![Page 1: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/1.jpg)
US-23 Flex Route Phase 2Operational and Environmental Study
Virtual Public Meeting
July 27, 2020
![Page 2: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/2.jpg)
Agenda
1. Introduction
2. US-23 Flex Route Phase I
3. Study Overview
4. Existing and Future Conditions
5. Flex Route Extension
6. Interchange Alternatives
7. Environmental Impacts
8. Next Steps
9. Questions?
10. Contact Us
2
![Page 3: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/3.jpg)
US-23 Flex Route
• Phase 1
• M-14 to south of M-36 (9 Mile Road)
• Opened to Traffic in 2018
• Phase 2
• M-36 to I-96/US-23 interchange
• Rebuilding Michigan Bond Program
• Operational and Environmental Study
• Traffic and operational analysis
• Road and bridge scoping
• Environmental surveys
• NEPA documentation
3
Introduction
![Page 4: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/4.jpg)
US-23 Flex Route Phase I
4
• Overall Improvement in Travel Time and Reliability• Travel Time • Planning Time • Speed• Crashes
• SB saw the greatest improvement
• NB will benefit from the extension to I-96
• MSU Study• Performance• Safety Impacts
![Page 5: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/5.jpg)
Study Overview
5
Purpose of the study is to focus on:
• Traffic Safety
• Operational Needs
• Directional Weekday (Monday – Friday) Peak Period Congestion
• Infrastructure Condition
Goal is to: Develop Safe, Efficient, Sustainable Transportation Improvements to assure that the corridor will meet current and future
highway operations using state-of-the-art traffic control measures along with improved infrastructure.
![Page 6: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/6.jpg)
Study Overview
6
Need is to focus on:
• Economic feasibility regarding restricted funding;
• Pavement condition;
• Directional weekday (Monday – Friday) peak period congestion;
• On-ramps that are short to adequately accelerate and merge into
traffic;
• Traffic operations at M-36, Silver Lake and I-96 interchanges;
• High crash segments throughout the corridor;
• Incident management areas to safely clear and investigate accidents; and
• Road and bridge maintenance.
![Page 7: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/7.jpg)
Study Overview
7
The Study includes:
• Road and bridge scoping to extend the US-23 Flex Route to I-96;
• Recommended alternatives at the M-36 and Silver Lake Road interchanges;
• Environmental Analysis that identifies potential environmental impact locations; and,
• NEPA documentation
![Page 8: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/8.jpg)
Existing and Future Traffic Conditions
8
Congestion (2020) –
• AM – Southbound US-23 near the
eastbound I-96 on-ramp as well as the
Silver Lake Road interchange.
• PM – Northbound where the flex lane
currently ends north of 8 Mile Road, as
well as near Lee Road and the I-96
ramps.
![Page 9: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/9.jpg)
Existing Safety Conditions
9
• Analyzed crashes from 2015 - 2019• Highest percentage of crashes near the
interchange areas • 99 crashes per year in southbound direction• 228 crashes per year in northbound
direction • High number of rear-end crashes due to
rush hour congestion• Short acceleration and deceleration lanes
![Page 10: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/10.jpg)
Existing Road and Bridge Conditions
10
• Acceleration and deceleration lanes are short• Shoulders are narrow • Pavement condition is fair to poor (north of
Silver Lake Road)• Bridges are in fair condition
• Study will document fix type
![Page 11: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/11.jpg)
Flex Route Extension
11
Extend the existing US-23 Flex Route from south of M-36 (9 Mile Road) to
the I-96/US-23 interchange
![Page 12: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/12.jpg)
Interchange Alternatives – M-36 (9 Mile Road)
12
![Page 13: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/13.jpg)
Interchange Alternatives – Silver Lake Road
13
Alternative 1: Single-point Urban Interchange (SPUI)
![Page 14: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/14.jpg)
Interchange Alternatives - Silver Lake Road
14
Alternative 2: Roundabouts (include Whitmore Lake Road and Fieldcrest Road)
![Page 15: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/15.jpg)
Environmental Impacts
15
Stage 1 – Initial Environmental Screening and Analysis
• Natural Environment• Air• Wetlands• Water Quality• Flora/Fauna
• Community Impacts• Public Engagement• Noise• Indirect/Cumulative• Public Parks• Detours• Right-of-way
![Page 16: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/16.jpg)
Next Steps
16
• Comment Period – August 10, 2020• Stage 2 Environmental Analysis• Stakeholder and Public Meetings #2 – October 2020• Submit Final NEPA Documentation to FHWA – December 2020• Design – FY 2021 • Construction – FY 2023
![Page 17: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/17.jpg)
Questions?
17
![Page 18: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/18.jpg)
Contact Us
Kari Martin, Project Manager
Monica Monsma, Public Involvement Specialist
(517) 335-4381
18
![Page 19: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/19.jpg)
Long-Range Freight Rail Active Transit Strategic Plan
Michigan State Long-Range Transportation Plan
![Page 20: US-23 Flex Route Presentation - michigan.gov€¦ · Monica Monsma, Public Involvement Specialist monsmam@michigan.gov (517) 335-4381 18. Long-Range Freight Rail Active Transit Strategic](https://reader033.vdocument.in/reader033/viewer/2022050408/5f850036d6d0aa294f330731/html5/thumbnails/20.jpg)
Public Outreach – Round 2 (June – Sept. 2020)
• Telephone Town Halls (Early June 2020)
• MetroQuest Survey
• MDOT Project Meetings• Coordinating with MPOs and Region Planners
• Michigan Mobility website• www.michiganmobility.org
• MDOT social media