Government of Jharkhand Urban Development & Housing Department Ranchi Smart City Corporation Limited 4 th Floor, Project Bhawan, Dhurwa, Ranchi- 834004 | e-mail: [email protected] CIN: U45309JH2016SGC009206 Tender Notice No. : RSCCL/C4/RFP-58/2017-58 Issued on: 12-10-2017 PR No. : 171791, 172537 Memo No: RSCCL/C4/RFP-58/2017-84 (Encl.) Ranchi/Date: 11-11-2017 CORRIGENDUM -II It is hereby informed that corrigendums/amendments/addendums have been made with respect to various clauses of invited RFP (Tender Notice No. : RSCCL/C4/RFP-58/2017-58) for Selection of Master System Integrator (MSI) for Implementation of Command Control and Communication Centre (C4) under Smart City Mission in Ranchi”. The corrigendums/amendments/addendums have been indicated in Enclosure-1. The above document along with Pre-bid replies are uploaded to our websites i.e. http://udhd.jharkhand.gov.in, http://smartranchi.jharkhand.gov.in and http://jharkhandtenders.gov.in The interested bidders are advised to refer the above documents before submission of their bids. Encl: As Above Sd/- (Rajesh Kumar Sharma) Director, SUDA

Upload: others

Post on 13-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Government of Jharkhand Urban Development & Housing Department

Ranchi Smart City Corporation Limited 4th Floor, Project Bhawan, Dhurwa, Ranchi- 834004 | e-mail: [email protected]

CIN: U45309JH2016SGC009206

Tender Notice No. : RSCCL/C4/RFP-58/2017-58 Issued on: 12-10-2017 PR No. : 171791, 172537

Memo No: RSCCL/C4/RFP-58/2017-84 (Encl.) Ranchi/Date: 11-11-2017

CORRIGENDUM -II

It is hereby informed that corrigendums/amendments/addendums have been made with respect to various clauses of invited RFP (Tender Notice No. : RSCCL/C4/RFP-58/2017-58) for

“Selection of Master System Integrator (MSI) for Implementation of Command Control and

Communication Centre (C4) under Smart City Mission in Ranchi”.

The corrigendums/amendments/addendums have been indicated in Enclosure-1. The above document along with Pre-bid replies are uploaded to our websites i.e. http://udhd.jharkhand.gov.in, http://smartranchi.jharkhand.gov.in and http://jharkhandtenders.gov.in

The interested bidders are advised to refer the above documents before submission of their bids.

Encl: As Above

Sd/- (Rajesh Kumar Sharma)

Director, SUDA

Page 2: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 1 of 37

f ENCLOSURE - 1

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

1. I 2.3.17 29 2.3.17 Pre-Qualification Criteria Refer Annexure I: Revised Pre-Qualification Criteria

2. I 2.3.18 33 2.3.18 Technical Evaluation Criteria Refer Annexure II: Revised Technical Evaluation Criteria

3. I 2.2.13 17 Earnest Money Deposit (EMD)

1. In terms of this RFP, a Bidder is required submit

EMD of ₹ 1.7 Crores in the form of DD / FDR / BG

issued by any nationalized / scheduled commercial

bank in favour of Ranchi Smart City Corporation

Limited payable at Ranchi

4. EMD should be valid for 90 days from the date of the

submission of Bid

4. I Annexure 3.2 -

Financial Proposal

Format &

Instructions

73 27. RSCCL reserves the right to extend the O&M

contract.

27. RSCCL reserves the right to extend the O&M contract at

price mutually agreed at the time such extension.

5. I 2.2.5 Bid Price iii) 17 iii) Prices quoted by the Bidder shall remain firm

during the entire contract period and not subject to

variation on any account.

iii) Prices quoted by the Bidder shall remain firm during the

entire contract period and not subject to variation on any

account. However, any changes in exchange rates, duties

and taxes should be adjusted accordingly as these are

beyond the control and changes as per government

regulations time to time.

6. I 2.3.21 Eligible

Goods and

Services, and OEM

Criteria

41 b) The components (including but not limited to CCTV

Cameras, Video Management System Software, ANPR

Cameras & Solution, RLVD Solution, Speed Violation

Solution, Edge Level (Field) Switches, Data Centre

Switches & Routers, Servers, Storage, Racks, Desktop

PC and Workstations etc.) should have existing

registered service/support centre or establish in India

b) The components (including but not limited to CCTV

Cameras, Video Management System Software, ANPR

Cameras & Solution, RLVD Solution, Speed Violation

Solution, Edge Level (Field) Switches, Data Centre Switches

& Routers, Servers, Storage, Racks, Desktop PC and

Workstations etc.) should have existing registered

service/support centre or establish in India within 30 days

Page 3: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 2 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

within 30 days of award of contract. The Bidder should

submit an undertaking from the OEM to that effect.

of award of contract. The Bidder should submit an

undertaking from the OEM to that effect. The OEM of

active devices including Data centers, network, Wi-Fi to be

quoted by the bidder should have local Technical

Assistance Centre (TAC) support in India through a toll free

number and should be able to log a call 24x7 via phone,

email or website for technical assistance.

7. I 2.2.4:

Completeness of

Bid

17 The Bid should be complete in all respects. Failure to

furnish all information required by the RFP document

or submission of a proposal not substantially

responsive to the RFP document in every respect will

be at the Bidder's risk and may result in rejection of its

Bid and forfeiture of the EMD.

The Bid should be complete in all respects. Failure to

furnish all information required by the RFP document or

submission of a proposal not substantially responsive to

the RFP document in every respect will be at the Bidder's

risk and may result in rejection of its Bid without any

prejudice.

8. I 2.2.5 Bid Price 17 Prices quoted by bidder shall remain firm during entire

contract period and not subject to variation on any

account .A bid submitted with adjustable price

quotation shall be treated as non-responsive and

rejected

Prices quoted by bidder shall remain firm during entire

contract period and not subject to variation on any account

.A bid submitted with adjustable price quotation shall be

treated as non-responsive and rejected. For evaluation

purpose, quoted price, exclusive of taxes, shall be

considered. However, if any, statutory variation like taxes

/duties/levies or there is introduction of any new taxes

/duties/ levies by any state Government or central

Government, that will considered separately as and when

changes occurred.

