urban transportation strategy in hyderabad...brts plan planned proposed brts for 2021 legend b1 b2...
TRANSCRIPT
Urban Transportation Strategy in Hyderabad
CTS : Existing Scenario• Population Size – 94 lakhs (GHMC: 66 lakhs, Outside
GHMC:28 lakhs)
• Salient Points on Travel Demand
o Total Person Trips – 1.12 crores (PCTR: 1.19)
o Total Person Trips by Vehicles – 89 lakhs
o Person km – 11.8 crores (Average TL: 13.25 km)
o Share of Bus Passenger Trips – about 36%
• Total Registered Vehicles 40 Lakhs,growth 11% p.a
2
HMA Population Forecast (in million)
9.4m
7.6m
5.7m
19m
15m
12m
Doubling of Population Over Next 30 years - Adding a “London”
3
Year MMTS Bus Metro Car 2W Auto Taxi Total Person Trips (millions/day)
2011 2.7% 43.0% 6.1% 36.4% 8.3% 3.6% 100% 8.9
2021 2.5% 26.6% 26.5% 2.5% 28.2% 8.4% 5.3% 100% 12.1
2031 2.6% 24.2% 31.1% 3.2% 26.1% 7.7% 5.2% 100% 16.5
2041 2.6% 21.7% 34.8% 3.9% 25.3% 6.8% 4.8% 100% 22.5
+36%
+85%
+153%
Study Objectives and Parameters• To evolve a long transportation plan for Hyderabad
Metropolitan region (2041) besides Capacity Building.
2041 Public Transport Travel
2041 AM Peak Hour
2011 Public Transport Travel
Transit Systems Proposed up to 2041
BRTSLength: 438 km
MMTSLength: 428 km
MetroLength: 417 km
6
Metro rail plan
PlannedMetro Under Construction
Legend
PlannedMetro Under Construction
Proposed Metro for 2021
Legend
PlannedMetroUnder Construction
Proposed Metro for 2021
Proposed Metro for 2031
Legend
M1
M4M7
M8
M3
M6
M2
M9M14
M10
M13
M11
M12
M5
Code 2021 Proposed Corridors Length
M1 Miyapur - Patancheruvu 8.45
M2 Faluknama - Shamshabad Airport 15.98
M3 Nagole - LB Nagar 5.07
M6 L B Nagar-Owaisi Hospital-Aramghad 15
M8 Tarnaka - Keesara 18.11
M7 Balanagar Y Junction-Balanagar-Bowenpalli-JBS 9.53
M4 JNTU-Shilparamam-Financial Dist. 15.56
M5 L B Nagar-Vanastalipuran 3
M15
M5M17
M18
Code 2031 Proposed Corridors Length
M13Lakdikapul-Mehdipatnam-
Gachiboli- Lingampally- BHEL21.85
M11MGBS-Ramanthpur-Uppal-
Ghatkesar22.41
M14Kapra - Gandi Maisama -
Thumukunta -BHEL37.22
M12MGBS-Umdanagar -Shamsabad
Airport25.67
M5Vanastalipuram - Pedda
Amberpet9
M6 Aramghad - Rethibowli 10
M9 Patancheruvu - Sangareddy 24
M10 Bowenpalli-Medchal 16.66
Code 2041 Proposed Corridors Length
M5 Pedda Amberpet - Chotuppal 27
M17
Gachibowli - Shamshabad
(along the ORR) 22.62
M15 Owaisi Hospital-Begumpet 29.13
M18
Nanal Nagar - Langar House -
APPA Junction 10.27
PlannedMetro Under Construction
Proposed Metro upto 2031
Proposed Metro for 2041
Legend
BRTS plan
PlannedProposed BRTS for 2021
Legend
B1
B2
B3
B4
B5
B6
B7
B11
B10
B12
B9
B11
Code 2021 Proposed Corridors Length
B2Lakdikapul-Mehdipatnam-Gachiboli-
Lingampally- BHEL22
B1 Aramghar-Rethibowli 10
B3MGBS-Umdanagar -Shamshabad
Airport26
Code 2031 Proposed Corridors Length
B4 JBS-Mulugu 39
B5 Pedda Amberpet-Choutuppal 27
B6 Owaisi Hosp.-Begampet 29
Code 2041 Proposed Corridors Length
B10 Biramal Guda-Aghapalli 29
B7 Bharat nagar-Narsapur 42
B9 Kapra-Kokapet 60
B11Outer Ring Road (Excluding
Gachibowli - Shamshabad Stretch)136
B12 Kuramalguda-Kothur 18
PlannedProposed BRTS for 2021
Proposed BRTS for 2031
Legend
PlannedProposed BRTS upto 2031
Proposed BRTS for 2041
Legend
PlannedExisting/Planned MMTS
Proposed MMTS
Legend
MMTS plan
MT1
MT5
MT3
MT7
MT4
MT6MT2
MT9
MT11
MT10
MT8
MT12
MT13
MT16
MT14
MT15
Code 2021 Proposed Corridors Length
MT1 Falaknuma-Umdanagar-Airport 18
MT2 Tellapur-Patancheru 12
MT3 Secunderabad-Bollaram 14
MT4 Sanathnagar-Moula Ali 19
MT5 MoulaAli-Malkajgiri-Sitaphalmandi 10
MT6 Bollaram-Medchel 14
MT7 Moulaali-Ghatkesar 14
Code 2031 Proposed Corridors Length
MT9 Umdanagar-Shadnagar 35
MT10 Medchel-Topran 34
MT11 Telapur- Ravulapalli 21
MT8 Ghatkesar-Bhongir 26
Code 2041 Proposed Corridors Length
MT14 Shadnagar - Jedcherla 24
MT12 Topran - Ramayampet 21
MT15 Ravulapalli - Vikarabad 24
MT13 Bhongir-Jangaon 23
MT16 Bibinagar-Nalgonda 72
Potential Right of Way Requirements
1992
SRDP
ROW(m)
Hierarchical Road Network
Arterials
Sub-Arterials
Distributors/Collectors
Local/Access Roads
Road Network Plan for 2041
Regional Commuter Rail System
Summary of Cost EstimatesAmount (INR Crores)
System 2021 2031 2041
Highway System 12,080 21,915 39,620
Metro System 24,810 63,630 84,520
MMTS 1,360 3,280
BRTS 935 2,490 6,415
Intra-city Bus System 2,190 3,265 4,750
Terminals 1,590 2,230 3,390
Traffic Management
Measures 5,945 8,985 11,390
Total 47,550 1,03,875 1,53,365
Government Initiations
✓ Metro Rail corridors Extensions/ New corridors
✓ Hyderabad Road Development Corporation Ltd (HRDCL)
✓ Strategic Road Development Plan (SRDP)
✓ Charminar Pedestrianization Project
An ISO 9001:2008 Certified Company
HRDCL PRORITY ROADS
16
AS for Rs 2631Crs for 20 works
Phase-1
Charminar Pedestrianization Project
An ISO 9001:2008 Certified Company
Phase-1 Charminarto Gulzar Houze
CharminarPedestrianization Project
Phase-2 GulzarHouze to Madina
Metro Corridor 1Proposed NGT line2.3km
Further routes for Ext
New Generation Tram for Hyderabad