US 6, Broadway Viaduct. Steve D. Kathol, P.E., S.E. Project Overview. Iowa ABC Workshop, August 11-12, 2008 Des Moines, Iowa. Broadway Viaduct. US 6, Broadway Viaduct. Project Overview. 3- UPRR Tracks. Indian Creek (In Culvert- Historic Structure). Historic Structures. 1- CNIC Track. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: US 6, Broadway Viaduct

US 6, Broadway ViaductSteve D. Kathol, P.E., S.E.

Iowa ABC Workshop, August 11-12, 2008 Iowa ABC Workshop, August 11-12, 2008 Des Moines, IowaDes Moines, Iowa

Project Overview

Page 2: US 6, Broadway Viaduct

Broadway Viaduct

Page 3: US 6, Broadway Viaduct

US 6, Broadway Viaduct

Historic Structures

Indian Creek (In Culvert- Historic Structure)

3- UPRR Tracks

1- CNIC Track City Streets

Project Overview

Page 4: US 6, Broadway Viaduct

US 6, Broadway ViaductExisting Viaduct

Existing viaduct: built in 1955, 1394’ x 64’, 19-span steel I-beam plus cellular abutments

Page 5: US 6, Broadway Viaduct

US 6, Broadway Viaduct

2-Lanes Eastbound Traffic

Detour Westbound Traffic

Traffic Phasing

Page 6: US 6, Broadway Viaduct

US 6, Broadway ViaductProposed Plan and Section

4-Column Piers W/ Base Grouted Drilled Shafts

Iowa BTE Beams

Aesthetics- To Be Determined

Light Wt. Fill W/ Retaining Walls at Ea. Approach

Page 7: US 6, Broadway Viaduct

US 6, Broadway ViaductConstruction Phasing

Page 8: US 6, Broadway Viaduct

US 6, Broadway ViaductConstruction Phasing

Page 9: US 6, Broadway Viaduct

US 6, Broadway ViaductConstruction Phasing

Page 10: US 6, Broadway Viaduct

US 6, Broadway ViaductConstruction Phasing

Page 11: US 6, Broadway Viaduct

US 6, Broadway ViaductConstruction Phasing

Page 12: US 6, Broadway Viaduct

US 6, Broadway ViaductBridge Cross-Section

Page 13: US 6, Broadway Viaduct

Broadway Viaduct

Identify accelerated construction methods to complete each stage in one construction season Maintain two traffic lanes (staged

construction) Avoid construction vibration

Evaluate the use of light weight fill for approach fill

Session Objectives