  • US CMS US CMS M&O Planning

    Dan GreenUS CMS Project Manager

    DOE/NSF Lehman Review, May 8-10, 2001

  • OutlineCMS and CERN PlanningResource Loaded Schedules Category A Category BUS CMS - Planning for the Physics - the research program.

  • Planning for the PhysicsCMS has put CPT in place to prepare for the research program. This is a coherent sum of Core SWC, Physics reconstruction and selection, and high level Triggers.CMS will present draft MOU for M&O and SWC at the next RRB meeting at CERN.Draft cost profiles for M&O, SWC have been shown to the JOG.Upgrade R&D and some fabrication is part of the research plan.US CMS has created a draft Management Plan for M&O.A resource loaded schedule (WBS) was made in preparation for the Lehman review. FNAL had a PMG review April 11-12, 2001.The Lehman review (May 8-10) has requested a complete plan for all costs of the US CMS Research Program - M&O + SWC + Upgrades.

  • US CMS Research Program - M&OLetter of August 17, 2000 from the Joint Oversight Group ( JOG - DOE/NSF) to Fermilab to manage Maintenance and Operations (M&O)Detector operations and data monitoring M&O of US CMS supplied subsystems Virtual control room at FNAL for US based physics analysis R&D for and fabrication of upgrades to the experiment First cost estimate shown to JOG on December 6, 2000.

  • CMS Steering CommitteeChanges have been made in CMS to plan for SWC + Physics. CMS is planning for the research program.M&O + SWC at the next RRB.US physicists are an integral part of the CMS management.US CMS

  • CPTCSC (SWC MOU)PimiaSticklandTRIDAS(Detector MOU)CittolinSmithPRSSphicas

    Common Technical BoardCSC IBTRIDAS IBTier 1Tier 1L. Bauerdick - US CMS SWC

  • PRS and Detector L2Tasks: detector simulation detector reconstruction detector calibration monitoring physics objects, reconstruction and selection test beam analysis e - SeezJ, - Eno - Gasparini, Acosta,b - MannelliECAL - FaureHCAL - GreenMU - GaspariniMitselmakherTracker - Rolandi

  • CMS L2 and PRS

  • Resource Loaded Schedule - M&OWBS 1-7 are subsystem costs for US built and/or managed systems (Category B)WBS 8 contains the Category A (common CMS costs), the Remote Control Room, and US CMS Outreach. Estimates for Cat. A are from CMS/CERNWBS 9 gives detail on the estimated costs for Project offices at FNAL and at CERN. WBS 10 is the management reserve.

  • WBS Dictionary - NotesUS CMS has begun to create a resource loaded schedule for M&O. The notes field is used for the dictionary and BOE.

  • Resource SheetThe base program resources must be called out explicitly, even if there is no explicit M&O cost. The US CMS research program cannot succeed without strong base support.

  • WBS 8.1 - M&O CERN and CMSDOE+NSF/CERN MOU is umbrella document - with general conditions applicable to experiments performed at CERN. Now work on MOU for Collaboration in the Exploitation of the CMS Detector and an IMOU on SWC.Category A error is large +- 400 k$/yr. US is pro rata ~ 20%. NO costs to US CMS before FY03.

    Chart1

    66.038109658567.5562271229.867763512237.952936585431.880466731775.905873170712.903998439121.44939707327.59058731714.5543523902

    113.316452598268.9086536079.953472187762.783439953136.751281923858.955181419415.3130341349136.286003800613.78173072146.125213654

    192.732643018972.373074113210.226630037797.54631728339.333192452860.573116377415.7332769811366.585353660414.1599492836.2933107925

    290.792055020674.442766085321.7124734415133.376622569557.382965524159.709301964215.5089096011454.411051312213.9580186416.2035638404

    965.93015093593.270262009423.3175655024422.047935592669.952696507124.48344377759.3270262009487.33711899925.82939137564.6635131005

    979.222146976793.25925209323.3148130233421.998115720969.944439069824.48055367449.3259252093473.29070437215.82870325584.6629626047

    Detector Services

    Publications

    Communications

    On-line computing

    Data Management

    Test Beams and Calibration

    Shops and Labs

    Services

    Consultancy and management

    Outreach

    FY

    AY(M$)

    CERN RRB Proposal

    Sheet1

    US SHARESteady State(kchf)PROFILE

    0.232A+B+CA+CCERN ACMS A200120022003200420052006

    180401264080802280Detector Services4357401225187582858400

    5180Publications445450460480800800

    0.4098101266Communications656565140200200

    On-line computing25041062086036203620

    Data Management210240250370600600

    Test Beams and Calibration500385385385210210

    Shops and Labs851001001008080

    Services8008902330293041804060

    Consultancy and management509090905050

    Outreach304040404040

    Total28703410556572701806518060

    Total A+C26203140526567801266512660

    A+C ONLY

    200120022003200420052006

    Detector Services397.1080139373681.40762463341158.96226415091748.62448418165808.44312205925888.3720930233