9. I Schedule A1 -

Command Control

& Communication

Centre Solution &

76 3.3. Internet router is 1 in quantity Please consider 2 nos. Internet Router

Page 4: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 3 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

Data Centre

Solution form/ 3.3

10. I Schedule A1 -

Command Control

& Communication

Centre Solution &

Data Centre

Solution

84 Addition Please consider 2 nos. Desktop GIS (Standard)

I Annexure 3.2 -

Financial Proposal

Format &

Instructions

73 Cost for Selection of Master System Integrator for

Implementation of Command Control and

Communication Centre for Ranchi City (Excluding of all

taxes and duties)

Prices indicated in the schedules shall be inclusive of

all taxes, Levies, duties etc. The prices should also

specify 5 year support cost as per provided formats

Cost for Selection of Master System Integrator for

Implementation of Command Control and Communication

Centre for Ranchi City (Including of all taxes and duties)

Clarification:

Financial quote inclusive of all Taxes is being asked but the

financial evaluation shall be done on the basis of financial

quote without Taxes

11. II 4.3.1

Core/Internet

Router/22/

Security features

161 • MD5 encryption for routing protocol

• NAT

• URL based Filtering

• RADIUS Authentication

• Management Access policy

• IPSec / Encryption

• L2TP

• MD5 encryption for routing protocol

• NAT

• RADIUS Authentication

• Management Access policy

• IPSec / Encryption

• L2TP

Page 5: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 4 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

12. Internet Router Addition Annexure III : Minimum Specification of Internet Router

13. II Sec 4.2.12, IP PBX,

Pt 10

152 Voice Codec support - G.711, G.729, G.729ab, g.722,

ILBC

Voice Codec support - G.711, G.729, G.729ab, g.722

14. II Sec 4.2.12, IP PBX,

Pt 18

153 Voice gateway to be provided with 1 PRI card scalable

to 3 PRI in future for PSTN (PRI) line termination.

Voice gateway to be provided with 2 PRI card scalable to 4

PRI in future for PSTN (PRI) line termination.

15. II Sec 4.2.13, Video

Conferencing

Unit, Pt 18

154 1920 x 1080 pixels progressive @ 30fps 1920 x 1080 pixels progressive @ 60fps (Minimum)

16. II Sec 4.2.13, Video

Conferencing

Unit, Pt 21

154 System shall have the capability to zoom in and follow

the person speaking.

The clause stands deleted.

17. II Sec 4.2.13, Video

Conferencing

Unit, Pt 22

154 Enable Roll Call / Disable Roll Call

Roll Call Review Names / Roll Call Stop Review Names

The clause stands deleted.

18. II Multiparty

Conference Unit,

Pt 13

156 Along with the Support for basic algorithms like G.711

and G.722.1 the bridge should also support wideband

Audio protocols like MPEG 4 AAC - LC and MPEG 4 AAC

– LD.

Along with the Support for basic algorithms like G.711 and

G.722.1 the bridge should also support wideband Audio

protocols like MPEG 4 AAC - LC / MPEG 4 AAC – LD

19. II Sec 4.2.13,

Multiparty

Conference Unit,

Pt 18

156 The bridge must be a secure Non-PC Hardware with a

strong operating system. The Hardware and software

must be from the same OEM.

The bridge must be a secure Non-PC Hardware with a

strong operating system. The Hardware and software may

be from the same OEM.

Page 6: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 5 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

20. II 4.2.4 Video

Display Wall

(VDM), Pt.25

141 Screen should have an anti-reflective glass backing to

prevent bulging.

The clause stands deleted

21. II 4.2.5 Video Wall

Controller, Pt. 11

143 Should support all RAID levels Should support minimum RAID 1 levels

22. II 4.2.5 Video Wall

Controller, pt. 19

143 To connect to minimum 2 sources through HDMI To connect to minimum 2 sources through HDMI /DVI

23. II 4.2.5 Video Wall

Controller, pt. 20

143 To connect to minimum 16 Displays through HDMI To connect to minimum 16 Displays through HDMI/DVI

24. II 4.3.6 Server

Hardware Load

Balancer

170 4.3.6 Server Hardware Load Balancer Addition

1) 8x1GbE copper ports, 4x1GbE SFP ports and 2x10GbE

SFP+ ports.

2) The appliance should have minimum 10 Gbps of

throughput from day one and scalable to 20 Gbps

3) The appliance should have minimum 8GB RAM scalable

to 16GB and 256GB SSD drive for performance & power

savings benefits at the component level

4) The appliance should have a minimum 40% scalability

after the implementation.

5) Should provide Secure online application delivery using

hardware-based high performance SSL acceleration with

minimum 5 Gbps of SSL throughput scalable to 10 Gbps.

Page 7: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 6 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

25. II 4.3.6 Server

Hardware Load

Balancer (Vol-II)

171 • Secure Web Based Management

• SSH

• TELNET

• SNMP v1, 2, 3 Based GUI

• Command Line

• Secure Web Based Management

• SSH/ TELNET

• SNMP v1/2/3 Based GUI

• Command Line

26. II 4.3.4 Data Centre

Core Switch, Sub

Clause : Ports , 3

165 The switch should support 1/10G SFP+, 1/10 G Base-T

and 40G QSFP based port line cards. The switch must

be scalable to support minimum 8 nos of 40 G QSFP

ports or more spread across different line cards.

Bidder to choose required ports as per their solution

The switch should support 1/10G SFP+ and 40G QSFP based

port line cards. The switch must be scalable to support

minimum 8 nos. of 40 G QSFP ports or more spread across

different line cards. Bidder to choose required ports as per

their solution

27. II 4.3.4 Data Centre

Core Switch, Sub

Clause : 4

166 "Switch should have minimum of 24 x 1G/10G Ports

Switch should have a minimum of 24 x 1G /10G BASE-T

ports

Switch should have a minimum of 8 x 40G QSFP+

ports"

"Switch should have minimum of 24 x 1G/10G SFP+Ports

Switch should have a minimum of 24 x 1G /10G

Switch should have a minimum of 8 x 40G QSFP+ ports"

28. II 4.3.4 Data Centre

Core Switch/

Backplane

166 Minimum 10 Tbps or more Switching fabric capacity

(as per network configuration to meet performance

requirements)

Minimum 9 Tbps or more Switching fabric capacity (as per

network configuration to meet performance requirements)

29. II 4.3.9.3 Tape

Library

178 Shall be offered with Minimum of four LTO6 FC tape

drive. Drive shall support encryption.

Shall be offered with Minimum of four LTO7 FC tape drive.

Drive shall support encryption.

30. 4.3.9.3 Tape

Library

179 40 LTO6 barcode labeled cartridges & 4 cleaning

cartridges from the tape library OEM to be provided

40 LTO7 barcode labeled cartridges & 4 cleaning cartridges

from the tape library OEM to be provided

Page 8: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 7 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

31. II 4.3.5 Data Centre

Switches

170 Dual load sharing AC and DC power supplies Dual load sharing AC or DC power supplies

32. II Addition Annexure IV: Minimum Functional Specification for BI

33. II 4.3.12 WAN

Router/14/

Security features

181 • MD5 encryption for routing protocol

• NAT ,URL based Filtering

• RADIUS/AAA Authentication

• Management Access policy

• IPSec / Encryption

• MD5 encryption for routing protocol

• NAT

• RADIUS/AAA Authentication

• Management Access policy

• IPSec / Encryption

34. II 2.16.2 Payment

Schedule

73 2.16 Project Implementation Schedule, Deliverables

and Payment Terms

Refer Annexure V : Revised Project Implementation

Schedule, Deliverables and Payment Terms

35. II 2.7.2 Disaster

Recovery and DR

Cloud

37 a) The proposed Cloud Service Provider (CSP) must be

an empaneled and audit complaint cloud service

provider by MeITY (Ministry of Electronics and

Information Technology) for Public cloud, Virtual

Private Cloud and Community Government Cloud.

