S upporting an energy-service per- formance contractor, McKenney’s developed and installed several energy conservation measures (ECM)— including new domestic hot water (DHW), heating hot water (HHW) and HVAC systems. THE CHALLENGE The facilities had existing steam boiler plants, chillers and HVAC equipment that had to remain operational during the ECM upgrades.  A plan was needed t o tie in the new systems without incurring service interruptions in high security, limited access work areas. THE SOLUTION During project development, McKenney’ s provided design/assist services to advance a phasing plan to meet facility requirements and avoid service interruptions. T emporary services were provided when facility interrup- tions were unavoidable. Components for the DHW, HHW systems and rooftop units for the HVAC systems were prefabricat ed—including boiler/pump skids that could be quickly installed —to minimize the team’s time on premise. THE RE SUL TS McKenney’ s installed the ECMs with minimal downtime and increased HVAC performance levels while reducing energy costs. Startup, commissioning and owner training resources led to a clean project close out. Upgrades Paid for by Energy Savings PROJECT NAME   Performance Contract Steam Decentralization and HVAC Replacement PROJECT L OCA TION   North Carolina PROJECT TEAM   Owner: North Carolina Department of Corrections   Prime Contractor: NORESCO, LLC   Engineer: BWA Engineering PA   Turnkey Design Builder: McKenney’s, Inc. SPECIALIZATIONS  Design/Assist  Energy Management  Pipe Shop Prefab Sheet Metal Shop Prefab MARKETS   Performance Contractor   Government The content of this document is not intended as an endorsement. www.mckenneys.com © 2015 McKenney’s, Inc., Atlanta, Georgia. A ll rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of M cKenney’s, Inc. All other trademarks are the property of t heir respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard  Atlanta, Geo rgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Upload: mckenneys-inc

Post on 09-Jan-2016

18 views

Category:

Documents


0 download

DESCRIPTION

Supporting an energy-service performance contractor, McKenney’s developed and installed several energy conservation measures (ECM)—including new domestic hot water (DHW), heating hot water (HHW) and HVAC systems.

TRANSCRIPT

7/17/2019 Upgrades Paid for by Energy Savings

http://slidepdf.com/reader/full/upgrades-paid-for-by-energy-savings 1/1

Supporting an energy-service per-

formance contractor, McKenney’s

developed and installed several

energy conservation measures (ECM)—

including new domestic hot water (DHW),

heating hot water (HHW) and HVAC systems.

THE CHALLENGE

The facilities had existing steam boiler plants,

chillers and HVAC equipment that had to

remain operational during the ECM upgrades.

 A plan was needed to tie in the new systems

without incurring service interruptions in high

security, limited access work areas.

THE SOLUTION

During project development, McKenney’sprovided design/assist services to advance

a phasing plan to meet facility requirements

and avoid service interruptions. Temporary

services were provided when facility interrup-

tions were unavoidable. Components for the

DHW, HHW systems and rooftop units for th

HVAC systems were prefabricated—includ

boiler/pump skids that could be quickly insta

—to minimize the team’s time on premise

THE RESULTSMcKenney’s installed the ECMs with minim

downtime and increased HVAC performanc

levels while reducing energy costs. Startup,

commissioning and owner training resource

led to a clean project close out.

Upgrades Paid for by Energy SavingsPROJECT NAME

  Performance Contract

Steam Decentralization

and HVAC Replacement

PROJECT LOCATION

  North Carolina

PROJECT TEAM

  Owner: North Carolina

Department of Corrections

  Prime Contractor:

NORESCO, LLC  Engineer: BWA Engineering PA

  Turnkey Design Builder:

McKenney’s, Inc.

SPECIALIZATIONS

  Design/Assist

  Energy Management

  Pipe Shop Prefab

  Sheet Metal Shop Prefab

MARKETS

  Performance Contractor

  Government

The content of this document is not intended as an endorsement.

www.mckenneys.com

© 2015 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of t heir respective owners.

404-622-5000

[email protected]

1056 Moreland Industrial Boulevard

Atlanta, Georgia 30316

704-357-1

info@mckenneys

3601 Performance R

Charlotte, North Carolina 28