upstream international europe flags pipeline
TRANSCRIPT
TO FORTIES
CATS
(BP)
SEA
L
INTERC
ON
NEC
TOR
BBL
LAN
GEL
ED
ST FERGUS
ABERDEEN
BRAEFOOT BAY
BACTON
STANLOW
TEESSIDE
ORKNEY ISLANDS
SHETLAND ISLANDS
SULLOM VOETERMINAL
FAROES
DEN HELDER
BERGEN
PARIS
LONDON
MOSSMORRAN
THE HAGUE
SEAN FIELD
INDE FIELD
SCHIEDAM
STAVANGER
GRIJPSKERK
LANGELO/NORG
EMMEN
ZEEBRUGGE
BALGZANDGREAT YARMOUTH
EASINGTON
HOWE
NELSON SOUTH
BRENT A
BRENT BBRENT C
BRENT D
PENGUINS
ANASURIA
GUILLEMOTTEAL SOUTHTEALCOOK
NELSON
GOLDENEYE
GANNET
CURLEW
CURLEW
HAEWENE BRIM
BITTERN
TRITON
SHEARWATER
SCOTER
BARQUE
BRIGANTINECLIPPER
GALLEON
SKIFF
INDE
SEAN
LEMAN
CORVETTE
AMELAND
ETAP
CARAVEL
SHAMROCK
PIERCE
STARLING
MERGANSER
SKUA
EGRETHERON
KEY
UPSTREAM INTERNATIONAL EUROPE
ACTIVITIES AROUND THE NORTH SEAThis map is for illustrative purposes and has not been drawn to scale
FLAG
S
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015
FLAGS PIPELINE
ST FERGUS
FLAGS PIPELINEThe Far north Liquids and Associated Gas System (FLAGS) pipeline runs from the Brent field to the St Fergus Gas Terminal.
KEY FACTS Sector
Diameter
Hydrocarbons Carried
Export Method
Operated / Non Operated
Northern North Sea
36 inch diameter
Gas
The Far north Liquids and Associated Gas System (FLAGS) pipeline runs from the Brent platforms to the St Fergus Gas Terminal
Operated
Commissioned 1982
HIGH LEVEL CAPACITY INFORMATIONThe basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years
Available Capacities
Description
Gas capacity
Comment
Due to the integrated nature of the SEGAL System, this capacity information needs to be read in conjunction with that of the St Fergus Gas Terminal and the FNGL Plant.
2015 2016 2017 2018 2019
>25% 5% to 25% <5% Unknown
Ullage as % of system capacity
KRISTIANSUND
OSLO
NYHAMNA
Gra
phic
s, M
edia
and
Pub
licat
ion
Serv
ices
(Abe
rdee
n)
ITV
/UD
: Re
f. 99
209
: M
AY 2
012
SUBSEA SATELLITE
SUBSEA SATELLITE NON OPERATED
SHELL OPERATED ASSET
NON OPERATED FPSO
SHELL PLANT
SHELL FPSO
OFFICE
ONSHORE GAS FIELD
KEY
FLAGS PIPELINE
INFRASTRUCTURE INFORMATION
Entry Specification:
Exit Specification:
Shipper Gas shall be technically free from objectionable odours and dust or other matters (whether in a solid, liquid or gaseous state or other physical state), waxes, gums, gum forming constituent which might cause injury to or interference with the operation of the lines, meters, regulators or other appliances through which it flows.CO2: 1.6 %vol maxH2S: 2.5 ppmv maxTotal Sulphur: 15 ppmv (as H2S) maxWater: 35 ppmv maxCricondenbar: 105 bar(a) maxOxygen: 10 ppm maxMercury: 0.01 µg/m3 maxC3+ : 5.5% mol minSpecs on several other trace contaminants
Not applicable
Capacity
33 million sm³/d wet gas
Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time
CONTACT INFORMATION
Shell For further enquiries regarding the above please contact Charles Cole +44 1224 88 2606 [email protected]
Last update: January 2015
Subject to the availability of relevant capacity, each of Shell and Esso is capable of independently providing transportation and processing services using its own proportionate share of available capacity in the Segal System (“Divided Rights”). Please contact either the Shell or Esso representative for further information:
For further enquiries regarding the above please contact Marc Bong-Schmidt +44 1372 412 354 [email protected]
Esso