The proposed Cloud Service Provider (CSP) must be an

empaneled and audit complaint cloud service provider by

MeITY (Ministry of Electronics and Information Technology)

for Public cloud, Virtual Private Cloud and Community

Government Cloud. The CSPs whose audit has been done

by STQC but are awaiting final report may also participate

subject to the condition that final audit certificate from

MeITY must be submitted to the competent authority

before the execution of the agreement (as per the

stipulated time period mentioned). A self-declaration (from

the bid submitting authority) in compliance with the above

condition along with evidence / documents confirming that

audit completion must be submitted with the proposal.

Page 9: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 8 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

36. II 2.7.2 Disaster

Recovery and DR

Cloud

37 g) All applications need to have high performance

clustering (redundancy) within the Data Centre with

heartbeat, automatic fail-over, and redundant data

storage is active passive or active-active configuration

as per the high availability targets. The data replication

should be continuous among all the servers and

shared storage should not be used. All mission critical

systems must be active-active configurations. Active

passive configurations may be permissible for

supporting applications.

All applications need to have high performance clustering

(redundancy) within the Data Centre with heartbeat,

automatic fail-over, and redundant data storage is active

passive or active-active configuration as per the high

availability targets. The data replication should be

continuous among all the servers and shared storage

should not be used. The mentioned no of cores & storage

should be provisioned from the day one of the project

commissioning on dedicated hosts over cloud. All mission

critical systems must be active-active configurations. Active

passive configurations may be permissible for supporting

applications.

37. II 4.2.15 Fixed Dome

Camera for Indoor

Surveillance

157 Video Compression: H.264 Video Compression: H.264/H.265

38. II 4.2.15 Fixed Dome

Camera for Indoor

Surveillance

159 Casing: NEMA 4X / IP-66 rated and IK 09 Casing: NEMA 4X / IP-66 rated and IK 10

39. II 4.2.15 Fixed Dome

Camera for Indoor

Surveillance

Addition Fixed Dome camera for indoor surveillance with inbuilt IR

should cover 20 meter.

40. II 4.4.2.2.

Outdoor/Fixed

Box Cameras

157 Video Compression: H.264 Video Compression: H.264/H.265

Page 10: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 9 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

41. II 4.4.3.2 Technical

Specifications:

ANPR Systems

5. Digital Network

Camera

264 a. Video Compression - H.264 Video Compression: H.264/H.265

42. II 4.4.3.2 Technical

Specifications:

ANPR Systems

5. Digital Network

Camera

265 Alarm I/O - Minimum 2 Inputs & 1 Output contact for

3rd Party Interface

Alarm I/O - Minimum 1 Inputs & 1 Output contact for 3rd

Party Interface

43. II 4.4.4.2 Technical

Specifications:

Red Light

Violation

Detection Systems

4. Digital Network

Camera

275 a. Video Compression - H.264 a. Video Compression - H.264/H.265

44. II 4.4.4.2 Technical

Specifications:

Red Light

Violation

Detection Systems

4. Digital Network

Camera

275 Alarm I/O - Minimum 2 Inputs & 1 Output contact for

3rd Party Interface

Alarm I/O - Minimum 1 Inputs & 1 Output contact for 3rd

Party Interface

Page 11: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 10 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

45. II 4.4.5.2 Technical

Specifications:

Speed Violation

Detection System

6. Digital Network

Camera

285 Alarm I/O - Minimum 2 Inputs & 1 Output contact for

3rd Party Interface

Alarm I/O - Minimum 1 Inputs & 1 Output contact for 3rd

Party Interface

46. II 4.4.5.2 Technical

Specifications:

Speed Violation

Detection System

6. Digital Network

Camera

285 a. Video Compression - H.264 a. Video Compression - H.264/H.265

47. II Secondary storage Addition Annexure VI: Specification for SAN Switch

48. II 3.2 Requirement

Phase

74 Prior to starting the site clearance, MSI shall carry out

survey of field locations as specified in Annexure IX,

for buildings, structures, fences, trees, existing

installations, etc.

Prior to starting the site clearance, MSI shall carry out

survey of field locations as determined by RSCCL

49. II 4.3.2 Firewall, pt.

9

163 • TCP/IP, PPTP

• RTP, L2TP

• IPSec, DES/3DES/AES

• PPPoE, EAP-TLS, RTP

• FTP, HTTP, HTTPS

• SNMP, SMTP

• DHCP, DNS support for Ipv6

• TCP/IP, PPTP

• RTP

• IPSec, DES/3DES/AES

• RTP

• FTP, HTTP, HTTPS

• SNMP, SMTP

• DHCP, DNS support for Ipv6

Page 12: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 11 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

50. II 4.3.2 Firewall, pt.

10

163 802.1Q, NAT,

PAT, IP Multicast support, Remote Access VPN, Time

based Access control lists, URL Filtering, support VLAN,

Radius/ TACACS, IPSec, SSLVPN

802.1Q, NAT,

PAT, IP Multicast support, Remote Access VPN , URL

Filtering, support VLAN, Radius/ TACACS, IPSec, SSLVPN

51. II 4.3.7 Blade

Servers / 7.

Networks

172 Should support Converged Network Adapter, which

aggregates both the Ethernet and FC connectivity on a

single controller. It should support scalability upto 160

Gb Ethernet connectivity per server.

Should support Converged Network Adapter, which aggregates both the Ethernet and FC connectivity on a single controller.

52. II 4.3.8 Blade

Chassis/ 7 Chassis

connectivity

173 The chassis should support redundant modules for

connectivity - Ethernet and Fiber Channel /Infiniband

modules OR converged fabric modules in lieu thereof

The chassis should support redundant modules for connectivity - Ethernet and Fiber Channel /Infiniband modules OR converged fabric modules in lieu thereof and it should support scalability upto 160 Gb.

53. II 4.3.20 Centralized

Antivirus & Anti-

Spam Solution -

point 3

196 Single Agent: Should be only single agent that

combines all the critical components for total security

on the endpoint. (Antivirus, Antimalware, Firewall,

VPN Client, Virtual Browser etc.)

Single Agent: Should be only single agent that combines all

the critical components for total security on the endpoint.

(Antivirus, Antimalware, Firewall etc.)

54. II 4.3.20 Centralised

Antivirus & Anti-

Spam Solution -

Point 18-e

197 Should Support Browser Virtualization The clause stands deleted

55. II 4.3.20 Centralised

Antivirus & Anti-

Spam Solution -

Point 23-m

203 Email archiving, mail box archiving, file archiving,

personal folders (.pst files) consolidation, journaling,

discovering mails

The clause stands deleted

56. II Addition – Integration Platform Annexure IV: Specification of Integration Platform

Page 13: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 12 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

57. III 14 Taxes 20 Taxes Taxes shall be paid on actuals on production of supporting

documents.

