BUILDING STRONG®
US ARMY CORPS OF ENGINEERS TULSA DISTRICT
US Army Corps of EngineersBUILDING STRONG®
LTC Eugene SnymanDeputy District Commander
Tulsa District
13-14 April 2010
BUILDING STRONG®SWD – Building Strong!
$211.4M
$9.9M
$324.5M
$29MIIS
ENV
CW
MP
SWT - FY10 Dollars by ProgramTotal Dollars: $574.8M
BUILDING STRONG®
FY10-14 Military Program
• Ranges • Clinics• Barracks• Admin Facilities• Artifact Storage• Tactical Equipment Maintenance Facilities• Airfield Pavement Upgrades• Chapel• Physical Fitness Centers• Rail Improvement Projects• Starship Barracks Upgrades• Industrial Building Infrastructure Upgrades• Technical Training Facilities• Control Tower• Access Control Points
BUILDING STRONG®
Fort Sill Program
BRAC: ADA School $204MAwarded: May - July 2007 Delivered: Summer 2009
BRAC: 31st ADA Brigade $138MAwarded: May - July 2008Deliver: Summer 2010
AIT Barracks
TEMF/Deployment St.Patriot Instructional BldgC4I Instructional Bldg
BUILDING STRONG®
FY10-14 Civil Works Program• Maintenance and repair of hydraulic steel structures • Dam Safety and Levee Rehabilitation• Bridge rehabilitation/repair/replacement• Road repair and maintenance• Public Use Area maintenance and upgrades• Hydropower projects• Chloride Control Pump houses, pipelines• Various Continuing Authority Projects
BUILDING STRONG®
Canton Dam Safety ProjectThe Canton Dam Safety project consists of stabilizing the existing spillway with steel anchors (complete) and constructing an additional auxiliary spill way channel (in progress). The projects are required to resolve stability, seepage, seismic, and hydrologic deficiencies on the dam.
FY 2010 Scheduled ActivitiesActivity Schedule
Award contract for the new Auxiliary Channel Highway Bridge July 2010
FY 2011 Scheduled Activities
Activity Schedule
Complete engineering and design for June 2011weir and fuse gates
Award weir contract Sept 2011
Award fuse gate contract Sept 2011
BUILDING STRONG®
Webbers Falls ProjectWebbers Falls Turbine Replacement: $40MReplace 3 slant axis turbines – related work
by separate contract
Awarded: Feb 2008 to AndritzDelivery: Jan 2013
BUILDING STRONG®
MATOCsSWT Solicitations will include both small business pool and an unrestricted pool. Target synopsis in fourth quarter of FY10.
NWO “Mega Environmental” (NWO/SWT/SWF/SPD joint $2.5 billion acquisition). Industry Day was held in Omaha, NE. Solicitation forthcoming – Omaha District is the lead for program.
POC: Ken Kebbell 918-669-7240
Environmental Services
BUILDING STRONG®
FY 10 MILCON Specific Construction
Project $ Range
Fort Sill WTU Complex, Admin, SFAC $ 1 - 5M(Barracks by Fort Worth COS)
Fort Sill AIT Barracks Complex, Ph 1, Bn HQ $ 1 - 5M(Barracks by Fort Worth COS)
McAlester AAP Demil Facility $ More than 10M
Sheppard AFB ENJJPT Ops Complex $ More than 10M
Tinker T-9 Noise Suppressor (CI) $ 5 – 10M
Vance Control Tower (CI) $ More than 10M
BUILDING STRONG®
FY 11 MILCON Specific Construction
Project $ Range
Fort Sill ADA Museum Ops Support Bldg $ More than 10M
Fort Sill Central Issue Facility $ More than 10M
McAAP Magazine Covers $ 1 - 5M
Tinker AFB, Bldg 3001, Phase # 3 $ More than 10M
BUILDING STRONG®
ARRA MILCON Construction
Project $ Range
Tinker AFB CDC (Mobile District Award) $ More than 10M
BUILDING STRONG®
Operations and Maintenance ProjectsProject $ Range
Toronto Lake: Replace Main Power Panel and Gallery Switches $ 25 – 100K
Broken Bow: Repair Septic and Dam Roadway Lighting $ 100 – 250K
Eufaula Lake: Replace Control and Limit Switches $ 100 – 250K
Tenkiller Lake: Rehab Project Office Wiring $ 100 – 250K
Council Grove and Kaw Lake: Replace Project Office Roof $ 100 – 250K
BUILDING STRONG®
Operations and Maintenance ProjectsProject $ Range
Fort Gibson Lake: Install Mooring Facility and $ 100 – 250KSeal Deck
Fort Gibson Lake: Transformer Oil Containment $ 250 – 500K
Tenkiller: Repair Spillway Bridge $ 500K – 1M
Canton and Fort Supply Lakes: Replace Low Flow $ 1 – 5MValves
Hulah Lake: Replace Tainter Gate Chains $ 1 – 5M
BUILDING STRONG®
Operations and Maintenance Projects
Project $ Range
Tenkiller: Repair Hatch Covers, Replace Gate Towervalves and Replace Unwatering Pumps $ 1 – 5M
Oologah Lake: Repair Gate Tower Service Gates $ 1 – 5M
John Redmond: Construct New Bulkhead $ 1 – 5M
Fort Gibson Lake: Transformer Oil Containment $ 250 – 500K
RS Kerr: Construct New Stop Logs $ 500K – 1M
BUILDING STRONG®
American Recovery and Reinvestment Act
As of 7 April 2010
-61 of 67 Contract Actions Awarded
-Represents 188 of 200 individual stimulus packages
-Total Obligated - $77.4M (includes Hired Labor)
- Program Total $112M of O&M
BUILDING STRONG®
Business Planning• Central Contractor Registration (CCR): Firms must be in CCR in
order to receive an award. CCR must be current.
• ORCA: Online Representations and Certifications – must be current and complete to receive an award.
• FEDBIZOPPS: www.fbo.gov– Non-Recovery Act Projects: All actions available for competition
will be advertised in FEDBIZOPPS
– Recovery Act Projects: All actions, both competitive and non-competitive, including task orders under SATOCs and MATOCs, will be advertised in the FEDBIZOPPS for the timelines required by FAR Part 5
BUILDING STRONG®
Additional Information• Southwestern Division Small Business POC: Melea Crouse
469-487-7105
• Contracting Division Central Telephone Line: 918-669-7270
• FEDBIZOPPS: www.fbo.gov
• USACE Recovery Act webpage: www.usace.army.mil/recovery/Pages/default.aspx
• Federal Government webpage:www.Recovery.gov