Page 1: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Alex Hagen, P.E.WisDOT Project Manager

Public Information Meeting #2

March 12, 2020

US 51 Stoughton Roundabout

Hoel/Silverado, STH 138, and Roby Road

Page 2: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Presentation Outline

• Project area• Project purpose and need• Proposed staging• Project schedule•Comments and questions

Page 3: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Project Area

Page 4: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Project Purpose and Need

• Project Purpose▪The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Roby Road intersection improvements along US 51 is to provide a safe and efficient transportation system to serve present and long-term travel demand while minimizing disturbance to the environment.

•Project Needs▪ Improve intersection safety (Roby Road has received HSIP funding)

▪Accommodate projected traffic volumes

▪ Improve bicycle and pedestrian accommodations

Page 5: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Alternatives – STH 138 & Hoel/Silverado

Page 6: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Alternatives – Roby Road

Page 7: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging

• Projects will be constructed together.• Jackson Street signal between the two project areas will maintain

normal operation during construction.•We will review the staging concepts of each construction area.

Page 8: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – STH 138 and Hoel/SilveradoStage 1

Page 9: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – STH 138 and Hoel/SilveradoStage 2

Page 10: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – STH 138 and Hoel/SilveradoStage 2B

Page 11: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – STH 138 and Hoel/SilveradoStage 2C

Page 12: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – STH 138 and Hoel/SilveradoStage 3

Page 13: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – STH 138 and Hoel/SilveradoStage 4

Page 14: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – Roby RoadStage 1

Page 15: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – Roby RoadStage 2

Page 16: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – Roby RoadStage 3A

Page 17: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – Roby RoadStage 3B

Page 18: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Proposed Staging – Roby RoadStage 4

Page 19: US 51 Stoughton Roundabout Hoel/Silverado, STH 138, and ...wisconsindot.gov/Documents/projects/by...•Project Purpose The purpose of the Hoel Avenue/Silverado Drive, STH 138, and

Project Schedule

• Spring 2022 – Begin Construction▪ Plans will be ready for 2021 construction if funding becomes available.