58. III 17.4 Term and

Extension of the

Contract

22 Where RSCCL is of the view that no further extension

of the term be granted to MSI, RSCCL shall notify MSI

of its decision at least 3 (three) months prior to the

expiry of the Term. Upon receipt of such notice, MSI

shall continue to perform all its obligations hereunder,

until such reasonable time beyond the Term of the

Contract within which, RSCCL shall either appoint an

alternative agency/MSI or create its own

infrastructure to operate such Services as are provided

under this Contract.

Where RSCCL is of the view that no further extension of the

term be granted to MSI, RSCCL shall notify MSI of its

decision at least 3 (three) months prior to the expiry of the

Term. Upon receipt of such notice, MSI shall continue to

perform all its obligations hereunder, until such reasonable

time beyond the Term of the Contract within which, RSCCL

shall either appoint an alternative agency/MSI or create its

own infrastructure to operate such Services as are provided

under this Contract. Such services beyond the Term of the

Contract shall be provided by MSI at mutually agreed terms

and conditions by the parties concerned.

59. III New Clause NA NA In the event of delay in performance attributable to the

presence of a force majeure event, the time for

performance shall be extended by a period(s) equivalent to

the duration of such delay.

60. III New Clause NA NA Bidder shall be entitled to receive payments for all services

rendered under this Assignment.

61. III New Clause NA NA Bidder shall not be liable for any delay or failure to perform

the services or deliverable under this

Agreement, to the extent that such delay or failure has

arisen as a result of any delay or failure solely by RSCCL to

perform any of its duties and obligations as set out in this

Agreement. In the event that Bidder is delayed or

prevented from performing its obligations due to such

Page 14: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 13 of 37

# Volume

No.

Clause No. Page No. RFP Original Clause Amended/Added Clause

failure or delay on the part of or on behalf of RSCCL, then

Bidder shall may be allowed an additional equivalent

period of time (as decided/ approved by the competent

authority) to perform its obligations with no cost extension.

62. III 38.3.2

Implementation

SLAs

36 The MSI is expected to mobilize the team for

commencement of work for this project within 14 days

of issuance of Letter of Intent (LoI). In case resources

are not mobilized, INR 40 thousand per proposed

resource not deployed for each week's delay or part

thereof.

The MSI has to mobilize the team for commencement of

work within 30 days of issuance of letter of intent. In case

of non-deployment of proposed resources, a penalty of INR

40,000/- per resource /per week will be imposed.

Sd/-

(Rajesh Kumar Sharma)

Director, SUDA

Page 15: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 14 of 37

ANNEXURE I: Pre-Qualification Criteria

# Basic Requirement Specific Requirements Documents Required

PQ 1 Legal Entity The Sole Bidder or Consortium

Maximum 4 companies are allowed in a consortium including Lead Member

Lead Member should be registered in India under Companies Act 1956/2013 or as amended and should have been in operation for at least 5 years as on date of submission of the bid

Other consortium members either should be registered in India under Companies Act 1956/2013 or as amended OR Registered Abroad under corresponding Act

• Copy of certificate of Incorporation/Registration under Companies Act 1956 / 2013 (for Indian companies)

• Global companies to provide equivalent proof of incorporation/registration

• A written undertaking from each of the consortium members, in case of a consortium, duly signed by the authorized signatory, holding a written power of attorney for this bid on a stamp paper, authorizing the lead bidder to incur liabilities and receive instructions for and on behalf of any and all consortium members, and the entire execution of the Contract, including but not limited to the payments.

PQ 2 Turnover The m i n i m u m average annual Turnover in Indian

Rupees for last 3 audited financial years (2014-15,

2015-16, 2016-17) from the business area of ICT

Infrastructure / IT System Integration Services.

For Sole Bidder or Lead Member of consortium

– Rs. 200 Cr

For Consortium members – Rs. 20 Cr

• Audited financial statements for last three Financial Years.

• Statutory auditor’s certificate clearly specifying the annual turnover for the specified years.

• MoA/AoA shall be submitted showing the area of business.

PQ 3 Net Worth The Sole Bidder or the Lead Member of consortium

should have positive net worth as per the audited

consolidated financial statements in each of the last 3

(Three) financial years 2014-15, 2015-16, 2016-17

• Certificate from the Statutory Auditor on net worth.

Page 16: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 15 of 37

# Basic Requirement Specific Requirements Documents Required

PQ 4 Project Experience The Sole Bidder or Lead Member or any member of its

consortium should have fully completed

(Implementation as well as Maintenance) OR completed

implementation i.e. Go-Live of all modules as per the

SoW and realized at least 50 % of CAPEX cost/Fee as per

Contract Agreement of 2 (Two) projects as a System

Integrator of the implementation & maintenance of

Command Control and Communication Centre

(Comprising minimum of Command Control Centre

Application, Dashboard, Video Wall and Operation

Room) OR Intelligent Traffic Management System

(ITMS). Project for any Central Government/ State

Government/PSU/ ULB/Govt. Boards/Defence/Metro in

India with project cost not less than INR 10 Cr in the last

7 (Seven) financial years

1. Work order/ Contract clearly highlighting the scope of work, Bill of

Material and value of the contract/order with value excluding

civil/mechanical/ HVAC works;

2. Completion/Commission Certificate issued & signed by the competent

authority of the client entity on the entity’s Letterhead with value

excluding civil/mechanical/HVAC works.

OR

Self-certificate from the bidder signed by the concerned project in-charge

of the bidder and counter signed by authorized signatory for this bid

holding written special power of attorney along with the official contact

details of the competent authority of the client entity along with Work

Order. The Client reserves the right to contact the aforementioned

competent authority.

In case of large orders/orders with operations & maintenance phase, the

completion/self-certificate may specify successful commissioning and in-

operation status of a part of the order meeting the requirement along

with certificate from statutory auditor certifying receipt of 50% of CAPEX

cost/fee.

PQ 5 Blacklisting As on date of submission of the proposal, the Sole Bidder

or the Lead Member and each members of the

consortium member, in case of a Consortium, should not

have been blacklisted by Central/State Government/ PSU

entity in India or similar agencies globally for

Undertaking by the authorized signatory as per the format given as

<Annexure 4>

The Sole Bidder or the Partner In charge and all other Members of

Consortium:

Page 17: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 16 of 37

# Basic Requirement Specific Requirements Documents Required

unsatisfactory past performance, corrupt, fraudulent or

any other unethical business practices.

1. Legal Attorney certified letter of undertaking to this effect on the letter

head, co-signed by bidders’ authorized signatory.

2. In case of consortium, this needs to be provided by each of the

consortium member.

PQ 6 Certifications The Sole Bidder or any member of consortium should

possess the following Certifications which are valid at the

time of bid submission:

• ISO 20000:2011 for IT

Service Management

• ISO/IEC 27001:2013 for Information Security

Management System

Copies of the valid certificate in the name of the Bidder.

