The Wisconsin Department of Transportation (WisDOT) invites you to a public meeting to discuss the resurfacing of US 45 from westbound County H to westbound WIS 28 in Washington County. The meeting will have an open house format and the public is welcome to attend at their convenience. The meeting facility is wheelchair accessible. Early identification of any possible issues or concerns from residents and business owners is important as preliminary plans are developed. Project Overview WisDOT is proposing to resurface 1.2 miles of US 45 from westbound County H to westbound WIS 28 in the village of Kewaskum in Washington County. The purpose of the project is to address the pavement deterioration and poor ride quality that can no longer be economically maintained. Proposed Improvements Improve the pavement by resurfacing the roadway Signal improvements at the US 45 and County H intersection Curb ramp upgrades to meet ADA requirements Replace pavement marking Local water main and sanitary sewer replacement Wednesday March 11th, 2020 5:00 - 7:00 pm Kewaskum Municipal Building Annex 1308 Fond Du Lac Ave, Kewaskum, Wisconsin DTSD SOUTHEAST REGION OFFICE 141 NW BARSTOW ST PO BOX 798 WAUKESHA, WI 53187-0798 US 45 Resurfacing Public Involvement Meeting #1

Upload: others

Post on 08-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US 45 Resurfacing DTSD SOUTHEAST REGION OFFICE 141 NW … · 2020. 3. 4. · DTSD SOUTHEAST REGION OFFICE 141 NW BARSTOW ST PO BOX 798 WAUKESHA, WI 53187-0798 US 45 Resurfacing Public

The Wisconsin Department of Transportation (WisDOT) invites you to a public meeting to discuss the resurfacing of US 45 from westbound County H to westbound WIS 28 in Washington County. The meeting will have an open house format and the public is welcome to attend at their convenience. The meeting facility is wheelchair accessible. Early identification of any possible issues or concerns from residents and business owners is important as preliminary plans are developed.

Project OverviewWisDOT is proposing to resurface 1.2 miles of US 45 from westbound County H to westbound WIS 28 in the village of Kewaskum in Washington County. The purpose of the project is to address the pavement deterioration and poor ride quality that can no longer be economically maintained.

Proposed Improvements• Improve the pavement by resurfacing the roadway• Signal improvements at the US 45 and County H intersection• Curb ramp upgrades to meet ADA requirements• Replace pavement marking• Local water main and sanitary sewer replacement

Wednesday March 11th, 2020 5:00 - 7:00 pm

Kewaskum Municipal Building Annex1308 Fond Du Lac Ave, Kewaskum, Wisconsin

DTSD SOUTHEAST REGION OFFICE141 NW BARSTOW STPO BOX 798WAUKESHA, WI 53187-0798

US 45 ResurfacingPublic Involvement Meeting #1

dota4p
Text Box
FIRST CLASS MAIL PRESORTED US POSTAGE PAID MILWAUKEE, WI PERMIT NO 864
Page 2: US 45 Resurfacing DTSD SOUTHEAST REGION OFFICE 141 NW … · 2020. 3. 4. · DTSD SOUTHEAST REGION OFFICE 141 NW BARSTOW ST PO BOX 798 WAUKESHA, WI 53187-0798 US 45 Resurfacing Public

Real EstateNew right of way acquisition is needed for this project to upgrade the pedestrian curb ramps at intersections to meet ADA requirements. Small areas of fee and temporary limited easement (TLE) will be needed to allow construction of the new curb ramps. Right of way needs will be determined during the preliminary design phase. WisDOT expects real estate acquisition to begin in the summer of 2020.

The village of Kewaskum is planning to construct a 9/11 Memorial site to serve as a public space for reflection and remembrance in front of the Kewaskum Municipal Building Annex located at the corner of US 45 and 1st Street. Additional information on the memorial can be found at www.wisconsin911memorial.com. It will be necessary to acquire a small amount of fee and TLE from this property to construct 2 pedestrian curb ramps.

Construction StagingUS 45 will be closed and detoured to through traffic during construction. Local traffic and emergency response access will be maintained. Roadway work will be staged within the closed roadway to maintain local traffic and pedestrian access.

Schedule For more information, contact:Preliminary Design Fall 2019 - Summer 2020 WisDOT Southeast Region Doug Cain Final Design Public Meeting #2 Construction

Summer 2020 - Fall 2022 141 NW Barstow St. WisDOT Project ManagerSummer 2021 PO Box 798 (262) 548-56032024 Waukesha, WI 53187-0798 [email protected]

US 45 Resurfacing Public Involvement Meeting #1WB County H to WB WIS 28, Washington County

NorthNorth Project Limits

South Project Limits

dota4p
Callout
Kewaskum Municipal Building Annex
dota4p
Polygonal Line
dota4p
Polygonal Line