    Publications406.2369337979414.3695014663435.2021563342447.6478679505560.8635482978560.7973421927

    Communications59.337979094159.85337243461.4959568733130.5639614856140.2158870745140.1993355482

    On-line computing228.2229965157377.5366568915586.576819407802.03576341132537.90755604762537.6079734219

    Data Management191.7073170732220.9970674487236.5229110512345.0618982118420.6476612234420.5980066445

    Test Beams and Calibration456.4459930314354.5161290323364.2452830189359.0508940853147.2266814282147.2093023256

    Shops and Labs77.595818815392.08211143794.609164420593.259972489756.086354829856.0797342193

    Services730.3135888502819.53079178892204.39353099732732.51719394772930.51203985612846.0465116279

    Consultancy and management45.644599303182.873900293385.148247978483.933975240735.053971768635.049833887

    Outreach27.386759581936.832844574837.843665768237.303988995928.043177414928.0398671096

    Total26203140526567801266512660

    US SHARE0.232* 1/1.5$/CHF*0.42 A/(A+C)

    200120022003200420052006200120022003200420052006

    Detector Services25.796136585444.264239296275.2861886792113.5906464924377.316465209382.5086511628Detector Services66.0381096585113.3164525982192.7326430189290.7920550206965.930150935979.2221469767

    Publications26.389151219526.917442815228.270732075529.079205502136.433696097436.4293953488Publications67.55622712268.90865360772.373074113274.442766085393.270262009493.259252093

    Communications3.8545951223.88807507333.99477735858.48143493819.10842402449.1073488372Communications9.86776351229.953472187710.226630037721.712473441523.317565502423.3148130233

    On-line computing14.825365853724.524781231738.104030188752.1002431912164.8624748409164.8430139535On-line computing37.952936585462.783439953197.546317283133.3766225695422.0479355926421.9981157209

    Data Management12.453307317114.355969501515.364528301922.415220907827.325272073127.3220465116Data Management31.880466731736.751281923839.333192452857.382965524169.952696507169.9444390698

    Test Beams and Calibration29.650731707323.029367741923.661373584923.32394607989.56384522569.5627162791Test Beams and Calibration75.905873170758.955181419460.573116377459.709301964224.483443777524.4805536744

    Shops and Labs5.04062439025.98165395896.14581132086.05816781293.64336960973.6429395349Shops and Labs12.90399843915.313034134915.733276981115.50890960119.32702620099.3259252093

    Services47.441170731753.2367202346143.1974037736177.5043169188190.3660621091184.8791813953Services121.4493970732136.2860038006366.5853536604454.4110513122487.3371189992473.2907043721

    Consultancy and management2.96507317075.3834885635.53123018875.45235103162.27710600612.2768372093Consultancy and management7.590587317113.781730721414.15994928313.9580186415.82939137565.8287032558

    Outreach1.77904390242.39266158362.45832452832.42326712521.82168480491.8214697674Outreach4.55435239026.1252136546.29331079256.20356384044.66351310054.6629626047

    Total170.1952203.9744342.0144440.4288822.7184822.3936Total435.699712522.174464875.5568641127.4977282106.1591042105.327616

    Sheet1

    Detector Services

    Publications

    Communications

    On-line computing

    Data Management

    Test Beams and Calibration

    Shops and Labs

    Services

    Consultancy and management

    Outreach

    US Category A (k$)

    CERN MOTF Estimates

    Sheet2

    Detector Services

    Publications

    Communications

    On-line computing

    Data Management

    Test Beams and Calibration

    Shops and Labs

    Services

    Consultancy and management

    Outreach

    FY

    AY(M$)

    CERN RRB Proposal

    Sheet3

  • 8.1 Category A SubtasksWBS 8.1.1 is the largest item in WBS 8.1 Explicitly call out the subtasks of 8.1

  • US CMS - at Present387 Members from 38 Institutions

  • How Will US CMS Grow?D0 doubled in size around the time of first data taking. US CMS is imagined to do likewise. CDF and D0 are natural future additional collaborators. It is expected that US LHC physics will engage a substantial fraction of the US HEP experimental community by the time of first LHC data.