PQ 7 Local Presence The Sole Bidder or the Lead Member of consortium, in

case of a Consortium, should have office in the State of

Jharkhand or should furnish an undertaking that the

same would be established within 60 days of signing the

contract, if project is awarded.

List and address of offices in Ranchi with GST Registration

OR

Undertaking from authorized signatory to open the local office with

GST Registration. Within 60 days of signing the contract, if project is

awarded

Page 18: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 17 of 37

ANNEXURE II: Technical Evaluation Criteria

# Technical Evaluation Criteria Points Documents Required

TQ 1.0 Company’s Financial Profile 10

TQ 1.1 The Sole Bidder or Lead Member in case of Consortium should

have minimum average annual turnover* of Rs. 200 Cr for the last

3 financial years (2014-15, 2015-16, 2016-17) from the business

area of ICT Infrastructure / IT System Integration Services.

(*Turnover of only 100% subsidiary will be considered but

parent, associated or other r e l a t e d entity will not be

considered.)

Points shall be awarded on pro-rata basis (the range is from 200

crores to 600 Crores and for 200 Crores- 0 mark and 600 Crores

and Above-10 Marks)

For Example:

If Turnover of a company is INR 300 Crores.

Point = (300-200)*10/(600-200)= 2.5

# Turnover above INR 600 Crores will score maximum of 10

marks

• Copy of certificate of Incorporation/Registration under Companies Act 1956/2013 (for Indian companies)

• Global companies to provide equivalent proof of incorporation/registration

• A written undertaking from each of the consortium members, in case of a consortium, duly signed by the authorized signatory, holding a written power of attorney for this bid on a stamp paper, authorizing the lead bidder to incur liabilities and receive instructions for and on behalf of any and all consortium members, and the entire execution of the Contract, including but not limited to the payments.

TQ 2.0 CMMi Level Certification (Sole Bidder or any member of the

consortium)

5

TQ 2.1 CMMi Level 3 3 CMMi Level Certification

TQ 2.2 CMMi Level 5 5 CMMi Level Certification

Page 19: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 18 of 37

# Technical Evaluation Criteria Points Documents Required

TQ 3.0 Relevant Experience 37.5

TQ 3.1 The Sole Bidder or any member of the consortium should have

fully completed (Implementation as well as Maintenance) OR

completed the implementation i.e. Go-Live of all modules as per

the SoW and realized at least 50 % of CAPEX cost/Fee as per

Contract Agreement of Command Control and Communication

Centre (Comprising minimum of Command Control Centre

Application, Dashboard, Video Wall, Operation Room) Project as

a System Integrator for any Central Government/ State

Government/PSU/ Urban Local Bodies/Defence/ Govt.

Boards/Metro Rail Corporations in India or Globally* with

project cost not less than INR 10 Cr (in case of projects in India)

or INR 25 Cr (in case of projects done Globally, the currency

conversion rate on the date of technical bid opening shall be

considered) in last 7 (Seven) financial years.

(For each project 5 points would be awarded, maximum 4

projects would be considered for evaluation)

20

Project Case study + Copy of work order and contract + Completion certificate

/ /Statutory auditor Certificate (50 % payment received from the client on

CAPEX)

1. Work order/ Contract clearly highlighting the scope of work, Bill of Material

and value of the contract/order with value excluding civil/mechanical/HVAC

works;

2. Completion/Commission Certificate issued & signed by the competent

authority of the client entity on the entity’s Letterhead with value excluding

civil/mechanical/HVAC works.

OR

Self-certificate from the bidder signed by the concerned project in-charge of

the bidder and counter signed by authorized signatory for this bid holding

written special power of attorney along with the official contact details of the

competent authority of the client entity along with Work Order. The Client

reserves the right to contact the aforementioned competent authority.

In case of large orders/orders with operations & maintenance phase, the

completion/self-certificate may specify successful commissioning and in-

operation status of a part of the order meeting the requirement along with

certificate from statutory auditor certifying receipt of 50% of CAPEX cost/fee.

TQ 3.2 The Sole Bidder or any member of the consortium should have

successfully completed or carrying implementation of Command

Control and Communication Centre (Comprising of Command

5

Page 20: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 19 of 37

# Technical Evaluation Criteria Points Documents Required

Centre Application, Management Dashboard, Video Wall,

q]Operation Room and Helpdesk Centre) project as a System

Integrator for any selected Smart Cities in India with project cost

not less than Rs. 10 Cr. (For each project 2.5 points would be

awarded, maximum 2 projects would be considered for

evaluation)

TQ 3.3 The Sole Bidder or any member of the consortium should have

fully completed (Implementation as well as Maintenance) OR

completed the implementation i.e. Go-Live of all modules as per

the SoW and realized at least 50 % of CAPEX cost/Fee as per

Contract Agreement in implementation & maintenance of any

ITMS (Intelligent Traffic Management System) project as a

System Integrator for any Govt. entity in India in the last 7

(Seven) financial years with project cost not less than Rs. 10 Cr.

Project for Metro rail corporations or Railways wouldn’t be

consider for technical evaluation in this category. (For each

project 2.5 points would be awarded, maximum 2 projects would

be considered for evaluation)

5

TQ 3.4 The Sole Bidder or any member of the consortium should

have completed project as a System Integrator for Implementing

and managing a Tier II or above data Centre in India for any

Central Govt. / State Govt. / PSUs/ Govt. Boards in the last 7

(Seven) financial years with the project cost not less than Rs. 10

Crores

7.5

Page 21: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 20 of 37

# Technical Evaluation Criteria Points Documents Required

(For each project 2.5 points would be awarded, maximum 3

projects would be considered for evaluation)

TQ 4.0 Proposed Key Personnel 27.5

TQ 4.1 Team Leader-cum-Program Manager 5.0 Resume to attach (Annexure 2.5 Vol I)

TQ 4.2 Solution Architect 3.0

TQ 4.3 IoT Expert 3.0

TQ 4.4 Command Control & Communication Centre Expert 4.0

TQ 4.5 Database Expert 2.5

TQ 4.6 Security Expert 2.5

TQ 4.7 System Admin 2.5

TQ 4.8 Network Expert 2.5

TQ 4.9 GIS Expert 2.5

TQ5.0 Proof of Concept (PoC) / Demonstration of Solution Proposed 10 PoC / Demonstration

TQ5.1 Capabilities of CCCC to be demonstrated using hosted

environment for minimum of 05 different City applications

domains (as listed in Annexure VII) through the relevant Use

cases in India context for respective application/s infrastructure

(sensors/gateways) in city services domains.

Note: The PoC Criteria is included in Annexure VII

PoC / Demonstration

TQ 6.0 Technical Proposal and Presentation # 10 Presentation

TQ 6.1 Understanding of the project and details of proposed solution

and architectures

To be

awarded

Presentation

Page 22: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 21 of 37

# Technical Evaluation Criteria Points Documents Required

TQ 6.2 Approach & Methodology for Implementation (should cover

Solution Architecture, scalability, Interoperability and

modularity features considering the future expansion of the

project and the detailed project execution of plan for completing

it on time)

by

Committee

TQ 6.3 Strategy for Cloud, DR requirements, SLA fulfilment and System

Security

TQ 6.4 Key learnings from the similar projects and recommendation for

successful execution of the proposed project

Total 100

Note:

Any project experience shall be considered under only one category during technical evaluation.

