urea monthly operation report [aug-2013]
TRANSCRIPT
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
1/15
Prepared By: MUR (E-II)
Reviewed By: SMZ (DAY ENGINEER)
Approved By: MSM/ SAK (UM/ Sr UM)
UREA PLANT OPERATIONSMONTHLY REPORT [AUG 2013]
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
2/15
TABLE OF CONTENTS
Urea plant production status ......................................................................... 1
Consumption Figures ..................................................................................... 1
Total down time status ................................................................................. 2
Achievements ............................................................................................... 3
Urea Plant Highlights ..................................................................................... 4
Health Safety & Environment ......................................................................... 7
Concerns ...................................................................................................... 08
Daily Production status ................................................................................ 09
Product Quality ............................................................................................ 11
Man Power Status ....................................................................................... 13
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
3/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 1 Page
UREA PRODUCTION FOR THE MONTH
Target 32005 MT of Urea
Actual Production 35076.05MT of Urea
Difference +3071.05 MT of Urea
UREA PLANT AVERAGE LOAD 77.17 %
(Basis: 30.30 days)
UREA PLANT MAXIMUM LOAD 80.63 %
HIGHEST PRODUCTION DURING THE MONTH 1282.53 MTPD
CONSUMPTION FACTORS
(At 70 % Plant Load)
Design/Actual
Ammonia consumption per MT of Urea: 0.578/0.578 tons
Steam consumption per MT of Urea: 1.38/1.66* tons
CO2consumption per MT of Urea: 0.725/0.75 tons
Electrical consumption per MT of Urea: 24.5 /42.29* KWh
*Plant is running at an average of ~77.17% Load, while consumption factors are for 100% plant
Load.
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
4/15
FATIMA FERTILIZER COMPANY LTD 2 Page
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
TOTAL DOWN TIME
No. of Shutdowns = 02
Total down time of the Month (Aug-13) = 16.78 Hrs
SR No ACTIVITY DATE TIME DOWN TIME TRIPPING REASON
1
Shutdown 28-08-13 07:47 hrs
10.78 Hrs
Cold Box (Rimming) leading to
Planned shutdown of NH3-Plant
backend
Startup 28-08-13 18:30 hrs
2
Shutdown 29-08-13 14:50 hrs
06 Hrs
E-102 A/B Tube rupture
Startup 29-08-13 20:50 hrs
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
5/15
FATIMA FERTILIZER COMPANY LTD 3 Page
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 3 Page
ACHIEVEMENTS
1. 12-Million Combined Safe Man Hours
Congratulations to all FFL employees on achieving 12 million combined (Permanent &
Contractual Employees) safe man hours on 26th
of August 2013, appreciate the efforts of all
those involved in achieving this remarkable milestone.
2. Urea Plant Injury Prevention Plan
Urea IPP prepared and presented in Executive HSE Committee meeting by SMZ, it was
appreciated by forum, and stewardship is in progress.
3. Mechanical seal failure of Steam Condensate circulation Pump (P-903 A)
During routine changeover of P-903 B to A, mechanical seal of P-903 A failed and heavy leakage
of steam condensate (~160 C) started meanwhile FSHH-1213 A/B/C timer actuated (ESD-1001
actuation time is 120 sec), board man quickly communicated to the area operator and P-903 A
stopped and flow adjusted from P-903 B. Emergency very well managed by DCS board man as it
might lead to ESD-1001 actuation and he also handle the abnormalities in plant parameters as
S.C circulation in Pool Reactor tubes reduced.
4. Urea Dust Dissolving/Recycling
Urea dust dissolving remained in progress during the month. Total dust recovered for the month
of Aug was 3585 bags i.e.; 179.25 MT of Urea. Despite of this dust recovery load, urea product
quality remained within design limits.
5. Urea Product Quality
Urea Product quality was maintained in allowable limits during humid weather and at low load,
Improvement in product fines observed after cleaning scrapper bed.
6. NP Plant Load Limitation
NP plant facing load limitation due to Low CO2flow from Urea plant, one factor contributing was
Low suction pressures at NP CO2compressor suction. By collaborative efforts between Urea and
NP operations team, pressure at NP CO2 Compressor suction increased to maintain CO2 flow
keeping Urea CO2Compressor in safe operating range.
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
6/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 4 Page
HIGHLIGHTS
OPERATIONAL ACTIVITIES
1. Scrapper Floor bed dry cleaning carried out.
2. IPP (Injury Prevention Plan) and FPP (Fire prevention Plan) for urea plant prepared and finalized.
3. Cooling water optimization at Urea plant remained continued during the whole month as Plant
Load varied.