    Chart1

    12217

    12521

    16840

    16027

    20132

    25551

    27557

    30996

    316117

    358116

    398136

    365110

    447100

    493108

    481105

    Physicists

    Grad Students

    CY

    Total Physicists

    D0 History

    Sheet1

    PhysicistsGrad Students

    198712217

    198812521

    198916840

    199016027

    199120132

    199225551

    199327557

    199430996

    1995316117

    1996358116

    1997398136

    1998365110

    1999447100

    2000493108

    2001481105

    Sheet1

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    Physicists

    Grad Students

    CY

    Total Physicists

    D0 History

    Sheet2

    Sheet3

  • 8.2 Remote Control RoomExpect (D0 experience) US CMS will grow dramatically in FY05, 06 by a factor ~ 2. Taking US CMS ~ CDF now, we estimate 200 students and 120 university postdocs in residence if we adopt this model.If all are at CERN, just the incremental costs to the base program are ~ 5.4 M$/year. This would also be a major change in the sociology of U.S. HEP.An alternative is to create a critical mass stationed in the US using the Tier1 UF (SWC) and Tier2 (NSF) as the primary computing resources for US physics analysis. The Remote Control Room (M&O) would be used to debug equipment, teleconference hold physics analysis meetings and take data shifts. We will attempt to create a coherent national US CMS physics effort with a real identity. Upper Atmospheric Research Collaboratory (UARC) is a data point (NSF).

  • US CMS - UF + RCRUS CMS

  • US CMS Remote ControlReality check: US CMS is using the CDF/KEK remote control room for Run II as a starting point. However, we want to expand the scope to encompass a US based physics group and US LHC accelerator tasks.

  • 8.3 US CMS - Outreach

    The US CMS Construction PO now supports proposals for educational initiatives. The US CMS Education Coordinator is responsible for prioritizing the proposals.

    The US CMS Project Office for the detector project then funds the agreed upon proposals. This effort would continue smoothly into the research phase of US CMS.

    QuarkNet is a powerful example of the educational possibilities inherent in the LHC. We plan to continue to exploit the outreach opportunities of US CMS e.g. CMS web cam in SX5

  • WBS 1-6, US CMS Category B

    The US CMS L2 Managers were asked to estimate their M&O tasks for;

    M&S costs to maintain and operate systems provided by US CMS (Category B).Resources needed to maintain technical personnel at CERN.Additional costs associated with the major annual shutdown.NOTE: Post-doc and graduate student salaries and incremental costs (e.g. per diem) are assumed to be supported by the university base programs. Use annual SOW to define that commitment?

  • WBS 1-6, US CMS - ScalingReality Check:For CDF Operations there are 2 FTE engineers and 14 FTE technicians.We plan for a similar economy of scale by putting a US CMS pool together for general engineering and technician tasks.This team would have 4 FTE engineers and 20 FTE technicians.This team in residence costs ~ 1.6 M$/yr.

  • WBS 7 - US CMS POReality Check:US CMS has experience from the construction project and we plan a smooth handoff.There will need to be both a CERN and a FNAL/NEU branch of the PO.There are ~ 6-8 FTE in the PPD/CDF Ops Dept. We expect ~ 4 FTE at CERN, ~ 4 FTE at Fermilab.The M&O PO costs ~ 1 M$/year and scales well with the current PO.

  • US CMS - L2 AccountsUS CMS - CERN Branch Project Office (opened on May 1, 2000)US CMS L2 CERN Team AccountsFunds sent to FNALAllocations by L2 managersTransfer to Team Accounts at CERNAuthorization of expenses by L2 managersInvoices sent to FNAL for financial trackingPO, EMU, HCAL, and SiTrkr have started L2 accountsServes as a model for M&O (Cat A+B) funding and tracking. FNAL has accepted a pass through overhead rate, treating CERN as a collaborating institution. This decision allowed US CMS to plan for the installation and commissioning phase of the detector.

  • US CMS - FY01 RequestsThe P.O. already has input to DOE/NSF in regards to a project perspective on base support increments for postdocs. This recommendation refers ONLY to project related activities and not research activities covered by the peer review process. Adequate base support wil, however, be critical to the success of the research program.

    Chart1

    80

    85

    70

    50

    70

    85

    85

    85

    US CMS - FY01 University Request

    Base_99

    SubsystemFY'01 RequestTotalL2 PriorityL1L1

    InstitutionEMUHCALTrigDAQECALFPixelSoftComPrjPrjMgtSiTrkDOENSFRequestPriorityComment

    Texas TechPD808080.011repeat, HF critical path

    UC DavisPD1708585.01-2FAST sites and controls

    Illinois ChicagoPD7070.070.023repeat, electronics critical in FY01

    RicePD505050.014repeat, trigger issues clarified

    UC San Diego (DOE)PD707070.015repeat, PRS/HLT - Lehman DAQ

    UC DavisPD1708585.016FPIX critical - bump bonds, Lehman

    FloridaPD8585.01-7EMU CSC testing at CERN begins FY01

    CaltechPD8585.018ECAL - laser monitor for test beam FY01

    0.0

    Total0.00.00.00.00.00.0540.070.0540.070.0610.0

    &C

    US CMS FY00 Base Funding (k$)L1 Summary&R

    September, 1999

    Base_99

    US CMS - FY01 University Request

    0

    0

    0

    0

    0

    0

    NSF - FY00 Base Request

    0

    0

    0

    0

    0

    0

    US CMS FY00 - University Requests

  • Management ReserveMuch of the research program costs will be salaries.A full contingency analysis at the lowest task level seems inappropriate.A management reserve of 25 % is proposed to be held in the Project Office.This level is similar to the R&D reserve held at the start of the detector project. This mechanism worked well in that instance.Problems will arise that must be solved, e.g. currency fluctuations. Other possibilities would be an accident at the detector or more frequent than expected repairs in this hostile accelerator environment. We must plan to cover these contingencies.