For projects where fee has been received in any currency other than Indian Rupees, than the foreign currency conversion rate available on Reserve Bank of India’s

portal as on the date of technical bid opening shall be used for conversion of amount in foreign currency to Indian Rupees equivalent.

Projects executed for bidder’s own or bidder’s group of companies shall not be considered.

#The Technical presentation shall be made by the Program Manager only as per the details provided in the CVs. Presentation shall be restricted around the submitted

Technical proposal to the authority. Any deviation from the technical proposal, shall not be considered during evaluation.

The Agency will be selected under the Quality cum Cost Based System (QCBS) with weightages on 70:30 (70% for technical proposal and 30% for financial proposal).

Bidder who meets the minimum pre-qualification criteria and score atleast 50 marks (out of 80 marks: excluding Presentation & PoC) in above mentioned Criteria

TQ1 to TQ4 will be called for Technical presentation & PoC. The Technical Presentation will be on Project Team Structure and Approach and Methodology for

Implementation.

The Financial Proposals of only those bidders will be opened who scores equal to or more than 70 (Seventy) marks in Technical Evaluation.

Page 23: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 22 of 37

Team Evaluation Matrix

# Resource Role Maximum Marks Other Requirements

1. Team Leader-cum-

Program Manager

5.0 a)Educational Qualification:

• BE/B. Tech with MBA/MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA = 0.5 Mark

b)Certification :

• PMP / Prince 2 (P) Certification = 1 Mark

c)Work experience in the capacity of Project/Program Manager in ICT implementation Projects:

• >=10 years = 1 Mark • >=8 and < 10 years = 0.5 Mark

d)Project/Program management Experience in ICT implementation Project (Command Control /Intelligent

Traffic Management System/Smart Parking Management System)

• > 3 Projects = 2 Marks • 2 – 3 Projects = 1 Mark

2. Solution Architect 3.0 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA = 0.5 Mark

b)Certification :

• Any industry standard certifications like TOGAF = 0.5 Mark

c) Work experience in the capacity of Solution Architect:

• >=10 years = 1 Mark • >=7 and <10 years =0.5 Mark

d) Work experience as Solution Architect:

Page 24: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 23 of 37

# Resource Role Maximum Marks Other Requirements

• 2 or more projects = 0.5 Mark

3. IoT Expert 3.0 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA = 0.5 Mark

b) Work experience in ICT based projects:

• >=7 years = 1 Mark • >=5 and <7 years = 0.5 Mark

c) Work experience of IoT related project implementation:

• 2 Projects = 1 Mark • At least 1 Project = 0.5 Mark

4. Command Control &

Communication Centre

Expert

4.0 a) Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA = 0.5 Mark

b) Work experience in setting-up Command Control Centre projects :

• >=9 years = 1 Mark • >=6 and <9 years = 0.5 Mark

c) Work experience in Command & Control Centre projects (Max. 2 Marks):

• 0.5 Mark per project

5. Database Expert 2.5 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA = 0.5 Mark

b)Certification :

• Any in Database (from the proposed OEM for this project) = 0.5 Mark

Page 25: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 24 of 37

# Resource Role Maximum Marks Other Requirements

c) Work experience in the capacity of DBA:

• >=6 years = 1 Mark • >=3 and <6 years =0.5 Mark

6. Security Expert 2.5 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent o >=9 years of experience in the capacity of security expert = 1 Mark o >=6 and <9 years in the capacity of security expert = 0.5 Mark

• BE / B. Tech / MCA o >=9 years of experience in the capacity of security expert = 0.5 Mark

b)Certification :

• Software Security ( CISM, CISSP, ComPTIA Security+)= 0.5 Mark

d) Work experience as Security Expert (IoT Related Projects):

• 2 Projects=1 Mark • 1 Project = 0.5 Mark

7 System Administrator

2.5 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA = 0.5 Mark

b)Certification :

• Any in System Administration= 0.5 Mark

c) Work experience in the capacity of System Administrator:

• >=9 years = 1 Mark • >=6 and <9 years = 0.5 Mark

8 Network Expert 2.5 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark

Page 26: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 25 of 37

# Resource Role Maximum Marks Other Requirements

• BE / B. Tech / MCA /MS = 0.5 Mark

b)Certification :

• Any in Network Administration= 0.5 Mark

c) Work experience in the capacity of Network Expert:

• >=9 years = 1 Mark • >=6 and <9 years = 0.5 Mark

9 GIS Expert

2.5 a)Educational Qualification:

• BE / B. Tech with MS/M. Tech. or equivalent = 1 Mark • BE / B. Tech / MCA / MS= 0.5 Mark

b) Work experience in the capacity of GIS Expert:

• >=9 years = 1 Mark • >=6 and <9 years = 0.5 Mark

c) Work experience as GIS Expert on Command Control / ITMS/ SPMS:

• At-least 2 Projects = 0.5 Mark

For each project to be considered for technical evaluation, resource should have worked for at-least Six Months on that particular project

CVs needs to be provided in the format provided as Annexure 2.5 in the RFP Volume I. Deviation from prescribed format shall attract rejection of the CV.

Deployment of key experts shall be as per the deployment plan provided in this RFP.

Page 27: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 26 of 37

Annexure III: Minimum Specification of Internet Router

S. No. Specification Compliance (Yes/No)

Product Documentation Reference

1. The router should have an aggregate throughput of at least 500 Mbps and expandable upto 1Gbps for

future expansion

2. The router should have redundant power supply for day 1

3. Router should support protocols like RIP, OSPF,BGP, VRRP/HSRP, for day one

4. Router should have at least 4*1G dual mode copper/SFP based interfaces

Page 28: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 27 of 37

ANNEXURE IV: Minimum Functional Specification for BI

# Description Compliance (Yes/No)

Product Documentation Reference

1 The BI platform should provide integrated end user access ranging from interactive dashboards, ad hoc query, integration with spreadsheets, proactive alerting, Scorecards

2 BI platform should have an ad-hoc query and analysis environment that works against a logical view of information from multiple data sources in a pure Web environment. BI platform should provide capability to combine data from multiple applications or databases in a single calculation.

3 BI Platform should provide capabilities to create KPIs to measure progress and performance over time and graphically communicate strategy & strategic dynamics using Strategy maps, Cause and Effect diagrams, and Custom views. Intuitive and dense visualizations must be available.

4 BI Platform should provide capability to create reports that capture a series of snapshots of BI Dashboard or report allowing the information to be viewed offline.

5 BI Platform should provide alerting engine that captures and distributes notifications via multiple channels in response to pre-defined business events and/or data exceptions to speed exception based decision making. When a condition is triggered, the user should be presented with a list of possible actions to take.

