 16: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 16Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Proposed new layout

Faraday cage & racks other side ofloading bay

Page 17: Upgrade of the SPS injection kicker system MKP · Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99 page 1 Upgrade of the SPS injection kicker system MKP l Present system l Why do we

page 17Jan Uythoven SL/BT. Group meeting 9 Nov. ‘99

Work in the coming Shutdownsl Shutdown ’99 - 2000

» Install 6 new RG cables tunnel» Prepare electronic racks and cabling BA1» MDPH replaced by MDSH: stronger, final position, new pc

l Shutdown 2000 - 2001» Upgrade of all electronics and new Faraday cage

» Installation of 3 new kicker tanks (S-modules)» Modification 6 PFNs

l Shutdown 2001 - 2002» Replacement of 1 kicker tank (L-modules)

» Modification of 2 PFNs

l Shutdown 2007 - 2008 (about)» Installation PFLs or upgrade of the PFNs