  • WBS - Cost and ManpowerReality Check: The T+E level is close to the scaling estimate. These cost estimates do not contain salaries of research personnel - postdocs and graduate students. However, the tasks are called out and there are ~ 48 FTE PD working on M&O. Note also Cat B does not start until ~ FY05

    Chart1

    00FY030FY03FY03FY03904525409500400000

    00FY040FY04FY04FY041252100686250950000

    532502.5340850FY0550000119780FY05FY0521824009537501600000

    88849055785080000295000247500277516135000223910011662502500000

    89849061085080000295000247500385400135000233830011662502500000

    89849039600080000295000247500309400135000233830011662502500000

    EMU

    HCAL

    Trigger

    DAQ

    ECAL

    Fpix

    SiTrk

    Common

    OpsOffice

    Mgt Reserve

    AY$

    US CMS M&O Cost Estimate

    Sheet1

    US CMS M&O: Cost Estimate

    WBSSubsystemFY03FY04FY05FY06FY07FY08

    1EMU$532,503$888,490$898,490$898,490

    2HCAL$340,850$557,850$610,850$396,000

    3Trigger$80,000$80,000$80,000

    4DAQ$50,000$295,000$295,000$295,000

    5ECAL$119,780$247,500$247,500$247,500

    6Fpix$277,516$385,400$309,400

    7SiTrk$135,000$135,000$135,000

    8Common$904,525$1,252,100$2,182,400$2,239,100$2,338,300$2,338,300

    9OpsOffice$409,500$686,250$953,750$1,166,250$1,166,250$1,166,250

    10Mgt Reserve$400,000$950,000$1,600,000$2,500,000$2,500,000$2,500,000

    11Upgrades$400,000$1,080,000$1,660,000$3,160,000$3,160,000$3,160,000

    Total$2,114,025$3,968,350$7,439,283$11,546,706$11,816,790$11,525,940

    US CMS M&O: Post-docs

    FY03FY04FY05FY06FY07FY08

    1EMU6.08.08.08.0

    2HCAL8.08.08.08.0

    3Trigger4.04.04.0

    4DAQ4.04.04.04.0

    5ECAL1.53.03.03.0

    6Fpix10.010.010.0

    7SiTrk11.011.011.0

    Total0.00.019.548.048.048.0

    US CMS M&O: Engineers

    FY03FY04FY05FY06FY07FY08

    1EMU3.03.43.43.4

    2HCAL2.52.52.51.0

    3Trigger1.01.01.0

    4DAQ1.01.01.0

    5ECAL1.01.01.01.0

    6Fpix1.201.201.20

    7SiTrk1.01.01.0

    11Upgrades1.02.02.02.02.0

    Total0.01.08.513.113.111.6

    US CMS M&O: Technicians

    FY03FY04FY05FY06FY07FY08

    1EMU1.32.62.62.6

    2HCAL3.13.13.12.8

    3Trigger1.01.01.0

    4DAQ1.03.03.03.0

    5ECAL1.03.03.03.0

    6Fpix3.03.02.0

    7SiTrk1.01.01.0

    Total0.00.06.416.716.715.4

    &RMay 8, 2001

    Cost Estimate

    US CMS M&O: Cost Estimate

    FY03FY04FY05FY06FY07FY08

    EMU$0$0$532,503$888,490$898,490$898,490

    HCAL$0$0$340,850$557,850$610,850$396,000

    Trigger$80,000$80,000$80,000

    DAQ$0$0$50,000$295,000$295,000$295,000

    ECAL$119,780$247,500$247,500$247,500

    Fpix$277,516$385,400$309,400

    SiTrk$135,000$135,000$135,000

    Common$904,525$1,252,100$2,182,400$2,239,100$2,338,300$2,338,300

    OpsOffice$409,500$686,250$953,750$1,166,250$1,166,250$1,166,250

    Mgt Reserve$400,000$950,000$1,600,000$2,500,000$2,500,000$2,500,000

    Upgrades$400,000$1,080,000$1,660,000$3,160,000$3,160,000$3,160,000

    Total$2,114,025$3,968,350$7,439,283$11,546,706$11,816,790$11,525,940

    FY03FY04FY05FY06FY07FY08

    Upgrades012333

    Mgt Reserve012333

    OpsOffice011111

    Common112222

    SiTrk000000

    Fpix000000

    ECAL000000

    DAQ000000

    Trigger000000

    HCAL000110

    EMU001111

    Total247121212

    &RApril 11, 2001

    Cost Estimate

    Upgrades

    Mgt Reserve

    OpsOffice

    Common

    SiTrk

    Fpix

    ECAL

    DAQ

    Trigger

    HCAL

    EMU

    Fiscal Year

    Cost Estimate ($M)