6 BI should have the capability to search existing content based on full indexing of Dashboards, Analyses, Views, Prompts, KPIs, Scorecards etc. The metadata should be indexed and searchable.

7 BI Platform should have the capability of queries reuse and caching both at the Web Server and within the Analytic Server layer.

8 BI platform should provide capabilities such as session and query management, cancellation, statistics logging, monitoring.

Page 29: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 28 of 37

# Description Compliance (Yes/No)

Product Documentation Reference

9 BI Platform should support capability of maintaining user security internally, using standard protocols e.g. LDAP, Active Directory.

10 BI Platform should generate optimized, native queries for each data source.

11 The BI Platform should provide a central management server that enables consistent diagnostics and troubleshooting.

12 Dashboards and Adhoc Query

13 Reporting and Adhoc Query should be available in form Web- based environment that is designed for users who want to create new analyses from scratch or modify and change existing analyses that appear on dashboard pages. BI should also provide feature of self-service where a user can upload his own excel sheet data and combine it with already published BI data and create his own dashboards with no help from IT.

14 Analysis & reporting layer should provide a single user interface for ad-hoc query, reporting & analysis against relational, OLAP and flat file data sources.

15 BI should provide capability for Dashboards to be personalized and automatically display data based on the user’s identity or role. BI should provide the capability where in Measures, descriptive attributes, filters, sorting patterns, sub-totals, charts, and pivot table views can be added, deleted, or changed from within the dashboard, after a user makes all the changes, the new analysis can be saved and shared with a group of users.

16 BI Platform should provide complete interactivity with dashboard content by selecting prompted values and filtering data; drilling on charts or tables to access detail; changing the sort order or sort direction of columns; maintaining context and moving to a different analysis by automatically passing constraints; or selecting columns to display.

17 The BI dashboards should provide support for real time collaboration

18 Enterprise Reporting

19 BI Platform should provide a highly customized report format, layout, and output in order to create reports from multiple data sources, in multiple document formats

Page 30: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 29 of 37

# Description Compliance (Yes/No)

Product Documentation Reference

20 The Report Builder should generate multiple layouts, including HTML, PDF. It also should provide an interactive, on-line format for delivery over the Web

21 Scorecards

22 The BI Platform should provide configuration of scorecards and KPI Builder which will allow users to build scorecards

23 Breach of KPI benchmarks should have the ability to trigger actions e.g. Email alerts, Invoke Web Service

24 BI platform should provide capability where in while viewing KPIs, Initiatives or Objectives business users can initiate discussion threads and attach related documents to collaborate with other users

Page 31: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 30 of 37

ANNEXURE V: Project Implementation Schedule, Deliverables and Payment Terms 2.16 Project Implementation Schedule, Deliverables and Payment Terms 2.16.1 Project Implementation Schedule and Deliverables Payment Schedule T = 14 Days from Date of signing of Contract

#

Milestones Deliverables Timelines (in months)

1 Project Implementation Phase T + 12 months

1.1 Project Inception Report Detailed site survey report including infrastructure requirement analysis, hardware deployment plan, recommended action plan to address the gaps, budget estimates for addressing the gaps uncovered during the survey, phase wise location distribution etc. Detailed Project Plan including resource deployment, Communication plan, Risk management plan, Information Security and Business Continuity, Sensitization & Training Plan, Operations management plan etc.

T + 1 months

1.2 Requirement Study • Command Control and Communication Centre (C4) including Data

Centre • City IT Network Infrastructure • Smart Parking Management System (SPMS) • Intelligent Traffic Management System (ITMS) • Environmental Monitoring System • City Web Portal & Mobile App • Enterprise GIS • City Wi-Fi • Integration of CCCC platform with existing & under-development

external Systems/ Applications as per scope

Architecture and design for C4, City IT Network and Data Centre including Data Centre Architecture, Network Architecture, Security architecture etc. Submission of FRS, SRS including Solution Architecture, Application Design Documents (HLD & LLD) of the proposed system Integration report for external applications

T + 3 months

Page 32: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 31 of 37

#

Milestones Deliverables Timelines (in months)

1.3 Hardware Delivery & commissioning for C4 & DC in Phase I a. Design, supply, installation, commissioning including interior civil work,

hardware, system software, network equipment, bandwidth & operationalization of Command Control & Communication Centre along with DC and DR

1. Site Completion/readiness Report 2. Delivery Acceptance Reports from RSCCL/authorized

entity 3. Installation & Commissioning Reports 4. Software Licenses details

T + 7 months

1.4 Phase I: Go-Live a. City IT Network Infrastructure – pan city availability of secure network

for all proposed edge devices & sensors. Guidelines issued by MoUD for cyber security requirement should be adhered to for designing network for sensor & Wi-Fi traffic

b. GIS – Supply, installation, data migration, training & operationalization of enterprise GIS system for the city

c. City web-portal – Design, development, content writing, training & deployment of city web portal

d. ITMS – Supply, installation, commissioning, training and operationalization of ITSM components (ANPR, RLVD, SVDS, ATCS, PA, ECB) at 30% of total identified locations

e. Wi-Fi - Supply, installation, commissioning, training & operationalization of City Wi-Fi at 50% of total identified locations

f. Environmental Sensors - Supply, installation, commissioning, training & operationalization of Environmental sensors at sensors

g. Variable Messaging Board - Supply, installation, commissioning, training & operationalization of Variable Messaging Boards at 50% of total identified locations

1. UAT/FAT and Go Live Certificate from RSCCL/authorized entity

2. Training Content & Completion Certificate 3. Security Audit Certificate from Cert-In/STQC for Data

Centre and Applications

T+9 months

1.5 Phase II: Go-Live a. ITMS – Supply, installation, commissioning, training and

operationalization of ITSM components (ANPR, RLVD, SVDS, ATCS, PA, ECB) at remaining 70% of total identified locations

1. Site Completion/readiness Report 2. Delivery Acceptance Reports from RSCCL/authorized

entity 3. Installation & Commissioning Reports 4. Software Licenses details

T + 11 months

Page 33: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 32 of 37

#

Milestones Deliverables Timelines (in months)

b. Wi-Fi - Supply, installation, commissioning, training & operationalization of City Wi-Fi at 50% of total identified locations

c. Smart Parking Solution – Supply, installation, commissioning, training & operationalization of smart parking solution at identified location

d. Variable Messaging Board - Supply, installation, commissioning, training & operationalization of Variable Messaging Boards at remaining 50% of total identified locations

e. Mobile App – Design, development, delivery, training & installation of mobile app in android & iOS for identified services & integration with existing services of RSCCL

5. UAT/FAT and Go Live Certificate from RSCCL/authorized entity

6. Availability of Mobile App on Play Store & Apple App Store

7. Training Content & Completion Certificate

1.6 Phase III: Integration & Project Final Go-Live Integration with external applications (existing & proposed)- City Surveillance System Smart Lighting ICT Enabled Solid Waste Management Intelligent Transportation System E-Challan System Public Bike Sharing Smart Water Supply System Smart Education Smart Health Management System BRTS/MRTS and City Bus Services

1. UAT/FAT and Go Live Certificate from RSCCL/authorized entity

2. Training Content & Completion Certificate 3. Security Audit Certificate from Cert-In/STQC 4. Source code of portal, Mobile App & customized

applications

T + 12 months = T1

2 Project Operation & Maintenance Phase T1 + 60 months

2.1 Operation & Maintenance • Monthly & Quarterly SLA Reports • Adhoc Reports

T1 + 60 Months

Based on findings of the site survey activity done by MSI, MSI may propose a change in the number of sites or individual units to be deployed in each phase as well as overall

scope and a consequent change in phasing. RSCCL also retains the right to suo-moto change the number of sites or individual units to be deployed for each scope item. The

final decision on change in phasing and related change in payment schedules shall be at the discretion of RSCCL.