4. Urea dust dissolving remained in progress during the month. Total dust recovered for the month
of Aug was 3585 bags i.e.; 179.25 MT of Urea.
5. Routine audits carried out and MWRs raised.6. Emergency talks conducted on various emergencies of urea plant during night shifts.
7. HP Ammonia Pump startup class room training conducted by M.Umar Riaz as per Technical
Training calendar urea plant for year 2013.
MAINTENANCE ACTIVITIES
1. E-102 B is handed over to maintenance for tube leakage rectification and to implement cooler by
pass installation modification. Tube bundle pulled out and inspected by Inspection team,
condition was very rusty.
Urea Dust dissolving
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
7/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 5 Page
2. Suction strainers of P-801 A/B, P-151 A/B, P-901 A/B, P-703 B, P-705 B, P-306 B, P-901 A/B, P-
309 A, P-903 A/B, P-802 B, P-303 B, P-951 A/B (discharge strainer) cleaned during the month.
3. P-801 A seal flush cooler cleaned, found chocked with mud.
4. Safety shower (near P-151 A/B) hand wheel problem rectified by maintenance.
5. PV-119 D/S steam trap bypass leakage rectified by maintenance.6. Gland leakages rectified at Vacuum section.
7. Prill Tower Elevator detailed maintenance carried out by maintenance team in the presence of
its vendor and it was remained out of service most of the time during the month. Now it is
working ok.
8. PSV-P363B calibrated by maintenance.
INSTRUMENT ACTIVITIES
1. AI-1261/1201 calibrated by Instrument team.
2. YT-2Y (Stage 2 Radial vibration) erratic reading problem rectified by Instrument.
3. PT-1024 and TT-1024 at 3rdstage discharge of CO2Compressor calibrated by Instrument team.
4. TT-1145 sensing cover replaced by Instrument as it was suspected that metallic pieces in G-602 B
are due this cover.
5. FSLL-1213 A/B/C Loop verified by instrument for changing ESD-1001 timer activation on HH flow
of P-903 A/B. Modification will be implemented after MOC approval.
6. LT-1024 A/B/C calibrated during shut down.
LT-146
1c
alibration
P-951 A/B discharge strainer
P-801 A seal flush cooler
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
8/15
FATIMA FERTILIZER COMPANY LTD 5 Page
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 6 Page
MACHINERY ACTIVITIES
1. P-903A mechanical seal replaced by machinery team.
2. G-602 A/B Mechanical cleaning carried out.
3. V-161 L.O console oil breather Mesh cleaned by machinery team.
4. G-602 B shifted to W/S after dismantling as abnormal sound observed from the bearings. NowG-602 B installed again after bearing replacement and running normal.
5. K-101 L.O replaced by machinery.
6. P-953 A/B, P-252 and P-309 A/B oil replacement/makeup carried out by machinery team.
7. K-101 and K-851 suction filter cleaned.
ELECTRICAL ACTIVITIES
1. PM-802B bearing replaced by Electrical as motor was giving abnormal sound.
2. PM-703 B bearing replaced by Electrical as motor was giving abnormal sound.
3. Abnormal sound observed from PM-703 A, problem was rectified by greasing of motor.
4. Abnormal sound observed from PM-705 A, problem was rectified by greasing of motor.5. Motor greasing and PM carried out on weekly basis.
6. Voltage measurement at KT-102 shorey/carbon brushes and K-102 gear box earthing brush
measured by electrical, declare ok.
7. Preventive maintenance of Prill tower Elevator carried out.
8. KM-851 taken in service after winding. Now, it is running fine.
K-851(Ventilator for Scrapper)
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
9/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 7 Page
HEALTH SAFETY AND ENVIORNMENT
1. Congratulations to all FFL employees on achieving 12 million combined (Permanent plus
Contractual Employees) safe man hours on 26th
of august 2013.
2. Fire Break Glass unit # 126 at Prill tower top inspection carried out by Electrical, declare ok.3. Emergency Response plan Role statement discussed with shift team with reference to
preparation of mock drill planned other than routine mock drill.
