uranium exploration company - uravan€¦ · uravan’s property portfolio consists of 8...

24
TSX-V : UVN TSX-V : UVN URANIUM EXPLORATION COMPANY EXPLORATION FOR HIGH-GRADE URANIUM DEPOSITS IN SANDSTONE BASINS GETTING TO DISCOVERY QUICKER AND MORE COST EFFECTIVELY USING APPLIED RESEARCH – SUCCESSFUL EXPLORATION THROUGH SCIENCE

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN TSX-V : UVN

URANIUM EXPLORATION COMPANY EXPLORATION FOR HIGH-GRADE URANIUM DEPOSITS IN SANDSTONE BASINS

GETTING TO DISCOVERY QUICKER AND MORE COST EFFECTIVELY USING APPLIED RESEARCH – SUCCESSFUL EXPLORATION THROUGH SCIENCE

Page 2: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

FORWARD LOOKING STATEMENTS This presentation may contain forward looking statements including those describing

Uravan’s future plans and the expectations of management that a stated result or condition will occur. Any statement addressing future events or conditions necessarily involves inherent risk and uncertainty. Actual results can differ materially from those

anticipated by management at the time of writing due to many factors, the majority of which are beyond the control of Uravan and its management. Readers are cautioned

that the foregoing list of risk factors should not be construed as exhaustive. These statements speak only as of the date of this release or as of the date specified in the

documents accompanying this release, as the case may be. Uravan undertakes no obligation to publicly update or revise any forward-looking statements except as

expressly required by applicable securities laws.

Page 3: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

URAVAN MINERALS INC. • Uravan is searching for partners to fund $10 - $15 Million in exploration

over the next 3 to 5 years in the Athabasca Basin, Saskatchewan Canada • Uravan is a uranium exploration company that engages in applied research. • Uravan has develop new surface geochemical technologies to identify

buried uranium deposits in under-explored areas. • Uravan has a technical group made up of highly experienced mineral

explorers and seasoned upper management.

Capital Structure

Shares Issued: 37,599,346 Insider holdings: 9,934,605 (29%)

Options Granted: 2,476,667@ $0.27 Warrants Granted: 5,951,366 @ $0.38

Working Capital: $2.0 Million

Uravan trades on the TSX Venture Exchange: Symbol UVN

Page 4: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

URAVAN’S KEY BUSINESS STRATEGY • Explore for high-grade uranium deposits in sandstone basin environments. • Target size – uranium deposits grading >1% containing >100,000,000

pounds U3O8

• Drill an economic uranium intersection

on one-in-three projects explored.

• Reduce the number of drill holes to discovery by two-thirds.

• Develop new exploration technologies

using applied research – successful exploration through science.

Page 5: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

RATIONALE FOR APPLIED RESEARCH To find the next generation of uranium deposits, a cost effective way to identify

buried uranium mineralization in under-explored terrain is essential

Page 6: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

To accomplish this, understanding the process by which elements move from buried uranium mineralization to near surface environments (soils

and plants) where they can be geochemically measured is critical

EXPLORATION THROUGH APPLIED RESEARCH

Page 7: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

FINDING DEPOSITS USING APPLIED RESEARCH

7

• Microbial activity at the surface of buried uranium mineralization promotes the migration of elements and gaseous compounds upward to surface environments

• This process traps and concentrates metal complexes and distinctive isotopic signatures in certain soil components and vegetation resulting in unique anomalies over the deposit.

• By sampling and analyzing soil and plant material, bedrock sources of buried mineralization can be identified.

Page 8: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

CIGAR WEST URANIUM DEPOSIT STUDY • In 2009, under a collaborative agreement with Areva and Cameco, Uravan and QFIR

conducted a pilot study over the known high-grade Cigar West uranium deposit1. • The study included sampling and analyzing drill core, soil horizons, vegetation and tree

cores over a known high-grade uranium deposit. • Objective: trace the movement of elements and unique isotopic signatures from the

deposit to surface environments.

Cigar West Study area showing locations of surface samples & drill holes

1The Cigar Lake deposit is on the Waterbury/Cigar uranium property; a joint venture partnership between Cameco Corporation, AREVA, Idemitsu Kosan Co. Ltd., and Tokyo Electric Power Co. [TEPCO]) located in the Athabasca Basin, Saskatchewan. Uravan thanks both AREVA and Cameco for their research collaboration and gracious support for the Cigar West Study; and the support provided by the Cigar Lake facility during our field operations.