    US CMS M&O Cost Estimate

    Resource Usage

    EMU

    HCAL

    Trigger

    DAQ

    ECAL

    Fpix

    SiTrk

    Common

    OpsOffice

    Mgt Reserve

    AY$

    US CMS M&O Cost Estimate

    US CMS M&O Resource Usage

    US CMS M&O: Post-docs

    FY03FY04FY05FY06FY07FY08

    EMU6.08.08.08.0

    HCAL8.08.08.08.0

    Trigger4.04.04.0

    DAQ4.04.04.04.0

    ECAL1.53.03.03.0

    Fpix10.010.010.0

    SiTrk11.011.011.0

    Total0.00.019.548.048.048.0

    US CMS M&O: Engineers

    FY03FY04FY05FY06FY07FY08

    EMU3.03.43.43.4

    HCAL2.52.52.51.0

    Trigger1.01.01.0

    DAQ1.01.01.0

    ECAL1.01.01.01.0

    Fpix1.21.21.2

    SiTrk1.01.01.0

    Upgrade R&D1.02.02.02.02.0

    Total0.01.08.513.113.111.6

    US CMS M&O: Technicians

    FY03FY04FY05FY06FY07FY08

    EMU0.00.01.32.62.62.6

    HCAL0.00.03.13.13.12.8

    Trigger1.01.01.0

    DAQ1.03.03.03.0

    ECAL1.03.03.03.0

    Fpix3.03.02.0

    SiTrk1.01.01.0

    Total0.00.06.416.716.715.4

    FY03FY04FY05FY06FY07FY08

    Technicians006171715

    Engineers019131312

    Post-docs0020484848

    &RApril 11, 2001

    000

    010

    6.38333333338.519.5

    16.683333333313.148

    16.683333333313.148

    15.3511.648

    Technicians

    Engineers

    Post-docs

    Fiscal Year

    FTEs

    US CMS M&O Resource Usage

    Chart2

    000

    000

    6.3833333333719.5

    16.68333333331148

    16.68333333331148

    15.351048

    Technicians

    Engineers

    Post-docs

    Fiscal Year

    FTEs

    US CMS M&O Resource Usage

    Sheet1

    US CMS M&O: Cost Estimate

    WBSSubsystemFY03FY04FY05FY06FY07FY08

    1EMU$532,503$888,490$898,490$898,490

    2HCAL$340,850$557,850$610,850$396,000

    3Trigger$80,000$80,000$80,000

    4DAQ$50,000$295,000$295,000$295,000

    5ECAL$119,780$247,500$247,500$247,500

    6Fpix$277,516$385,400$309,400

    7SiTrk$135,000$135,000$135,000

    8Common$904,525$1,252,100$2,182,400$2,239,100$2,338,300$2,338,300

    9OpsOffice$409,500$686,250$953,750$1,166,250$1,166,250$1,166,250

    10Mgt Reserve$400,000$950,000$1,600,000$2,500,000$2,500,000$2,500,000

    11Upgrades$400,000$1,080,000$1,660,000$3,160,000$3,160,000$3,160,000

    Total$2,114,025$3,968,350$7,439,283$11,546,706$11,816,790$11,525,940

    US CMS M&O: Post-docs

    FY03FY04FY05FY06FY07FY08

    1EMU6.08.08.08.0

    2HCAL8.08.08.08.0

    3Trigger4.04.04.0

    4DAQ4.04.04.04.0

    5ECAL1.53.03.03.0

    6Fpix10.010.010.0

    7SiTrk11.011.011.0

    Total0.00.019.548.048.048.0

    US CMS M&O: Engineers

    FY03FY04FY05FY06FY07FY08

    1EMU3.03.43.43.4

    2HCAL2.52.52.51.0

    3Trigger1.01.01.0

    4DAQ1.01.01.0

    5ECAL1.01.01.01.0

    6Fpix1.201.201.20

    7SiTrk1.01.01.0

    11Upgrades1.02.02.02.02.0

    Total0.01.08.513.113.111.6

    US CMS M&O: Technicians

    FY03FY04FY05FY06FY07FY08

    1EMU1.32.62.62.6

    2HCAL3.13.13.12.8

    3Trigger1.01.01.0

    4DAQ1.03.03.03.0

    5ECAL1.03.03.03.0

    6Fpix3.03.02.0

    7SiTrk1.01.01.0

    Total0.00.06.416.716.715.4

    &RMay 8, 2001

    Cost Estimate

    US CMS M&O: Cost Estimate

    FY03FY04FY05FY06FY07FY08

    EMU$0$0$532,503$888,490$898,490$898,490

    HCAL$0$0$340,850$557,850$610,850$396,000

    Trigger$80,000$80,000$80,000

    DAQ$0$0$50,000$295,000$295,000$295,000