4. Following Incident report (IR-01) raised during the month;
P-903A mechanical seal failure Elevator got stuck at 5thFloor Ammonia Recirculation cooler tube rupture
5. Following topics were discussed in weekly D-Level meeting;
Fire Detection and Alarm system MOC Technology Piper Alpha (Safety Beacon) Executive HSE waiver PSSR (Pre-startup safety review)
6. The oil spillage from the breather of the K-102 lube oil circuit run down tank is a constant
cause of slippery stairs / railings and unsatisfactory housekeeping in the CO2 compressor
area. Issue needs to be addressed at the earliest. Machinery team is already aware about
the problem.
7. Flash reports issued were discussed on regular basis with team.
8. HSE procedures discussion continued during night shift.
9. Management safety audit conducted as per schedule at urea plant. 07-unsafe actions and 01
unsafe condition reported. All observations status is close now.
10.19-observations related to HSE reported during the month, 14 observations status is close
now, remaining are open.
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
10/15
FATIMA FERTILIZER COMPANY LTD 8 Page
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
CONCERNS
1. Compressor operating parameters are deteriorating with time, second stage pressure is high
and 3rd stage pressure is low with high temp, RPM of machine is running high at low plant
load, compressor stages efficiency as calculated by process is also low, need to investigate in
detail and rectify the root cause.
2. Flow dips observed in FT-1021 so to get margin, second antisurge valve is opened so due to
more recycling, rpm of machine is high which causes high steam consumption.
3. Oil droplets from Rundown tank are cause of high concern as it can be cause of slippage and
also a big hazard for fire.
4. E-102 B 03-leaked tubes have been plugged after SFT and hydro test. E-102 B tube bundle
pulled out and inspected by inspection, its condition is deteriorating, declared misfit for
operation, working on bypass is in progress
5. As both Ammonia recirculation coolers are unavailable due to tube rupture. So, P-102 A is
running with recycle line isolated, executive HSE waiver has been taken on the subject issue.
E-102 B is handed over to maintenance team for tube plugging and cooler by-pass
modification job. They are working on it and plugged 02 leaky tubes.
6. K-102 pinion ACP (anti-coupling) side journal bearing temperatures (at TT-2125/26)
remained high i.e.; greater than 100 C, during the month. Now, temperatures are stable at
110/114 C, problem communicated to vendor and proposed solution is still pending.
7. FT-1232 remained fluctuating, the faulty reading issue is minimized after installation of
sunlight shed at FT, but could not be completely ruled out. MOR is initialized by Instrument
team for remote display of transmitter.
8. P-301 B outboard radial vibration were high i.e. VI-2301/2302 B were 46/57 um,
respectively.
9. LT-1135 at P-401 A/B (Urea Melt Pumps) suction remained erratic during the month and LV-
1135 remained on Manual mode. These cause level fluctuations at melt pump suction and
cause disturbance in associated parameters.
10.Some Asset number/tags are missing in eAM maintenance module, end users are facing
problems in raising MWR, problem communicated to the concern.
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
11/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 9 Page
PRODUCTION PROFILE
Sr No Date Production MT
1 1Aug, 2013 1246.37
2 2Aug, 2013 1271.45
3 3 Aug, 2013 1275.54
