1 US Department of Energy 2011 PERT Conference Best Practice Presentation PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley National Laboratory

Upload: keaton-dunnington

Post on 02-Apr-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

1

US Department of Energy2011 PERT ConferenceBest Practice Presentation

PRIME CONTRACT CROSSWALK

David Chen

Deputy Procurement Manager

Lawrence Berkeley National Laboratory

Page 2: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

2

US Department of Energy2011 PERT ConferenceBest Practice Presentation

PERT Best Practice

High Level Observation: “Prime contract High Level Observation: “Prime contract crosswalk and policies and procedures crosswalk and policies and procedures provide a solid structure for the procurement provide a solid structure for the procurement system.”system.”

Assurance Criteria Observation: “The team Assurance Criteria Observation: “The team was impressed with the level of detail in the was impressed with the level of detail in the crosswalk.”crosswalk.”

Page 3: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

3

US Department of Energy2011 PERT ConferenceBest Practice Presentation

What & Why? All provisions of a DOE M&O contract should All provisions of a DOE M&O contract should

undergo a systematic review to:undergo a systematic review to: Identify all Procurement-related requirements, Identify all Procurement-related requirements,

andand Identify if and how those requirements apply and Identify if and how those requirements apply and

are implemented.are implemented.

LBNL’s Prime Contract Crosswalk was developed to LBNL’s Prime Contract Crosswalk was developed to document this systematic review.document this systematic review.

Page 4: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

4

US Department of Energy2011 PERT ConferenceBest Practice Presentation

How Is It Set Up? The Crosswalk is an Excel document consisting of The Crosswalk is an Excel document consisting of

these worksheets:these worksheets: Prime Contract ClausesPrime Contract Clauses Clause I.114, Contractor Purchasing System Clause I.114, Contractor Purchasing System

(DEAR 970.5244-1) (DEAR 970.5244-1) DEAR 970.44DEAR 970.44 Prime Contract AppendicesPrime Contract Appendices Appendix G, Purchasing SystemAppendix G, Purchasing System Appendix I, DOE Directives Appendix I, DOE Directives Appendix I, ESH StandardsAppendix I, ESH Standards

Page 5: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

5

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Each worksheet identifies:Each worksheet identifies: The number(s) and title of the ProvisionThe number(s) and title of the Provision Whether or not it is procurement-relatedWhether or not it is procurement-related If it is a clause, whether:If it is a clause, whether:

it is procurement-relatedit is procurement-related flowdown to subcontractors is requiredflowdown to subcontractors is required

The implementing procurement document(s) The implementing procurement document(s) used at LBNLused at LBNL

Comments describing the requirement and its Comments describing the requirement and its applicationapplication

Page 6: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

6

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Important FeatureImportant Feature The listings provide for expansion to track all of The listings provide for expansion to track all of

the individual elements of a provision that is the individual elements of a provision that is multi-faceted.multi-faceted.

Example: “Contractor Purchasing System” Example: “Contractor Purchasing System” Clause is identified in the Contract Clauses Clause is identified in the Contract Clauses crosswalk, but its various paragraphs are crosswalk, but its various paragraphs are addressed in a separate crosswalk.addressed in a separate crosswalk.

Page 7: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

7

US Department of Energy2011 PERT ConferenceBest Practice Presentation

How Is It Used? The Crosswalk was initially used to identify The Crosswalk was initially used to identify

and address gaps in implementing the prime and address gaps in implementing the prime contract procurement-related requirements.contract procurement-related requirements.

Now it is used to ensure new or revised Now it is used to ensure new or revised procurement-related requirements due to procurement-related requirements due to prime contract modifications are properly prime contract modifications are properly identified, implemented, and tracked.identified, implemented, and tracked.

Page 8: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

8

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Prime Contract Clauses

Page 9: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

9

US Department of Energy2011 PERT ConferenceBest Practice Presentation

I.114, Contractor Purchasing System (DEAR 970.5244-1)

Page 10: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

10

US Department of Energy2011 PERT ConferenceBest Practice Presentation

DEAR 970.44

Page 11: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

11

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Prime Contract Appendices

Page 12: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

12

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Appendix G, Purchasing System

Page 13: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

13

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Appendix I, DOE Directives

Page 14: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

14

US Department of Energy2011 PERT ConferenceBest Practice Presentation

Appendix I, ESH Standards

Page 15: US Department of Energy 2011 PERT Conference Best Practice Presentation 1 PRIME CONTRACT CROSSWALK David Chen Deputy Procurement Manager Lawrence Berkeley

15

US Department of Energy2011 PERT ConferenceBest Practice Presentation

LBNL CONTACT FOR QUESTIONS

John O’NeillJohn O’Neill

1 Cyclotron Road, MS 71R02591 Cyclotron Road, MS 71R0259

Berkeley, CA 94720Berkeley, CA 94720

Tel: 510-486-7344Tel: 510-486-7344

Fax: 510-486-4380Fax: 510-486-4380

Email: [email protected]: [email protected]