    ECAL$119,780$247,500$247,500$247,500

    Fpix$277,516$385,400$309,400

    SiTrk$135,000$135,000$135,000

    Common$904,525$1,252,100$2,182,400$2,239,100$2,338,300$2,338,300

    OpsOffice$409,500$686,250$953,750$1,166,250$1,166,250$1,166,250

    Mgt Reserve$400,000$950,000$1,600,000$2,500,000$2,500,000$2,500,000

    Upgrades$400,000$1,080,000$1,660,000$3,160,000$3,160,000$3,160,000

    Total$2,114,025$3,968,350$7,439,283$11,546,706$11,816,790$11,525,940

    FY03FY04FY05FY06FY07FY08

    Upgrades012333

    Mgt Reserve012333

    OpsOffice011111

    Common112222

    SiTrk000000

    Fpix000000

    ECAL000000

    DAQ000000

    Trigger000000

    HCAL000110

    EMU001111

    Total247121212

    &RApril 11, 2001

    Cost Estimate

    Upgrades

    Mgt Reserve

    OpsOffice

    Common

    SiTrk

    Fpix

    ECAL

    DAQ

    Trigger

    HCAL

    EMU

    Fiscal Year

    Cost Estimate ($M)

    US CMS M&O Cost Estimate

    Resource Usage

    EMU

    HCAL

    Trigger

    DAQ

    ECAL

    Fpix

    SiTrk

    Common

    OpsOffice

    Mgt Reserve

    AY$

    US CMS M&O Cost Estimate

    US CMS M&O Resource Usage

    US CMS M&O: Post-docs

    FY03FY04FY05FY06FY07FY08

    EMU6.08.08.08.0

    HCAL8.08.08.08.0

    Trigger4.04.04.0

    DAQ4.04.04.04.0

    ECAL1.53.03.03.0

    Fpix10.010.010.0

    SiTrk11.011.011.0

    Total0.00.019.548.048.048.0

    US CMS M&O: Engineers

    FY03FY04FY05FY06FY07FY08

    EMU3.03.43.43.4

    HCAL2.52.52.51.0

    Trigger1.01.01.0

    DAQ1.01.01.0

    ECAL1.01.01.01.0

    Fpix1.21.21.2

    SiTrk1.01.01.0

    Upgrade R&D1.02.02.02.02.0

    Total0.01.08.513.113.111.6

    US CMS M&O: Technicians

    FY03FY04FY05FY06FY07FY08

    EMU0.00.01.32.62.62.6

    HCAL0.00.03.13.13.12.8

    Trigger1.01.01.0

    DAQ1.03.03.03.0

    ECAL1.03.03.03.0

    Fpix3.03.02.0

    SiTrk1.01.01.0

    Total0.00.06.416.716.715.4

    FY03FY04FY05FY06FY07FY08

    Technicians006171715

    Engineers007111110

    Post-docs0020484848

    &RApril 11, 2001

    Technicians

    Engineers

    Post-docs

    Fiscal Year

    FTEs

    US CMS M&O Resource Usage

  • US CMS Research Program - SWC11/98: DOE and NSF Joint Review of ATLAS and CMS Computing/Software5/99: DOE and NSF Review of US ATLAS and US CMS Computing and Software1/00: DOE/NSF Review of US LHC Software and Computing Projects10/00: Hoffmann Review Report (CERN SWC Review)11/00: US LHC Software and Computing Review

    There have been several US reviews of SoftWare and Computing needs over more than 2 years. A large investment in SWC is needed to realize the investment in the construction of the CMS detector. Note SUSY can come in the first month at 10% luminosity.

  • US CMS Research ProgramUpgrades are estimated - both R&D and fabrication. They should be proposal driven and reviewed in the context of the full US HEP program. Note that SWC also has upgrades as a part of the plan (Moores Law).Contingency is explicitly held in an annual management reserve. The proposals for allocation of reserve should be reviewed as they are in the construction project.Postdocs and students are estimated from CDF and D0 scaling. They are identified as necessary to the success of US CMS research, but their support is assumed to reside in the base program.