Page 9: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

The results of the study clearly identified distinctive elements and isotopic compositions that have been mobilized from the Cigar West deposit to the surface media through > 450 meters of sandstone.

CIGAR WEST URANIUM DEPOSIT STUDY

Page 10: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

WHY WE USE LEAD ISOTOPES IN URANIUM EXPLORATION

• Lead (Pb) is the natural end product of uranium (U) decay and can therefore be used as a vectoring tool to uranium deposits.

• Uranium has 2 main isotopes: U235 and U238. • 99% occurs as U238, while ~0.7% occurs as U235. • Importantly each isotope naturally decays over time to a

different isotope of lead • U238 Pb206 U235 Pb207 • We use the ratio between these two Pb isotopes to

identify possible U deposits

As a result of the Cigar West Study, Uravan has developed new technologies and specific indicators that identify the most probable location of buried uranium mineralization versus drilling blind conductors.

Page 11: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

WHY WE USE LEAD ISOTOPES IN URANIUM EXPLORATION

• 207/206 isotope ratio values measured in soil, water or vegetation is ~0.90 (common lead); not anomalous

• At a uranium deposit this 207/206 ratio is ~0.10 (radiogenic lead); very anomalous

• As radiogenic lead migrates away from a deposit it ‘mixes’ with common lead, producing 207/206 ratios at <0.65.

• It is this subtle change in lead isotopic composition that Uravan’s geochemical analyses can measure to vector drilling.

Page 12: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

URAVAN’S RESEARCH PARTNERS • Queen’s Facility for Isotope Research (QFIR) at Queen’s University, Ontario. • Under the direction of Dr. Kurt Kyser, QFIR is a group of highly experienced

research geochemists • QFIR lab is a state-of-the-art research facility. • The QFIR research team works collaboratively with Uravan’s technical group to

develop new exploration technologies. • Dr. Colin Dunn, an independent specialist in biogeochemistry, is working closely

with Uravan’s technical group and QFIR to advance the interpretation of biogeochemical results.

• Dr. Kurt Kyser and Dr. Colin Dunn are key technical advisors for Uravan

Page 13: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

DEEP EXPLORATION GEOCHEMISTRY FOR URANIUM DEPOSITS

• Uravan and QFIR have entered into a three (3) year collaborative applied research grant; a government sponsored NSERC CRD approved project.

• Goals of the study: (1) Apply recently developed geochemical protocols for remote sensing undercover deposits (from the Cigar Lake Study) to the Outer Ring and other Uravan Athabasca Basin projects. (2) Develop new protocols for more reliable and definitive indicators of mineralization at depth in these prospective but under-explored areas.

• Budget: $100,000 per year for 3 years from Uravan with matching funds by the Federal Government.

Page 14: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

URAVAN PROPERTY PORTFOLIO • Uravan’s property portfolio consists

of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project.

• Successful drilling on the OR-MATH project, completed in 2011, will be followed in 2012 with several more drill-holes planned.

• Strong surface geochemical patterns that correlates with a major EM conductor on the Halliday project will be drill tested in 2012; 5 drill-holes planned.

• Stewardson, Johannsen and Poplar projects are in pre-drilling stages. Data analysis on surface geochemistry is pending.

Page 15: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

Outer Ring Project (OR) • 100% Uravan - acquired in

December 2009. • Surface geochemical program

completed in July 2010. • Surface geochemical targets

developed • Initial drilling completed in

June 2011; follow up drilling in 2012

ATHABASCA BASIN URANIUM PROPERTY PORTFOLIO Johannsen Lake Project (JL) • 100% Uravan - acquired in August

2010. • Surface geochemical program

completed in August 2010. • Data analysis outlines potential

drill targets. • Drilling planned for 2012;

Math Option (MATH) • 100% Uravan – Purchase

Option • VTEM survey outlines strong

conductor on Math and OR • Surface geochemical survey

completed in2011 • One drill-hole competed in

2011; follow up in 2012,

Poplar Point Project (PP) • Uraniferous boulder

train on property • Multiple untested EM

targets • Historic drilling indicates

anomalous uranium values

Page 16: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

Stewardson Lake Project (SL) • 100% Uravan - acquired in December 2010. • Located along the Virgin River structural

corridor. • Multiple anomalous geophysical and surface

geochemical targets identified • Surface geochemical program completed in

2011. Data analysis pending.

ATHABASCA BASIN URANIUM PROPERTY PORTFOLIO Halliday Lake Project (HL) • 100% Uravan - acquired in December 2010. • Geophysical surveys identified 15 Km

anomalous EM, gravity and resistivity • Historic drilling intersected 0.1 meters

grading 0.12% U3O8 in altered sandstone • Surface geochemical program completed in