4 4 Aug, 2013 1275.78
5 5Aug, 2013 1245.32
6 6Aug, 2013 1169.16
7 7 Aug, 2013 1131.148 8 Aug, 2013 1160.55
9 9 Aug, 2013 1276.47
10 10 Aug, 2013 1062.45
11 11 Aug, 2013 1046.89
12 12 Aug, 2013 1098
13 13 Aug, 2013 1201.56
14 14 Aug, 2013 1282.53
15 15 Aug, 2013 1195.33
16 16 Aug, 2013 1123.8817 17 Aug, 2013 1124.22
18 18 Aug, 2013 1124.05
19 19 Aug, 2013 1125.43
20 20 Aug, 2013 1122.49
21 21 Aug, 2013 1124.39
22 22 Aug, 2013 1123.70
23 23 Aug, 2013 1122.66
24 24 Aug, 2013 1124.39
25 25 Aug, 2013 1123.7026 26 Aug, 2013 1087.02
27 27 Aug, 2013 1056.40
28 28 Aug, 2013 574.39
29 29 Aug, 2013 786.50
30 30 Aug, 2013 1192.04
31 31 Aug, 2013 1202.25
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
12/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 10 Page
PRODUCTION PROFILE
Production Profile
Month of Aug, 2013
0
200
400
600
800
1000
1200
1400
1Aug,2013
2Aug,2013
3Aug,2013
4Aug,2013
5Aug,2013
6Aug,2013
7Aug,2013
8Aug,2013
9Aug,2013
10Aug,2013
11Aug,2013
12Aug,2013
13Aug,2013
14Aug,2013
15Aug,2013
16Aug,2013
17Aug,2013
18Aug,2013
19Aug,2013
20Aug,2013
21Aug,2013
22Aug,2013
23Aug,2013
24Aug,2013
25Aug,2013
26Aug,2013
27Aug,2013
28Aug,2013
29Aug,2013
30Aug,2013
31Aug,2013
Production MT
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
13/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 11 Page
UREA PRODUCT QUALITY ANALYSIS
Date Moisture (%) Biuret (%) APS (mm) Fines (%)
1Aug, 2013 0.36 1.05 2.11 0.6
2Aug, 2013 0.37 1.01 2.07 1.0
3 Aug, 2013 0.39 0.96 2.12 0.9
4 Aug, 2013 0.39 1.06 2.06 0.6
5Aug, 2013 0.40 1.03 2.09 0.6
6Aug, 2013 0.36 1.04 2.11 1.0
7 Aug, 2013 0.36 1.0 2.11 0.3
8 Aug, 2013 0.36 1.01 2.11 0.6
9 Aug, 2013 0.37 1.0 2.09 0.5
10 Aug, 2013 0.37 1.05 2.12 0.6
11 Aug, 2013 0.40 1.04 2.13 0.4
12 Aug, 2013 0.39 1.02 2.11 0.4
13 Aug, 2013 0.35 1.04 2.10 0.7
14 Aug, 2013 0.41 0.98 2.17 0.4
15 Aug, 2013 0.42 0.98 2.08 0.9
16 Aug, 2013 0.36 1.10 2.14 0.6
17 Aug, 2013 0.42 1.02 2.12 0.5
18 Aug, 20130.35 1.07 2.11 0.5
19 Aug, 2013 0.34 0.97 2.10 0.2
20 Aug, 2013 0.38 0.99 2.15 0.8
21 Aug, 2013 0.38 1.05 2.10 0.8
22 Aug, 2013 0.34 1.04 2.10 0.9
23 Aug, 2013 0.35 1.05 2.11 1.3
24 Aug, 2013 0.39 1.08 2.13 0.5
25 Aug, 2013 0.34 1.05 2.10 0.7
26 Aug, 2013 0.38 1.06 2.12 0.7
27 Aug, 2013 0.37 1.08 2.12 0.7
28 Aug, 2013 0.37 1.02 2.10 0.6
29 Aug, 2013 0.35 1.05 2.13 0.6
30 Aug, 2013 0.39 0.98 2.20 0.3
31 Aug, 2013 0.39 1.06 2.12 0.7
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
14/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
FATIMA FERTILIZER COMPANY LTD 12 Page
UREA PRODUCT QUALITY ANALYSIS
UREA PRODUCT QUALITY ANALYSIS
Month of Aug, 2013
0
0.5
1
1.5
2
2.5
1
Aug,2013
2
Aug,2013
3
Aug,2013
4
Aug,2013
5
Aug,2013
6
Aug,2013
7
Aug,2013
8
Aug,2013
9
Aug,2013
10Aug,
11Aug,
12Aug,
13Aug,
14Aug,
15Aug,
16Aug,
17Aug,
18Aug,
19Aug,
20Aug,
21Aug,
22Aug,
23Aug,
24Aug,
25Aug,
26Aug,
27Aug,
28Aug,
29Aug,
30Aug,
31Aug,
Moisture (%)
Biuret (%)
APS (mm)
Fines (%)
-
8/13/2019 Urea Monthly Operation Report [Aug-2013]
15/15
UREA PLANT OPERATIONS MONTHLY REPORT [AUG, 2013]
MAN POWER STATUS
*Congratulation to Mr. Ch. Akbar for his promotion to Sup-II. *Congratulation to Mr. Naeem, Mubeen, Dewarka and Arslan for their promotion to Opt-II.
MANAGEMENT
Sr. No Designation No of Employees
1 Sr. UM 1
2 UM 1
Sr. Engr 1
2 Engineer I 3
3 Engineer II 1
5 GTE 1
Total Manpower 8
Total Permanent Manpower 7
STAFF
Sr. No Designation No of Employees
1 Sup I 3
2 Sup II 1
2 *Sup III 4
3 Opt I 0
4 *Opt II 7
5 Opt III 3
6 Manpower on contract 0
7 Apprentices 1+4
Total 23
Total Permanent Manpower 18