  • The Cost of US CMS ResearchThe components of the research program are SWC, M&O, Upgrades and scaled estimates for the dislocation costs associated with postdocs and students - base program cost.

    Chart1

    2.31996199619961996

    4.621997199719971997

    10.951998199819981998

    38.031999199919991999

    24.262000200020002000

    21.274.57200120012001

    21.816.27200220022002

    21.737.441.70.41.1

    15.9813.542.91.12.5

    6.316.245.81.63.7

    200617.68.43.14.8

    200717.18.73.24.8

    200817.18.63.14.8

    Construction Project Funding

    SWC Cost Estimate

    M&O Cost Estimate

    Upgrades

    Research Personnel

    FY

    AY(M$)

    US CMS - Construction and Research

    CMS Data

    20012002200320042005200620072008

    A45567092513252175228022802280

    B2502703004905400540054005400

    C17151800346043756870676067406740

    A/B75120130150140140140140

    B/C14516016016090909090

    A/C2003505507303350335033503350

    A/B/C3040404040404040

    Total287034105565727018065180601804018040

    20012002200320042005200620072008

    Category C22459888

    Category B00016666

    Category A11124444

    Total336718181818

    CMS Data

    Category C

    Category B

    Category A

    Year

    Cost (MCHF)

    Draft CMS M&O Cost Estimate (Unofficial)

    Phases

    200020012002200320042005200620072008

    Assembly and Installation

    Maintenance and Operations

    Manufacture and Assembly

    Installation in Interaction Hall

    Maintenance and Operations

    US M&O

    $20 k$100 k$60 k$15 k$35 k$25 k

    Post-docsEngineersTechniciansPost-docsEngineersTechniciansAnnual M&SAnnual R&DSubsys TotalEAC $M% TPC% M&O

    at CERNat CERNat CERNfor shutdownfor shutdownfor shutdown(k$)(k$)

    EMU812624600600$1,840 k$35.0 M34%23%

    HCAL723312300200$1,150 k$37.6 M36%15%

    Trig512500300$1,120 k$7.6 M7%14%

    DAQ41212300200$885 k$5.4 M5%11%

    ECAL413211800250$1,500 k$9.5 M9%19%

    Fpix511222500300$1,210 k$6.4 M6%15%

    SiTrk250100$190 k$2.6 M3%2%

    US CMS357131371130501950$104.0 M100%100%

    $700 k$700 k$780 k$195 k$245 k$275 k$3,050 k$1,950 k$7,895 k

    Costs to maintain personnel at CERN:$2,180 k42.2

    Additional costs associated with annual shutdown:$715 k10.7

    M&S for M&O$3,050 k3

    Upgrade R&D$1,950 k2

    Project Office$900 k10.9

    Category A$800 k20.8

    Total:$9,595 k89.6

    EMUHCALTrigDAQECALFpixSiTrkTotal

    Upgrade R&D Costs0.60.20.30.20.250.30.11.95

    Annual Major Shutdown Costs0.260.1300.0850.090.1500.715

    Research and Technical Personnel Costs at CERN0.380.520.320.30.360.260.042.18

    US Subsystem M&O Costs (Cat B)0.60.30.50.30.80.50.053.05

    US M&O

    0.60.260.380.6

    0.20.130.520.3

    0.300.320.5

    0.20.0850.30.3

    0.250.090.360.8

    0.30.150.260.5

    0.100.040.05

    Upgrade R&D Costs

    Annual Major Shutdown Costs

    Research and Technical Personnel Costs at CERN

    US Subsystem M&O Costs (Cat B)

    Subsystem

    Cost Estimate ($M/year)

    US CMS Subsystem M&O Cost Estimate

    Profile

    Project Office (Construction)0.950.75

    200320042005200620072008

    Project Office (FNAL & CERN) Costs0.20.40.90.90.90.9

    Outreach0.050.10.10.1

    Upgrade R&D Costs0.48750.9751.951.951.95

    Remote Control Room0.10.20.30.30.30.3

    Annual Major Shutdown Costs0.35750.7150.7150.715

    Research and Technical Personnel Costs at CERN0.5451.092.182.182.182.18

    US Subsystem M&O Costs (Cat B)0.76251.5253.053.053.053.05

    US share of common CMS M&O costs (Cat A)0.20.40.80.80.80.8

    Total US CMS M&O Costs1.80754.10258.61259.9959.9959.995

    $2,632,021$4,832,608$7,142,231$11,177,833$11,273,373$11,223,373

    1996199719981999200020012002200320042005200620072008

    Construction Project Funding2.34.6210.9538.0324.2621.2721.8121.7315.986.3

    SWC Cost Estimate4.576.277.4413.5416.2417.617.117.1

    M&O Cost Estimate1.72.95.88.48.78.6

    Upgrades0.41.11.63.13.23.1

    Research Personnel1.12.53.74.84.84.8

    Total000004.576.2710.6420.0427.3433.933.833.6

    Profile

    Project Office (FNAL & CERN) Costs

    Outreach

    Upgrade R&D Costs

    Remote Control Room

    Annual Major Shutdown Costs

    Research and Technical Personnel Costs at CERN

    US Subsystem M&O Costs (Cat B)