Page 34: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 33 of 37

MSI should complete all the activities within the defined timelines as indicated above. The timeline will be reviewed regularly during implementation phase and may be

extended in case RSCCL feels that extension in a particular Request Order/Integration or any track is imperative, for the reason beyond the control of the bidder. In all such

cases RSCCL’s decision shall be final and binding. MSI will be eligible for the payment based on the completion of activities and approval of the relevant deliverables.

# Milestones Timelines Payment

1. Requirement study T + 3 Months 2% of capex value

2. Hardware Delivery & commissioning for C4 & DC in Phase I T + 7 Months 30% of capex value

3. Phase I : Go Live T + 9 Months 18% of capex value

4. Phase II : Go Live T + 11 Months 10% of capex value

5. Phase III : Integration & Project Final Go-Live T1 = T + 12 months 20% of capex value

6. One year of successful completion of Project Final Go-Live T1 + 12 Months Remaining 20% of capex value shall be paid in two (2)

equal half yearly instalments

7. Project Operations & Maintenance phase for a period of 60 months from

the date of Final Go Live

T1 + 60 Months OPEX will be paid in twenty (20) equal quarterly

instalments spread across 5 years Post Final Go-Live

T = 14 Days from Date of signing of Contract

Note 1: If successful bidder requests for Mobilization advance, following conditions shall be applicable –

a. Mobilization advance can be maximum of 10% of capex value

b. Mobilization advance shall be released only after receipt of Bank Guarantee of 110% of the requested amount

c. Mobilization advance shall be interest bearing and PLR rate of interest shall be payable to RSCCL by the successful bidder

d. Mobilization advance shall be adjusted by Phase III of project implementation (T + 12 months)

Note 2:

a. All payments to the Systems Integrator shall be made upon submission of invoices along with necessary approval certificates from RSCCL

b. The above payments are subject to meeting of SLA’s failing which the appropriate deductions as mentioned in the Volume III of this RFP

Annexure VI: Specification for SAN Switch

Sl. No. Compliance (Yes/No) Product Documentation Reference

Page 35: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 34 of 37

1 Minimum Dual SAN switches shall be configured where each SAN switch shall be configured with minimum of 24 Port or higher as per solution requirement

2 Required scalability shall not be achieved by cascading the number of switches and shall be offered within the common chassis only

3 Should deliver 16 Gbit/Sec Non-blocking architecture with 1:1 performance for up to 24 ports in a energy-efficient fashion

4 Should protect existing device investments with auto-sensing 4, 8, and 16 Gbit/sec capabilities.

5 The switch shall support different port types such as FL_Port, F_Port, E_Port, EX_Port.

6 The switch should be rack mountable

7 Should provide enterprise-class availability features such as redundant and hot pluggable components like power supply and FAN

8 The switch shall provide Aggregate bandwidth of 384 Gbit/sec end to end.

9 Switch shall have support for web based management and should also support CLI.

10 5 years comprehensive warranty

Page 36: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 35 of 37

Annexure VI: Minimum Functionality of Integration Platform

S. No. Compliance (Yes/No) Product Documentation Reference

1 The Integration Platform should be implemented as a separate layer in terms of installing on an exclusive server in DC to enable ENTERPRISE-wide Integration with various internal systems & external applications

2 Integration platform should be implemented using SOA and must support ESB

3 Integration platform should support adapters base framework mechanism to enable efficient integration

Should provide OOTB adapters for databases, File, FTP, JMS, AQ,LDAP, email, MSMQ, MQ, Cache, event adapter & Socket

Should support cloud integration platform via cloud adapter/SDK

Should provide OOTB adapter for oracle eBusiness Suite, SAP etc

4 Integration Platform should support single development platform for various styles of integration patterns (data

integration, process integration, workflow, synchronous, asynchronous).

5 Integration platform should support graphical user interface to configure various integration scenario.

6 Integration platform should provide Business Activity Monitoring dashboards to monitor real time integration

scenarios

7 Integration platform should provide support for mobile-friendly standards (REST, JSON and also automated

conversions REST/SOAP in terms of its usage in mobile enable integrations with back office applications

8 Integration platform should be hot-pluggable at infrastructure layer (Application server & database). It should support Application server like Oracle, IBM, JBOSS & database like Oracle, DB2, MS Sql Server etc

9 Integration platform should have built in caching technologies to enable Service Result Caching will dramatic

improvement in performance and high availability through cached service results.

11 Should provide single package to install- development IDE, Application server, integration engine and management

console

Page 37: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 36 of 37

12 Should provide high availability & scalability across all integration service components like integration engine,

orchestration engine, JMS etc

13 Platform should provide Encrypt inbound and Decrypt outbound data based on sensitivity of the data

Page 38: Urban Development & Housing Department Ranchi Smart City ... Ranchi Smart City Corporation Limited 4th Floor ... 41 b) The components (including but not limited to CCTV Cameras, Video

Page 37 of 37

Annexure VII: POC Evaluation Criteria. Bidders will be required to do the Demo / POC. Bidder will be given minimum of 21days prior notice to do the Demo/ PoC. Place for Demo/ POC will be provided by RSCCL. The overall guidance for the POC is provided below: Capabilities of CCCC to be demonstrated using hosted environment for minimum of 05 different City applications domains as listed below through the relevant Use cases in India context for respective application/s infrastructure (sensors/gateways) in following city services domains. Minimum one of the existing City applications (part of 5 different city applications) will also need to be integrated with CCCC so as to demonstrate the capabilities (Data will be Provided by authorities to bidders on the day Technical Presentation). 1. Smart Lighting 2. Intelligent Transportation System 3. City Surveillance 4. Smart Wi-Fi 5. Emergency Services (in case of fire or accident or causality in urban area etc.) 6. Environmental sensors 7. Variable Messaging Sign Board 8. ICT based Smart waste management 9. Intelligent Traffic Management System The capabilities needs to be demonstrated with a physical visualization unit (along with other sensors if needed) to be locally presented during the evaluation. For each of the 5 use cases demonstrated following capabilities.

Note: The cost of PoC will not be reimbursed by RSCCL. The unsuccessful bidders has to dismantle the devices/equipment within 7 days at their own cost.