2011. Five drill-holes planned for 2012

Thluicho Lake Project • Shallow basement hosted u

mineralization • Multiple untested conductors • Anomalous pathfinder elements in

outcrop. • Looking for partner.

Page 17: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

POSITIVE RESULTS – OR/MATH SURFACE GEOCHEMISTRY AND DRILLING RESULTS

• Surface geochemical program completed in July 2010 and June 2011, respectively

• Geochemical program completed using new surface geochemistry technology developed from the Cigar West Study.

• Positive lead (Pb) isotope ratios and associated pathfinder element geochemistry in the C-soil horizon clays, vegetation and tree-cores.

• Surface geochemistry defines trends coincident with geophysics and other structural features.

• Seven (7) drill-holes competed targeting surface geochemistry.

• Follow up drill program planned for 2012 consisting of several drill-holes.

Page 18: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN Positive Surface Geochemistry at Halliday • Surface geochemical program competed in June 2011 • Strong correlation between radiogenic Pb 207/206 in soils and tree-cores and other

pathfinder elements; key to identifying U mineralization at depth. • Surface geochemistry coincident with major EM conductive trend • Five drill-hole program and additional geophysical survey planned for summer 2012.

Page 19: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

Garry Lake Uranium Project • 100% Uravan; seeking JV partner • Airborne geophysical surveys

completed • Surface discovery: well defined

glacial boulder train consisting of 19 uranium mineralized cobbles assaying 0.87% to 27.12% U3O8 .

• Status: On hold pending LUP • Issues: Caribou protection concerns

in NE Thelon Basin • Pending funding, in 2012 Uravan will

begin to engage land use regulators to develop a path forward to obtain an LUP in 2013.

THELON BASIN PROPERTY PORTFOLIO

Page 20: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

ROTTENSTONE NICKEL COPPER – PGE + AU PROJECT

• Advanced drill ready project • Comprehensive database: airborne/ground

geophysical surveys plus surface soil and tree top geochemical surveys.

• Rottenstone 1960’s deposit produced 40 thousand tons of high-grade ore grading 3.28% Ni, 1.83% Cu and 9.63 g/t PGE+Au in an ultramafic intrusive.

• Recent interpretive work on the new geophysics has defined new drill targets

• Ten (10) diamond drill holes have been selected to test several favorable areas.

Page 21: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

ROTTENSTONE NICKEL – COPPER – PGE + AU PROJECT

• Proposed drill holes to test a series of strong sub-vertical conductors

• These strong conductors coincide with other favorable geological, structural and geochemical features.

Page 22: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

• These strong steeply dipping conductors are believed to represent meaningful concentrations of sulphide mineralization.

ROTTENSTONE NICKEL – COPPER – PGE + AU PROJECT

Page 23: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN

EXPLORATION ACTIVITIES FOR 2012 $2.5 MILLION 2012 BUDGET

• Initial 5 drill-hole program plus TDEM geophysical survey on Halliday property • Follow up minimum 2 drill-hole program on OR-Math uranium projects • Potential drill program on Johannsen Lake or Stewardson uranium project – late

summer 2012 • Continue Athabasca Basin land acquisitions in highly prospective corridors • Continue collaborative applied research with QFIR, Dr. Kurt Kyser and Dr. Colin Dunn

on Halliday, Outer Ring, Johannsen and Stewardson projects.

Page 24: URANIUM EXPLORATION COMPANY - Uravan€¦ · Uravan’s property portfolio consists of 8 strategically located uranium projects plus the Rottenstone Ni-Cu-PGE project. • Successful

TSX-V : UVN TSX-V : UVN

FOR MORE INFORMATION CONTACT Larry Lahusen, CEO

[email protected]

www.uravanminerals.com

Suite 204, 2526 Battleford Avenue S.W., Calgary, Alberta T3E 7J4 Phone : 403.264.2630 Fax : 403.264.629