    US share of common CMS M&O costs (Cat A)

    Year

    Cost ($M)

    US CMS M&O Cost Estimate

    DOE-NSF

    Construction Project Funding

    SWC Cost Estimate

    M&O Cost Estimate

    Upgrades

    Research Personnel

    FY

    AY(M$)

    US CMS - Construction and Research

    Total USTotal USTotal USTotal CMSNumber ofCommonSubsystem

    (Inc. R&D)"Project"EACCost BookScientistsProjectsEAC

    DOE147.05147.05115.4588.5123920.0690.74

    NSF21.320.218.2312.1462.9413.86

    DOE87%88%86%88%84%87%87%

    NSF13%12%14%12%16%13%13%

    TotalEMUHCALTriggerDAQECALFpixComPrjPrjOfcSiTrk

    DOE115.4534.1032.557.984.655.283.6520.064.652.53

    NSF18.230.915.130.743.902.732.941.420.46

    Total133.6835.0137.687.985.389.186.3823.006.082.99

    TotalEMUHCALTriDASECALTrackingComPrjPrjOfc

    DOE115.4534.1032.5512.625.286.1820.064.65

    NSF18.230.915.130.743.903.192.941.42

    Total133.6835.0137.6813.369.189.3723.006.08

    TotalEMUHCALTriDASECALTracking

    DOE90.7434.1032.5512.625.286.18

    NSF13.860.915.130.743.903.19

    Total104.6035.0137.6813.369.189.37

  • US CMS - SummaryThe physics available at the LHC is compelling.The transition from US CMS construction to research is being planned.There are now resource loaded schedules in place for all the components the US CMS research program.Our aim is to enable the US physicists to be a coherent group making a major impact on physics analysis within CMS.

  • Detector Upgrades - IUS CMS Scope restoration (8.6 M$)ME4/2 mechanicsME4/2 electronicsME4/1 electronicsInstallation and Commissioning the aboveFpix third layer

  • Detector Upgrades - IICMS Scope Restoration - US Management (4.0 M$) of EMU, HCALME1/1 electronics and cablesHF shieldingHF tooling and supportsRepairs (5.5 M$)HE |y|=3 scintillator repairFpix replacement for radiation damage

  • Detector Upgrades - IIIR&D EDIA - ( 0.2 M$/year)TRIDAS Upgrades ( ~1.0 M$/year)increase in C.M. energy ~ transparentincrease in luminosity --> smarter L1 trigger and faster L2, L3 event buildingDAQ improvements with commodity purchasesr.f. changes in bunch crossing time ?

  • JOG and FermilabLetter of August 17, 2000 from JOG to Fermilab to manage M&ODetector operations and data monitoring (Category A, WBS 8)M&O of US CMS supplied subsystems (Category B)Virtual control room at FNAL for US based physics analysis (WBS 8)R&D for and fabrication of upgrades to the experiment (WBS 8)First cost estimate shown to JOG on December 6, 2000.

  • M&O PlanningCMS has put CPT in place to prepare for Physics.Draft cost profiles for M&O, SWC have been shown to the JOG, most recently Dec. 6, 2000.Upgrade R&D and some fabrication is part of the plan.We DO NOT assume that the Project can use M&O funding to complete installation.Planning and resource loaded schedules are being created for SWC and M&O which will both be needed to realize the investment in the CMS detector. These efforts need to be globally optimized.US CMS has made a draft OMP for M&O.The Lehman review has requested a complete plan for all costs of the US CMS Research Program - M&O + SWC.

  • D0 - Demographic GrowthCDF has ~ 406 physicists with 154 students. D0 has ~ 493 physicists with 108 students.The are now ~ 160 students and university postdocs in residence at D0. There will be an increase when Run IIa is in full operation.D0 doubled in size just before data taking. US CMS is imagined to do likewise.

    Chart1

    12217

    12521

    16840

    16027

    20132

    25551

    27557

    30996

    316117

    358116

    398136

    365110

    447100

    493108

    481105

    Physicists

    Grad Students

    CY

    Total Physicists

    D0 History

    Sheet1

    PhysicistsGrad Students

    198712217

    198812521

    198916840

    199016027

    199120132

    199225551

    199327557

    199430996

    1995316117

    1996358116

    1997398136

    1998365110

    1999447100

    2000493108

    2001481105

    Sheet1

    Physicists

    Grad Students

    CY

    Total Physicists

    D0 History

    Sheet2

    Sheet3